Gatwick Stream Riverside Garden Park, Horley

Similar documents
TOWPATH MOWING GUIDELINES

BOULDER CREEK CATTLE FENCING FOR KOKANEE HABITAT ENHANCEMENT 2010

PORTISHEAD BRANCH LINE PRELIMINARY ENVIRONMENTAL INFORMATION REPORT VOLUME 4 APPENDIX Water Receptors

Finn Creek Park. Management Direction Statement Amendment

Bear Creek Habitat Improvement Project

GOOSENECK SWAMP INFORMATION DAY - Saturday 14 th December 2013

APPENDIX D: SUSTAINABLE TRAIL DESIGN. APPENDICES Town of Chili Parks and Recreation Master Plan Update

M.J. Milne & Associates Ltd.

Monifieth (Potentially Vulnerable Area 07/10) Local Plan District Local authority Main catchment Tay Estuary and Montrose Angus Council, Dundee coasta

Hydro-Electric Schemes Compliance Report June June 2013

Appendix 8.D Water Vole and Otter Survey Report

Wilts & Berks Canal. Appendix E: Hydrology and Hydraulics CONTENTS 1. INTRODUCTION 2 2. HYDROLOGY 2 3. HYDRAULIC MODEL 2 4.

Specification for Grip blocking using Peat Dams

FINGER-TATUK PROVINCIAL PARK

Managing Japanese knotweed in the Gardons basin

The Vjosa River in Albania

Initial OPW Designation APSR AFRR IRR Co-ordinates Easting: Northing: River / Catchment / Sub-catchment Type of Flooding / Flood Risk

ENVIRONMENTAL SYSTEMS LESSONS High School level DRAFT

This document is being shared by the Parks, Recreation and Musuem Advisory Board at the request of Golden citizens and in order to be transparent

KP Lasnaya 1 River

Plans and Design Calculations for the Alder Creek Diversion Fish Screen

Presentation Overview

General Summer and Winter Views

Bear Creek Watershed Restoration Project Final Project Report December 21, 2016

Europe s wild jewel - The Vjosa River in Albania

EAST DON TRAIL ENVIRONMENTAL ASSESSMENT. Community Liaison Committee Meeting #3 July 15, :30 to 8:30 pm Flemingdon Park Library

ROAD AND TRAIL PROJECT APPROVAL

RIO VISTA MUNICIPAL AIRPORT

4. Didymo: An Otago context

Hawke s Bay Regional Parks Network. Pekapeka Regional Park Individual Park Plan

EXPLANATORY STATEMENT

BUSINESS ZONE - OPTION 400 (Western footpath) Have your say. Love the Bay Delivering on the Cycleway

Damn those dams their effects on stream ecosystems

Appendix 3. Greenway Design Standards. The Whitemarsh Township Greenway Plan

Bedfordshire and Luton Species Action Plan: Hazel Dormouse

Loop Walks Key Criteria

Groundwater Recharge/Discharge Y 1, 2, 3, 4, 5, 16 X Wetland appears to be a contiguous hydraulic system, draining towards Goff Mill Brook.

Axe and Saw Permit: Safe Use of Axes

SH73 Route Security Strategic Study Project Summary

Danube River Basin District

Phoenix Habitat Restoration Projects

2.1 Physical and Biological Description Matabitchuan River Watershed

Juvenile coho salmon use of constructed off-channel habitats in two Lower Klamath River tributaries: McGarvey Creek & Terwer Creek

The Lower Prut Floodplain Natural Park (Romania)

X. WHATCOM CREEK SMA. X.1 Watershed Analysis. X.1.1 Landscape Setting

Canal Steward Program Adoption Package

Mark West Creek Flow Study Report

Property access tracks

Beautiful Walks from the Blue Ball Inn

FEASIBILITY CRITERIA

1.1.1 Landscape character This is the upper part of a bowl-shaped landform, extending east from the Rothiemurchus character area, contained by the

Chapter 4.0 Alternatives Analysis

Mearns Castle High School. Geography Department. Glaciated Landscapes


HORSHAM RIVERSIDE WALK

Yard Creek Provincial Park. Management Plan

Welcome KROSNO CREEK DIVERSION PROJECT CLASS ENVIRONMENTAL ASSESSMENT

Mt. Hood National Forest

Economic Development Sub- Committee

ACTION PLAN FOR THE PERIOD concerning the STRATEGY ON IMPLEMENTATION OF THE FRAMEWORK AGREEMENT ON THE SAVA RIVER BASIN

Sandbag Barrier. Suitable Applications Sandbag barriers may be suitable: As a linear sediment control measure:

Snowmobiling's Endless Winter:

NON TECHNICAL SUMMARY. Introduction

Peace Project Water Use Plan

Watchorn Provincial Park. Management Plan

ETOBICOKE CREEK NORTH TRAIL PROJECT. May 18, 2017 at Michael Power High School 105 Eringate Drive, Etobicoke ON M9C 3Z7

