Final Approach Operations Symposium

Similar documents
ICAO PBN CONCEPTS, BENEFITS, AND OBJECTIVES

Título ponencia: Introduction to the PBN concept

Learning Objectives. By the end of this presentation you should understand:

GBAS ICAO Provisions. Presented by Sylvie GRAND-PERRET EUROCONTROL Navigation Unit

Controller Training Case Study Implementation of new RNP AR APCH for RWY07 (North Circuit) at HKIA

USE OF RADAR IN THE APPROACH CONTROL SERVICE

PBN Performance. Based Navigation. - PBN & Airspace Concepts - ICAO PBN Seminar Introduction to PBN

Considerations for. RNP to xls. Operations. Juergen Ruppert. Regional Director Air Traffic Optimisation Services GE Aviation

PBN Operational Approval Continental En Route Navigation Specifications

Approach Specifications

European Aviation Safety Agency

PBN and Procedure Design training

PBN Syllabus Helicopter. Learning Objective. phase Theoretical PBN concept. in ICAO Doc 9613)

RNP OPERATIONS. We will now explain the key concepts that should not be mixed up and that are commonly not precisely understood.

3. The proposed amendments to Annexes 4, 11, 15 and the PANS-OPS, Volumes I and II are in Attachments B through F, respectively.

International Civil Aviation Organization. PBN Airspace Concept. Victor Hernandez

Nav Specs and Procedure Design Module 12 Activities 8 and 10. European Airspace Concept Workshops for PBN Implementation

PBN ROUTE SPACING AND CNS REQUIREMENTS (Presented by Secretariat)

PBN Syllabus Aeroplane. Learning Objective. phase Theoretical PBN concept. in ICAO Doc 9613)

Lecture Minimum safe flight altitude

Open Questions & Collecting Lessons Learned

(RN R A N V A V & & RN R P N

AMENDMENT No. 14 TO THE PROCEDURES FOR AIR NAVIGATION SERVICES AIRCRAFT OPERATIONS. (Doc 8168) VOLUME I FLIGHT PROCEDURES FIFTH EDITION

Design Airspace (Routes, Approaches and Holds) Module 11 Activity 7. European Airspace Concept Workshops for PBN Implementation

APAC PBN UPDATE Slide 1 of xx

EASA RNP (AR) Workshop The Landscape Working Together

New generation aircraft in the instrument approach domain. Jean-Christophe Lair Airbus Test pilot 1 st Feb. 2017

IFR SEPARATION WITHOUT RADAR

AERONAUTICAL INFORMATION SERVICES TO AERONAUTICAL INFORMATION MANAGEMENT STUDY GROUP (AIS-AIMSG)

Practical Experiences & ATM Workshop. ATM Requirements. Setting the Scene. Many Issues (and many solutions) This Forum s central theme MIXED MODE

Practical Experiences & ATM Workshop. ATM Requirements. Setting the Scene

TANZANIA CIVIL AVIATION AUTHORITY AIR NAVIGATION SERVICES INSPECTORATE. Title: CONSTRUCTION OF VISUAL AND INSTRUMENT FLIGHT PROCEDURES

IATA User Requirements for Air Traffic Services (URATS) NAVIGATION. MIDANPIRG PBN SG/3 Meeting Cairo, Egypt, February 2018

AERONAUTICAL SERVICES ADVISORY MEMORANDUM (ASAM) Focal Point: Gen

DSNA NAVIGATION STRATEGY

Title: PBN Operations and Licensing Requirements - Declaration for AOC Holders

TWELFTH AIR NAVIGATION CONFERENCE

Flight Operations Inspector Manual

RNP Solutions in Australia Australia s PBN Transition brings Opportunities for Active Noise Abatement.

A Pilot s perspective

Annex to Decision 2016/015/R

IFR SEPARATION USING RADAR

ICAO Air Navigation Panels/Study Groups Work Programme

PBN and airspace concept

Status of PBN implementation in France

Gestão de Tráfego Aéreo 2015/2016 Exam Name Student ID Number. I (5.5/20, 0.5 each)

AERONAUTICAL SERVICES ADVISORY MEMORANDUM (ASAM) Focal Point: Gen

Advisory Circular. Radius to Fix (RF) Path Terminator

RNP AR Experience. Phil Rakena PBN Project Manager February 2015

PBN Operational Approval Oceanic and Remote En Route Navigation Specifications

Honeywell.com PBN Concepts Krakow, Poland

(Presented by United States) EXECUTIVE SUMMARY

A Standard for Equivalent Lateral Spacing Operations Parallel and Reduced Divergence Departures

