USDA TRAILS STRATEGY PROGRAM

Similar documents
USDA Trails Strategy WRI: ENGLISH PEAK SURVEY. Theodore Mendoza San Diego State University June 6 th 2016 August 18 th Advisor: Sam Commarto

Kit Carson-Challenger Ridge Trail Project

Non-motorized Trail Plan & Proposal. August 8, 2014

Trail Assessment Report

American Conservation Experience

RE: Access Fund Comments on Yosemite National Park Wilderness Stewardship Plan, Preliminary Ideas and Concepts

FINAL TESTIMONY 1 COMMITTEE ON RESOURCES UNITED STATES HOUSE OF REPRESENTATIVES. July 13, 2005 CONCERNING. Motorized Recreational Use of Federal Lands

Appendix C. Tenderfoot Mountain Trail System. Road and Trail Rehabilitation Plan

Los Padres National Forest: Santa Barbara Ranger District. Water Resources Projects Final Report

Kennesaw Mountain Trail Club. Trail Skills Workshop ~ Dips and Drains. Presented by: Jay M Dement

Jericho Research Forest Recreational Trail Mapping and Assessment. Prepared for the University of Vermont Natural Areas

DECISION MEMO. Rawhide Trail #7073 Maintenance and Reconstruction

Peter Axelson. Beneficial Designs, Inc. Minden, NV

ADOPT-A-TRAIL MANUAL C. Bailey-May

ROAD AND TRAIL PROJECT APPROVAL

Decision Memo Broken Wheel Ranch Equestrian Outfitter Special-Use Permit Proposed Action

Tracy Ridge Shared Use Trails and Plan Amendment Project

GOLDEN EARS PROVINCIAL PARK

Hiking Las Vegas.com

2012 Squaw Butte Trail Warriors

September 14, Comments of the Colorado Trail Foundation On the USFS Scoping Notice of August 13, 2010 RE: the relocation of the CDNST/CT Page 1

Response to Public Comments

PROPOSED ACTION South 3000 East Salt Lake City, UT United States Department of Agriculture

Appalachian Trail Sustainability Research Study

MIDDLE SCHOOL CURRICULUM TR AILING ICE AGE M YST ERI E S SEARCHING GLACIAL FEATURES

RE: Extreme Avalanche Hazard at New Jumbo Glacier Resort (JGR) Daylodge Building Site

April 19-21, See below for Course Descriptions. Columbia Cascades Trail Skills College Cascades Locks, Oregon.

Bear Creek Habitat Improvement Project

Kit Carson-Challenger Ridge Trail Project Annual Performance Report-2014 October 22, 2014

SEGMENT ASSESSMENT REPORT

Photopoint Monitoring in the Adirondack Alpine Zone

2.0 PARK VISION AND ROLES

Itinerary Overview. Colorado San Juan Mountaineering 15-days

Itinerary Overview. Continental Divide Alpine Backpacking 22 days Ages Course Description

Allagash Wilderness Waterway Tramway Carry NFCT Waterway Work Trip July 15-17

Environment and Natural Resources Trust Fund 2017 Request for Proposals (RFP)

Itinerary Overview. Sangre de Cristo Alpine Backpacking 22 days Ages Course Description

Logo Department Name Agency Organization Organization Address Information 5700 North Sabino Canyon Road

White Mountain National Forest

MASTER PLAN EXECUTIVE SUMMARY

USDA Forest Service Deschutes National Forest DECISION MEMO. Round Lake Christian Camp Master Plan for Reconstruction and New Facilities

Appendix 1: Best Management Practices For Hang Gliding and Paragliding in Jasper National Parks

Decision Memo for Desolation Trail: Mill D to Desolation Lake Trail Relocation

Daisy Dean Trail 628/619 ATV Trail Construction

APPENDIX D: SUSTAINABLE TRAIL DESIGN. APPENDICES Town of Chili Parks and Recreation Master Plan Update

PROPOSED PARK ALTERNATIVES

A GIS Analysis of Probable High Recreation Use Areas in Three Sisters Wilderness Deschutes and Willamette National Forests

Sierra National Forest

Itinerary Overview. Maroon Bells Mountaineering 22-days. Course Description

Thank you for the opportunity to comment on the proposed action to add trails and trailheads to the Red Rock District trail system.

