HARBOR INFRASTRUCTURE INVENTORIES Duluth-Superior Harbor, Minnesota/Wisconsin

Similar documents
HARBOR INFRASTRUCTURE INVENTORIES Buffalo Harbor, New York

HARBOR INFRASTRUCTURE INVENTORIES Erie Harbor, PA

HARBOR INFRASTRUCTURE INVENTORIES Cleveland Harbor, OH

Ohio Freight Conference Great Lakes Commercial Navigation

Alexandria Port, Egypt

World-Class. World-Wide.

Panama Canal Stakeholder Working Group Meeting

Waterways Council November 10, 2017

Port Everglades Master/Vision Plan Update

Creating Short Sea Opportunities - The Terminal s Role

CORPS OF ENGINEERS ALASKA DISTRICT Dredging Projects. Michael Tencza, PE Operations Project Manager November 4, 2015

Efficiency that delivers GENERAL PRESENTATION UCSD FRONTERA FRIDAY APRIL 1 ST. 2016

MIAMI INTERNATIONAL REAL ESTATE CONGRESS ERIC OLAFSON MANAGER TRADE DEVELOPMENT

Bigger, Deeper, Wider

GREAT LAKES SYSTEM DELIVERS

South Jersey Port Corporation

Great Lakes Navigation System Buffalo District

Appendix B. Cultural Heritage Properties

PORT OF CORPUS CHRISTI BUILDING FOR THE FUTURE

Port of Pensacola - WHSE 9 & 10 52,500-92,500 SF WHSE +/-

Port Everglades Overview

BUILDING THE CAPACITY FOR GREATNESS 2019 STATE OF THE PORT

I INTRODUCTION AND BACKGROUND

Port of San Diego Overview and Updates. September 2017

Serving the Tampa Bay Maritime Community Since Celebrating over 125 Years of Service

Humboldt Bay Harbor, Recreation and Conservation District

John Wood Chairman. Port of Brownsville

PRICE REDUCED. Delaware River Port Development Opportunity 707 Water Street, Gloucester City, New Jersey. Sale Price $2,650,000

The Panama Canal Expansion: Myths and Realities for the North American Economy

Port Everglades Master/Vision Plan Update

NAFTA Next Chicago, Illinois April 23 rd, 2014

Port Everglades 2014 Master/Vision Plan Update

TNPA 2 nd Strategic Customer Forum Update on Infrastructure Projects. 13 August

OPEN CELL SHEET PILE TECHNOLOGY. Presentation to Alaska State Legislature, House Finance Committee

ASL Marine Holdings Ltd.

Engineering With Nature Geographic Project Mapping Tool (EWN ProMap)

Appendix C. Cultural Heritage Properties

Aid to Local Ports FY19 Requests

THE PLUS INDUSTRIAL MANUFACTURING EMPLOYER OF THE YEAR USACE BUFFALO DISTRICT BARGES MILLER BOAT LINE FERRY WILLIAM MARKET RYBA MARINE BARGES & TUG

Marine. endry. Our History. Our Busines.s HENDRYMARINE.COM

Baltimore Harbor & Channels, Maryland and Virginia

Geotechnics. Curriculum Vita MARINE WORK RELATED PROJECTS.

Port of Pensacola WHSE 8 83,000 SF WHSE +/-

Southern New Jersey s International Seaports

AVAILABLE BAY TOWN PLAZA FOR LEASE Bay Road Saginaw, MI Commercial Realty Inc.

Waterfront Plan Working Group Meeting Maritime & Water-Dependent Uses Meeting Agenda

Mr. Jeff Keever Deputy Executive Director Virginia Port Authority May 2, 2012

NEWBORO AND PORTLAND HARBOUR REDVELOPMENT PLANS

Infrastructure Developments in Brazil s Northern Arc

COMMONWEALTH OF THE BAHAMAS MINISTRY OF PUBLIC WORKS & TRANSPORT NASSAU HARBOUR PORT IMPROVEMENT PROJECT. Nassau Harbour Port Improvement Project

INNOVATIVE MARINE DESIGNS PND ENGINEERS, INC. January 14, 2016

Roberts Bank Terminal 2 Project

BOARD OF TRUSTEES OF THE GALVESTON WHARVES Tariff Circular No. 6

Task Force Meeting #2

The Americas. Port of the Americas. Rhonda M. Castillo Gammill, Esq., P.E. Executive Director, Port of the Americas Authority

Port Everglades: Making The Last Mile Count. AAPA Annual Convention November 3, 2015

Belknap Street Superior, WI Belknap Plaza Incredible Investment Opportunity in Superior, WI

Project Update 3. Carpentaria Rail. Port Carpentaria Railway Project. Carpentaria Rail. 21 Second Ave, Mount Isa, Queensland, Australia, 4825

Current and Forecast Demand

Port of Durban. Entrance Channel Widening & Deepening Project Completion Function. 31 March 2010

Globus Maritime Limited Trading Update and Financial Highlights for the Three Months and Nine Months Ended September 30, 2007.

