BUILDING BETTER COMMUNITIES

Similar documents
TO MAXIMUM CAPACITY AND BEYOND

NO COMPROMISES AS FEATURED IN AUSTRALIAN CONSTRUCTION FOCUS

Site Accommodation. Site Offices Complexes Lunchrooms Toilets Ablutions Change Rooms First Aid Rooms

Interactive. Interfleet is acquired by SNC-Lavalin. Interfleet expands to WA. New Regional Manager NZ. Issue State Manager South Australia

CAPABILITY STATEMENT TRANSPORT

Industry briefing NOVEMBER 2017

Spiral Duct. Contents. Introduction 1. Duct & Fitting Range 2. Duct Sizes 3. Fittings 5. Round Duct Connector 7. Installation 8

TOGETHER, WE DELIVER SOLUTIONS For projects around the world.

Mackay Region. Destination Tourism Strategy

CORROSION PREVENTION. Leaders in Corrosion Prevention and Sealing Technology.

Sunshine Coast Council Locked Bag 72 Sunshine Coast Mail Centre QLD Submitted via online portal. 2 June 2017.

YWCA Townsville Townsville

20 November Company Announcements Australian Securities Exchange Limited Level 4, 20 Bridge Street SYDNEY NSW 2000 AUSTRALIA.

2009 Annual General Meeting

Our local knowledge teamed with our global expertise provides our customer base with the complete heavylift and transportation solution across

Mining. Capability brochure

Airport forecasting is used in master planning to guide future development of the Airport.

ICN Gateway Breakfast (SA) Jon Whelan A/Manager Project Delivery 9 July 2015

3 Provide all-important brand experiences 3 Build relationships face-to-face 3 Australian mining industry capital expenditure will

LOCAL BUYING. Supporting Western Australia through local buying. PROGRAM BUILDING OUR FUTURE TOGETHER

Business Capability Statement

Regional and Remote Communities. Capability

DEXUS Property Group (ASX: DXS) ASX release

Online Report Alpha wins approval for $10 bln Aussie coal mine, rail project

NSW METS LEVERAGING GLOBAL ADVANTAGE SYDNEY 13 MAY 2016

TECHPORT AUSTRALIA - AUSTRALIA S PREMIER NAVAL INDUSTRY HUB

Aviation and Associated Sector

capability profile PO Box 8102 Suite 4, Level 2, 85 Lake St Cairns QLD 4870 Phone

Canberra Business Council CEO, Chris Faulks, congratulated Aspen for its incredible achievements.

DEXUS Property Group (ASX: DXS) ASX release

15-17 November 2018 Bankstown Airport

Department of Employment, Economic Development and Innovation. Current Queensland coal infrastructure developments

For personal use only

Fraser Coast. Destination Tourism Strategy

NICKI KENYON GENERAL MANAGER CONSUMER MARKETS VISIT VICTORIA. VICTORIAN TOURISM CONFERENCE 25 July 2017

For personal use only

INLAND RAIL. Connecting Australia. 5 June 2018 National Infrastructure Summit inlandrail.com.au

Committee for Melbourne 2018 Election Priorities

Market Insights & Salary Guide 2018 Data & Analytics

The Company wishes to release to the market the following presentation that will be made today.

YONGNAM HOLDINGS LIMITED (Company Registration No N) (Incorporated in the Republic of Singapore on 19 October 1994)

AUSTRALIAN manufacturing

Office locations QLD NSW VIC

CASE STUDY. Changing Places, May Park, Horsham, Victoria. landmarkpro.com.au BRISBANE SYDNEY MELBOURNE ADELAIDE PERTH AUCKLAND

For personal use only

Sponsorship Package 2015

V SEP Page 1 of 8 EMPLOYMENT FREQUENTLY ASKED QUESTIONS MILSKIL THE COMPANY. Who is Milskil?

CAIRNS A STRATEGIC PORT

Original artwork commissioned by DeGrey Civil and completed by employee Carl Garlett. Boodarie Contracting.

Draft Greater Sydney Region Plan

ALPHA AWNING SERIES. Stylish, Robust & Energy Efficient.