Park-specific management and policies Wainuiomata Recreation Area

Image donated by Hilltown local artist MICHAEL WOLSKI (

Côd Canŵio C oeing Co The Canoeing Code

A487 PONT SEIONT ARCHAEOLOGICAL RECORDING REPORT NO Y mddiriedolaeth Archaeolegol Gwynedd Gwynedd Archaeological Trust

HEAD OF ECONOMIC PROMOTION AND PLANNING Nathan Spilsted, Senior Planning Officer Tel:

Formation of a Corrie

INTERNATIONAL BIRD STRIKE COMMITTEE Amsterdam, April 2000 PHOENIX RIO SALADO/TEMPE TOWN LAKE

MEETING MINUTES Page 1 of 5

Unimproved meadow with extensive riverside frontage and a bank of mixed hardwoods with good hard track access in the heart of rural South Wales.

To: From: Plans showing the alignments of the routes discussed in this section are presented in Appendix A.

NOISE MANAGEMENT BOARD - GATWICK AIRPORT. Review of NMB/ th April 2018

Recreational Carrying Capacity

Thirteenth International Water Technology Conference, IWTC , Hurghada, Egypt 1249

City of Durango 5.8 FUNDING TRAILS DEVELOPMENT

Recrystallization of snow to form LARGE. called FIRN: like packed snowballs. the weight of overlying firn and snow.

EXECUTIVE SUMMARY PROGRAM DEVELOPMENT REPORT PURPOSE EXISTING SETTING EXPANDING PARKLAND

Appendix A Appendix A (Project Specifications) Auk Auk / Black Diamond (Trail 44) Reroute

Red Tarn, Lake District They are all features of glacial erosion

Calderdale Flood Partnership. The Calderdale flood action plan is supported and delivered by partners across the catchment.

RIVER ACCESS STRATEGY

1.4 Understand how moving ice acts as an agent of erosion and deposition. (Chap. 2)

FOOTPATH MANAGEMENT IN ICELAND A VISUAL REFLECTION ON QUALITY CONCERNS AND FOOTPATH POLICY CONSIDERATIONS

Photographic Log Client: Project Number: Site Location: Site Name: Photograph ID: Date: Location: Direction: Comments: Photograph ID:

BURGHCLERE PARISH RIGHTS OF WAY

DATE: January 19, WCA Governing Board. Johnathan Perisho, Project Manager. Mark Stanley, Executive Officer

Policy PL Date Issued February 10, 2014

Stainforth & Keadby Canal Installation of Multiuser Path

Air Operator Certification

FRIENDS OF RIDGE WOOD Informal Meeting and AGM

Appendix 8 Sawston Greenway Review

Title/Name of the area: Chwaka Bay, Zanzibar

WITHYCOMBE PARISH COUNCIL

An experimental habitat enhancement effort for a sandy river: San Rafael River restoration project

BABIA GÓRA DECLARATION ON SUSTAINABLE TOURISM DEVELOPMENT IN MOUNTAIN AREAS

Transcription:

Gatwick Stream Riverside Garden Park, Horley An Advisory Visit by the Wild Trout Trust January 2014 1

1. Introduction This report is the output of a Wild Trout Trust visit to the Gatwick Stream in Horley, West Sussex. The Visit was made following conversations with Fran Southgate from the Sussex Wildlife Trust (SWT) and Kevin Lerwill from the Gatwick Green Space Partnership, which is also part of the SWT. Kevin was leading a group of volunteers undertaking hedge laying and scrub clearance on-site and the opportunity was taken to meet and discuss options for the Gatwick Stream. Comments in this report are based on observations on the day of the visit and discussions with Kevin Lerwill and Paul Capper from the Horley Piscatorial Society. The river was in semi-spate conditions during the visit, making any evaluation of river bed gravels and spawning opportunities for flow loving fish species impossible. Throughout the report, normal convention is followed with respect to bank identification, i.e. banks are designated Left Bank (LB) or Right Bank (RB) whilst looking downstream. Section of stream inspected Section inspected 2