Guthega to Mt Twynam. 2183m. 1583m. 6 hrs 45 mins 14.8 km Return. Experienced only. 913m

Itinerary Overview: What you will be doing Maroon Bells Alpine Backpacking 22 days

Colorado s forests are slated to lose thousands of miles of roads through the new OHV Route Designation process. DON T LET IT HAPPEN!

White Mountain National Forest. Campton Day Use Area Development Project. Scoping Report. Prepared by the Pemigewasset Ranger District May 2013

Itinerary Overview. Sawatch Range Mountaineering Ages days

Colorado Mountain Club 2015 Stewardship Team Program Accomplishments

Part 1: Introduction to Decision Making

Bradley Brook Relocation Project. Scoping Notice. Saco Ranger District. United States Department of Agriculture Forest Service

Eco Explorer. Steps. Purpose

Internship Announcement. Mount Rainier National Park. NPS Academy Internships 6 Positions. Please Respond By April 15, 2019

2017 EMPLOYEE SATISFACTION SURVEY RESULTS

To: Cam Hooley From: Trails 2000 Date: September 30, 2016 Re: Hermosa Comments. Dear Cam:

Itinerary Overview and Travel Information: 15-Day Alaska Alpine Backpacking Course for Adults

KENNESAW MOUNTAIN TRAIL CLUB WORKDAY

Table of Contents. page 3 Long term Goals Project Scope Project History. 4 User Groups Defined Trail Representative Committee. 5 Trail Users Breakdown

Survey of Littleton Down

MUNICIPALITY OF ANCHORAGE

Mission. Purpose. Idaho Trails Association promotes the continued enjoyment of Idaho s hiking trails.

2019 Work Week Crew. Schedule and Descriptions

Submission on the Tukituki Catchment Proposal: EPA reference numbers; NSP 13/ , NSP 13/ , NSP 13/ , NSP 13/02.

Decision Memo for Philmont Scout Ranch Bike Trail and Access Reroute Project

Bear Creek Watershed Restoration Project Final Project Report December 21, 2016

Grizzly Peak A - East Ridge July 15, 2012

National Strategy for a Sustainable Trail System

Hiking Las Vegas.com

Mikaela Weisse Scott Kloeck-Jenson Fellowship report Travel Award (2014) Lima, Peru

David Johnson. Tom, Attached please find the final scoping letter and figures for your review. David

Analysis and design of road and bridge infrastructure database using online system

Coast to Crest Trail Corridor Hike

Central Cascades Wilderness Strategies Project

Geoscape Toronto The Oak Ridges Moraine Activity 2 - Page 1 of 10 Information Bulletin

TRANSMITTAL. Please contact me with any questions. 7 Spruce Road, Freeport, ME T: (207)

CENTER PIVOT TRACK MANAGEMENT OPTIONS

Understanding user expectations And planning for long term sustainability 1

Finally it was unloaded from the power carrier and moved into place using rock bars and brute strength.

Mt. Hood National Forest

Appendix A. Tenderfoot Mountain Motorcycle Trail System. Maintenance and Construction Plan (6/13/13)

Final Research Progress Report: 9 August 2011

Friends of Petrified Forest National Park

Course Description. North Cascades Alpine Backpacking for Veterans

Trail Beginning Elevation: 7553 ft The Poison Creek Trailhead is located at the end of National Forest Road 646E (NF-646E).

Aviation Operations. Program Learning Outcomes. Program Description. Career Options

Backpacking Trip Planning. Presenters: Dana Perry Christine Fogarty

MOUNTAIN BIKING THE CASCADE LOOP

ROPE Outdoor Trip Leader

DRONING FOR INFORMATION

Marble: 7:09 am Creede: 1:01 pm Today s Airtime: 5.8 hrs Cartographic length 351 miles. Total PIC Time: Total Logged Time 1623.

LEAVE NO TRACE CENTER FOR OUTDOOR ETHICS CONSULTING SERVICES

Installing a Drainage Chimney. Written by Nevin Sunday, 28 May :35 - Last Updated Tuesday, 18 July :52

Franklin Falls. NFCT Waterway Work Trip July Introduction: Driving directions and meeting location: Camping and lodging: Food:

Transcription:

USDA TRAILS STRATEGY PROGRAM WRPI Program: English Peak Survey Jorge D. Briceño Southwestern Community College Internship Time Period: June 6, 2016 August 8, 2016 Advisor: Sam Commarto Recreation Officer United States Forest Service Report Submission:

Table of Contents USDA Trails Strategy Program Acknowledgments 2 Executive Summary 3 Project Objectives 4 Project Approach 5 Project Outcomes 6 Conclusion 7 Appendices 8 Page 1

Acknowledgements This project was supported by Hispanic-Serving Institution s Education Program Grant no. 2015-38422- 24058 from the USDA National Institute of Food and Agriculture." I would like to thank the wonderful people in the Klamath National Forest of the Scott/Salmon River District for being so open to all my questions, and for trying to be the best mentors possible. I would like to thank Joe Grey, Ellen, Sam Commarto, Dan Hendrickson, and Allen Schroder in particular for making my internship a fun and exciting learning experience. Page 2

USDA Trails Strategy Program Executive Summary Being a part of the Trails Strategy Program in the Klamath National Forest involved making plans for future trail development/maintenance, using GPS/GIS software, and doing trail work with watershed always in mind. To get an idea of what is involved in trail maintenance, I was sent out with a back country trails crew. Going out with a crew and doing work on a trail gave a really good perspective on estimating how long a project would take, what tools are needed, how many people are required for the job, and how long a job would take. Reports like these help the Forest Service estimate a trail crews capabilities in a limited amount of time, and are also helpful for other agencies to see when contracting employees to estimate cost and workload. The trail reports are also very important for funding when proposals are made to the agency for money and materials. Another part of my job as an intern was to analyze trails and make a report on what things needed to be done to maintain the trail for future generations. Page 3

Project Objectives Accompanied by a GPS, I was able to go on a trail ready to take pictures and make waypoints on a GIS created map to geo-locate points of interest. This included noting rare plant species, invasive plant species, and also points that require any kind of maintenance. My trip to survey English Peak was one of my most information packed surveys. Large gulley s are being formed by the water coming down a large slope that is a drainage bowl for rain and snowfall. The objectives of this project were to stay overnight at English Peak in order to GPS waypoint and track where some of the larger gulley s are forming. These gulley s start as small ruts and form large gulley s where the water has the potential to move fast and cause a lot of erosion. This is a high priority area due to the rare high mountain meadows of the Klamath, and because of an important trail to get to a fire lookout at English Peak. A new drainage plan is to be made with the information gathered from this survey in order to protect the trail and the meadow below the drainage. All the ruts and gulley s drain into a rare high mountain meadow near English Peak and is in danger of being destroyed by water running too rapidly, thus creating large ruts. Rare plant species that live in symbiotic relationships are being wiped out in the Klamath due to over growth of conifers and watershed problems. These high mountain meadows of the Klamath are not only important because of the diversity of plants, but also for the ability of these meadows to spread water out over a large area. Spreading water as it comes down a mountain gives the soil some time to absorb the water coming down the mountain. When the water spreads out, it also loses velocity, causing less erosion to trails below. Erosion is a huge problem in the Klamath due to it s rugged, steep terrain so there is quite an effort being made to protect these meadows. The goals for this project was to gather information about the gulley s, mark where they are affecting trail, and try to come up with possible culprits for the erosion being done. All the goals were met in a two-day trip to English Peak since the drainage bowl watershed did not cover too much ground. My major is in Forest Management and Protection, so learning about how the watershed affects the trails and surrounding landscape is critical to me. Watershed is especially important to me living in San Diego since there is not much thought put into watershed here in San Diego and I see it regularly as an avid mountain biker and member of the San Diego Mountain Bike Association. Since it does not rain often, people tend to think it never rains, but when it does, it really shows the trail who is boss out here; that is nature. I was interested in this internship due to these reasons of wanting to make forest protection a career, and trail building a hobby while mountain biking. These goals have only been strengthened with the knowledge I have learned during my time in the Klamath National Forest. I was able to do everything I was told I was going to do in my internship thanks to my great supervisor/advisor Sam Commarto. My goals were to learn how to build a good trail with watershed and future generations in mind and those goals were met. I still wish I could do some more surveying and do a little more report making though, just to see what doing paperwork for the Forest Service is like in a management type position. Page 4

