During Construction. Full Resident and Non-Resident Services. Contract Administration and Construction Supervision of Groundside and Airside Projects

Similar documents
Aviation Sector Services. Transportation / Aviation

2018 Airport Master Plan Overview of Development Concepts. Greg Ballentine (WSP)

REGION OF WATERLOO INTERNATIONAL AIRPORT AIRPORT MASTER PLAN EXECUTIVE SUMMARY MARCH 2017

CLASS SPECIFICATION 5/12/11 SENIOR AIRPORT ENGINEER, CODE 7257

The implementation of this Master Plan will be undertaken in logical stages to meet passenger and workforce demands.

TERMINAL DEVELOPMENT PLAN

CASE STUDY The New Guayaquil International Airport

The Evolution of the YOW De-Icing Facility SWIFT Conference & Trade Show September 14-17, Hyatt Regency Montreal

Los Angeles International Airport (LAX) Airside $907M

TRANSPORTATION: Airports and Aviation Services

2006 ANNUAL GENERAL MEETING

Safety, Infrastructure, and Tenant Improvement Project. Public Hearing Informational Brochure February 26, 2013

Addendum - Airport Development Alternatives (Chapter 6)

Kansas City Aviation Department. August 25, 2015

ACTION TRANSMITTAL

Sunshine Coast Airport Master Plan September 2007

DRAFT. Master Plan RESPONSIBLY GROWING to support our region. Summary

CIVIL AVIATION AUTHORITY

A Master Plan is one of the most important documents that can be prepared by an Airport.

Ronan Delaney. DELANEY_RONAN_AVIATION_JUN_2018.DOCX

HILLSBORO AIRPORT MASTER PLAN UPDATE Planning Advisory Committee Meeting 1

Rodrigues Regional Assembly Chief Commissioner s Office

STUDY OVERVIEW MASTER PLAN GOALS AND OBJECTIVES

JOSLIN FIELD, MAGIC VALLEY REGIONAL AIRPORT DECEMBER 2012

GLOBAL AIRPORTS AND THE CHALLENGE OF REGIONAL INTEGRATION: COMPARING CHICAGO AND TORONTO

Mayor Dave Bronconnier cc: All City of Calgary Alderman. Eastbound Extension of Airport Trail and Related Works

The presentation was approximately 25 minutes The presentation is part of Working Group Meeting 3

The Calgary Airport Authority. Parallel Runway Project. Public Consultation Meetings April 30 th, May 2 nd & May 4 th

Norfolk International Airport

Bloor Street West Rezoning Application for a Temporary Use By-law Final Report

TABLE OF CONTENTS. Airport Master Plan Update Manchester-Boston Regional Airport. W:\ _Manchester\MPU\Final\Executive Summary.

Fort Wayne International Airport Master Plan Study. Executive Summary

The Corporation of the City of Kawartha Lakes Council Report

2012 Performance Framework AFI

INFORMATION PAPER TO THE STRATEGIC DEVELOPMENT COMMITTEE

Westover Metropolitan Airport Master Plan Update

RESOLUTION NO

Parkland County Municipal Development Plan Amendment Acheson Industrial Area Structure Plan

TWELFTH AIR NAVIGATION CONFERENCE

TORONTO TRANSIT COMMISSION REPORT NO.

AVIATION. Planning / Design / Management. wsp.com/aviation

Performance Based Navigation (PBN) Implementation Plan. The Gambia

Kittitas County Airport Bowers Field Airport Master Plan Planning Advisory Committee Meeting #1 April 6, 2016

TANZANIA CIVIL AVIATION AUTHORITY SAFETY REGULATION CHECKLIST FOR INSPECTION OF SURFACE MOVEMENT GUIDANCE CONTROL SYSTEM (SMGCS)

MINISTRY OF TOURISM AND RECREATION

Huronia/Midland Airport, CYEE

Bend Municipal Airport Urban Renewal Plan. Tashman Johnson LLC Elaine Howard Consulting LLC

GRANDE PRAIRIE AIRPORT. Reduced Visibility Operations Plan

INFORMATION FOR STANWELL MOOR AND STANWELL COMMUNITIES

Appendix. Gatwick Airport Ltd - Further information on Gatwick s revised phasing strategy (including Programme) Gatwick Airport Limited

Draft Concept Alternatives Analysis for the Inaugural Airport Program September 2005

NOTICE OF OPPORTUNITY FOR PUBLIC COMMENT RELATED TO PASSENGER FACILITY CHARGE Posted March 25, 2019

CIVIL AVIATION AUTHORITY, PAKISTAN OPERATIONAL CONTROL SYSTEMS CONTENTS

IRTI/TF/1. DRAFT ICAO Position FOR WRC-15 Agenda Item 5 (WP/09)

Framework for a Plan of Action for Aviation Infrastructure Development in Africa Draft Framework for a Plan of Action for African States ( )