Southern Regional Forum. Creating Legacy. Thursday, 24th May 2018

BRISBANE MARKETING MEMBERSHIP. 2018/19 MEMBERSHIP PROSPECTUS

Warehouse case study. Cargo Facility, Stansted. 35 million, transit warehouse cargo facility pre-let to Federal Express at Stansted Airport

Key Projects Carmichael Rail Line (CRL)

Technical Design Manual

INTERIM REVIEW OF AUSTRALIAN CONSTRUCTION MARKET CONDITIONS JULY 2015

What Makes UCT Unique

DAVID SHELDON Chair Australian Regional Tourism Network (ARTN inc 2001)

BRIEFING PAPER APRIL 2002 MINING AREA C DEVELOPMENT PORT HEDLAND PORT & CAPACITY EXPANSION

SKYCITY ENTERTAINMENT GROUP LIMITED (SKC) INVESTOR PRESENTATION FOR UBS INVESTOR CONFERENCE

For personal use only

Double Win for Liberty Industrial at World Demolition Awards

Gold Coast: Modelled Future PIA Queensland Awards for Planning Excellence 2014 Nomination under Cutting Edge Research category

QANTAS GROUP HALF YEAR FINANCIAL RESULTS 22 FEBRUARY 2018 ALAN JOYCE SPEECH

Indonesia. Market overview. Opportunities and challenges. Jakarta. Austrade in Indonesia

Draft Greater Sydney Region Plan

Summary Delivery Plan Control Period 4 Delivery Plan More trains, more seats. Better journeys

Australia & New Zealand

For personal use only

EXPRESSION OF INTEREST EOI 0008

Clearly the Best FLEXIBLE SEE-THRU SWING DOORS

Dufferin Jog Elimination Project

YONGNAM HOLDINGS LIMITED (Company Registration No N) (Incorporated in the Republic of Singapore on 19 October 1994)

Clearly the Best FLEXIBLE PVC SOLUTION

NSW BUSINESS CONDITIONS SEPTEMBER Quarterly snapshot of NSW economy informed by the businesses of NSW

PERSONNEL PROFILE DAVID BREADMORE

ENVIRONMENT ACTION PLAN

Please find attached an announcement for immediate release to the market.

DIRECTORY OF DEFENCE SUPPLIERS

This transaction is at the securityholder level and will not impact the day-to-day operations, management or employees of SP AusNet.

Contents. Company Background FLOWSTOPPER Plugging Device Kit and Replacement Parts Key Features & Benefits... 4

INNOVATION CAMPUS.

What we know about the economic benefits of naval shipbuilding for South Australia

INNOVATIVE & CONTEMPORARY MODUL AR SOLUTIONS Commercial>Mining>Recreational>Residential

Life on the WATER. Wyndham Harbour

ITA AITES WORLD TUNNEL CONGRESS 2009

PIPE Networks Limited 2008 Annual General Meeting

Who does what? Tourism operations at local and regional levels. In many regional centres there can be confusion about who does what in tourism.

YONGNAM HOLDINGS LIMITED (Company Registration No N) (Incorporated in the Republic of Singapore on 19 October 1994)

Draft Greater Sydney Region Plan

ARTC & INLAND RAIL 14 NOVEMBER 2017 SIMON THOMAS, PROGRAMME DIRECTOR ARTC INLAND RAIL

Sydney Metro West A new railway for Western Sydney

Australia and New Zealand

December 2017 Quarterly Activities Report

Overview. Mining projects map

Watpac advises that the Scheme Resolution was not passed by the requisite majorities of Watpac shareholders, with:

Outlook: FY13 EBITDA guidance $28M - $29M. Pursuing contracted 300MW in 2013 growth strategy. FY13 maiden franked dividend payment expected

Shaping the Future of Railway Institute of Railway Technology

ADELAIDE OVAL REDEVELOPMENT

Transcription:

BUILDING BETTER COMMUNITIES AS FEATURED IN AUSTRALIAN CONSTRUCTION FOCUS

BUILDING BETTER COMMUNITIES BUILDING BETTER ABERGELDIE COMPLEX INFRASTRUCTURE COMMUNITIES ABERGELDIE COMPLEX COMPLEX INFRASTRUCTURE Specialists in small but complex infrastructure projects, Abergeldie Complex Infrastructure takes an adaptable approach to project planning and management, paying close attention to minute engineering details. Written By Aleisha Parr Specialists in small but complex infrastructure projects, Abergeldie Complex Infrastructure takes an adaptable approach to project planning and management, paying close attention to minute engineering details. The company is something of a one-stop-shop, providing specialist services in dams, bridges, marine, process, and rail, electrical, mining and steel fabrication. Its emphasis is on building better communities across eastern Australia. Explains Mick Boyle, Managing Director, The major contractors in Australia focused on larger projects and I felt that there was an op- portunity for taking on the smaller, but still significant projects, especially the complex ones that call for a more adaptable approach, where the engineering detail really matters and specialist expertise can make all the difference. Our commitment to building sustainable communities goes beyond merely providing the infrastructure. Established in 1994 by Mr Boyle with one local office in Sydney, the company has since expanded through natural growth and acquisitions - to offer its complex engineering services across Eastern Australia. It now has offices in Brisbane, Newcastle, Mackay and Canberra, and is licenced for building as well as demolition works in New South Wales, Queensland and the Australian Capital Territory. The first of its acquisitions was in 2007, taking up 100% ownership of Ardent Underground Pty Ltd, a blind bore shaft drilling company. This strategic acquisition helped Abergeldie Complex Infrastructure enter the bourgeoning mining industry under the banner of Abergeldie Mining. Next, in 2008, the company acquired John Young (Kelvinhaugh) Pty Ltd. Abergeldie Complex Infrastructure had been nurturing this relationship over the ten years prior, so the transition was a natural one, bringing in-house expertise in civil process engineering. Now contracting as Abergeldie Young Process Engineering, the arm provides design, supply and installation services to clients in the wastewater treatment, water supply, fuel, food and materials handling industries. We had been doing this kind of work ourselves on a reasonable scale, but we wanted more depth to our capabilities to and take on 2 ABERGELDIE COMPLEX INFRASTRUCTURE: BUILDING BETTER COMMUNITIES AS FEATURED IN AUSTRALIAN CONSTRUCTION FOCUS 3

