UNIVERSITI SAINS MALAYSIA. Second Semester Examination 2010/2011 Academic Session. April/May 2011

Similar documents
MAKLUMAN TERKINI PELAN PENGURUSAN TRAFIK UNTUK PEMBINAAN MRT SSP SEPANJANG JALAN KEPONG 28 NOVEMBER 2018

PENGUMUMAN TRAFIK MAKLUMAN TERKINI PELAN PENGURUSAN TRAFIK UNTUK PEMBINAAN MRT SSP SEPANJANG JALAN KEPONG (ARAH SUNGAI BULOH DAN ARAH JINJANG)

BEACH RESPONSE DUE TO THE PRESSURE EQUALIZATION MODULES (PEM) SYSTEM MOHD SHAHRIZAL BIN AB RAZAK. A project report submitted in fulfillment of the

28 OGOS PENUTUPAN PENUH LORONG SEPANJANG PERSIARAN DAGANG (ARAH SUNGAI BULOH DAN ARAH KEPONG)

1. LANJUTAN PENUTUPAN LORONG SEPANJANG JALAN KUALA SELANGOR (ARAH SUNGAI BULOH DAN ARAH KEPONG)

PENGUMUMAN TRAFIK MAKLUMAN TERKINI PELAN PENGURUSAN TRAFIK UNTUK PEMBINAAN MRT SSP SEPANJANG JALAN KEPONG GARDEN DAN JALAN ST. THOMAS 20 DISEMBER 2018

1. LANJUTAN PENUTUPAN LORONG DI JALAN CEMPAKA, BANDAR SRI DAMANSARA

MAKLUMAN TERKINI PELAN PENGURUSAN TRAFIK UNTUK PEMBINAAN MRT SSP SEPANJANG BANDAR SRI DAMANSARA & LEBUHRAYA SUNGAI BESI 23 NOVEMBER 2018

LAPORAN PERKEMBANGAN KAJIAN KEBERKESANAN SISTEM PEMASA PENYAMAN UDARA

PENGUMUMAN TRAFIK MAKLUMAN TERKINI PELAN PENGURUSAN TRAFIK UNTUK PEMBINAAN MRT SSP SEPANJANG LEBUHRAYA BESRAYA & SERI KEMBANGAN 20 OGOS 2018

06 APRIL Untuk maklumat lanjut sila rujuk peta di bawah.

MODELLING COASTAL VULNERABILITY INDEX TO SEA LEVEL RISE FOR THE EAST COAST OF PENINSULAR MALAYSIA ISFARITA BINTI ISMAIL

Nota: Pelajar hendaklah mengikuti skema pengajian yang disediakan berdasarkan keputusan MUET (atau yang setara) setiap semester.

RDG 336 Interior Design Professional Practice [Amalan Profesional Rekabentuk Dalaman]

MALAYSIA AIRPORTS HOLDINGS BERHAD. TENDER NOTICE (Via eprocurement)

Penggunaan Algoritma Genetik bagi Menentukur Model Anjakan Mod Pengangkutan

13 months 4.25% Min RM25,000 to RM10 mil

Contoh 7.3 ( Jenis pinjaman ke-7 / SPPI / Ubahsuai rumah / Pembelian dengan pemaju )

PERAMALAN INDEKS KUALITI AIR DI TASIK CHINI DENGAN MENGGUNAKAN KAEDAH POHON KEPUTUSAN

BAB 4 PENEMUAN KAJIAN. permulaannya bab ini akan menerangkan profil atau karakteristik responden

PERAMALAN INDEKS KUALITI AIR DI TASIK CHINI DENGAN MENGGUNAKAN KAEDAH POHON KEPUTUSAN

Kaedah Relatif Untuk Penentuan Nilai Pembetulan Medan Bebas Mikrofon Pengukuran Bunyi

MANUAL PENGGUNA (USER GUIDE MANUAL) PERMOHONAN PENDAHULUAN PERJALANAN MELALUI PORTAL MYUPSI (TRAVELLING ADVANCEMENT APPLICATION USING MYUPSI PORTAL)

PROBLEM-2: MEDAN MAGNET

PER: TAWARAN PROMOSI UNTUK PASANGAN DAN PENAMBAHBAIKAN KEMUDAHAN OLEH MALAYSIA AIRLINES (MAS) KEPADA KAKITANGAN KERAJAAN

TERMS & CONDITIONS: PLAZA PREMIUM LOUNGE ACCESS

11H 09M NEW ZEALAND PULAU UTARA + PULAU SELATAN (ALL IN HALFBOARD)

GARIS PANDUAN TUNTUTAN BAYARAN PROGRAM LUAR (PESISIR) / KHAS

CENTRALISED INFORMATION MANAGEMENT SYSTEM (CIMS) PENDAFTARAN KONTRAKTOR TEMPATAN (Permohonan Pembaharuan PPK, SPPK, STB) MANUAL PENGGUNA V 1.

SISTEM TUNTUTAN PERJALANAN ONLINE PEMBANTU PENYELIDIK UKM

PERAMALAN KUALITI AIR DI TASIK CHINI MENGGUNAKAN MODEL RANGKAIAN NEURAL BUATAN

Di dalam praktikal ini, perhatikan fasa bulan mula daripada bulan baru hingga bulan purnama.