AERONAUTICAL INFORMATION CIRCULAR 18/18

AERODROME OPERATING MINIMA

REPUBLIC OF CROATIA. LDDU - DUBROVNIK/Čilipi Airport - Temporary suspension of RNAV (GNSS) RWY12 and trial of PBN instrument flight procedures

CONTROLLED AIRSPACE CONTAINMENT POLICY

PBN and RNAV concepts

NAM/CAR Regional Safety/Air Navigation/Aviation Security Implementation Matters 5.2 Effectiveness of air navigation implementation mechanisms

SULAYMANIYAH INTERNATIONAL AIRPORT MATS CHAPTER 11

Operational Authorization Process for ILS Precision Runway Monitor (PRM) and Simultaneous Offset Instrument Approach (SOIA)

Work Programme of ICAO Panels and Study Groups

NEW FPL Transition Phase & Implementation Stages

Effective: PERFORMANCE-BASED NAVIGATION (PBN) IN AUSTRALIA

KSFO RNAV TO GLS DEMONSTRATION

REPUBLIC OF CROATIA. Croatia Control Ltd. Aeronautical Information Service Rudolfa Fizira Velika Gorica, POBox 103 Croatia

Near Term Potential for System Capacity Gains from RNP and RNAV Procedures

Organización de Aviación Civil Internacional. Международная организация гражданской авиации

Airplane Navigation Capabilities

Don-Jacques OULD FERHAT VP Airspace and Airlines Services. Airbus. PBN Safety programs

Navigation at the. Federal Aviation Administration Crossroads

Performance Based Navigation (PBN) Implementation Plan. The Gambia

Air Navigation Bureau ICAO Headquarters, Montreal

TWELFTH WORKING PAPER. AN-Conf/12-WP/137. International ICAO. developing RNAV 1.1. efficiency. and terminal In line.

AREA NAVIGATION RNAV- MANAGEMENT

Challenges in Complex Procedure Design Validation

Atlanta NextGen PBN Activities

Performance-based Navigation (PBN) Operations Plan VERSION 1.1

INTERNATIONAL CIVIL AVIATION ORGANIZATION FIRST MEETING OF DIRECTORS OF CIVIL AVIATION OF THE CARIBBEAN REGION (CAR/DCA/1)

Date Planned/Implemented December Status Developing. Date Planned/Implemented Before May Status Implemented

GOVERNMENT OF INDIA OFFICE OF THE DIRECTOR GENERAL OF CIVIL AVIATION TECHNICAL CENTRE, OPP. SAFDARJUNG AIRPORT, NEW DELHI

RNP AR and Air Traffic Management

CFIT-Procedure Design Considerations. Use of VNAV on Conventional. Non-Precision Approach Procedures

ICAO Global Provisions and Regional Strategy for the Introduction of GNSS Services in Africa-Indian Ocean (AFI) Region

REPORT FORM IR(A) INITIAL SKILL TEST. (Use Type or Class Rating forms to revalidate IR(A) or renew expired IR(A)) Type rating: Type rating:

Required Navigation Performance Authorization Required (RNP AR) Procedure Design Manual

Performance Based Navigation Operational End-State 2023

ILS/MLS Approaches to Parallel Runways

TABLE OF CONTENTS 1.0 INTRODUCTION...

AUSTRALIA AERONAUTICAL INFORMATION SERVICE AIRSERVICES AUSTRALIA GPO BOX 367 CANBERRA ACT 2601 CESSATION OF NAVIGATION APPROVALS UNDER CAO 20.

AIC 01/ Aug 2012

Presentation of the First Deputy Director, Scientific and Research Institute of Airnavigation

Chapter 6. Nonradar. Section 1. General DISTANCE

PBN Implementation in the UK

UK Performance-based Navigation (PBN) Implementation Status

SBAS as a solution for safe approaches in New Zealand and Australia

CHAPTER 7 AEROPLANE COMMUNICATION AND NAVIGATION EQUIPMENT

Regulations & Obligations

ICAO EUR PERFORMANCE BASED NAVIGATION TASK FORCE & EUROCONTROL RAiSG MEETING (ICAO EUR PBN TF & EUROCONTROL RAiSG)

Regulative Baseline for the Implementation of IFR Operations at Uncontrolled Aerodromes in the Czech Republic / CZCAA IFR Study.