MASTER PLAN 2010 ADDENDUM REPORT

Chapter 8.0 Implementation Plan

CHAPTER 4: ALTERNATIVES

Noise Mitigation Program

Villeneuve Airport. July 3, 2013 Steve Rumley Vice President, Operations & Infrastructure

TWELFTH AIR NAVIGATION CONFERENCE

TWELFTH AIR NAVIGATION CONFERENCE

Collier County Airport Authority. Joint Automated Capital Improvement Program

ENVIRONMENT ACTION PLAN

Airport Master Planning Process & Update

Executive Summary. MASTER PLAN UPDATE Fort Collins-Loveland Municipal Airport

AIRPORT MASTER PLAN UPDATE

Stephanie Sinnott, Executive Director, Finance, Office of the City Manager

2018 Airport Master Plan. Public Meeting and Open House February 7, 2018

Yakima Air Terminal/McAllister Field Airport Master Plan Update

Billy Bishop Toronto City Airport; Porter Airlines Proposal Review; Interim Results/Findings, Airbiz, 26 June 2013

RUNWAY SAFETY GO-TEAM METHODOLOGY

AIRPORT PLANNING. Joseph K CHEONG. Lima, September 2018

FORECASTING FUTURE ACTIVITY

Committee. Presentation Outline

AN-Conf/12-WP/162 TWELFTH THE CONFERENCE. The attached report

2017 Appropriation Budget Table of Contents Board Approved August 19, 2016

Credit No IN. National Project Director 9,Institutional Area, Lodhi Road, New Delhi Tel:

Safety Management 1st edition

9.1 INTRODUCTION 9.2 EXISTING DEVELOPMENT. Southern Cross University

Draft Concept Alternatives Analysis for the Inaugural Airport Program September 2005

Chapter Seven COST ESTIMATES AND FUNDING A. GENERAL

Chapter 5 Airport Development Alternatives

1 PROJECT STATUS UPDATE 2 ND CONCESSION FROM BRISTOL ROAD TO DOANE ROAD TOWNS OF EAST GWILLIMBURY AND NEWMARKET

An Overview of GMR Megawide Consortium s Unsolicited Proposal. March 2018

Chapter 1: Introduction Draft

TECHNICAL ADVISORY COMMITTEE MEETING 3 SEPTEMBER 10, Airport Master Plan

Canada s Airport Occupations: the important unseen workforce David Berrington 3 November 2010

Annual General Meeting. April 15, 2010

Rebuilding Plan For Mosul International Airport

Appendix D Project Newsletters. Tacoma Narrows Airport. Master Plan Update

Air Navigation Bureau ICAO Headquarters, Montreal

1.0 PURPOSE 2.0 REFERENCES 3.0 BACKGROUND

Santa Cruz Wharf Improvement Project. Briefing Paper. Prepared by City of Santa Cruz. for

RESOLUTION No APPROVAL OF WAYNE COUNTY AIRPORT AUTHORITY FISCAL YEAR 2018 BUDGET. By Board Member Mark Ouimet

October 7, Mr. Geoffrey Wilson Chief Executive Officer PortsToronto 60 Harbour Street Toronto, Ontario M5J 1B7. Dear Geoff,

Master Plan Update Community Advisory Committee Kick-off Meeting

Notice of Passenger Facility Charge (PFC) Approvals and Disapprovals

Decision Strategic Plan Commission Paper 5/ th May 2017

MONTEREY REGIONAL AIRPORT MASTER PLAN TOPICAL QUESTIONS FROM THE PLANNING ADVISORY COMMITTEE AND TOPICAL RESPONSES

Transcription:

Page 1 of 5 May 21, 2007 HOME PROFILE SECTORS & SERVICES CAREERS SEMINARS & PAPERS LINK airport development Description of Service transportatio services link Airport Developm Pre-Construction Area Development Planning Project Management Feasibility Studies Site Investigations and Condition Surveys Preliminary Design, Design Review and Final Design of: runways, taxiways, ramps, aprons, tunnels, roadways and bridges service, departure and arrival structures parking structures electrical systems and illumination power generation and distribution master plans mechanical systems and utilities water, sewer, storm, storm retention sub-structures, water reservoirs building envelope, roofing, windows and curtainwalls residential and business park During Construction Full Resident and Non-Resident Services Contract Administration and Construction Supervision of Groundside and Airside Projects Construction Staging Inspections and Field Review Traffic Detours and Operation Plans Signage NOTAM and Advisory Documentation Preparation Provision of Site Staff with Security Clearances Security and Escort Co-ordination Tenant/Community Liaison Conflict Resolution Services Post Construction Testing and Commissioning Strategic Maintenance Planning Renewals Planning Aircraft and Airport Noise Assessment Mediation, Arbitration and Expert Concrete Techno Field Services Infrastructure In Advice Rail and Transit Roads and Highw Sustainable Tran Transportation E Transportation P Transportation S MH sectors Building Enginee Life Sciences Municipal Telecommunicati Transportation