MEDIA COVERAGE. TITLE : Scomi nets RM9.73 million profit in first quarter. : New Straits Times. COMPANY : Scomi Group Bhd DATE : 26 August 2015

PEMBANDARAN, PERUBAHAN ATMOSFERA BANDAR DAN PERSEPSI MANUSIA DI BANDARAYA IPOH, PERAK

TERMS & CONDITIONS. RHB Plaza Premium Lounge Program 2019

PERAMALAN KUALITI AIR DI TASIK CHINI MENGGUNAKAN MODEL RANGKAIAN NEURAL BUATAN

PEMELIHARAAN DAN PEMULIHARAAN ALAM SEKITAR. memantulkan sinaran cahaya matahari untuk mengelakkan kesan rumah hijau

ALGORITHM TO PREVENT AND DETECT INSIDER MULTI TRANSACTION MALICIOUS ACTIVITY IN DATABASE SEYYED MOJTABA DASHTI KHAVIDAKI

Terms and Conditions for Park, Shop & Win Rewards with Watsons Touch n Go Card

PERINTAH KAWALAN HARGA DAN ANTIPENCATUTAN (PENANDAAN CAJ PERKHIDMATAN BAGI HOTEL DAN RESTORAN) 2015

GARIS PANDUAN TUNTUTAN BAYARAN PROGRAM LUAR (PESISIR) / KHAS

PANDUAN KIRA KELAYAKAN DAN ISI BORANG SECARA ONLINE

PANDUAN KIRA KELAYAKAN DAN ISI BORANG SECARA ONLINE

BAB 5 RUMUSAN DAN CADANGAN. Bab ini akan membincangkan hasil penemuan daripada ujian yang

ISI KANDUNGAN BAB KANDUNGAN MUKASURAT PENGENALAN DAN LATAR BELAKANG ORGANISASI

SENARIO INDUSTRI PELANCONGAN DI MALAYSIA & PELUANG BUSINES PELANCONGAN UNTUK KOPERASI

Journal of Sports Science and Physical Education, Malaysia ISSN: Abstract

KESAN FOKUS LUARAN DAN DALAMAN KE ATAS ANGKATAN PRESS BEHIND NECK ATLET ANGKAT BERAT

PENJADUALAN SEMULA JADUAL AUDIT DALAMAN 2015, MS ISO/IEC 27001:2013 (Pindaan pada 17 November 2015)

GUNATANAB BANDAR : SISTEM PENYEDIAAN LETAK KERETA BANDAR SANDAKAN

Penilaian terhadap kedatangan pelancong antarabangsa ke kepulauan Malaysia

KAJIAN KE ATAS KUALITI UDARA DALAMAN KOC TREN BAGI PERKHIDMATAN MONOREL DAN KOMUTER NAFHATUN AMIRRAH BINTI MOHAMED AZRI

TEMPAT MENARIK SYDNEY

ruhl v l Deformation Gharacteristics of Malaysian Fired Clay-Bricks for Masonry Structures by Assoc. Prof. Dr. Badorul Hisham Abu Bakar

Kajian Kecerahan Langit di ufuk

KOMPONEN DAN KOS BAGI KERJA-KERJA MENAIKTARAF LANDASAN KERETAPI KONVENSIONAL MOHD NOR BIN ISMAIL

PENGARUH KELEMBAPAN KE ATAS KEKERUHAN ATMOSFERA (I): KAEDAH

PENDEDAHAN MAKLUMAT KEWANGAN MENERUSI INTERNET: PRAKTIS DAN HUBUNGANNYA DENGAN PENENTU SYARIKAT. MOHD NOOR AZLI BIN ALI KHAN

REKABENTUK DAN PEMBANGUNAN ALMANAK BERDASARKAN EPOK J2000.0

eclaims - Gambaran Keseluruhan

10H 8M MESIR&THURSINA DENGAN PENGINAPAN HOTEL 4**** Harga dari RM5790

Integrasi Kaedah Geospatial dan Pemodelan Hidrodinamik untuk Mengkaji Impak Kenaikan Aras Laut Terhadap Kawasan Pantai

KOS KITARAN HAYAT TAPAK TELEKOMUNIKASI JENIS GREENFIELD SHEIKH MOHD SHAHRIEN BIN SHEIKH RAZMAN UNIVERSITI TEKNOLOGI MALAYSIA

Welcome all of you to the Club 3 rd Annual General Meeting 24 th March 2012 Kim Hee Restaurant Butterworth

PROGRAM PENGAJIAN PRASISWAZAH

Kajian Kualiti Hidup Masyarakat Nelayan Pesisir Pantai Negeri Kedah A study of Quality of Life of Coastal Malay community in Kedah

PEMETAAN KEPEKATAN OKSIGEN TERLARUT DALAM TASIK REKREASI TAMAN TASIK TAIPING, PERAK

5. Keistimewaan Kad Infinite UOBM adalah seperti berikut:- Mata Ganjaran 5X UNIRinggit untuk Perbelanjaan di Luar Negara;