Table 1 shows the number of licensed SBSR firms in the country by category and geographical division.

Roberts Bank Terminal 2 Project

The Panama Canal Update: Some Implications for Western Hemisphere Trade

Message from the CEO. Message from the Chair. 2 portofhalifax.ca

2012 Texas Water Conservation Association Meeting

PORT DEVELOPMENT STRATEGIES & SUCCESS STORIES. PORTMIAMI AN EVOLVING GATEWAY Juan M. Kuryla, PPM PortMiami Director and CEO

SAMOA PORTS AUTHORITY

December 2012 Update. I-95 New Haven Harbor Crossing. Corridor Improvement Program

Madagascar. Ports description

LRTP Ref. Type of Work. Detailed Project Description. Cruise Terminal H Improvements C-6 $13,050 $13,050

Challenges with recruiting small business for USCG Ship Repair Contracts in USCG District 8

City of Fort Lauderdale. Frequently Asked Questions. Proposed Sea Wall Ordinance

ACEC/MW and ACEC/MD. Maryland Port Administration. Steve Johnson. June 6, 2017

MASSACHUSETTS PORT AUTHORITY REQUEST FOR LETTERS OF INTEREST DEVELOPMENT OF THE MASSPORT MARINE TERMINAL

Jamaica Investment Forum 2018 th. Montego Bay

Port Everglades 2014 Master/Vision Plan Update

TSAKOS INDUSTRIAS NAVALES S.A.

SAME/SBA CONFERENCE. Col. Christopher W. Sallese Commander, Galveston District U.S. Army Corps of Engineers April 11, 2012

STRATEGY OF DEVELOPING AND INTEGRATION OF MARITIME SECTOR

The Galveston Seawall

DOCKING AND ROUTING PLAN

VERSION DATE OF ISSUE DESCRIPTION PREPARED CHECKED APPROVED Technical note HHP DKA OYBE

the foss seattle shipyard helping you succeed in a competitive market

Alicia Cervera Lamadrid Presents INS IDE R

NC Dredge Studies. Sterling Baker, P.E. NCDOT James Gregson NCDEQ April 5, 2018

NC Dredge Studies NCBIWA Spring Conference April 23, 2018

June 28, 2017 Press Conference

USACE GALVESTON DISTRICT PROJECT UPDATE

State of South Africa s Maritime Industry Transport Portfolio Committee. 08 May 2012 Commander Tsietsi Mokhele Chief Executive Officer

North Cruise Berth Projects PortMiami

Walvis Bay and its role as a logistics hub for the SADC region. Christian Faure Executive: Marketing and Strategic Business Development

Present Usage and Facilities of Coastal Channels of CDCII

Floating Docks. Our unique capability is your solution

Water Resources Update after NCGA Long Session


Port Handbook SANSOUCI PUERTO SANTO DOMINGO

BACKGROUNDER Office of the Premier Government of Canada

Marine Exchange of Alaska Port of Juneau Navigation Study

The Panama Canal: A Challenge to Efficiency in the 21st Century

Transcription:

HARBOR INFRASTRUCTURE INVENTORIES Duluth-Superior Harbor, Minnesota/Wisconsin Harbor Location: Duluth-Superior Harbor is located at the westernmost tip of Lake Superior. Authority: River & Harbor Act of 3 June 1896 Project Description: Duluth-Superior Harbor was originally authorized as a deep draft commercial harbor. The project depths are 28 to 32 feet in the entrance; 27 feet deep in the iron-ore route channels, and 20 to 23 feet in the inner channels. There are two piers at the Duluth Entry and there are four piers at the Superior Entry. The Duluth Entry north pier consists of four sections and is partially SSP in nature. The south pier at the Duluth Entry also consists of four sections. Section M, 104.25 feet long, is a double wall SSP structure containing a wale and tie-rod system with a concrete cap including a stairway, parapet walls and base for the entry front range light. Section N, 980.0 feet long, is a double wall SSP structure similar to Section M. This section contains a walkway, parapet walls and is 30.0 feet wide. Section N-1, 65.0 feet in length, is partially a double SSP wall tie-rod system and a single SSP front wall with earth anchor tie backs. Section O, 583.0 feet long contains the curved portion of the harbor entrance, is a single SSP front wall. The Superior Entry north breakwater consists of five sections. Sections T and U are rock-filled timber cribs with concrete caps, 52.0 feet and 400.0 feet long, respectively; Section W, 3,189.0 feet long, is a rubble mound structure constructed of core stone covered with armor stone; Section V, 496.0 feet in length, is a concrete cap resting on two parallel rows of piling. A Wakefield wall, two Geo tubes on the landward side and two riprap groins on the lakeside were added in 2002. Section X, 530.0 feet long is a rubble mound structure containing an internal sheet piling driven to 16.0 feet below LWD. The south breakwater at the Superior Entry also consists of four sections. Sections T and U, the pier head and breakwater head, are rock-filled timber cribs resting on a submerged pile foundation, 100.0 feet and 352.0 feet long, respectively. Section W, 1,014 feet long is a rubble mound structure comprised of core stone covered with armor stone resting on the lakebed. Section V, 400.0 feet long, is a concrete cap resting on two parallel rows of piling. The Superior Entry north entrance pier consists of two sections. Section P, the pierhead, is 19.0 feet long and is a concrete structure resting on a submerged pile foundation and the lakebed. Section R, 2,077 feet long is the transition section to land and is a concrete structure resting on a submerged pile foundation and the lakebed. The south entrance pier at the Superior Entry is composed of four sections. Section P-1, 30.0 feet long, is a SSP wall capped with concrete. Section Q and a portion of Section R-1, 480.0 feet long is a SSP structure capped with concrete. Sections R-1, R-2, R-3, R-4, S-1 and S-2, totaling 1,096 feet are SSP walls with tie backs. Traffic: Five year average (2006-2010) tonnage is 41.1M tons of material shipped and received

