Historical background

Similar documents
NAVISAT Middle East & Africa

This working. Action by the - AIS/MAP. TF/6 Report Report changes as. monopoly 1.3. The establishment SUMMARY REFERENCES.

IRTI/TF/1. DRAFT ICAO Position FOR WRC-15 Agenda Item 5 (WP/09)

Agenda Item 1: Use of VSAT technology in the AFI Region

The contribution of the ATM SATCOM Safety Board (ASSB) Filippo Tomasello Rulemaking Official (EASA) Chair of the ASSB 10 Oct. 2011

Air traffic services (ATS) datalink using Iris Precursor. Contextual note SESAR Solution description form for deployment planning

ASSEMBLY 39TH SESSION

AN-Conf/12-WP/162 TWELFTH THE CONFERENCE. The attached report

Workshop Exercise, EGYPT Air Navigation Plan 10 /12/2010

ICAO Global Provisions and Regional Strategy for the Introduction of GNSS Services in Africa-Indian Ocean (AFI) Region

S 2 BAS Space Services Benefits in Aviation Systems. 2 nd ARTES Applications Workshop April 19 th, 2012 Harwell, UK

Terms of Reference for a rulemaking task. Requirements for Air Traffic Services (ATS)

IATA Fuel Efficiency Program

... Egypt & MEDUSA. 8th Euromed GNSS WG meeting Brussels, 25 November 2015

SOUTH AFRICA PBN NEAR TERM IMPLEMENTATION PLAN PROJECT

PROJECT: GROUND/GROUND COM PROJECT.1 Coordinator: South Africa DOMAIN: IIM (Infrastructure & Information Management)

GANP 2019/ASBUs. Olga de Frutos. Marrakesh/10 th December Technical Officer Air Navigation

Remote Towers and the Digitalising of Middle Eastern & European ATM Infrastructure

Special Africa-Indian Ocean Regional Air Navigation Meeting (Durban, South Africa 24 to 29 November 2008) FOLLOW-UP ON ATM RECOMMENDATIONS

A CONOPS for DFMC GNSS Dual Frequency Multi Constellation Global Navigation Satellite System

MID Region AIM Database (MIDAD)

Regional air navigation planning and implementation performance framework: Review of programmes and projects

IATA User Requirements for Air Traffic Services (URATS) NAVIGATION. MIDANPIRG PBN SG/3 Meeting Cairo, Egypt, February 2018

Work Programme of ICAO Panels and Study Groups

NORTH ATLANTIC VISION

MEDUSA & NANSC, Egypt

Iris Information Event October Overview of SESAR P. Tavernise

INTERNATIONAL CIVIL AVIATION ORGANIZATION

Air Traffic & Navigation Services

PROJECT: EUR/SAM CORRIDOR AIRSPACE CONCEPT

MANAGING THE CHANGES AS A STATE CASE STUDY UAE Airspace Restructuring Project

EUROPEAN COMMISSION DIRECTORATE-GENERAL FOR MOBILITY AND TRANSPORT

WORLDWIDE SYMPOSIUM ON ENABLING THE NET-CENTRIC INFORMATION ENVIRONMENT:

Framework for a Plan of Action for Aviation Infrastructure Development in Africa Draft Framework for a Plan of Action for African States ( )

EANPG PROGRAMME COORDINATING GROUP (COG) PERFORMANCE BASED NAVIGATION IMPLEMENTATION TASK FORCE (PBN TF)

182ND SESSION OF THE COUNCIL

International Civil Aviation Organization. Runway and Ground Safety Working Group. Third Meeting (RGS WG/3) (Cairo, Egypt, September 2016)

IAC 2011 Cape Town, October th

Safe Skies for Air Navigation over Africa

WORKSHOP 1 ICAO RPAS Panel Working Group 1 Airworthiness

NEFAB Annual Report 2016

Single European Sky II

TERMS OF REFERENCE Special Committee (SC) 186 Automatic Dependent Surveillance Broadcast (ADS-B) Revision 22