Nanyang. Celebrating together in Nanyang. see pages 4 and 5. Chua Chu Kang

Building a better Hong Kah North

AMALI : BULAN. Tajuk : Terbit dan Terbenam Bulan. Tujuan Amali : Mengkaji perubahan fasa-fasa bulan. Pernyataan masalah:

Preliminary Survey Finding of The Built and Living Environment In Camp 5,Pulau Jerejak Settlement

vii. 1. MAKLUMAT PROGRAM

Bukit Gombak. Standing shoulder to shoulder in Bukit Gombak. see pages 4 and 5. Chua Chu Kang

APLIKASI MUDAH ALIH TRAVELER DIARY. Mishalany Murthy Dr. Umi Asma Mokthar. Fakulti Teknologi & Sains Maklumat, Universiti Kebangsaan Malaysia ABSTRAK

Fakulti 8ains Kognitif dan Pembangunan Manusia

Impak Pembangunan Pelancongan ke atas Persekitaran Manusia dan Fizikal Komuniti Pulau Tioman

============================================================================

UNIT JAMINAN KUALITI FAKULTI SAINS SOSIAL DAN KEMANUSIAAN

HERITAGE TRAIL PLANNING IN MELAKA HISTORIC CITY : ITS POTENTIAL OBJECTIVES, THEMES AND TARGET USERS LAI SIN YEE

"UniMAP : Persepsi dan Impak Ekonomi Perlis"

GARIS PANDUAN INDUSTRI PEMBETUNGAN MALAYSIA

TREND PENUAAN PENDUDUK: SATU SOROTAN KARYA

RHB BANK BERHAD PLATINUM CREDIT CARD - GENERAL TERMS AND CONDITIONS (EEFECTIVE 1 SEPTEMBER 2018)

KEBERKESANAN JAWATANKUASA AUDIT DAN FUNGSI AUDIT DALAMAN TERHADAP KEBERKESANAN PENGURUSAN RISIKO ENTERPRISE

PAKEJ ELEx (ENGLISH LANGUAGE EXPERIENCE) PUSAT PEMAJUAN KOMPETENSI BAHASA Centre for the Advancement of Language Competence (CALC)

TERMS AND CONDITIONS

... ' ' HAt< Mtllt< PUPimAWM SULTAM~H NUR laitlt\r UKl. tcsis

GARIS PANDUAN TUNTUTAN BAYARAN PROGRAM LUAR (PESISIR) / KHAS

UNIVERSITI PUTRA MALAYSIA. PREVALENCE OF Vibrio cholerae IN COCKLES IN SELANGOR AND PAHANG, MALAYSIA

RHB PRIVACY NOTICE FOR NEW CUSTOMERS NOTIS PRIVASI RHB UNTUK PELANGGAN-PELANGGAN BARU

FAKTOR TARIKAN PELANCONGAN PANTAI: KAJIAN KES DI PANTAI IRAMA BACHOK, KELANTAN

ANUGERAH KUALITI SIRIM 2014

Jurnal Hadhari Special Edition (2012)

PEMBANGUNAN APLIKASI TELEFON PINTAR BAGI PERKONGSIAN TEMPAT MAKAN DI MALAYSIA UNTUK PLATFORM ANDROID (Jom Makan) NOR ROSMIZA BINTI WAHAB

Panduan Pengguna Disediakan Oleh

KESAN SUMBER FITOPLANKTON DAN SISTEM TERNAKAN YANG BERBEZA TERHADAP TUMBESARAN DAN KEMANDIRIAN TIRAM JUVENIL (Crassostrea iredalei) FAUSTINO

PENGARUH KELEMBAPAN KE ATAS KEKERUHAN ATMOSFERA (11): ANALISIS DATA

FAKTOR-FAKTOR YANG MEMPENGARUHI PENGUSAHA SEK LAPIS SARAWAK DI RUCHING MENGINOVASIKAN PENGELUARAN

EDU PELANCONGAN TASIK CHINI MELALUI LAWATAN MAYA

Transcription:

UNIVERSITI SAINS MALAYSIA Second Semester Examination 2010/2011 Academic Session April/May 2011 EAL 335/4 Highway & Transportation Engineering [Kejuruteraan Pengangkutan dan Lalulintas] Duration: 3 hours Masa : 3 jam Please check that this examination paper consists of EIGHTEEN (18) pages of printed material before you begin the examination. [Sila pastikan bahawa kertas peperiksaan ini mengandungi LAPAN BELAS (18) muka surat yang bercetak sebelum anda memulakan peperiksaan ini.] Instructions : This paper contains SIX (6) questions. Answer FIVE (5) questions. [Arahan : Kertas ini mengandungi EN (6) soalan. Jawab LIMA (5) soalan. You may answer the question either in Bahasa Malaysia or English. [Anda dibenarkan menjawab soalan sama ada dalam Bahasa Malaysia atau Bahasa Inggeris]. All questions MUST BE answered on a new page. [Semua soalan MESTILAH dijawab pada muka surat baru]. In the event of any discrepancies, the English version shall be used. [Sekiranya terdapat percanggahan pada soalan peperiksaan, versi Bahasa Inggeris akan diguna pakai]....2/-