Transportation Importance: Duluth-Superior Harbor is a major international receiving and shipping port on the Great Lakes. This project serves as an important Harbor of Refuge and $2 Billion worth of cargo is shipped via the Duluth-Superior docks annually. It is also the home port of U.S. Coast Guard s 225 foot long cutter Alder and home to U.S. Coast Guard auxiliary station and a Marine Safety Unit, responsible for port safety and security, marine environmental protection, and commercial vessel safety missions under the auspices of the Dept. of Homeland Security. Congressional Interest: Representative Rick Nolan D-MN-8 Representative Sean Duffy R-WI-7 Senator Al Franken D-MN Senator Amy Klobuchar D-MN Senator Ron Johnson R-WI Senator Tammy Baldwin D-WI Current Condition Assessment: B/C Date of Site Visit: 15 September 2010 Summary of Impact: Prevailing waves come from the north direction. Overtopping waves could have an immediate impact on the docks in Superior Bay located inside the piers. Any significant wave activity within the bay could damage vessels moored at the docks. Presently, over 20 docks within the bay are sufficiently protected, but could be exposed to greater wave heights under the right conditions. In both cases, an increased wave climate would result in damage to docked vessels and the docks themselves. Other federal and commercial businesses subject to inundation are the Canal Park Visitor Center and Museum, USACE Duluth Area Office Building and Vessel Yard, the Duluth Aerial Lift Bridge, Paulucci Professional Building, Duluth Entertainment Convention Center, Great Lakes Aquarium and the South Pier Inn.

Examples of Protected Infrastructure: 1. Duluth Canal Park Visitor Center and Historical Museum: The museum, operated by the U.S. Army Corps of Engineers is located along the Duluth ship canal at the Aerial Lift Bridge. It provides displays, historic artifacts and programs that explain the roles of Duluth and Superior in Great Lakes shipping and the U.S. Army Corps of Engineers in maintaining the nation s waterways. There is no admission charge to the Visitor Center or any of its programs. The center is open year-round and operation hours vary with the seasons.

2. USACE Duluth Area Office: The Area Office, located on the westernmost end of the Great Lakes, is responsible for the dredging of federal harbors and the repair of breakwaters and piers on Lake Superior. The Duluth Area office is also responsible for the operation of the Canal Park and Canal Park Visitor Center. Canal Park is located along the Duluth ship canal. 3. Duluth Aerial Lift Bridge: Is a major landmark in the port city of Duluth and is one of the most popular tourist attractions in Minnesota. The bridge was constructed in 1904-1905 as the Aerial Ferry Bridge which ferried people across the canal in a gondola. The lift span was added in 1929-1930 to handle increased traffic. Today, the Aerial Bridge lifts an average of 5,500 time a year, and over forty times a day during the summer months. It is owned and operated by the City of Duluth.

4. Paulucci Professional Building: Built in 1878, is a four story structure overlooking the Duluth ship canal and Aerial Lift Bridge. The Paulucci Building is a mixed-use commercial property with over 140,000 square feet of commercial offices and retail shops. 5. Duluth Entertainment Convention Center: The complex is located adjacent to the Duluth ship canal. The center is a 250,000 square foot multi-function facility and offers meeting, exhibit,sporting and special event space.