Page 2 of 5 development telecommunication systems Specification Development and Contract Preparation Project Scheduling and Cost Estimating Construction Tendering Expertise in the use of ICAO Aerodrome Design Manual and Transport Canada TP312E Aerodrome Standards And Recommended Practices Rehabilitation Design Aircraft and Airport Noise Assessment Impact Analyses and Modeling Life Safety Planning fire alarm systems fire protection systems Code Consulting building, fire and electrical safety codes Value Engineering Witness Services Utilities Calgary International Airport The Calgary Airport Authority is developing 700 acres of land for industrial, aviation and recreational use. Morrison Hershfield was retained by the Authority to complete the preliminary design, detailed design and construction administration for two trade park sections at the Calgary International Airport. Significant design was required to create effective stormwater management facilities on the Deerfoot South site. Morrison Hershfield integrated the facilities to provide for the largest land area possible for saleable commercial property. The second section was prepared for future expansion of WestJet's head office, hangar expansion, and expanded parking facilities. Lester B. Pearson International Airport

Page 3 of 5 By the year 2020, the annual number of travelers at Pearson International is expected to be 50 million. Over the years, MH has provided a wide range of services at this, Canada s busiest, airport. Major civil engineering projects undertaken at the airport include: the preliminary and detail design and field administration for a fourlane tunnel to the infield; a two-lane tunnel under Britannia Road to the de-icing facility; contract administration services for the redevelopment of road access in and around the new terminal development; five-year renewals/strategic maintenance plans for airport bridges, and; inspections and full engineering services for the rehabilitation of 22 concrete bridges including departure ramps. Additional projects include the Utilities Master Plan, high-voltage distribution system design, parking garage restoration (Terminal 1), design of snow chutes for parking structures (Terminal 2), rehabilitation of the departure deck (Terminal 2), fire alarm system (Terminal 2), retaining wall rehabilitation, investigation of computer floor, and building code consulting (Terminal 3), re-roofing and fall arrest design (Terminal 3). Airport Utilities Master Plan Morrison Hershfield entered into a joint venture arrangement to prepare a utilities master plan for Lester B. Pearson International Airport. The objective of the assignment was to prepare a plan that would ensure the adequate provision of water supply, storm and sanitary systems, high temperature hot water and chilled water, electricity and telecommunications services during the airport s evolution. Morrison Hershfield was responsible for the high temperature hot water, chilled water, electricity and telecommunications components of the utilities master plan. Southern Ontario Airport Assessment Study Morrison Hershfield (MH) developed a state-of-theart object-oriented simulation program to create flexible and versatile models of complex, multicomponent, and multi-modal transportation systems to various levels of detail. The program has come to be known as AIMä or the Airport Impact Model. It was used to simulate both the air and groundsides of airports in Southern Ontario, the road network connecting the various airports, and a high-speed rail link through the area.

Page 4 of 5 The multi-modal aspect of the developed program made it possible for Transport Canada to trade-off investments in transportation facilities. Features of the model also allowed Transport Canada to assess operational factors, as well as the social, economic, and environmental factors associated with different policy and investment decisions. Edmonton International Airport Morrison Hershfield has provided building code consulting, planning, design, tender, and contract administration services for both asphalt and concrete reconstruction of runways, taxiways, and aprons at the Edmonton International Airport, following ICAO Aerodrome Design Standards. Additional projects include design services for improving the central pedestrian vertical transportation system at the Air Terminal Building and a water reservoir assessment. Ottawa Macdonald-Cartier International Airport Morrison Hershfield provided building envelope design review services and is undertaking field review of the building envelope of the new 57,000 sq. m. Passenger Terminal Building. The innovative, open-concept design of the three-level structure allows passengers to see aircraft right from the time they enter the terminal. MH specialists conducted impact testing of the glazing systems, and fire protection and life safety review. Periodic field reviews conducted during construction confirm that fire separations were built as the design intended. Morrison Hershfield has also carried out the upgrade of power generation units and loadbanks at the airport. Airport Operations Control Centre

Page 5 of 5 Morrison Hershfield provided prime consultant services for upgrades to the Airport Operations Control Centre (AOCC) and Facilities Operations and Maintenance Control Centre (FOMCC) at Lester B. Pearson International Airport. The services provided encompassed the preparation of the project brief; the design concept; the construction documents; tender call, evaluation and award; and construction and contract administration. An extensive investigation and evaluation of stakeholder requirements pertaining to engineering and architectural design, console design, display design and the IT systems that are used to manage airport operations was undertaken. The final project plan is focused on a reconfigured AOCC and enhancements to the FOMCC. The plan provides a roadmap that will help the airport manage growth while providing for immediate enhanced operational improvements that will facilitate the monitoring of a new terminal building. It outlines a staging strategy for the AOCC that was developed to meet the airport s dynamic and divergent stakeholder needs amidst challenging operational constraints. Advanced technological solutions for endto-end control of all operational, life safety and security systems have been developed. All contents copyright 2007 Morrison Hershfield Group Inc.. All rights reserved. Disclaimer Please conta with any technical comments or questions about this site.