- 2-1. (a) Explain in detail THREE (3) applications of speed based on a speed study. [6 marks] A traffic survey was conducted at Jalan Perkasa, which is a multilane road, to determine the relationship of space mean speed, flow and density. Results of the study are shown in Table 1. Assuming the relationship between speed and density is linear, by plotting the speed-density graph determine: (i) free-flow speed (ii) jam density (iii) the maximum flow (per lane) for Jalan Perkasa Table 1: Results of study at Jalan Perkasa Space mean speed (km/hr) Flow (pcu/hr/lane) 47.8 1350 52.6 1360 50.5 1318 49.8 1358 44.3 1360 45.7 1320 55.2 1307 60.7 1140 57.8 1240 62.4 1105 [7 marks] (c) If Jalan Perkasa is a two-lane per direction road and is currently experiencing bottleneck situation at a section of the road, in which one lane is closed for traffic due to construction work, determine the speed of vehicles at that section of road if the maximum flow at that bottleneck section is 1100 pcu/hr/ln and average headway for passenger cars at almost standstill position is 5.5m. Use Greenshield s Model to solve the problem [7 marks] 2. (a) Discuss briefly FOUR (4) factors which influence the capacity of a signalised intersection [4 marks] A signalized intersection located at Jalan Intan with the junction configuration as shown in Figure 1 is proposed. The hourly design volume during year 2011 is as shown in Table 2 and the proposed traffic signal phasing is shown in Figure 2. Annual growth rate is 5.5% and assume amber time = 3 s and all-red interval = 2 s. (i) (ii) (iii) (iv) (v) Sketch the ring diagram. Calculate saturation flow based on Arahan Teknik (Jalan) method using the information in Table 3, 4, 5 and 6. Determine minimum cycle length that will avoid oversaturation. Design for the traffic signal for year 2021 based on Highway Capacity Manual method using: X c = 0.90 X c = 0.95 Sketch the signal timing distribution diagram based on both values of X c and discuss on the differences. [16 marks]...3/-

- 3 - West 3.5 m 3.5 m 3.0 m East South 3.2 m 3.4 m Level gradient for all approaches Turning radius = 8 m Figure 1: Junction layout Table 2: Design hourly volume (existing-year 2011) Approach Direction Flow (pcu/hr) South East West Left-turn 155 Right-turn 214 Left-turn 52 Straight through 295 Straight through 112 Right-turn 245 Figure 2: Phasing diagram Table 3: Relationship between effective lane width and saturation flow Lane width, w (m) Saturation flow, S (pcu/hr) 3.0 1845 3.25 1860 3.5 1885 3.75 1915 4.0 1965 4.25 2075 4.5 2210 4.75 2375 5.0 2560 5.25 2760...4/-

- 4 - Table 4: Correction factor for the effect of gradient Fg Gradient 0.85 For upward slope of 5% (+5%) 0.88 For upward slope of 4% (+4%) 0.91 For upward slope of 3% (+3%) 0.94 For upward slope of 2% (+2%) 0.97 For upward slope of 1% (+1%) 1.00 For level gradient (0%) 1.03 For downward slope of 1% (-1%) 1.06 For downward slope of 2% (-2%) 1.09 For downward slope of 3% (-3%) 1.12 For downward slope of 4% (-4%) 1.15 For downward slope of 5% (-5%) Table 5: Correction factor for the effect of turning radius Ft Turning radius, R 0.85 R < 10 m 0.90 10 m < R < 15 m 0.96 15 m < R < 30 m Table 6: Correction factor for turning traffic % turning traffic Factor for right-turn, F r Factor for left-turn, F l 5 0.96 1.00 10 0.93 1.00 15 0.90 0.99 20 0.87 0.98 25 0.84 0.97 30 0.82 0.95 35 0.79 0.94 40 0.77 0.93 45 0.75 0.92 50 0.73 0.91 55 0.71 0.90 60 0.69 0.89 3. (a) Give THREE (3) advantages and THREE (3) disadvantages of signalised intersections. [6 marks] You are given a project to assess the traffic impact surrounding USM, Engineering Campus due to a housing scheme (Taman Impian) which will be built beside Taman Pekaka (opposite USM) as shown in Figure 3. The proposed development can be accessed through a signalised intersection which is Junction C as well as through a small road from Taman Pekaka. The housing scheme is expected to be completed by year 2015. Table 7 shows the proposed development...5/-

