Lake Manitou Dam and Spillway Upgrade

Similar documents
DRAFT GENERAL IMPLEMENTATION PLAN AND SPECIFIC IMPLEMENTATION PLAN MIDDLETON MUNICIPAL AIRPORT MOREY FIELD. Revised 12/12/03

THE LEVEES OF DALLAS COUNTY

City of Fort Lauderdale. Frequently Asked Questions. Proposed Sea Wall Ordinance

ORDINANCE NO. C-16- WHEREAS, the proposed minimum seawall elevation exceeds the current maximum by 0.7 feet (8.4 inches); and

DEVIL CANYON PROJECT RELICENSING FERC PROJECT NUMBER TRANSPORTATION SYSTEM MANAGEMENT PLAN November 2018

Mr. Michael Malone CPS Energy 145 Navarro Street San Antonio, Texas Project No

Section 61 Recreational Vehicle Park / Campground (Bylaw No. 2012/10)

SECTION 3 GENERAL DESCRIPTION OF THE RIVER BASIN

Cofferdam Performance Hurricanes Harvey & Irma

Study Tour C: Swaziland and Kruger National Park (Pre-tour) 11 to 15 May 2016

Hydro-Electric Schemes Compliance Report June June 2013

U.S. DEPARTMENT OF COMMERCE National Oceanic and Atmospheric Administration National Ocean Service Datums Page Page 1 of 5

Principle Causes of Dam Failures. Structural failure. Cracking. Stability failure. BIA Summer Water Resources Training Dam Safety Inspections

Hydraulic Report. Trail 5 Snowmobile Trail Over Mulligan Creek. Prepared By: COLEMAN ENGINEERING COMPANY Karisa V. Falls, P.E.

Section XIII. Cost Estimates

Appendix 4 St. Charles Basin

North Cruise Berth Projects PortMiami

International Osoyoos Lake Board of Control Annual Report to the International Joint Commission

International Osoyoos Lake Board of Control Annual Report to the International Joint Commission

Appalachian Power Company Smith Mountain Hydroelectric Project FERC No Debris Management Plan

Agenda Report. Spruce Street Outlet Drainage Improvements Tower Road Relief Sewer

PROPOSED ACTION South 3000 East Salt Lake City, UT United States Department of Agriculture

Application for Permit to Develop in a Floodplain Area

Rule Governing the Designation and Establishment of All-Terrain Vehicle Use Trails on State Land

^ox, 7. Environment Agency. Hayling Island North Strategy *. M ^, v. * > -.

The Galveston Seawall

Initial OPW Designation APSR AFRR IRR Co-ordinates Easting: Northing: River / Catchment / Sub-catchment Type of Flooding / Flood Risk

PHOTOGRAPHS WRITTEN HISTORICAL AND DESCRIPTIVE DATA

Projected Advertisement Date

Duncan Hastie, P.E. Dewberry

Sandbag Barrier. Suitable Applications Sandbag barriers may be suitable: As a linear sediment control measure:

Porter Fk. #1. All unauthorized items removed as per FS & Rec Res guidelines. Footbridge may be needed for wheel chair access and for safety

[Internal Agency Docket Nos. FEMA-B-7759, FEMA-B-1138 and FEMA-B-1208] AGENCY: Federal Emergency Management Agency, DHS.

Clayfaulds Farm, Bonnybridge, Stirlingshire, FK4 2HA. Offers over 450,000

Damn those dams their effects on stream ecosystems

ROYAL VIEW DEVELOPMENT

Decision Memo for Desolation Trail: Mill D to Desolation Lake Trail Relocation

2. SECTOR Energy 1. PROJECT TITLE LOWER VRBAS HYDROPOWER PLANTS

SOUTH AFRICAN NATIONAL COMMITTEE ON LARGE DAMS BIENNIAL CONFERENCE 8-10 November 2011 Management and Design of Dams in Africa

2011 Nags Head Beach Nourishment Project Update. Tim Kana & Haiqing Kaczkowski

EAST SIDE TRANSPORTATION INITIATIVE APEGM SEPTEMBER 9, 2009

Project Overview. Hunter Mill Road Over Colvin Run Bridge Replacement Fairfax County. Get Involved. Public Information Meeting. Contact Information

Outer Banks Bridges Update:

State Level Historic Documentation Report. John Blue Bridge Hampshire County

EAST DON TRAIL ENVIRONMENTAL ASSESSMENT. Community Liaison Committee Meeting #3 July 15, :30 to 8:30 pm Flemingdon Park Library

Uinta-Wasatch-Cache National Forest Salt Lake Ranger District

Bradley Brook Relocation Project. Scoping Notice. Saco Ranger District. United States Department of Agriculture Forest Service

Assessing Your Trails, Keeping Them Safe and Enjoyable

Trail Feasibility Study

Navigating Indiana Road Signage

Wilts & Berks Canal. Appendix E: Hydrology and Hydraulics CONTENTS 1. INTRODUCTION 2 2. HYDROLOGY 2 3. HYDRAULIC MODEL 2 4.