TOR FOR THE DEVELOPMENT OF A ECOTOURISM BUSINESS PLAN FOR FAYOUM

Certification Procedure

International Civil Aviation Organization. Satellite spectrum to support the safe operation of Unmanned Aircraft Systems

CEPT Workshop on Spectrum for Drones / UAS

THE DEVELOPMENT OF NATIONAL PERFORMANCE FRAMEWORK FOR ANS IN ERITREA Presented by Ghebreab Ghebremedhin Director ANS/AGA Division

GNSS AVIATION APPLICATIONS AND PROGRAMMES IN MADAGASCAR

TERMS OF REFERENCE Special Committee (SC) 186 Automatic Dependent Surveillance Broadcast (ADS-B) Revision 18

International Civil Aviation Organization. MIDANPIRG Air Traffic Management Sub-Group. Fourth Meeting (ATM SG/4) (Amman, Jordan, 29 April 3 May 2018)

TERMS OF REFERENCE Special Committee (SC) 209 Minimum Operational Performance Standards for ATCRBS/Mode S Transponder (Rev 6)

The support of an European ANSP

ASSEMBLY 39TH SESSION

The Information Paper of the. Milestones of Roadmap Development International Communion and Promotion Overview of China's PBN Implementation Roadmap

Next Generation Airspace Developments: Key Operational Trends and Enablers

CONFERENCE ON THE ECONOMICS OF AIRPORTS AND AIR NAVIGATION SERVICES

TWENTY-SECOND MEETING OF THE ASIA/PACIFIC AIR NAVIGATION PLANNING AND IMPLEMENTATION REGIONAL GROUP (APANPIRG/22)

Context Scope Procurement approach Topics for discussions Timeline. EDA/ESA UAS Workshop May

Air4All Frequency Group Study on military spectrum allocations required for the Insertion into the GAT of the UAS

SATELLITE DISTRIBUTION SYSTEM OPERATIONS GROUP (SADISOPSG)

DIRECTORS GENERAL OF CIVIL AVIATION CONFERENCE ON A GLOBAL STRATEGY FOR AVIATION SAFETY

ICAO framework for LPV

ATFM/CDM ICAO s Perspective

Space Based ADS-B. ICAO SAT meeting - June 2016 AIREON LLC PROPRIETARY INFORMATION

Aeronautical Communications: Changes Ahead - FCI

RMT.0464 ATS Requirements The NPA

Flight Procedure Design and Cartography

RAAC/15-WP/14 International SUMMARY REFERENCES. A Safety

AERONAUTICAL SERVICES ADVISORY MEMORANDUM (ASAM) Focal Point : Gen

Roadmapping Breakout Session Overview

INTERNATIONAL CIVIL AVIATION ORGANIZATION EASTERN AND SOUTHERN AFRICAN (ESAF) REGIONAL OFFICE MEETINGS, SEMINARS AND WORKSHOPS PROGRAMME FOR 2017

RNP AR APCH Approvals: An Operator s Perspective

CNS/ATM Systems Interoperability and Harmonization

ICAO EUR Region Civil/Military Cooperation Seminar/Workshop

Honeywell Advanced Technologies Europe Radek Zaruba, May, ANTARES WP33 User Terminal for General Aviation

Space-Based Aircraft Tracking: Increasing Safety and Reducing Risk in 2018

EPATS European Personal Air Transport System

ICAO Air Navigation Panels/Study Groups Work Programme

COMPREHENSIVE REGIONAL IMPLEMENTATION PLAN FOR AVIATION SAFETY IN AFRICA

SBAS-ASECNA Programme Status

Russian Federation ATM modernization program

Elie El Khoury ICAO Regional Officer ATM/SAR Middle East Office Cairo/

THE DEVELOPMENT OF NATIONAL PERFORMANCE FRAMEWORK FOR AIR NAVIGATION SYSTEMS MAURITIUS

ICAO Cyber Summit & Exhibition CLOSING REMARKS. 10 April 2017

MID Region Air Navigation Strategy

Global ATM System ~Interoperability and Harmonization ~

RMT.0464 ATS Requirements

Aviation Data and Analysis Seminar February Economics of Airports and Air Navigation Services Providers