- 5 - Figure 3: Schematic plan of proposed development Table 7: Proposed development No. Land use Unit 1 Terrace house 215 units 2 Flat 60 units 3 Supermarket 100 tsf (i) By using the trip generation information from Table 8 which was extracted from Trip Generation Manual, Malaysia, 2010, estimate the trips generated and attracted by the proposed development for both peak and peak periods using regression equation and average rate. Explain the differences between the trips estimated based on regression equation and average rate. Also, give recommendations as which values should be used. [8 marks] Table 8: Trip generation information (Trip Generation Manual, Malaysia, 2010) No. Land use Time Regression equation Rate 1 Terrace house 2 Flat 3 Supermarket T = 0.6316 (x) + 25.8197 T = 0.6416 (x) + 14.0177 T = 0.2661 (x) + 33.6072 T = 0.2352 (x) + 32.8120 T = 3.4852 (x) + 54.0000 T = 3.8326 (x) + 112.5600 0.78 0.76 0.48 0.45 8.79 11.47 Percent In Out 29 71 60 40 27 73 63 37 54 46 52 48 Pcu/veh 0.89 0.85 0.91 0.88 0.89 0.84 (ii) Based on the schematic plan of the proposed development shown in Figure 3, propose a detail plan for traffic survey [6 marks]...6/-

- 6-4. Trip generation is the first stage of Travel Demand Forecasting Process. The government plans to construct some facilities based on the current results of trip generation survey. Table 9 shows each model of trip generation and peak of each land use. Table 10 shows the number of units based on survey data during year 2010. If the units growth rate of each facilities is 15% per year, answer the followings: (a) Total trips in pcu/veh. of each land use of and peak in 2012. [4 marks] (c) (d) The and peak trip Attraction and Production in pcu/veh for each land use in 2012. [4 marks] If the total trip Production during the and peaks of each land use are equally distributed, determine total trips Attraction of each land use. [6 marks] If the total trips of and peak of Terrace house, Shop house and Detached/Semi-detached are the same at 500 units and total trips of and peak of Primary school and Secondary school are the same at 2000 student, determine the trip generation model and the total trips in pcu/veh. [6 marks] Table 9: Trip Generation Model Land use Peak Figures In % Out % pcu/ veh 1 Terrace house T = 0.75(x) + 22.6 T = 0.53(x) + 80.1 29 61 71 39 0.90 0.87 2 Shop house T= 8.06 (x) + 11.9 T= 10.68 (x) + 34.7 59 52 41 48 0.90 0.87 3 Detached/ Semi-detached T = 1.89(x) 20.9 T = 0.53(x) 23.1 42 56 58 44 0.88 0.91 4 Primary School T = 0.26(x) T = 0.23(x) 70 46 30 54 0.92 0.91 5 Secondary School T = 0.19(x) T = 0.17(x) 73 41 27 59 0.95 0.96 Table 10: Number of units of each land use Year 2010 Land use Var Unit 1 Terrace house Units 250 2 Semi Detached house Units 70 3 Shop houses Units 35 4 Primary School Students 1500 5 Secondary School Students 850...7/-

- 7-5. A trip distribution study was conducted at Pulau Pinang. The area has been divided into FOUR (4) zones (Teluk Bahang, Georgetown, USM main campus and Balik Pulau) and each zone is connected with other zones by highway network as shown in Figure 4. Annual growth rate of each zone are given in Table 11 and the number of trips between zones (year 2010) is shown in table 12. Using this information, answer the following questions: (a) Determine the trips of each zone for year 2012. [5 marks] (c) (d) Determine trips distribution of each zone using Fratar model with two iterations. [5 marks] Determine trips distribution of each zone using Average model with two iterations. [5 marks] Compare results and (c). Which model gives the most suitable result and give a brief comments. [5 marks] Tk. BAHANG GEORGETOWN BALIK PULAU USM MAIN CPUS TO BUTTERWORTH Figure 4: Link node network Table 11: Growth Rate of Zones Zone Growth Rate (%) per year Teluk Bahang 300 Georgetown 400 USM main campus 200 Balik Pulau 100...8/-

- 8 - Table 12: Trips at links at year during 2010 Links Present Trips (year 2010) Teluk Bahang - Georgetown 25 Teluk Bahang - USM main campus 50 Teluk Bahang - Balik Pulau 25 Georgetown - Teluk Bahang 25 Georgetown - USM main campus 150 Georgetown - Balik Pulau 75 USM main campus - Teluk Bahang 50 USM main campus - Georgetown 150 USM main campus - Balik Pulau 200 Balik Pulau - Teluk Bahang 25 Balik Pulau - Georgetown 75 Balik Pulau - USM main campus 200 6. The trips assignment study have been done in five centers in Perak. The centers are Taiping, Gopeng, Cameron Highlands, Batang Padang and Teluk Intan. Figure 5 shows link node network, while Table 13 shows cost per trip between centers and Table 14 shows number of trips from zone to other centers. Based on the above information: (a) Determine the minimum path (center to center) using the all-or-nothing method and draw the diagram. [4 marks] (c) Determine total trips of each individual link. Determine total cost of all trips. [4 marks] [5 marks] (d) TAIPING If all access of local road from and to Gopeng have to use toll highway with toll fee of RM 2.80 per trip, determine the minimum path and total trips of each individual link. [7 marks] CERON HIGHLANDS GOPENG TELUK INTAN BATANG PADANG Figure 5: Link node network...9/-