a broader market, says Mr Boyle. John Young Kelvinhaugh had long been a very well respected process engineering operator. With that acquisition we can now do a lot more, larger scale work, especially in the water treatment field. Abergeldie Complex Infrastructure also seized the opportunity to enter the steel fabrication industry, having for several years sub-contracted out a lot of high value work on many projects. In 2009, the company acquired 50 per cent of ASM Fabrications Pty Ltd, which specialises in the fabrication of aluminium, mild steel and stainless steel. The major contractors in Australia focused on larger projects and I felt that there was an opportunity for taking on the smaller, but still significant projects. All of this growth has proven incredibly beneficial for the medium sized company, which has remained small enough to offer personal attention, but has become large enough to offer specialist services in multiple areas. Recently, the infrastructure industry in Australia has been booming, with government funded projects handed out in large parcels, primarily to larger companies. However, the past year has been quieter than expected, with many of the BER stimulus projects reaching completion and new projects being delayed by Federal and State elections, as well as by discussion about the mining tax. While most smaller organisations would see this as a disadvantage, Abergeldie Complex Infrastructure has capitalised on its strengths, focussing on winning tenders for smaller, specialist works packages within much larger projects. These kinds of works sometimes require nuanced skills that are just too complex for some of the larger companies to tackle. A project worth hundreds of millions of dollars would usually be seen as beyond the capabilities of a company like ours, and we might not even be given a chance to tender, says Mr Boyle. But there are often opportunities for five, ten or twenty million dollar contracts within those bigger projects. Blind boring of ventilation shafts for major mine developments is one of those specialist areas where Abergeldie s unique expertise has been in demand. Explains Mr Boyle, We have the equipment, the personal and the methodology to blind bore shafts deeper and of bigger diameter bigger than can anyone else in the world. Blind boring offers particular benefits to new mines as it does not require underground access throughout the process; you simply begin from the surface and drill down into either an existing mine or the proposed location on the new mine face. This is particularly advantageous in difficult ground conditions. A real benefit of the technology, says Mr Boyle, is that we can create a shaft and at the same time provide a high-quality shaft liner without anyone having to work inside the shaft itself during construction. Compared to conventional methods, it takes a much smaller workforce and it is much safer. Everyone is up on the surface. The shaft s composite steel/concrete liner is cast in segments at a temporary, outdoor factory on the site. Once the liner segments have cured to the required strength, they are lowered into the bored-out shaft. Throughout the boring and lining operation, the shaft is filled with water. This enables the bored out spoil to be pumped out and stabilises the entire process, increasing safety and project success. The process water is recycled, as might be expected of Abergeldie Complex Infrastructure, which has a strong commitment to strict environmental standard. Our commitment to building sustainable communities goes beyond merely providing the infrastructure. said Mr Boyle. Abergeldie has also purchased its own earth pressure-balance tunnel boring machine (EPBM). It has been put to good use on several pipe-jacked tunnel projects, some of them on challenging sites. On the Burrows Road pipejacked tunnel project at Alexandria, our team really showed what innovation means when it comes to engineering, says Mr Boyle. The soil was so wet that they had to create their Rambler Welding Industries STRUCTURAL STEELWORK STAINLESS STEEL DIVISION SITE WORK SPECIALISTS MATERIALS HANDLING STAIRS AND HAND RAILS TANKS RWI can supply and install steelwork for any type of building. Phone: 02 6921 3062 Fax: 02 6921 4472 Email: inquiries@ramblerwelding.com.au 39 Lewington Street Wagga Wagga NSW 2650 www.ramblerwelding.com.au 4 ABERGELDIE COMPLEX INFRASTRUCTURE: BUILDING BETTER COMMUNITIES AS FEATURED IN AUSTRALIAN CONSTRUCTION FOCUS 5