2. Catchment overview The Gatwick Stream is headwater tributary of the River Mole. The stream is heavily impacted by the long culvert system which takes the stream beneath the South Terminal and railway station at Gatwick Airport. The stream also receives effluent from the waste water treatment plant at Tinsley Green, as well as draining the extensive network of local roads and urban conurbation lying to the east of the Airport. The Gatwick Stream is reputed to support a small wild brown trout (Salmo trutta) population as well as eels (Anguilla Anguilla) and a mixed coarse fish community. 3. Habitat assessment and project opportunities The 1km reach of the Gatwick Stream bordering the Riverside Garden Park runs through a short section of natural meandering channel. Either side of the Park section, the stream has been heavily modified, with the short downstream having been straightened, presumably to accommodate the A23 dual carriageway. The upstream section is fragmented by a flow gauging weir and then buried in a culvert flowing beneath the Gatwick South Terminal. From what could be seen, the stream appears to support a range of in-channel habitat, with pool, glide and shallow riffle features. In-channel maintenance work has obviously been quite relaxed and there were many examples of good habitat being supported by fallen and semi-fallen trees, promoting valuable river bed and bank scour, as well as providing a habitat for invertebrates and cover for fish. Several potential issues were observed which may give rise for concern. 1. A significant issue is the proximity of the footpath running adjacent to the LB in several locations. The channel is deeply incised, comparatively high and steep. In several locations the bank is actively eroding (photo 1 and 2) and without intervention the footpath is likely to be severely damaged. Several options are available. Measures to slow down the high energy, erosive flow can but undertaken using simple techniques using materials won from riverside trees. For the site depicted in photo 1 a stub flow deflector made from a tree trunk or thick branch section could be keyed into the bank and configured to kick the flow away from the margin and towards the centre of the channel. The bare eroded bank faces at both sites can be protected by installing a brushwood mattress against the face to flow down water velocity and trap sediment (example depicted in photo 4). Ideally there should also be a managed retreated and the formal path should be either moved back, or narrowed to make space for defensive planting between the path and the top of the bank. 3

A large section of tree trunk keyed into the bank and secured to the bed could save this bank. The deflector should be configured to point between 40 and 60 degrees facing UPSTREAM to deflect erosive energy towards the centre of the channel and away from the failing bank. Photo 1. Steep bank on the outside of the bend will lead to bank failure and damage to the footpath. Photo 2 Another area where the path is in danger. Unfortunately the shape of the alders is forcing water into the bank under high flow conditions. 4

In flood conditions erosive flow will be kicked over and under this trunk and forced towards the bank, exacerbating bank erosion. This trunk should be coppiced hard back to the original stool Photo 3. View from upstream looking down highlights the angle of the left hand trunk promoting the bank erosion. Chestnut clefts are driven into the bed and the top of the bank face to provide a secure anchour for either vertical laths or wire to pin down the brashings. Photo 4. A brushwood mattress packed against an eroded bank face on the river Great Ouse 5

Currently the channel is quite heavily shaded. Some tree work would be desirable to provide a 50:50 dappled light and shade regime. Retaining low, overhanging cover is important, particularly over the outside of bends and over deeper pool habitat. There were some undesirable non native laurel or rhododendron trees which were blocking out all light and ideally they should be removed (photo 5). Photo 5. Laurel trees completely shading the channel should be removed. Several house gardens back onto the Gatwick stream from the RB. The treatment of the river bank varied considerably, with some garden bottoms being sensitively managed with others less so. A campaign to raise awareness about the flood defence and ecological value of the river bank would be worthwhile. 4. Conclusions This section of Gatwick stream provides a short but potentially extremely valuable wildlife corridor and fishery. A follow up visit to examine the river bed under normal flow conditions is recommended. There was some discussion regarding an impounding weir structure further downstream which has been recently lowered. It was suggested that this might have adversely impacted on the Gatwick Stream fish community. This would seem to be a very unlikely scenario and although it is possible the lowering of an impoundment downstream has resulted in the park section running lower and 6

faster, this should have resulted in improved conditions for flow loving fish species such as dace, chub, gudgeon, bullhead and possibly trout. With the an active local group prepared to undertake work, it is possible to organise a River Habitat Workshop, where the WTT could potentially partner the Gatwick Green Space group. Together we could provide training, tools and materials necessary to undertake some in-channel improvements and provide improved understanding of the techniques available that can enhance both riparian and in-channel habitat. 5. Recommendations Consider pegging in brushwood against the eroding bank face adjacent to the footpath. Coppice out any tree trunk which exacerbates bank erosion. Install a tree trunk stub flow deflector, keyed into the bank and extending a third of the way across the existing channel width to reduce erosion of the footpath. Remove non native trees shading the channel. Highlight the importance of sensitive use of the river bank with garden owners adjacent to the RB. Coordinate and implement a Practical Habitat Workshop, led by the WTT, where interested groups can be trained with the simple techniques required to maintain and improve in-channel and riparian habitats. A training day could also incorporate some simple invertebrate monitoring techniques promoted through the Riverfly Partnership. This is a great technique where local volunteers can monitor water quality performance. More details are available via www.riverflies.org Local coppicing of river-side trees to allow in more sunlight on densely shaded sections. Pinning LWD into the channel to promote river bed scour and promotion of deeper pool habitat. Pinning in brushwood tree material parallel to the bank to provide enhanced in-channel cover for fish and invertebrates. designs for stream enhancement can be found in the WTT habitat manuals available via our web site www.wildtrout.org Note. All work carried out within 8m of the top of the bank on a main river watercourse will require prior written consent from the Environment 7

Agency. The WTT can assist with project designs and the submission of applications for consent. Acknowledgement The WTT would like to thank the Environment Agency for supporting the advisory and practical visit programme. Disclaimer This report is produced for guidance and not for specific advice; no liability or responsibility for any loss or damage can be accepted by the Wild Trout Trust as a result of any other person, company or organisation acting, or refraining from acting, upon guidance made in this report. 8