- 9 - Table 13: Cost per trips between centers (RM) Cost per trips Between Zones (RM) Zone Taiping Gopeng Cameron Batang Teluk Intan Highlands Padang Taiping 0 8 15 N.A 5 Gopeng 8 0 3 5 12 Cameron Highlands 15 3 0 7 N.A Batang Padang N.A 5 7 0 6 Teluk Intan 5 12 N.A 6 0 Table 14: Trips between centers Trips Between Zones Zone Taiping Gopeng Cameron Batang Teluk Intan Highlands Padang Taiping 0 50 60 70 30 Gopeng 40 0 30 60 80 Cameron Highlands 90 40 0 20 50 Batang Padang 80 70 90 0 30 Teluk Intan 30 40 50 60 0...10/-

- 10-1. (a) Terangkan secara terperinci TIGA (3) aplikasi laju berdasarkan satu kajian kelajuan. [6 markah] Satu kajian lalu lintas telah dijalan di Jalan Perkasa, iaitu satu jalan pelbagai lorong, untuk menentukan kehubungan antara laju min ruang, aliran dan ketumpatan. Keputusan kajian ditunjukkan dalam Jadual 1. Dengan menganggap hubungan antara laju dengan ketumpatan adalah lelurus, dengan plot graf laju-ketumpatan tentukan: (i) (ii) (iii) laju aliran bebas ketumpatan sesak aliran maksimum (per lorong) untuk Jalan Perkasa Jadual 1: Keputusan kajian di Jalan Perkasa Laju min ruang (km/j) Aliran (ukp/j/lorong) 47.8 1350 52.6 1360 50.5 1318 49.8 1358 44.3 1360 45.7 1320 55.2 1307 60.7 1140 57.8 1240 62.4 1105 [7 markah] (c) Sekiranya Jalan Perkasa merupakan jalan dua-lorong sehala yang sedang mengalami situasi pergentingan di sebahagian jalan, di mana satu lorong ditutup untuk laluan disebabkan oleh kerja-kerja pembinaan, tentukan kelajuan kenderaan pada bahagian jalan yang sedang mengalami pergentingan tersebut sekiranya aliran maksimum di bahagian genting ialah 1100 upk/j/lorong dan purata jarak kepala untuk kenderaan penumpang dalam keadaan berhenti adalah 5.5 m. Guna Model Greenshield untuk menyelesaikan masalah ini [7 markah] 2. (a) Terangkan secara ringkas EMPAT (4) faktor yang mempengaruhi kapasiti suatu persimpangan berlampu isyarat [4 markah] Satu persimpangan berlampu isyarat di Jalan Intan dengan konfigurasi simpang seperti yang ditunjukkan dalam Rajah 1 dicadangkan. Aliran rekabentuk jaman untuk tahun 2011 ditunjukkan dalam Jadual 2 dan fasa lampu isyarat yang dicadangkan ditunjukkan dalam Rajah 2. Kadar pertumbuhan tahunan adalah 5.5% dan anggap masa kuring = 3 s dan masasemua-merah = 2 s....11/-

(i) (ii) (iii) (iv) (v) - 11 - Lakarkan rajah cincin. Kira aliran tepu dengan berdasarkan kaedah Arahan Teknik (Jalan) method dengan menggunakan maklumat dalam Jadual 3, 4, 5 dan 6. Tentukan masa kitar minimum yang diperlukan untuk mengelak tepuan lebih. Rekabentuk lampu isyarat untuk tahun 2021 berdasarkan kepada kaedah Highway Capacity Manual dengan menggunakan: X c = 0.90 X c = 0.95 Lakarkan rajah agihan masa lampu isyarat dengan berdasarkan kedua-dua nila X c can bincangkan perbezaannya. [16 markah] Barat 3.5 m 3.5 m 3.0 m Timur Selatan Mendatar untuk semua jalan tuju Jejari belok = 8 m 3.2 m 3.4 m Rajah 1: Lakaran Simpang Jadual 2: Aliran rekabentuk jaman (tahun semasa-tahun 2011) Jalan tuju Arah pergerakan Aliran (ukp/j) Selatan Timur Barat Belok kiri 155 Belok kanan 214 Belok kiri 52 Terus 295 Terus 112 Belok kanan 245 Rajah 2: Gambarajah fasa...12/-

- 12 - Jadual 3: Hubungan antara lebar jalan berkesan dengan aliran tepu Lebar lorong, w (m) Aliran tepu, S (ukp/j) 3.0 1845 3.25 1860 3.5 1885 3.75 1915 4.0 1965 4.25 2075 4.5 2210 4.75 2375 5.0 2560 5.25 2760 Jadual 4: Faktor pembetulan untuk kesan gradien Fg Gradien 0.85 Untuk cerun menaik 5% (+5%) 0.88 Untuk cerun menaik 4% (+4%) 0.91 Untuk cerun menaik 3% (+3%) 0.94 Untuk cerun menaik 2% (+2%) 0.97 Untuk cerun menaik 1% (+1%) 1.00 Untuk kawasan mendatar (0%) 1.03 Untuk cerun menurun 1% (-1%) 1.06 Untuk cerun menurun 2% (-2%) 1.09 Untuk cerun menurun 3% (-3%) 1.12 Untuk cerun menurun 4% (-4%) 1.15 Untuk cerun menurun 5% (-5%) Jadual 5: Faktor pembetulan untuk kesan jejari membelok Ft Jejari membelok, R 0.85 R < 10 m 0.90 10 m < R < 15 m 0.96 15 m < R < 30 m Jadual 6: Faktor pembetulan untuk lalu lintas yang membelok % aliran lalu lintas membelok Faktor belok kanan, F r Faktor belok kiri, F l 5 0.96 1.00 10 0.93 1.00 15 0.90 0.99 20 0.87 0.98 25 0.84 0.97 30 0.82 0.95 35 0.79 0.94 40 0.77 0.93 45 0.75 0.92 50 0.73 0.91 55 0.71 0.90 60 0.69 0.89...13/-

