Rudy McLellan, P.E. GEC, Inc., Baton Rouge, LA For Vicksburg Bridge Commission, VBC

Similar documents

Design Public Hearing for the Existing and Proposed Bridge Crossings on Aden Road (Rte 646) over the Norfolk Southern RR, Nokesville, Virginia

Use steel clip angle as a drill template and drill through mullion. Install bolts with bolt heads on the masonry side of the jamb mullion.

A A A T E C H N O L O G Y

Historic Bridge Foundation Facebook Archives

TGS CEDAR PORT INDUSTRIAL PARK

Visual Presentation Drawings

MANUFACTURER OF QUALITY BLEACHERS, BENCHES, & PICNIC TABLES FOR OVER 25 YEARS

IMPORTANT OWNER-OPERATOR INSTALLATION INSTRUCTIONS C2213 / C2220

P3 & Design-Build. 101 st Annual THE Conference February 25 th, Speaker: Andrew Gensch, P.E.

Head to University Avenue and save!

IS A BUDGET ONLY DESCRIPTION QUANTITY UNIT

California Department of Transportation. An Overview of the State Movable Bridge Inventory

80' MIN 100'-0" 15'-0" 2 FEDERALLY DREDGED NAVIGATION CHANNEL MEASURED AT EL -10' (NOTE 4) NAVIGATION CHANNEL EXISTING YACHT CLUB FLOATS

Introduction...COMB-2 Design Considerations and Examples...COMB-3

Mississippi River & Tributaries Project History & Overview

Strut Clamp Pipe & Conduit

KAWNEER 1786 RIM EXIT DEVICE

HARD. Preventing. Nosegear Touchdowns

Bridging Belmont. By ROGER AMSDEN, LACONIA DAILY SUN

Friday, September 14, 2018

Select Barn Equipment

TITAN Fuel Tanks. INSTALLATION INSTRUCTIONS G e n e r a t i o n V

Texas Department of Transportation Corpus Christi District. Corpus Christi Harbor Bridge

ARLINGTON MARKETPLACE NEW RETAIL BATON ROUGE, LA

Reliance-TC-Type l Standard Horizontals-Aluminum Pressure Plates Integral TC Verticals w/o Face Cap - 2-1/2 x 6

Reliance-TC-Type l Standard Horizontals-Aluminum Pressure Plates Integral TC Verticals w/o Face Cap - 2-1/2 x7-1/4

Meeting Notice: 7:00 P.M. Tuesday December 11, 2012 Memorial City Hall 1 st Floor Council Caucus Room 24 South Street Auburn, New York

Waterways Council November 10, 2017

BUILD. In this issue: NEW AERIALS OF CONSTRUCTION NEW PROJECT IN CONSTRUCTION PAC K AG E 4. August 2018

Series SSG and Captured corner mullion. Installation Instructions

803 Airport Rd Terrell, TX (972) RELIANCE-TCIG -THERMAL COMPOSITE CURTAIN WALL - 2 1/2 x 7 1/4 -

Reliance-TC-Type ll Thermal Composite Type ll - Horizontals and Verticals w/ Aluminum Pressure Plate - 2-1/2 x 7-1/4

803 Airport Rd Terrell, TX (972) RELIANCE-TCIG -THERMAL COMPOSITE CURTAIN WALL - 2 1/2 x 6 -

Large testing machines, Proposal, List of Photographs & Titles, May 1951

The Holes Creek Bridge Replacement By Bradley McClelland

CONTACT: Nichole Lawrence CELL: FOR IMMEDIATE RELEASE Wednesday March 28, 2018

Outer Banks Bridges Update:

Dufferin Jog Elimination Project

The Galveston Seawall

Z-PURLIN MOUNTING WARNING:

ARLINGTON MARKETPLACE NEW RETAIL BATON ROUGE, LA

IMPORTANT OWNER-OPERATOR INSTALLATION INSTRUCTIONS. Part # C3206. REVISED Version 6 BY: JL 8/5/2015 TECH SUPPORT (800)

IRONTON-RUSSELL BRIDGE REPLACEMENT

HISTORY AND REVIEW OF RAILWAY-HIGHWAY GRADE CROSSING WARNING SYSTEMS AND THE GENESIS OF STANDARD SPECIFICATION

Abstract. Introduction

FIXED WINDOW SECTION DETAILS

IMPORTANT OWNER-OPERATOR INSTALLATION INSTRUCTIONS C3215/C3215A

EXTERNAL COMMUNICATIONS TEAM MEETING MARCH 2015

the foss seattle shipyard helping you succeed in a competitive market

BuildingEnvelope Oldcastle ( ) -

Hydraulic Report. Trail 5 Snowmobile Trail Over Mulligan Creek. Prepared By: COLEMAN ENGINEERING COMPANY Karisa V. Falls, P.E.

