F100090 Fed ID: F100090 Farmington MPO Rec Num: 4 Lead Agency: City of Aztec Proj East Arterial Route Phase 1B Fr: US 550 To: Legion Rd Project Desc.: Construct new road Category: Capacity Proj NMDOT Dist.: 5 County: San Juan Municipality: City of Aztec Est. Proj. Cost: $3,500,000 TIP Amendment Pending? Prel. Engr. Right-of-way Remarks: Added to FFY2014-2019 TIP through Amendment #5 (PC approval on 3-20-14), TIP Modification #5 moves the funding from FFY 2015 to 2014. Work Zone: Reg. Sig. STP-Sm Urb $2,990,400 01 $2,990,400 $509,600 $3,500,000 $509,600 $3,500,000 1
F100091 Fed ID: F100091 Farmington MPO Rec Num: 3 Proj East Arterial Route Phase II Fr: Current end of Legion Rd To: NM 173 Lead Agency: City of Aztec Est. Proj. Cost: $7,319,750 TIP Amendment Pending? Project Desc.: Construct remaining road section from end of Phase I to NM 173 including a detached multi-use pedestrian path. Utility work consisting of a 10- inch water line will be constructed for the entire length of the project. Category: Capacity Proj Prel. Engr. NMDOT Dist.: 5 County: San Juan Municipality: City of Aztec Right-of-way Remarks: Legion Rd added to the FFY2014-2019 TIP through Amendment #4 (approved January 16,2014), Removed Legion Rd from TIP per amendment #6 to FFY 2014-2019 TIP on 8.21.14 substituted Phase II of East Arterial Route. 2.13.15 reworded scope of work to include pedestrian path and utility work (10" water line). Modification # 16 removes $1M in State STP-Sm Urb $2,990,400 15 $2,990,400 Severance Tax $2,819,750 $509,600 Local Non-Match $1,000,000 01 17 $2,819,750 $4,500,000 $509,600 $2,819,750 $1,000,000 $7,319,750 2
F100100 Fed ID: F100100 Farmington MPO Rec Num: 42 Proj East Pinon Hills Boulevard Extension Phase I Fr: NM 516 (E.Main) To: Hubbard Lead Agency: City of Farmington Est. Proj. Cost: $3,950,000 TIP Amendment Pending? Project Desc.: Phase I: Full rebuild of the Intersection of Piñon Hills and NM 516; Extension of Piñon Hills Blvd to include earthwork, asphalt, street lighting, drainage improvements and signalization upgrades. Future Phases II & III are outside of the current cycle. Category: Capacity Proj Prel. Engr. NMDOT Dist.: 5 County: San Juan Municipality: City of Farmington Right-of-way Remarks: Amendment #9 (Dec 1, 2014) includes describing Phase II ($14,250,000 - Hubbard to CR 3000 & Phase III ($8,250,000 - CR 3000 to CR 390) to this project as future phases outside of 2014-2019 TIP cycle. This amendment #9 also adds $250,000 for FY2019 for Final & PS&E Certifications. Deleted $250,000 CMAQ Flex from FFY2019 moved to a new STP-Sm Urb $2,853,696 01 $2,853,696 TCSP $48,000 16 $48,000 $486,304 $12,000 Local Non-Match $300,000 01 $3,700,000 $486,304 $12,000 $300,000 $3,700,000 Work Zone: Reg. Sig. 3
F100101 Fed ID: F100101 Farmington MPO Rec Num: 42.1 Category: Capacity Proj Proj East Pinon Hills Blvd Extension Phase II Fr: Hubbard To: CR 3000 NMDOT Dist.: 5 County: San Juan Municipality: City of Farmington Lead Agency: City of Farmington Est. Proj. Cost: $13,265,454 TIP Amendment Pending? Project Desc.: Includes earthwork, asphalt, intersection lighting, bridges over the Animas River and oxbow, drainage improvements, environmental mitigation. Prel. Engr. Right-of-way Remarks: Added Phase II to the TIP with $250,000 to CMAQ Flex in FFY 2017, added new scope for Phase II 2.13.15. Work Zone: Reg. Sig. CMAQ-Flex $213,600 15 $213,600 $36,400 $250,000 $36,400 $250,000 4