State Route 8 Corridor. Northern Summit County s Path to Success

Outline of the Shinryu Head Works

1. The scour elevation can normally be found on the bridge hydraulics sheet and in the Pile Data Table. True False

Version Isolated & Non-Waters Only 1 of 3

Permeable RECREATIONAL TRAILS

Lake Wissota Access Locations within the LaFayette Township. By Chad Martin

GOULS FARM, GLASS, BY HUNTLY, ABERDEENSHIRE, AB54 4YL.

Spencer Environmental Appendix A: Alternative Analysis for Construction Access Route

Sales Associate Course

DAMAGE ASSESSMENT OF SAND FENCING GARDEN CITY, NORTH LITCHFIELD AND LITCHFIELD BEACH GEORGETOWN COUNTY, SC

Mainelli Wagner & Associates, Inc.

Prepared by Cathy Quinlan & Brad Hertner Upper Thames River Conservation Authority. For the City of Woodstock

Bat Cave Canyon Ranch 2,920 acres Jeff Davis County, Texas

Lodsbridge Mill, Selham, West Sussex

UNITED STATES DEPARTMENT OF THE INTERIOR BUREAU OF RECLAMATION REGION 4 SALT LAKE CITY, UTAH. May 29, 1958

MAY 2017 AROUND THE BEND. Survey Economics Customers & services. Mobile Scanning Bringing the goods. Black Elk Peak Definitive elevation

Sulphur Creek Wetlands Restoration Project in the Valles Caldera National Preserve, Sandoval County, New Mexico

MORGAN CREEK GREENWAY Final Report APPENDICES

HIGHWAY 17 WILDLIFE and REGIONAL TRAIL CROSSINGS

Conservation Area Management Statement

Project Purpose: Project History and Status:

USGS Methods of Collecting High Water Marks (HWMs)

Overview of Highway 37 Project. Napa County Board of Supervisors December 20, 2016

P3 & Design-Build. 101 st Annual THE Conference February 25 th, Speaker: Andrew Gensch, P.E.

MINUTES OF THE SPECIAL MEETING OF THE LADY LAKE TOWN COMMISSION LADY LAKE, FLORIDA June 20, 2016

DATA BOOK IV : COST ESTIMATE

PUBLIC NOTICE ***************************** New Castle Airport. Intention to File a Passenger Facility Charge (PFC) Application

Citrus County, FL Map Modernization Scoping Meeting

Plans and Design Calculations for the Alder Creek Diversion Fish Screen

Airport System Zoning Checklist Revised January 16, 2019

Photographic Log Client: Project Number: Site Location: Site Name: Photograph ID: Date: Location: Direction: Comments: Photograph ID:

Datum on benchmarks All benchmarks with a Township name and number are on 1929 datum:. All benchmarks with a four-digit number are on 1988 datum:

Overview of Highway 37 Project. Novato Rotary November 4, 2016

Stephanie Sinnott, Executive Director, Finance, Office of the City Manager

WASHTENAW COUNTY PARKS AND RECREATION COMMISSION

CA CA CA CA CA CA CA CA CA CA Educational facilities - public elementary and high schools and private schools with a curriculum similar to public

BRIEF OVERVIEW ORLANDO NORTH AIRPARK ENTERPRISE ZONE

APPENDIX B: NPIAS CANDIDATE AIRPORT ANALYSIS

CatExes vs. EAs When and How to Prepare

CITY OF BRIDGEPORT - GEODETIC CONTROL MONUMENTATION ESTABLISHED SEPTEMBER 2008

Three Canyons Ranch Master Homeowners' Association Board Meeting Minutes July 19, 2014 (approved at 8 Oct 2014 board meeting)

COASTAL CONSERVANCY. Staff Recommendation March 25, 2004 SONOMA COUNTY COASTAL TRAIL, PHASE I. File No Project Manager: Richard Retecki

Hutchinson Regional Airport Request for Proposals for Hangar Lease RFP #15-163

City of Markham Staff Presentation. York Region Lake to Lake Trail. Implementation DEVELOPMENT SERVICES COMMITTEE. September 6, 2016 PRESENTATION TO

RETAIL BUILDING 435 E. BRACKENRIDGE ST. & 442 E. DOUGLAS AVE., FORT WAYNE, IN FOR SALE

Transportation Impact Assessment Paradise Shores RV Resort Development Stettler County, Alberta Progress Update February 2018 PO#

White Mountain National Forest Saco Ranger District

AKINS DRIVE REMOVE EXISTING BASKETBALL COURT SLAB (5,901 SF) AND GOALS (2 EA) REMOVE EXISTING SWINGSET REMOVE EXISTING PLAYSCAPE AND "SANDBOX"