Project Approach In order to mark waypoints and make tracks of the ruts, my partner and I were given a tablet to record points of interest. Points of interest included areas of high erosion, fallen trees, rare trees/plant species, and most importantly, watershed. Watershed is one of the most important things in the Klamath National Forest due to its topography. My partner and I were always thinking about whether something is going to have an effect on the trail, and if so, how can we minimize that impact. After learning about the many different ways to minimize impact on the trail, and learning how to keep a trail a trail for many years, we were able to give comments and considerations for what could be done to help. My partner and I used a map generated by other interns in the recreation department and accessed the maps on an application called PDF Maps. This application allowed my partner and I to take pictures and record descriptions of any waypoint we marked. We were also able to make tracks of where we go on the map. With that tool, we were able to find, and locate where the ruts/gulley s are starting near the ridge, all the way down to the end of the gulley where the water runs into a large meadow. As we got GPS tracks of the gulley s, a tape measure was used to measure the size of the gulley and we were able to mark where each measurement that was made on the GIS map. The size of the gulley s was very important in order to observe whether the check dams that were installed were a good idea, or just making matters worse. Project Outcomes The problems at English Peak were solely a problem of watershed. Throughout the internship I cut and moved logs, rebuilt tread, maintained water bars, and moved boulders. In my opinion, most problems that arise on the trail were due to unmaintained water bars, or misplaced water bars. Logs and rocks are less a problem because they usually do not destroy or erode trail like water does. My partner and I ended up tracking more than 8 large gulley s, favoring the large ones causing the most damage. While tracking one of the largest gulley s an old trail was found. This old trail or old watershed area had water bars placed forcing the water to go vertically down the hill instead of horizontally, or parallel to the trail. These badly placed water bars seemed to be causing large amounts of water and dirt to flow down the mountain causing the large amounts of erosion that was noted. Check dams were also seen in many gulley s and some seem to have created a waterfall. These check dams that were put as Band- Aid s, in my opinion, were causing the water to pick up speed by creating 1-2 foot waterfalls. These badly placed check dams and water bars are focusing water into specific areas causing large amounts of erosion. If the water were to spread out, like meadows help do, the erosion in this area would be much Page 5

less despite the bad soil. The mountain side that forms a bowl and the loose, grainy soil near English Peak calls for an erosion disaster. Small plants and grasses also help spread out water, but the water bars are leaving the drainage bowl almost naked due to lack of water on the slope and an excess of water in the gulley s. After all the information is gathered and the hitch is over, the information is uploaded onto a google map to see in real time. Every waypoint and comment is transferred over to a computer and then uploaded onto google maps. Using google maps, I was able to see mine and my partners waypoints and GPS tracks on a satellite image map. This information is saved to be used for further analysis whether it be with a trail crew leader or a Biologist that works for the forest. Conclusion This internship experience really opened my eyes to all the hard work, planning, and research that is done in order to make sure our trails last a long time without regular maintenance. This project showed me how and what to observe when looking at any watershed area. Also, because I worked with the recreation department, we were also looking to see how the water affects the trail. There are many ways to maintain a trail with many different methods, but in my time with the Forest Service I learned that the mission is to look 10 or more years ahead while doing trail work. I was also able to talk to California Conservation Corp. back country trails crew, and they also had the same mission in mind while doing trail work. Band aids are not always the best option if you want something to be permanent. The experience and knowledge that I gained while in the Klamath, no doubt, will take me to where I want to be with the help of my degree. Learning about trails and the watershed is not only a goal for my career but also my hobby in mountain biking. Before my internship started in the Klamath, my supervisor had me and my partner go to ranger academy where we got our official Leave No Trace Trainer Certificate. This training taught me about how to camp in the backcountry while minimizing impact. All the things I learned during the internship are very diverse things but I believe together, all these skills only help me be a good steward of the trails and the public lands that we share. Whether it be representing my local mountain bike association, a company, or any agency in the future, I now have the confidence in the skills I acquired to be able to step forward and be a leader for others. This knowledge does not come easy and I can say that I did not know almost anything about really being in the backcountry so I had a lot of questions. From the experience at ranger academy and seeing other experiences on the news, I noticed that we were all taught to recycle and things of that nature, but when was anyone taught basic wilderness ethics that protect the environment outside our homes? Funny thing is, most people are in the same situation because the majority of people live in or cities. Education is key when talking about protecting our forests because the forest is not just one persons, or one agencies forest, it is public land that belongs to everyone. Page 6

Appendices A screenshot of the GIS created waypoints and tracks after being uploaded to google earth Page 7

An example of a bad trail because of the berm causing water to run down the trail instead of off the trail Page 8

Page 9

Pictures taken at the water bars that were found near the ridge that were placed along an old trail, or just a method to focus water off the mountain. Huge gulley s formed as a result of these water bars Page 10

Page 11

One of the many gulley s that are relentlessly trying to destroy the trail below Page 12