6. Great Lakes Aquarium: Is one of a few aquariums in the United States that focuses on freshwater exhibits. All the exhibits of the 62,000 square foot complex are based upon actual habitats in the Lake Superior basin. The Great Lakes Aquarium provides on-site and outreach educational programs to learners of all ages. The aquarium is open every day except Christmas from 10am to 6pm. 7. South Pier Inn: The Inn is located at the foot of the Aerial Lift Bridge and situated on 400 feet of private shoreline. Suites at the Inn feature whirlpools, fireplaces and private balconies with a spectacular view of the Aerial Lift Bridge and Lake Superior. 8. USACE DuluthVessel Yard: The complex houses the Duluth Area Office warehouse. In addition, the vessel yard is a work area for the Duluth Area Office field personnel as well as a docking area for their survey vessels, crane barges and tugs. The Vessel Yard also provide mooring facilities for the EPA and the University of Minnesota Duluth research vessels.

9. General Mills Duluth Grain Elevator A: The General Mills Duluth facility has a 3.5 million bushel storage capacity. This is one of the city's oldest grain elevators still in operation (built in 1908). Some of the grain received by rail or water is shipped by rail to General Mills' plants. Combined capacity of the company's Duluth and Superior elevators is 16.2 million bushels. 10. Duluth Storage: This remains the Twin Ports' most automated grain facility. Cargill had moved its historic grain export operations into what was, in 1978, a state-of-the-art facility on Duluth's waterfront. The next year, the company expanded its "Elevator B" with the addition of concrete silos. Efficiency and technology expedited grain handling, utilizing a rail horseshoe to accommodate 220 hopper cars. The company was acquired by Whitebox Advisors in 2008 and began operating as W.B. Duluth Storage, LLC. This facility was sold to Ceres Global Ag Corp. in 2010, along with 11 other grain-handling facilities in North America. 11. Holcim Inc.: Holcim (US) Inc. (formerly St. Lawrence Cement) is one of the nation's largest manufacturers and suppliers of cement and mineral components. The Duluth facility handles Portland Type I cement in bulk that comes by ship from Mississauga, Ontario, and leaves the plant in rail cars or trucks. The facility, built in 1980, measures 284 feet from the ground to the top of the superstructure - the tallest building in Duluth/Superior and surrounding area. There are four silos, each with 10,000-ton capacity and interstices with the capacity of another 3,000 tons. The facility handles about 20 ships per year.

12. Duluth-Seaway Port Authority: The Duluth Seaway Port Authority (DSPA) is an independent, public agency created by the Minnesota State Legislature to foster regional maritime commerce, promote trade development, facilitate industrial development, and serve as an advocate for port interests here and around the world. The Port Authority also owns/manages multiple waterfront properties, including the 120-acre Clure Public Marine Terminal (the port's only general cargo facility), Garfield Pier, Erie Pier, and an industrial park near the Duluth International Airport. DSPA also operates Foreign Trade Zone #51. 13. Fraser Shipyards: one of the largest U.S. owned ship repair facilities on the Great Lakes, as well as the only U.S. owned ship repair facility on Lake Superior. The facility includes two graving docks and shops for all types of ship repair and renovation. Although not presently building any vessels, it is keeping busy with ship renovation, repair and conversion work. 14. Gavilon Grain, LLC: Gavilon Grain LLC (formerly Peavey Company-Connors Point) has a long history in Duluth-Superior dating back to 1898, when the former Continental Grain Co. was located in Duluth. Today, the Superior facility can hold eight million bushels of grain.

15. Lafarge Corporation: The Superior Terminal has 8500 NT of storage in the silos, with two dock faces at 90 degrees to each other - 900 feet and 400 feet at full depth. Lafarge employs over 70,000 people worldwide. This facility has truck and rail loading and rail unloading capability. (Note: The Duluth facility was permanently closed in 2008). 16. Hansen-Mueller - Superior, WI Elevators: Former ConAgra elevators in Superior were acquired in 2008 by Hansen-Mueller Co., a respected leader in the grain industry. Headquartered in Omaha, Nebraska, Hansen- Mueller provides an individualized approach to grain merchandising through price discovery, marketing, transportation and logistics throughout the world. Rapid growth has allowed the company to strategically place multiple grain elevators throughout the U.S. to move commodities quickly and efficiently utilizing rail, barge, truck and/or ship for on-time delivery. 17. Burlington Northern Sante Fe (BNSF) Ore Dock #5: Despite its massive size, it has been a somewhat reclusive resident of Superior's Belgian neighborhood of Allouez since 1892. The Twin Ports largest taconite transshipment facility, it has a total dock capacity of 73,156 tons of iron ore, but stockpile capacity (5.2 million tons) in its Allouez yard is far higher. The pellets are moved by conveyor belt up and over the town to the dock.

Potential Impact Area: The following graphic displays property parcels that could be impacted within various zones defined by different setbacks from the shoreline behind existing Federal coastal structures. Values are based on real property tax assessments from these parcels, and don t reflect any detailed coastal zone damage assessments. Figures simply reflect property values at various setbacks.