IMPORTANT OWNER-OPERATOR INSTALLATION INSTRUCTIONS. Part # A7006

The Olathe Quiet Zone

Effect of Support Conditions on Static Behavior of 1400m main span and 700m side span Cable-stayed Bridge

PRESENTED TO Town of Middlebury, VT. PRESENTED BY VTrans, VHB, Fitzgerald & Halliday, Inc., and Kubricky Construction

IMPORTANT OWNER-OPERATOR INSTALLATION INSTRUCTIONS FRONT TIEDOWNS CHAIN AND CLEVIS REMOVED

TREASURE ISLAND FERRY SHELTER & BUS SHELTERS. Arts Commission Civic Design Review APRIL 18, 2016

Edward W. Daniel, LLC

BUILD. Update CONSTRUCTION. In this issue: FEATURED PROJECT: KENT AVENUE ARCH CONSTRUCTION AT THE SJ RIVER VIADUCT FEBRUARY 2019

HIGH SPEED RAIL CROSSING WITH FLANGE-BEARING CROSS TRAFFIC. UPRR/TPW Crossing in Chenoa, IL

AASHTO AS Presented to AASHTO T 8, June 13, 2017

D3107/ FMT09DGRO6.5 REAR TIEDOWNS W/ FACTORY INSTALLED RECEIVER APPLICATION FITS

IMPORTANT OWNER-OPERATOR INSTALLATION INSTRUCTIONS D4101. REVISED vers6 BY: JL 8/6/2015 TECH SUPPORT (800)

Reliance-TC-Type ll Thermal Composite Type ll - Horizontals and Verticals w/ Aluminum Pressure Plate - 2-1/2 x 6

Grade Crossings in High Speed Rail Corridors

Paper 1F and 3H: Decision-Making Exercise. Wednesday 4 June 2008 Morning Resource Booklet. Advance Information

DIVISION BULLETIN NO. 2

Return of the Minehead Turntable

An Education In Offshore Pipeline Construction. By Allyn Stott

Sample Estimate Reports Estimate Reports were created in XL-Pro Software


OPEN CELL SHEET PILE TECHNOLOGY. Presentation to Alaska State Legislature, House Finance Committee

REPORT ON TRAIN DERAILMENT IN PITTSBURGH TUNNEL WEDNESDAY OCTOBER 10, 2001 By Thomas Edward Fox

Port of Pensacola - WHSE 9 & 10 52,500-92,500 SF WHSE +/-

FORT YORK PEDESTRIAN & CYCLE BRIDGE

K SIGNAGE & TRAFFIC CONTROL. Table of Contents

Blohm + Voss Oil Tools Service Support 24/7

Sound Transit. Tunnels and Underground Structures Committee January 24, 2011

Assembly Instructions

SECTION SPECIFICATIONS PART 1 GENERAL

Assembly Instructions - TSK

GARFIELD BRIDGE. Building A Bridge to No-Where

Tavernier Round. 3/8 x 1-7/8 Washer /8-16 Serrated Flange Nut

Delivers the BEST SPRAY FINISH available on the market today! MADE IN THE USA WITH GLOBAL COMPONENTS

AVAILABLE SPACE KANAWHA MANUFACTURING BUFFALO PLANT

APPENDIX F. Structural Design Report

LAS VARAS RANCH CA COASTAL TRAIL PROPOSED ALIGNMENT

NEWS LETTER OF THE PIKES PEAK N GINEERS MODEL RAILROAD CLUB Celebrating 26 years of model railroading November 2015 RAILROADING SINCE OCTOBER 13, 1989

INVESTMENT OPPORTUNITY

Runway Roughness Evaluation- Boeing Bump Methodology

Hose Clamps & Fittings

Natare Stainless Steel Pools & Spas Elevated Pools, Whirlpools, Spas, Hydrotherapy, Competition, Recreation and Instructional Pools

National Transportation Safety Board

Runway Roughness Evaluation- Boeing Bump Methodology

Longitudinal Joint Construction. Mike Robinson, PE

Mathey Dearman's revolutionary MagnaCut XM enables

Guadalupe Delta Log Jam History & GBRA Operations in the Lower Basin. March 23, 2017

YCU 750 TU Unitized Curtain Wall System

Transcription:

OLD MISSISSIPPI RIVER BRIDGE AT VICKSBURG Challenges Maintaining a Vital East-West Rail Corridor Rudy McLellan, P.E. GEC, Inc., Baton Rouge, LA For Vicksburg Bridge Commission, VBC