The Single European Sky and SESAR, the European ATM modernisation programme. Patrick Ky, Executive Director 26 May 2010

Information Management towards SWIM

Policies for Certification, operation and maintenance of UAS Andres Eduardo Parra Catama Air Safety Inspector Civil Aviation Authority of Colombia

TERMS OF REFERENCE Special Committee (SC) 216 Aeronautical Systems Security (Revision 8)

Global Aviation Safety Workshop Abuja Nigeria. Group A Road 2. Group A Road 2 Inconsistent Regulatory Oversight

ESA Iris Programme Overview of results from Iris Phase 1. Briefing 28 July

ICAO SMxP Course MID RMA Board/15 PBN SG/3 AIM SG/4 & MIDAD TF/5 CNS SG/8 AVSEC Training FAL Implementation Seminar ACAC/ICAO Civil/Military Workshop

Introduction DRAFT March 9, 2017

Accountability Report of the ICAO NACC No Country Left Behind (NCLB) Strategy

DEPARTMENT OF CIVIL AVIATION

ESA-EDA: Paving the Way for New UAS Capabilities in Europe

Transcription:

Page Page 1 1 NAVISAT Presented By NAVISAT Chairman & CEO

Contents Page Page 2 2 1. Historical background 2. NAVISAT Integration into the Global Infrastructure 3. NAVISAT Studies Status 4. NAVISAT Vision, Mission & Goals 5. Offered Services 6. Recommended Action by Meeting

Historical background Page Page 3 3 Since 1997, the "NAVISAT" initiative was presented to different interested entities in the Middle East and Africa regions. A preliminary feasibility study for the project was carried out (June. 2004 Dec. 2005). The result of the study was promising. During the study, five steering committee meetings took place. The members were the major Civil Aviation entities in the region (ACAC, ICAO regional offices, DGAC & the Egyptian Civil Aviation authority). In 1998, three satellite fillings (API) were submitted by Egypt to the ITU by the names EGYSAT1, 2 & 3. In 2003, new filings were submitted by the names NAVISAT1, 2 & 3. In November 2006, A company called "NAVISAT Middle East and Africa" was established in Egypt as the current primary mission is to carry out a detailed study for the project.

Historical background Page Page 4 4 During its 17th meeting in Rabat (2nd April to 4th April 2007), the ACAC Air Navigation Committee has announced its continuous support to the NAVISAT as a regional system to offer the aeronautical communication and navigation services as the offered services are cost effective than the similar available services and A NAVISAT group was established by the ACAC Air Navigation Committee during its 18th meeting, held in Rabat, 13-15 August, 2007. A working paper was presented to ICAO PBN/GNSS TF/1, Cairo, 20-23 October 2008. A working paper was presented to ICAO MIDANPIRG/11, Cairo, 9-13 February. 2009.

Integration into the Global Infrastructure Page Page 5 5 IRIS NEXTGEN SESAR SGB NAVISAT MTSAT

NAVISAT Studies Status Page Page 6 6 The NAVISAT detailed studies composed mainly of two groups of studies, The Business & Technical Detailed studies and the Complementary studies. The Business & Technical Detailed studies Plan is composed of 4 Phases for implementing the Business & Technical Detailed Study as follows; 1- Phase 1-A : Strategic Objectives & Detailed Planning Duration: 1 month (Awarded & Completed detailed below) Purpose: To define the optimal pathway for scoping the later business case, requirements definition, design phases by capitalizing on Phase 0 study outcomes, identifying potential gaps, and providing an updated and comprehensive strategic outlook

NAVISAT Studies Status Page Page 7 7 Phase 1-A study was awarded in 11 September 2008 and the project kick off meeting was held on 12 October, 2008. The study included a 3-day-workshop. Phase 1-A was completed and all deliverables were accepted in mid January 2008. The purpose of the workshop was to capture information and views from NAVISAT potential stakeholders and future users in the regions. The workshop was attended by a number of organizations representing the Aviation Field. Separate meetings were held with the MID Region ICAO WG including representatives of 17 countries, and with Egypt Air Technical and Operations Teams. The workshop included 3 main sessions, addressing the following issues; - Business/commercial aspects - Technical/operational aspects - Governance & regulatory aspects