Transcription:

Final Approach perations Symposium Transition to Final Approach ATC/ATM Aspects Charlie Eliot NMD/TRG/TDD 2 February 2017

Agenda PBN to support the Approach RNP to xls What is it? Parallel Approach perations Final Approach perations Symposium 2

PBN to Support Approaches FLIGHT PHASE Additional Functionalities NAVIGATIN SPECIFICATIN En Route ceanic / En Route Remote Continental ARR APPRACH Initial Intermed Final Missed a DEP (Required or ptional) RF FRT TAC Baro VNAV RNAV 10 (RNP 10) 10 RNAV 5 b 5 5 RNAV 2 2 2 2 RNAV 1 1 1 1 1 1 1 RNP 4 4 RNP 2 2 2 RNP 1 c 1 1 1 1 1 Advanced RNP 2 d 2 or 1 1 1 1 0.3 1 1 R RNP APCH e 1 1 0.3 1 RNP AR APCH 1-0.1 1-0.1 0.3-0.1 1-0.1 Specific requirements for RF & VNAV RNP 0.3 0.3 0.3 0.3 0.3-0.3 0.3 Final Approach perations Symposium 3

RNP to xls What is it? AM411 3500 VR/NDB NPA A-RNP RNP 1 + RF RNP APCH RNP AR APCH RNP 0.3 IAF AM410 6000 RNP APCH LNAV IF AM412 2000 AM413 1500 FAF MAPt MDA/MDH MAPt RNP APCH Baro MDA/MDH RNP APCH SBAS DA/DH DA/DH DA/DH A P V ILS/MLS/GLS (xls) 7NM 5NM Final Approach perations Symposium 5

Parallel runways - modes of operations Simultaneous parallel approaches Mode 1, independent parallel approaches: simultaneous approaches to parallel instrument runways where radar separation minima are not prescribed between aircraft using adjacent ILS or MLS Mode 2, dependent parallel approaches: simultaneous approaches to parallel instrument runways where radar separation minima between aircraft using adjacent ILS or MLS are prescribed. Simultaneous parallel departures Mode 3, independent parallel departures: simultaneous departures for aircraft departing in the same direction from parallel runways. Segregated parallel approaches/departures Mode 4, segregated parallel operations: simultaneous operations on parallel runways where one runway is used exclusively for approaches and landings, and one runway is used exclusively for departures. In the case of segregated parallel approaches and departures there may be semi-mixed modes of operations. Semi-mixed parallel operations ne runway is used exclusively for approaches while the other is used for a mixture of approaches and departures. ne runway is used exclusively for departures while other is used for both departures and approaches. Mixed parallel operations Simultaneous parallel approaches with departures interspersed on both runways Final Approach perations Symposium 7

Parallel runway operations Annex 14, Volume 1 Final Approach perations Symposium 8

Factors affecting Parallel Runway perations The safety of parallel runway operations in controlled airspace is affected by several factors: The use and accuracy of the radar monitoring system PfA allows for ADS-B and MLAT The effectiveness of the controller intervention when an aircraft deviates from the approach course The precision with which aircraft fly the approach PfA introduces RNP AR APCH and RNP APCH subject to appropriate safety assessment Final Approach perations Symposium 9

Proposed New Surveillance Criteria Runway Centreline Spacing Less than 1 310 m (4 300 ft) but not less than 1 035 m (3 400 ft) ATS Surveillance System Criteria A minimum accuracy for an ATS surveillance system as follows: for radar an azimuth accuracy of 0.06 degrees (one sigma)or for MLAT and other systems, an accuracy of 30 m (100 ft) at a range of applicability of 15 NM; an update period of 2.5 seconds or less, and a high resolution display providing position prediction and deviation alert is available. Less than 1525 m (5 000 ft) but not less than 1 310 m (4 300 ft) As above, or the following conditions: a minimum azimuth accuracy better than 0.3 degrees (one sigma), and an update period of 5 seconds or less, and it is determined that the safety of aircraft operation would not be adversely affected. 1 525 m (5 000 ft) or more A minimum azimuth accuracy of 0.3 degrees (one sigma) or better, and an update period of 5 seconds or less. Note. - Guidance material pertaining to use of ADS-B and MLAT and their system performance is contained in the Assessment of ADS-B & Multilateration Surveillance to Support Provision of ATS Surveillance Services & State Implementation Roadmap (Circ 326) Final Approach perations Symposium 10