River Crossings at Vicksburg Vicksburg, Miss East Bank R/R-Hwy 1930 I-20 Hwy 1973 Delta, LA West Bank

Bridge Plan, Elevation & Section

Thru Truss Section

Thru Truss Section 1921 Steam Engine

Piers with Lateral Movements

Recorded Pier Top Movements Pier 1 12.2 West Pier 2 35.3 West Pier 3 10.2 West Pier 4 3.7 West Pier 5 5.2 West Pier 6 1.5 West Pier 7 0 8 7 6 5 Pier 4 Pier 3 Source: Pier 2 VBC Historical Records Pier 1 HNTB or Predecessors (1929-2009) GEC (2010-2012)

Bridge Repairs 1996 To 2012 1996 & 2007 Pier 2 Bearing Reset, Wind Anchor Reset, Conc. Support Enlarged 2002 Pier 2 Bearing Reset, Pier East Side Enlarged, Anchor Eyebar Reset 2002 Pier 6 Bearing Reset, Steel Expansion Joint Reset 2002 & 2011 Pier 1 Span 1 Lifted, 3.5 & 3.0 Thick Shims Added 2004 East Approach Steel Column Strengthening & Support Brackets 2005 Span 3 Truss Removed 7 From Truss, Stringers, Deck, Rails 8 7 6 5 Pier 4 Pier 3 Source: Pier 2 VBC Historical Records Pier 1 HNTB or Predecessors (1929-2009) GEC (2010-2012)

Vicksburg Pier 2 Wind Anchor Offsets 2006 2012 Date Measurement Total Movement 1930 to 1993 10.3 West 10.3 West 11-02-1994 13.0 West 13.0 West 02-06-1997 Reset 0.0 13.3 West 01-23-2001 4.6 West 17.9 West 11-05-2004 7.2 West 20.5 West 12-01-2008 10.0 West 23.3 West 03-26-2009 Reset 0.0 23.3 West 11-20-2012 1.8 West 25.1 West

Vicksburg Pier 2 Bearing Reset Reset 1997, 2002 & 2009 2012

Pier 2 Bearing Support Enlarged Vicksburg 2012

Pier 2 Anchor Eyebar Reset Vicksburg Anchor Eyebar (50 Ft Long) 1.25 Thread Bars (Grade 150 Ksi) 2012

Pier 2 Wind Anchor Enlarged Vicksburg 2012

Pier 1 & 2 Tilt Measurements East toward Vicksburg Upper CL Cut Mark Pier 2 Lower CL Cut Mark Pier 1 Date Pier 2 Pier 1 1939 No Record 7.0 East 8-22-2001 4.0 East 9.1 East 9-16-2002 3.1 East 9.5 East 8-22-2003 2.8 East 9.6 East 8-17-2007 2.8 East 10.4 East 12-19-2012 5.7 East 12.8 East

Pier 4 Plumb Bob Measurements East toward Vicksburg Pier 4 Plumb Bob (35 Ft Long) 1993 To 2001 1 West Tilt

Bridge East Approach Elevation East toward Vicksburg Pier 3 Bent DR Bent ER Bent CR Pier 2 Pier 1 Bent BR Bent AR 1936 Steel Support Added 1929, 1943 1952 Heavy Rock Revetment & Dikes

Pier 2, Pier 1, Bents ER & DR

Pier 2 East Side Enlarged Anchor Eye Bar Reset East toward Vicksburg 2012

Pier 1 Vertical Settlement Steel Shims Steel Bearing Date Total Shim Thickness Total Settlement 1929 to 1930 No Record 4.2 1930 Plans 1987 to 2003 2.50 Existing 4.2 02-19-2003 6.00 (+3.5 ) 7.7 05-23-2011 9.00 (+3.0 ) 10.7

Pier 1 Span 1 Jacking Total 400 Ton Dead Load Lift 6-Temporary 50 Ton Hydraulic Jacks at Each of the Two Bearing Permanent Steel Pipe Jack Support

Bent ER Vertical Settlement ER North Shims 2012 2012 Total Shim Thickness (Settlement) Dates ER South ER North Prior To 1998 Existing 4.0 0.5 03-11-1998 7.5 (3.5 ) 1.2 (0.7 ) 11-01-2006 16.4 (14.4 ) 6.8 (6.3 ) 09-14-2012 19.0 (15.0 ) 9.2 (8.7 )

March 2011 Barge Collision Video Year 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 Strikes 2013 Louisiana 1 0 Transportation 1 2 2 Conference 0 2 Old Vicksburg 5 1 Railroad 1 4 Bridge 1

Questions Rudy McLellan, PE Email: rmclellan@gecinc.com