Nevada Transportation Conference Transportation Funding Jacob Snow, General Manager Regional Transportation Commission of Southern Nevada
Steven Horsford, Senator
Kelvin Atkinson, Assembly Transportation Committee
Barbara Buckley, Assembly Speaker
Steve Holloway, Associated General Contractors
Bryan Gresh, RTC Lobbyist
Jim Gibbons, Governor
Senate Bill 5 Un-sunsets the sales tax Provides funding from the underground storage tank fee assessed to fueling facilities
Un-sunsets the 1/8 cent sales tax: Allows RTC to bond against those revenues now Put projects out for bid immediately Creates jobs
Removing the Sunset Provision: Allows RTC to bond $169 million
Underground Storage Tank Fees: Will generate approximately $4.5 million per year
Creates more than 2,000 jobs in Southern Nevada
Surface Transportation Program (STP-Urban) projects North Las Vegas North 5th St, north of Losee to Cheyenne $30,000,000 Las Vegas Blvd North, Lake Mead to Carey $7,000,000 Clark County Cactus Ave at I-15 $11,500,000 Cactus Ave at I-15 $10,000,000Las Vegas Blvd South, SR-146 St.Rose Pkwy to Silverado Ranch $12,300,000 Henderson RTC Stephanie St. at I-515 $1,600,000 Las Vegas Blvd South at Bruner $1,400,000 Total scheduled, 2011-2014 $73,300,000 Direct, indirect or induced construction jobs: 868
Priority given to project readiness Projects will begin to go out to bid by May Projects may start construction by August
Clark County Design Projects Maryland Pkwy: Pebble Rd to St. Rose Pkwy Rainbow Blvd: Cactus Ave to Blue Diamond Rd Tropicana Ave: Hualapai Wy to Ft. Apache Rd Durango Dr: Blue Diamond Rd to Windmill La Construction Projects CC-215 Beltway @ North 5th St Interchange Rainbow Blvd: Beltway to Tropicana Ave Cactus Ave Bridge over UPRR Maintenance Projects Arville: Twain to Pennwood Bermuda: Hidden Wells to Sunset Bonanza: Hollywood to Los Feliz Charleston: Nellis to Hollywood Convention Center: Las Vegas Blvd to Paradise Decatur: Hacienda to Tropicana Desert Inn: Eastern to Mojave Eastern: Flamingo to Desert Inn Hollywood: Charleston to Stewart Karen: Maryland to Eastern Maryland Parkway: Tropicana to Sahara Mojave: Boulder Highway to Charleston Pecos: Russell to Flamingo Pecos: 1360' South of Warm Springs to Warm Springs Russell: Stephanie to Boulder Highway Russell: Mountain Vista to 1300' East of Nellis Serene: Spencer to Eastern Spencer: Ford to Robindale Twain: Sandhill to Boulder Highway Windmill: Maryland to Eastern Windmill: Las Vegas Blvd to Bermuda Wyoming: Arden to Nellis
Las Vegas Design Projects Main St/Commerce St One-Way Couplet Valley View Blvd: Charleston Blvd to Desert Inn Rd (Phase II) Vegas Dr/US-95 Bridge Widening Jones Blvd Widening: US-95 to Sahara Ave Kyle Canyon Rd Interchange @ US-95 Las Vegas Blvd Widening: I-515 to Owens Ave Main St: Bonanza Rd to Owens Ave Additional Bus Turnouts (Design & ROW) Washington Ave/Rancho Rd Intesection Improvements Presidio Ave/Industrial Rd Connector (Pre-Design) Symphony Park Ave/Lewis Ave Overpass (Pre-Design) Maintenance Projects Bonanza Rd: Las Vegas Blvd to Nellis Blvd and Maryland Pkwy: Stewart Ave to Sahara Ave Rainbow Blvd: Gowan Rd to Red Coach Ave Decatur Blvd: Lake Mead Blvd to Rancho Dr Lake Mead Pkwy: Jones Blvd to Hualapai Wy Cheyenne Ave: Durango Dr to Hualapai Wy Ann Rd: US-95 to Durango Dr Construction Projects Valley View Blvd: US-95 to Charleston Blvd (Phase I) Bonneville Ave/Clark St One-Way Couplet: Las Vegas Blvd to Maryland Pkwy (Phase II) Decatur Blvd/Charleston Blvd Intersection Improvements Martin L. King Blvd: Costco to Metro Headquarters Decatur Blvd; E. Charleston Blvd; Pecos Rd; Lamb Blvd Bus Turnouts