F100110 Fed ID: F100110 US0064 Farmington MPO Rec Num: 101.1 Proj US 64 Phase IV Fr: MP 57.8 To: MP 60.2 Project Desc.: Widen to 6 lanes Category: Capacity Proj NMDOT Dist.: 5 County: San Juan Municipality: Unincorporated San Juan Co Lead Agency: NMDOT D-5 Rt 1 BMP 57.8 Rt 2 BMP: 0 Rt 1 EMP: 60.2 Rt 2 BMP: 0 Length: 2.4 Miles Est. Proj. Cost: $15,600,000 TIP Amendment Pending? Prel. Engr. Right-of-way Remarks: Amended in the FFY 2014-2019 TIP through Amendment #2 (approved on Sep 19,2013). Split ROW and Construction funding as part of Modification #4 (Feb 10, 2014). Decreases NHPP by $4,440,034 in FY 2016 and STP by $2,655,239 also in FY 2016 as part of Amendment #7 to FFY2014-20190 TIP 9.18.14. TIP Modification 11 moves $3,018,546 from NHPP $10,563,443 03 $2,171,389 03 $12,734,832 NHPP $213,600 16 $299,040 16 $512,640 NHPP $81,168 17 $81,168 $36,400 $1,864,929 $370,031 $250,000 $12,808,580 $2,541,420 $2,271,360 $15,600,000 Work Zone: Reg. Sig. 5
F100112 Fed ID: F100112 US0064 Farmington MPO Rec Num: 101.2 Category: Capacity Proj Proj US 64 Phase V Fr: MP 56 To: MP 58 Project Desc.: CP-91 Widen to 6 Lanes NMDOT Dist.: 5 County: San Juan Municipality: Unincorporated San Juan Co Lead Agency: NMDOT D-5 Rt 1 BMP 56 Rt 2 BMP: 0 Rt 1 EMP: 58 Rt 2 BMP: 0 Length: 2 Miles Est. Proj. Cost: $13,224,714 TIP Amendment Pending? Prel. Engr. Right-of-way Remarks: Added this phase of the US 64 widening project to the Regionally Significant List from the Unfunded List as part of Amendment #2 to the FFY 2014-2019 TIP (approved Sept 19, 2013). Brings total FY 2015 total to $974,000 and changes from NHPP to STPF per amendment #7 to FFY2014-2019 TIP. TIP Modification #14, added CP-91 language to Scope of Work Zone: Reg. Sig. NHPP $4,240,116 03 $4,240,116 $7,059,080 03 STP-Flex $832,186 15 $832,186 $141,814 $722,566 $864,381 $1,202,952 $974,000 $4,962,682 $5,936,683 $8,262,032 6
F100113 Fed ID: F100113 US0064 Farmington MPO Rec Num: 101.3 Proj US 64 Phase VI Fr: MP 54 To: MP 56 Project Desc.: Widen to 6 lanes Category: Capacity Proj NMDOT Dist.: 5 County: San Juan Municipality: Unincorporated San Juan Co Lead Agency: NMDOT D-5 Rt 1 BMP 54 Rt 2 BMP: 0 Rt 1 EMP: 56 Rt 2 BMP: 0 Length: 2 Miles Est. Proj. Cost: $9,000,000 TIP Amendment Pending? Prel. Engr. Right-of-way Remarks: Added this phase of the US 64 widening project to the Regionally Significant List from the Unfunded List as part of Amendment #2 to the FFY 2014-2019 TIP (approved Sept 19, 2013). Work Zone: Reg. Sig. NHPP $6,565,803 STP-Sm Urb $1,123,797 $1,310,400 $9,000,000 03 03 7