No Transgression Zone (NTZ) In Mode 1, as no ATS separation is prescribed to protect aircraft on the other approach path a No Transgression Zone (NTZ) is defined. The NTZ is a corridor of airspace established equidistant between 2 extended runway centre lines. The NTZ has a minimum width of 2000ft (610m) and extends from the nearest threshold to the point where the 1000ft (300m) vertical separation is reduced between aircraft on the adjacent extended runway centre lines. The Normal perating Zone (NZ) is the airspace in which aircraft are expected to operate while manoeuvring to pick up and fly the ILS localizer course or the MLS final approach track. Final Approach perations Symposium 11

Independent parallel approaches - Requirements Instrument landing systems (ILS) and/or MLS are being conducted on both runways PfA will introduce GLS and PBN approach possibilities Missed approach track for one approach diverges by at least 30 from the missed approach track of adjacent approach PfA will introduce ELS for departures (at this stage) Aircraft are advised of the runway identification (or ILS localizer or MLS frequency) as early as possible Aircraft shall not penetrate the NTZ For independent parallel approaches two aerodrome controllers should be required, one for each runway, with separate aerodrome control frequencies PfA proposes one monitoring controller subject to safety assessment Final Approach perations Symposium 12

Radar vectoring requirements Radar vectoring is used to intercept the ILS localizer course or the MLS final approach track PfA will introduce a published arrival and approach procedure that intercepts the IAF or IF as an alternative to vectoring When vectoring to intercept the ILS localizer course or MLS final approach track, the final vector shall: a) enable the aircraft to intercept the ILS localizer course or MLS final approach track at an angle not greater than 30 ; and b) to provide at least 1.0 NM (2km) straight and level flight prior to the ILS localizer final course or MLS final approach track; and c) The vectors shall also enable the aircraft to be established on the ILS localizer course or MLS final approach track, in level flight for at least 2NM (3.7km) prior to intercepting the ILS glide path or specified MLS elevation angle. Final Approach perations Symposium 13

Separation requirements A minimum of 1000ft (300m) vertical separation or, subject to radar system and display capabilities a minimum of 3NM (5.6km) radar separation shall be provided at least until 10NM (19 km) from the threshold and until aircraft are established: a) Inbound on the ILS localizer course and/or MLS final approach track; and PfA - inbound on the final approach course or track, or on an RNP AR APCH procedure (Established on RNP AR APCH) b) Within the normal operating zone (NZ) Each pair of parallel approaches has a high side and a low side for vectoring to provide vertical separation until aircraft are established inbound on their respective parallel ILS localizer course and/or MLS final approach track.... The high side altitude should be 1000ft (300m) above the low side at least until 10NM (19km) from the threshold. PfA Note: vertical separation may be discontinued when an aircraft is established on an RNP AR APCH procedure, in accordance with the Established on RNP AR APCH procedure Final Approach perations Symposium 14

Proposal for Amendment - Status Separation and Airspace Safety Panel (SASP) latest: PfA for parallel approach operations to PANS ATM (ICA Doc 4444), PANS PS (ICA 8168) and the SIR (ICA Doc 9643) forwarded for processing. introduction of GBAS (GLS) as another precision approach system for parallel approach ops => considered relatively simple (terminology for MLS and GLS) introduction of PBN approach specifications has been more challenging: => baulked landing on RNP AR APCH => RNP APCH performance outside the FAF? => Is FD/AP required? => Established on RNP AR APCH v EoR Result: Amendment delayed to 2018 applicability cycle, PfA now being processed within ICA. Final Approach perations Symposium 15

RNP 0.3? Considered as the best potential RNP accuracy to support parallel runway operations. The current navigation specifications that enable a performance of 0.3NM: RNP AR APCH RNP APCH (inside the FAF) Advanced RNP with scalability RNP 0.3 (for helicopters up to the FAF) Scalable RNP not supported by all types of aircraft RNP AR operational approval is expensive and should be obtained for each procedure. Procedure design aspects: RNP AR APCH routes protected to 2 x RNP only, other operations require buffers as detailed in PANS PS Vol II Final Approach perations Symposium 16

Final Approach perations Symposium 17