- 13-3. (a) Berikan TIGA (3) kebaikan dan TIGA (3) keburukan persimpangan berlampu isyarat. [6 markah] Anda diberikan satu projek untuk mengkaji impak lalu lintas di sekitar Kampus Kejuruteraan, USM disebabkan oleh satu pembangunan kawasan perumahan di sebelah Taman Pekaka (berhadapan USM) seperti yang ditunjukkan dalam Rajah 3. Cadangan pembangunan boleh dicapai melalui satu persimpangan berlampu isyarat iaitu Simpang C dan juga melalui satu lorong kecil daripada Taman Pekaka. Kawasan perumahan tersebut dijangka siap pada tahun 2015. Jadual 7 menunjukkan pembangunan yang dicadangkan. Rajah 3: Pelan skema pembangunan yang dicadagkan Jadual 7: Cadangan pembangunan No. Guna tanah Unit 1 Rumah teres 215unit 2 Rumah Pangsa 60 unit 3 Pasaraya 100 tsf...14/-

- 14 - (i) Dengan menggunakan maklumat penjanaan perjalanan daripada Jadual 8 yang diambil daripada Manual Penjanaan Perjalanan, Malaysia, 2010, anggarkan perjalanan yang dijana dan ditarik oleh cadangan pembangunan tersebut untuk kedua-dua waktu puncak pagi dan waktu puncak petang dengan menggunakan persamaan regresi dan kadar. Terangkan perbezaan perjalanan yang dianggarkan berdasarkan persamaan regresi dan kadar. Juga, bagi cadangan nilai yang harus digunakan. [8 markah] Jadual 8: Maklumat penjanaan perjalanan (Manual Penjanaan Perjalanan, Malaysia, 2010) No. Guna tanah Waktu Persamaan regresi Kadar 1 Rumah teres 2 Rumah pangsa 3 Pasaraya T = 0.6316 (x) + 25.8197 T = 0.6416 (x) + 14.0177 T = 0.2661 (x) + 33.6072 T = 0.2352 (x) + 32.8120 T = 3.4852 (x) + 54.0000 T = 3.8326 (x) + 112.5600 0.78 0.76 0.48 0.45 8.79 11.47 Peratus Masuk Keluar 29 71 60 40 27 73 63 37 54 46 52 48 Ukp/ kend 0.89 0.85 0.91 0.88 0.89 0.84 (ii) Berdasarkan kepada pelan skematik cadangan pembangunan yang ditunjukkan dalam Rajah 3, cadangkan satu rancangan kajian lalu lintas yang terperinci [6 markah] 4. Penjanaan Perjalanan adalah tahap pertama dari Proses Peramalan Permintaan Perjalanan. Kerajaan bercadang untuk membina beberapa kemudahan berdasarkan hasil kajian penjanaan perjalanan. Jadual 1 menunjukkan masing-masing model dari penjanaan perjalanan waktu puncak pagi dan waktu puncak petang. Jadual 2 menunjukkan jumlah unit berdasarkan kajian pada tahun 2010. Jika kadar pertumbuhan unit masing-masing adalah 15% setiap tahun. Anda dikehendaki untuk menghitung: (a) (c) Jumlah perjalanan di smp/kend. waktu puncak pagi dan waktu puncak petang dari setiap guna lahan pada tahun 2012. [4 markah] Perjalanan "Pengeluaran" dan "Penarikan" waktu puncak pagi dan waktu puncak petang di smp/kend. dari setiap guna lahan pada tahun 2012. [4 markah] Apabila jumlah perjalanan "Pengeluaran" waktu puncak pagi dan waktu puncak petang setiap guna lahan teragih secara merata kepada unit lainnya, tentukan jumlah perjalanan "Penarikan" dari masing-masing guna lahan di smp/kend. [6 markah]...15/-