A core of good people is Abergeldie s greatest competitive advantage. PROJECTS Erskineville Railway Overbridge Mick Boyle ranks the Erskineville Railway Overbridge project, for which the firm won a national award in 2009, as one of the most stimulating projects Abergeldie Complex Infrastructure had had ever done. This was an old brick overbridge spanning six railway tracks. The project, reports Mr Boyle was completed over seven weekend shutdowns. The original bridge was demolished in that time and replaced in stages with the new build. There was almost no impact on the rail system at all. This was probably one of the most complex and challenging projects we have ever done, and it s particularly pleasing that we won an award for it, he recalls. The entire process came off without so much as a hitch. Current Project Abergeldie is currently constructing a blind-bored ventilation shaft in the Hunter Valley for Austar Coal mine. The 465 metre deep shaft will be used for ventilation and access to Austar s Stage 3 underground works. With a composite steel and concrete lining, the shaft will have a finished diameter of 4.5 meters. The liner will be fully water tight and maintenance free. Abergeldie Complex Infrastructure has completed shafts previously for clients such as North Goonyella Coal Mine, BHP Billiton and Springvale Coal, however this is their first shaft in the Hunter Valley. We re really excited to have a chance to showcase our expertise in blind-bored shaft drilling in one of Australia s major coal fields, reports Mr Boyle, I m hopeful that this shaft is the first of many in the Hunter Valley. Recent Project In the last 6 months the company has completed three 2800mm pipe-jack tunnels with its new TBM. One tunnel was located in in Burrows Road, Alexandria, Sydney and two were in Victoria. The 87m long Alexandria tunnel was constructed for Energy Australia s cable network. The tunnel is below the water table, near the Alexandria Canal in Sydney s industrial district. The scope also included initial fit-out of the tunnel with cable support brackets and refitting the launch and receive pits for use as permanent access structures. The soft, water-charged soil presented some extreme tunnelling challenges, which were met with innovative solutions drawing on experience from outside the normal range of tunnelling and drilling. The project is currently a finalist in the Sydney Engineers Australia Awards, presented every year in September. 6 ABERGELDIE COMPLEX INFRASTRUCTURE: BUILDING BETTER COMMUNITIES AS FEATURED IN AUSTRALIAN CONSTRUCTION FOCUS 7

I think that the important thing is to keep doing interesting projects, because that is how you keep skilled people with you... own original mix of drilling fluids to stabilise the soil and stop the machine from sinking into the mud. When the drilling machine broke through at the end of the tunnel, it was bone dry and just 7mm off the target alignment. Abergeldie Complex Infrastructure operates a Third Party Certified management system which incorporates a Quality Assurance System to AS/NZS ISO9001:2008, an Environmental System to AS/ NZS ISO14001:2004 and an OHS&R System to AS/NZS 4801:2001. The company also maintains an active membership, at each state level, in the Civil Contractors Federation Association. Membership helps Abergeldie Complex Infrastructure to maintain an association with the Local Government Associations, the minister for Local Government and the Minister for the Environment. As focussed as Abergeldie Complex Infrastructure is on nurturing productive relationships externally, the process of delivering quality outcomes begins from within, with its staff and workforce. I think that the important thing is to keep doing interesting projects, because that is how you keep skilled people with you, says Mr Boyle. A core of good people is Abergeldie s greatest competitive advantage. When you have that kind of high-calibre team, you can meet and exceed your clients expectations; and we do. We do complex projects that require a lot of planning, and that means you need high-calibre people, continues Mr Boyle. When you have that kind of high-calibre team, you can meet and exceed your clients expectations; and we do. Indeed, the company far exceeds industry and client expectations, with significant wins in numerous industry awards. While part of Abergeldie Complex Infrastructure s success in winning awards may be attributed to its focus on highly complex and specialised projects, which typically are more impressive to clients and award competition judges, for Abergeldie the keys to success are dedication to quality outcomes which meet or exceed client expectations, and commitment to building better communities. A large part of the how and why of winning awards is about your clients perceptions of your performance, says Mr Boyle. Simply, he says, do a good job that the keeps the client happy and the awards should logically follow. 8 ABERGELDIE COMPLEX INFRASTRUCTURE: BUILDING BETTER COMMUNITIES AS FEATURED IN AUSTRALIAN CONSTRUCTION FOCUS 9

Abergeldie Complex Infrastructure 5/5 George Young St Regents Park NSW 2143 p: 02 9644 7300 www.abergeldie.com 8th floor, 55 Hunter Street Sydney NSW 2000 PO box 4836 Sydney NSW 2001 Ph: 02 8412 8119 ABN 93 143 238 126