F100114 Fed ID: F100114 US0550 Farmington MPO Rec Num: 104 Category: Maintenance Proj Bridge Preservation: US 550 #9178 & #9179 Fr: 169.5 To: 169.5 Project Desc.: Bridge Maintenance and Preservation, resurface bridge. NMDOT Dist.: 5 County: San Juan Municipality: Unincorporated San Juan Co Lead Agency: NMDOT D-5 Rt 1 BMP 169.5 Rt 2 BMP: 0 Rt 1 EMP: 169.5 Rt 2 BMP: 0 Est. Proj. Cost: $260,000 TIP Amendment Pending? Prel. Engr. Right-of-way Work Zone: Reg. Sig. Remarks: Added to TIP as part of amendment #7 (FFY2014-2019) $260,000 NHPP funding for FY2017. NHPP $222,144 05 $222,144 $37,856 $260,000 $37,856 $260,000 8
F100115 Fed ID: F100115 US0550 US0550 Farmington MPO Rec Num: 105 Category: Hwy & Brg Pres Proj Bridge Preservation: US 550 8243 & 8244 & US-64 7526 Fr: To: Lead Agency: NMDOT D-5 Project Desc.: Bridge preservation mainenance project ashfalt work at mile posts 151.09, 150.85 & 35.60 NMDOT Dist.: 5 County: San Juan Municipality: Unincorporated San Juan Co Rt 1 BMP 150.85 Rt 2 BMP: 151.09 Rt 1 EMP: 150.85 Rt 2 BMP: 151.09 Est. Proj. Cost: $933,900 TIP Amendment Pending? Prel. Engr. Right-of-way Remarks: Dec 1, 2014 adds F100115 to TIP $933,900 NHPP funds with a State match. NHPP $797,924 14 $797,924 $135,976 $933,900 $135,976 $933,900 9
F100130 Fed ID: F100130 Farmington MPO Rec Num: 41.1 Category: Bike/Ped Proj 20th Street Phase I Fr: Clayton To: Fairview Project Desc.: Construct sidewalks to North Side of 20th Street NMDOT Dist.: 5 County: San Juan Municipality: City of Farmington Lead Agency: City of Farmington Est. Proj. Cost: $249,000 TIP Amendment Pending? Prel. Engr. Right-of-way Remarks: Changed and split an existing TPE project into two new phases using TAP funds as part of Amendment #3 to the FFY 2014-2019 TIP (approved Nov 14,2013). Added $28,143 in local non match funds as part of Amendment #7 to FY2014-2019 TIP. TAP-Sm Urb $188,700 28 $188,700 Local Non-Match Local Non-Match $28,143 15 $32,157 $28,143 $28,143 $249,000 28 $32,157 $28,143 $28,143 $277,143 10
F100131 Fed ID: F100131 Farmington MPO Rec Num: 41.2 Category: Bike/Ped Proj 20th Street Phase 2 Fr: Fairview To: Sullivan Project Desc.: Pedestrian Facilities, including sidewalks NMDOT Dist.: 5 County: San Juan Municipality: City of Farmington Lead Agency: City of Farmington Est. Proj. Cost: $225,000 TIP Amendment Pending? Prel. Engr. Right-of-way Remarks: Changed an existing TPE project into two new phases using TAP funds as part of Amendment #3 to the FFY 2014-2019 TIP (approved Nov 14, 2013) TAP-Sm Urb $130,782 28 $130,782 $22,287 Local Non-Match $71,931 15 $225,000 $22,287 $71,931 $225,000 11
F100170 Fed ID: F100170 NM0173 Farmington MPO Rec Num: 102 Category: Safety Proj NM 173 Fr: MP 2.0 To: NM 575 Project Desc.: Safety Improvements NMDOT Dist.: 5 County: San Juan Municipality: Unincorporated San Juan Co Lead Agency: NMDOT D-5 Rt 1 BMP 2 Rt 2 BMP: 0 Rt 1 EMP: 3.5 Rt 2 BMP: 0 Length: 1.5 Miles Est. Proj. Cost: $2,000,000 TIP Amendment Pending? Prel. Engr. Right-of-way Remarks: Modification #10 moved FY2015 HSIP Safety Funds to FY2016 in the amount of $1M.Amendment #8 (Oct 8 2014) adds an additional $110,000 to FY2015 in STPF funds. (Dec 1, 2014) TIP Amendment #9 amends the termini description from MP 2.0 to NM 575. Safety (HSIP) $463,200 15 $463,200 Safety (HSIP) $463,200 16 $463,200 Safety (HSIP) $926,400 21 $926,400 STP-Sm Urb $93,984 15 $93,984 $73,600 $73,600 $16,016 $1,000,000 $110,000 $1,000,000 $147,200 $16,016 $2,110,000 12