- 15 - (d) Jika jumlah perjalanan waktu puncak pagi dan waktu puncak petang bagi Rumah teres, Rumah kedai dan Rumah berkembar adalah sama pada 500 unit dan jumlah perjalanan waktu puncak pagi dan waktu puncak petang adalah sama bagi Sekolah rendah dan Sekolah menengah pada 2000 pelajar. Tentukan model penjanaan perjalanan dari waktu puncak pagi dan waktu puncak petang dan jumlah perjalanan waktu puncak pagi dan waktu puncak petang. [6 markah] Rajah 9: Model penjanaan perjalanan Guna lahan Puncak Model Masuk % Keluar % pcu/ veh 1 Rumah teres T = 0.75x + 22.6 T = 0.53 x + 80.1 29 61 71 39 0.90 0.87 2 Rumah kedai T= 8.06 x + 11.9 T= 10.68 x + 34.7 59 52 41 48 0.90 0.87 3 Rumah berkembar T = 1.89x 20.9 T = 0.53x 23.1 42 56 58 44 0.88 0.91 4 Sekolah rendah T = 0.26x 70 30 0.92 T = 0.23x 46 54 0.91 5 Sekolah menengah T = 0.19x T = 0.17x 73 41 27 59 0.95 0.96 Rajah 10: Jumlah unit guna lahan Tahun 2010 Guna lahan Var Unit 1 Rumah teres Unit 250 2 Rumah berkembar Unit 70 3 Rumah kedai Unit 35 4 Sekolah rendah Pelajar 1500 5 Sekolah menengah Pelajar 850 5. Satu kajian pengagihan perjalanan telah dijalankan di Pulau Pinang. Daerah ini telah dibahagikan kepada EMPAT (4) zon (Teluk Bahang, Georgetown, kampus USM utama dan Balik Pulau) dan setiap zon bersambung dengan zon yang lain dengan rangkaian lebuhraya seperti terlihat dalam Rajah 4. Kadar pertumbuhan untuk setiap zon diberikan dalam Jadual 11 dan jumlah perjalanan antara zon (tahun 2010) diberikan dalam Jadual 12. Dengan menggunakan maklumat ini, anda dikehendaki menjawab soalan-soalan berikut:...16/-

- 16 - (a) Tentukan jumlah perjalanan setiap zon pada tahun 2012. [5 markah] Tentukan pengagihan perjalanan setiap zon menggunakan model Fratar dengan dua ulangan. [5 markah] (c) Tentukan pengagihan perjalanan setiap zon menggunakan model rata-rata dengan dua ulangan. [5 markah] (d) Bandingkan hasil dan (c). Mana satukah yang memberikan hasil paling sesuai dan berikan komen secara ringkas. [5 markah] Tk. BAHANG GEORGETOWN BALIK PULAU USM MAIN CPUS TO BUTTERWORTH Rajah 4: Sambungan titik temuan rangkaian Jadual 11: Kadar pertumbuhan zon Zon Kadar pertumbuhan (%) setiap tahun Teluk Bahang 300 Georgetown 400 USM kampus induk 200 Balik Pulau 100...17/-

- 17 - Jadual 12: Perjalanan pada sambungan untuk tahun 2010 Sambungan Perjalanan terkini (tahun 2010) Teluk Bahang - Georgetown 25 Teluk Bahang - USM kampus induk 50 Teluk Bahang - Balik Pulau 25 Georgetown - Teluk Bahang 25 Georgetown - USM kampus induk 150 Georgetown - Balik Pulau 75 USM kampus induk - Teluk Bahang 50 USM kampus induk - Georgetown 150 USM kampus induk - Balik Pulau 200 Balik Pulau - Teluk Bahang 25 Balik Pulau - Georgetown 75 Balik Pulau - USM kampus induk 200 6. Kajian pengumpukan perjalanan telah dijalankan di lima pusat bandar di Perak. Pusat-pusat bandar iaitu Taiping, Gopeng, Cameron Highlands, Batang Padang dan Teluk Intan. Rajah 2 menunjukkan sambungan rangkaian, Jadual 5 menunjukkan kos perjalanan antara pusat bandar dan jadual 6 menunjukkan jumlah perjalanan dari pusat bandar ke pusat bandar yang lain. Berdasarkan maklumat ini: (a) Tentukan laluan minimum (pusat ke pusat) dengan menggunakan kaedah pengumpukan Semua-atau-Tiada dan gambarkan lakaran. [4 markah] (c) Tentukan Jumlah perjalanan setiap rangkaian individu. Tentukan jumlah harga dari semua perjalanan. [4 markah] [5 markah] (d) Jika semua akses jalan lokal dari dan kepada Gopeng mesti melalui jalan raya tol dengan bayaran RM 2.80 setiap perjalanan, tentukan laluan minimum dan jumlah perjalanan setiap rangkaian individu. [7 markah] TAIPING CERON HIGHLANDS GOPENG TELUK INTAN BATANG PADANG Rajah 5: Sambungan titik temuan rangkaian...18/-

- 18 - Jadual 13: Harga bagi setiap perjalanan antara pusat (RM) Zon Kos setiap perjalanan antara zon (RM) Taiping Gopeng Cameron Highlands Batang Padang Teluk Intan Taiping 0 8 15 N.A 5 Gopeng 8 0 3 5 12 Cameron Highlands 15 3 0 7 N.A Batang Padang N.A 5 7 0 6 Teluk Intan 5 12 N.A 6 0 Jadual 14: Jumlah perjalanan antara pusat Zon Perjalanan antara zon Taiping Gopeng Cameron Highlands Batang Padang Teluk Intan Taiping 0 50 60 70 30 Gopeng 40 0 30 60 80 Cameron Highlands 90 40 0 20 50 Batang Padang 80 70 90 0 30 Teluk Intan 30 40 50 60 0 ooooooooo