North Las Vegas Design Projects Simmons St: Cheyenne Ave to Lone Mountain Rd North 5th St: Cheyenne Ave Interchange Losee Rd: Craig Rd to CC-215 Ann Rd: Camino al Norte to Losee Rd Centennial Pkwy: Revere St to Lamb Blvd Clayton St Bridge @ CC-215 Construction Projects North 5th St: Carey Ave to Losee Rd Simmons St: Carey Ave to Cheyenne Ave North 5th St: Losee Rd to Cheyenne Ave (Match Funds) Maintenance Projects Carey Ave: Losee Rd to Revere St North 5th St: San Miguel Ave to Sgt. Jordan Ave
Henderson Design Projects St Rose Pkwy/Maryland Pkwy Traffic Signal Horizon Dr at Pacific Ave US-95/I-515 & Horizon Ridge Pkwy Corridor Traffic Improvements Eastern Ave:(east half): I-215 to Candelaria Dr (Design & ROW) Stephanie St: Galleria Dr to Russell Rd (including widening bridge over I-515) Sunridge Height Pkwy: Executive Airport Dr to Seven Hills Dr Volunteer Blvd Widening: Las Vegas Blvd to Executive Airport Dr St Rose Pkwy/Bermuda Rd Traffic Signal Green Valley Pkwy Bus Turnout south of Sunset Rd (Design & ROW) Construction Projects Starr Rd/Executive Airport Dr/Volunteer Blvd: Las Vegas Blvd to Anthem Boundary Galleria Dr: Boulder Hwy to Burns Ave (ROW Acquisition & Construction) Warm Springs Rd: Pabco Rd to Lake Mead Pkwy Galleria Dr: Olsen St to Lake Las Vegas Pkwy Maintenance Projects Starr Rd/Executive Airport Dr/Volunteer Blvd: Las Vegas Blvd to Anthem Boundary Galleria Dr: Boulder Hwy to Burns Ave (ROW Acquisition & Construction) Warm Springs Rd: Pabco Rd to Lake Mead Pkwy Galleria Dr: Olsen St to Lake Las Vegas Pkwy Starr Rd/Executive Airport Dr/Volunteer Blvd: Las Vegas Blvd to Anthem Boundary Galleria Dr: Boulder Hwy to Burns Ave (ROW Acquisition & Construction) Warm Springs Rd: Pabco Rd to Lake Mead Pkwy Galleria Dr: Olsen St to Lake Las Vegas Pkwy
Boulder City Design Projects US-93 Frontage Road San Felipe Dr Improvements Including Pedestrian & Bicycle Improvements South Dry Lake Dr Gingerwood Pkwy & Bristlecone Dr Completion Construction Projects Citywide Slurry Seal Adams Blvd & Nevada Wy Reconstruction Maintenance Projects Citywide Slurry Seal
Mesquite Design Projects Exit 118 @ I-15 Exit 120 @ I-15 Bertha Howe Ave, John Deere Dr to Hardy Wy Construction Projects Exit 120 @ I-15 Lower Flat Top Mesa Pkwy(Eli Whitney), I-15 to Hardy Wy Bertha Howe Ave, John Deere Dr to Hardy Wy Maintenance Projects Pioneer Blvd: Calais Dr to Horizon Blvd N Grapevine Rd: Mesquite Blvd to Grapevine Overpass Chaparral Dr: Marilyn Pkwy to Vista Del Sol Ct Pioneer Blvd: Exit 122 going north to 100 feet north of the Mesa Blvd intersection Mesa Blvd: Eureka's north entry to El-Dorado Rd Pulispher Ln: Mesquite Blvd to Leavitt Ln Leavitt Ln: Pulispher Ln to end of Roadway at Hafen's Dairy Smokey Ln: Pulspher Ln to Riverside Rd Hardy Wy: Abbott Wash to Mesquite Heights Rd Turtle Back Rd: Mesquite Heights Rd to Pioneer Blvd
RTC RTC Transit Sahara Ave BRT Rancho Rd BRT Maryland Pkway BRT RTC ITS Arterials Furnish & Install: Nellis Blvd; Cheyenne Ave; Paradise Rd; Decatur Blvd; Las Vegas Blvd CC-215: I-515 to I-15
Sahara Avenue Bus Rapid Transit Project
ACE Stations Level boarding platform
ACE Stations Off-board fare collection
Bonneville Transit Center