F100200 Fed ID: F100200 Farmington MPO Rec Num: 43 Category: Safety Proj San Juan Blvd/Scott Ave Intersection Fr: Project Desc.: Traffic signal reconstruction NMDOT Dist.: 5 County: San Juan Municipality: City of Farmington Lead Agency: City of Farmington To: Est. Proj. Cost: $504,900 TIP Amendment Pending? Prel. Engr. Right-of-way Remarks: Added this safety project to the Regionally Significant List from the Unfunded List as part of Amendment # 1 to FFY 2014-2019 TIP (Approved June 20th 2013. Split funding: $20,000 for PE and $355,000 for Construction as part of Modification #4 (Feb 10, 2014). Added $59,900 in LN-Match funds in 2015 for PE and $70,000 in LN-Match in 2015 for Construction as Safety (HSIP) $18,528 15 $18,528 Safety (HSIP) $328,872 21 $328,872 Local Non-Match Local Non-Match $1,472 $26,128 $59,900 $70,000 $20,000 $484,900 15 21 $27,600 $59,900 $70,000 $504,900 13
F100210 Fed ID: F100210 Farmington MPO Rec Num: 81 Lead Agency: County of San Juan Proj CR 350/ CR 390 Intersection Fr: 500' South of intersection on CR 350 To: 500' North of Intersection on CR 350 Est. Proj. Cost: $650,000 TIP Amendment Pending? Project Desc.: Preliminary Engineering, ROW acquisition, and construct improvements CR 350/CR390 intersection- 500ft North and South of intersection on CR 350, 500ft west of intersection on CR 390. Category: Safety NMDOT Dist.: 5 County: San Juan Municipality: Unincorporated San Juan Co Prel. Engr. Right-of-way Remarks: Revised work description, funding, and fiscal years as part of Modification #3 (Dec 5, 2013). 12.02.14 updated project termini description as part of TIP modification #12 FFY2014-19. Modification #14 moves $35K FY2015 ROW funds to FY2016 to Safety Funds. Safety (HSIP) $106,536 15 $106,536 Safety (HSIP) $495,624 21 $495,624 $8,464 $39,376 $115,000 $535,000 $47,840 $650,000 14
F100220 Fed ID: F100220 Farmington MPO Rec Num: 44 Category: Bike/Ped Lead Agency: City of Farmington Proj South Side River Road River Trail Fr: Pinon Hills Blvd Ext To: 0.6 Miles west Project Desc.: Construct River Trail NMDOT Dist.: 5 County: San Juan Municipality: City of Farmington Est. Proj. Cost: $93,586 TIP Amendment Pending? Prel. Engr. Right-of-way Remarks: Added this TAP project as part of Amendment #3 to the FFY 2014-2019 TIP (approved Nov 14, 2014) TAP-Rural $46,586 28 $46,586 Local Non-Match $39,062 15 $7,939 $39,062 $54,525 $7,939 $39,062 $93,587 15
F100221 Fed ID: F100221 NM0371 Farmington MPO Rec Num: 103 Category: Safety Proj NM 371/N36 Fr: NA To: NA Lead Agency: NMDOT D-5 Project Desc.: Install beacon flashers/advanced warning signal system at intersection of NM371 and N36 NMDOT Dist.: 5 County: San Juan Municipality: Unincorporated San Juan Co Est. Proj. Cost: $100,000 TIP Amendment Pending? Prel. Engr. Right-of-way Remarks: Added to TIP as part of amendment #7 (FFY2014-2019) $100,000 State Capital Outlay funding for FY2015. State Capital Outlay $100,000 01 $100,000 $100,000 $100,000 16