2015 City of Tuscaloosa Floodplain Management Plan Tuscaloosa, Alabama

Transcription:

South Bend Lake Manitou Dam and Spillway Upgrade Fort Wayne Rochester Indiana 1828 to 2017 Lafayette Sky Medors, P.E., LFA David Nance, P.G., IDNR

Project Background Location: Rochester Indiana, Central Northern Indiana. Primary purpose, At Construction: Hydropower mill operations; Recently: Recreational use only Dam: completion date 1827 Height: 10 feet Dam length 400 feet Maximum storage 3,875 Ac-Ft Surface area 775.0 acres Crest width: 10 feet Drainage area 44.2 square miles Owner: City of Rochester, 1992 maintance agreement with IDNR

Lake Manitou Dam, 190 Years, History

Key Elements Reference Map N Public Park & Beach Public Access Auxiliary Dam Spillway Lake Manitou

Indiana Floodplain Information Portal indnr.maps.arcgis.com Hospital

Flood of Record* Flood Event: August 18 23, 1990 Crest 780.87, NGVD 29 = 780.46 NAVD 88 Secondary Event, December 1990 Crest 780.04 NGVD 29 = 779.63 NAVD 88 Court Established level is 778.41 NGVD 29 = 778.0 NAVD 88 Weir Design Level (average of preexisting) 778.12 NGVD 29 = 777.71 NAVD 88 Auxiliary Spillway Design Level 779.71 NGVD 29 = 779.3 NAVD 88 Crest of North Embankment 780.5 NAVD 88 *Design and NFIP maps are based on the NAVD 88 Datum Test USGS data records and Court Establishment are based on NGVD 29 Datum. 0.41 larger value than NAVD 88 Agreement, City of Rochester and IDNR February 1991 City of Rochester and the Department of Natural Resources. The Department assumes the sole responsibility for the revisions, maintenance, and repair of the control section and the repair of the adjoining embankments of the structure. Further, the Department will design, construct and fund the necessary revisions [for] a control section and adjoining embankments. The City agrees to be responsible for all annual routine maintenance.. In the agreement the City is also to provide ingress and egress to the Department.

Response: Winter 1991-1992 Repairs Recent History

IEAP, Compiled, 2014, Presented to the City Summer of 2015 Indiana Office of Community and Rural Affairs Grant

IEAP, breach analysis completed in 2014 and presented to the City in the 2015

2015 Brush Clearing North Embankment, Before Auxiliary Spillway Spillway North fence

2015 Brush Clearing North Embankment, After Auxiliary Spillway Spillway

August 2015, Before Brush Clearing, During Geotechnical Data Collection

April 2016, After Brush Clearing, Photos/160420_N-access

August 2015, Before Brush Clearing, During Geotechnical Data Collection

September 2015, After Brush Clearing

September 2015, After Brush Clearing

September 2015, After Brush Clearing

September 2015, After Brush Clearing

Regional Geology http://www.in.gov/dnr/water/4635.htm

http://www.in.gov/dnr/water/4635.htm

Map of Indiana Showing Near-Surface Aquifer Sensitivity Sally L. Letsinger Miscellaneous Map 93 Indiana Geological Survey

Geotechnical Evaluation, 2015

Concrete Spillway Evaluation, 2015

Design Plans, 2016

Key Elements Reference Map N Public Park & Beach Public Access Auxiliary Dam Spillway Lake Manitou

December 1

December 13

December 13

December 28 Site is stabilized for the Winter

Winter Break

Key Elements Reference Map N Public Park & Beach Public Access Auxiliary Dam Spillway Lake Manitou

March 16-21, 2017

March 22, 2017

March 22, 2017

March 22, 2017 Unknown History Can Change Plans Decide, Document, and Move On

March 23, 2017 South Wall Steel Sheet Piling Complete

March 31, 2017 South Wall Complete

April 6, 2017 North Wall Steel Sheet Piling Complete, Ready for Concrete

April 12, 2017

April 12, 2017 North Embankment & Auxiliary Spillway

May 8, 2017

Flexamat Erosion Control Use and Placement May 8, 2017

May 8, 2017

May 18, 2017

May 18, 2017

July 15, 2017 Auxiliary Spillway Spillway

July 15, 2017 Auxiliary Spillway

Spillway Complete (panoramic) July 15, 2017

July 15, 2017 HPTRM,

August 23, 2017

August 23, 2017

August 23, 2017

August 23, 2017

August 23, 2017

August 23, 2017

After Auxiliary Spillway Spillway July 2017 North Embankment and Auxiliary Spillway Before Auxiliary Spillway Spillway September 2015

Lake Manitou Dam and Spillway Upgrade Public Park & Beach Questions Public Access? Auxiliary Spillway Dam Spillway Lake Manitou Sky Medors, P.E., LFA David Nance, P.G., IDNR