NAVISAT Detailed Studies Status Page Page 8 8 2- Phase 1-B : Business Plan and System Specifications Duration: 5 months (awarded) Purpose: To establish the business case for NAVISAT and define the service technical specification as well as the Space System and Ground System Requirements leading to a business scenario decision point at the end of this phase. 3- Phase 1-C : Sales / Marketing / Operating / Implementation Plans & RFI Development Duration: 6 months (planned to start after the end of phase 1-B) Purpose: To further develop the business case for the selected scenario, define the organization, prepare market capitalization plan and release and evaluate an RFI package for the technical implementation.

NAVISAT Detailed Studies Status Page Page 9 9 4- Phase 1-D: Detailed SOW and RFP Development & Bid Evaluations Duration: 5-10 months (planned to start 3 months after the start of phase 1-C) Purpose: To develop a SOW, RFP and associated Technical documentation to support a competitive procurement, evaluation of proposals, and final contract negotiations

NAVISAT Detailed Studies Status Page Page 10 10 The RFP for implementing the following Phases (1-B, C, D) was launched in December 2008, and the Technical & Commercial Proposals were received, and evaluated. Phase 1-B study was awarded in the 19th of February, 2009. The project kick off meeting was held on the 1st of March 2009. Frequency coordination, regularity and certification activities The RFP for implementing the Frequency Coordination / Regulatory & Certification Studies (Phase 1) was launched in January 2009, and the Technical & Commercial Proposals were received and evaluated.

NAVISAT Detailed Studies Status Page Page 11 11 The Frequency Coordination / Regulatory & Certification Studies (Phase 1) was awarded and the kick off meeting was held on the 10th of March 2009. The RFP for phase-2 finalized and it will be lunched by the end of the Ist phase Complementally study The RFP's for the complementary studies, listed below, were finalized, and they are planned to be launched by the beginning of April 2009; Human Resources Studies Financial Studies Legal Studies The fund raising process is planned to be executed during phase 1-C of the Business & Technical Detailed Study in the 4th quarter of this year.

NAVISAT Vision & Mission Page Page 12 12 As a result of phase 1-A study NAVISAT project has a solid strategy (vision, mission, objectives, goals and service portfolio)

The NAVISAT Strategic Objectives Page Page 1313

Offered Services NAVISAT Different service offerings for different applications and different users Page Page 14 14 Mobile Communications for civil aviation's and airlines AERONAUTICAL MISSION Ground-air voice and data communications for air traffic control and operational services Fixed Communications for civil aviation's Navigation Payload Ground-ground voice and data links for air traffic services and operational services COMPLEMENTARY MISSION Telecommunication and/or Meteorological Observation GPS-like signals Integrity data Correction data Enhancement of GPS availability Airlines Service Providers Aeronautical Communication Air Traffic Services Passenger Communications State ATS providers Aeronautical VSAT Network Operators SBAS Service Providers Remote CNS infrastructure operations

Offered services Page Page 15 15 The NAVISAT is planed to offer the following services in the Middle East and Africa regions at competitive price. Aeronautical services (it is the main mission): The ICAO CNS/ATM requirements will be completely fulfilled. Mobile Communications services for civil aviations and airlines (data services and voice services) other services like telemedicine and security may be offered. Fixed Communications services for civil aviations and airlines (data links with different bit rates can be offered though VSAT systems) Navigation services (broadcasting of the augmented navigation signals over the region). Complementary services Other communications requirements for the passengers will be available (e.g. GSM, internet..)

Action by the meeting Page Page 16 16 The meeting is kindly invited to: 1. Take note of the contents of this WP paper, 2. Consider NAVISAT as a regional project for Middle east and Africa In any national/international conference/meeting for CNS/ATM

Page Page 17 17 Thank You