F100230 Fed ID: F100230 Farmington MPO Rec Num: 21.1 Lead Agency: City of Bloomfield Proj Vereda del Rio San Juan River Trail Phase II Fr: Existing Trail To:.324 Miles East Project Desc.: Construct river trail Category: Bike/Ped NMDOT Dist.: 5 County: San Juan Municipality: City of Bloomfield Est. Proj. Cost: $199,636 TIP Amendment Pending? Prel. Engr. Right-of-way Remarks: ROW, Envt, previously completed under CN 0002(091). Added and split this project (Phase II & III) via TAP funds as part of Amendment #3 to the FFY 2014-2019 TIP (approved Nov 14,2013). Modification # 17 moves construction funds from FY2015 to FY2016. TAP-Sm Urb $39,568 15 $39,568 TAP-Sm Urb $119,012 28 $119,012 $6,743 $20,281 Local Non-Match $14,032 28 $46,311 $153,325 $27,024 $14,032 $199,636 17
F100231 Fed ID: F100231 Farmington MPO Rec Num: 21.2 Category: Bike/Ped Lead Agency: City of Bloomfield Proj Vereda del Rio San Juan River Trail Phase III Fr: End of Phase II To:.495 Miles East Project Desc.: Construct River Trail NMDOT Dist.: 5 County: San Juan Municipality: City of Bloomfield Est. Proj. Cost: $203,050 TIP Amendment Pending? Prel. Engr. Right-of-way Remarks: Added and split this project (Phase II & III) via TAP funds as part of Amendment #3 to the FFY 2014-2019 TIP (approved Nov 14,2013). Modification #17 moves FY2015 construction funds to FY2016. TAP-Sm Urb $158,580 28 $158,580 $27,024 Local Non-Match $17,446 28 $203,050 $27,024 $17,446 $203,050 18
F100240 Fed ID: F100240 Farmington MPO Rec Num: 2 Category: Bike/Ped NMDOT Dist.: 5 County: San Juan Municipality: City of Aztec Lead Agency: City of Aztec Proj Animas River Trail Fr: Hampton Arroyo To: 320' north of US 550/NM 516 intersection Project Desc.: Construction of a pedestrian trail and transit stop providing connectivity to Aztec Ruins National Monument Est. Proj. Cost: $547,805 TIP Amendment Pending? Prel. Engr. Right-of-way Remarks: Orignially added to FFY2014-2019 TIP through Amendment #3 on Nov 14, 2013 FTA Transit in the Parks $319,900 28 $319,900 Local Non-Match $227,905 15 $547,805 $227,905 $547,805 19
F100250 Fed ID: F100250 Farmington MPO Rec Num: 1 Category: Bike/Ped Lead Agency: City of Aztec Proj Animas River Trail Fr: Aztec Ruins To: Martinez Lane NMDOT Dist.: 5 County: San Juan Municipality: City of Aztec Project Desc.: Construct bicycle/pedestrian trail from Aztec Ruins (Ruins Rd) to pedestrian bridge to Martinez Lane Est. Proj. Cost: $350,000 TIP Amendment Pending? Prel. Engr. Right-of-way Remarks: Orignially added to FFY2014-2019 TIP through Amendment #2 for $806,911 on Sept 19, 2013. Modification #4 to the FFY 2014-2019 TIP (Feb 10, 2014) reduced funding to $350,000. Local $350,000 28 $350,000 $350,000 $350,000 20
TF00001 Fed ID: TF000001 Farmington MPO Rec Num: 201 Category: Transit Proj Red Apple Transit Capital/Operating Fr: N/A To: N/A Project Desc.: Annual operating costs and purchase of one cutaway bus NMDOT Dist.: 5 County: San Juan Municipality: City of Farmington Lead Agency: City of Farmington Est. Proj. Cost: $1,289,587 TIP Amendment Pending? Remarks: Prel. Engr. Right-of-way Construction Work Zone: Exempt FTA 5307 (Sm Urb Cap) $63,500 23 $63,500 FTA 5307 (Sm Urb Oper) $605,106 23 $605,106 $620,981 $1,289,587 $620,981 $1,289,587 21