A CONOPS for DFMC GNSS Dual Frequency Multi Constellation Global Navigation Satellite System

Similar documents
IATA User Requirements for Air Traffic Services (URATS) NAVIGATION. MIDANPIRG PBN SG/3 Meeting Cairo, Egypt, February 2018

EUROCONTROL EUROCONTROL S CIVIL-MILITARY VIEWS ON A EUROPEAN AIR NAVIGATION STRATEGY

GANP 2019/ASBUs. Olga de Frutos. Marrakesh/10 th December Technical Officer Air Navigation

Russian Federation ATM modernization program

Air traffic services (ATS) datalink using Iris Precursor. Contextual note SESAR Solution description form for deployment planning

ICAO Cyber Summit & Exhibition CLOSING REMARKS. 10 April 2017

ICAO Global Provisions and Regional Strategy for the Introduction of GNSS Services in Africa-Indian Ocean (AFI) Region

RPAS - Standardisation activities

ICAO framework for LPV

From AIS to AIM. COMSOFT AIS to AIM Lima, Peru Context and Overview Isabel Zambrano Rodriguez

Next Generation Airspace Developments: Key Operational Trends and Enablers

GBAS implementation status: international context and situation in France

Work Programme of ICAO Panels and Study Groups

NORTH ATLANTIC VISION

TWENTY-SECOND MEETING OF THE ASIA/PACIFIC AIR NAVIGATION PLANNING AND IMPLEMENTATION REGIONAL GROUP (APANPIRG/22)

Aeronautical Communications: Changes Ahead - FCI

TWELFTH AIR NAVIGATION CONFERENCE

ASSEMBLY 39TH SESSION

UK Implementation of PBN

SESAR AEROMACS PROJECTS P9.16 New Communication Technology at Airport P Airport Surface Datalink

Global ATM System ~Interoperability and Harmonization ~

The evolving air navigation system and the impact on avionics

NextGen Trajectory-Based Operations Status Update Environmental Working Group Operations Standing Committee

French DSNA approach to CNS rationalization & evolution

European RPAS Roadmap RPAS Activities in SESAR th USA/Europe Air Traffic Management R&D Seminar

ATC automation: facts and steps ahead

TWELFTH AIR NAVIGATION CONFERENCE

TWELFTH AIR NAVIGATION CONFERENCE

NAM/CAR Regional Safety/Air Navigation/Aviation Security Implementation Matters 5.2 Effectiveness of air navigation implementation mechanisms

TERMS OF REFERENCE Special Committee (SC) 209 Minimum Operational Performance Standards for ATCRBS/Mode S Transponder (Rev 6)

TWELFTH AIR NAVIGATION CONFERENCE

Aviation System Block Upgrades Module N B0-86/PIA-3

Aircraft Systems and 4D Trajectory Management

DSNA NAVIGATION STRATEGY

FAA GBAS Program Update January 29, 2010

TERMS OF REFERENCE Special Committee (SC) 186 Automatic Dependent Surveillance Broadcast (ADS-B) Revision 18

Flying SESAR from the RPAS Perspective. Robin GARRITY, SESAR JU ATM Expert Third SESAR Innovation Days, Stockholm, 26 th to 28 th November 2013

The support of an European ANSP

Performance Based Navigation (PBN) Implementation Plan. The Gambia

15 years of experience of GNSS approach procedures implementation: where are we now?

Evolving and improving landing networks with EGNOS

PENS Symposium How to join PENS

EUROCONTROL. Centralised Services concept. Joe Sultana Director Network Manager 1 July 2013

GNSS NOTAM. Aline Troadec RNAV approach specialist EUROCONTROL. AI Operations November 2013

Learning Objectives. By the end of this presentation you should understand:

Introduction of New CANSO Member Simon Li Director General CAD Hong Cong

ICCAIA CNS-ATM Committee Report to Council

Remote Towers and the Digitalising of Middle Eastern & European ATM Infrastructure

EUROPEAN COMMISSION DIRECTORATE-GENERAL FOR MOBILITY AND TRANSPORT

2012 Performance Framework AFI

This material draws on information published by Airservices and AOPA Australia. We acknowledge their work in this publication.

FF-ICE A CONCEPT TO SUPPORT THE ATM SYSTEM OF THE FUTURE. Saulo Da Silva

GBAS implementation status: international context and situation in France

State of Harmonisation Document

Aviation System Block Upgrades (ASBU), Blocks 0 and 1

Bits to Blocks Aviation System Block Upgrades (ASBU)

Terms of Reference for a rulemaking task

TWELFTH AIR NAVIGATION CONFERENCE

European ATM Development The Big Idea

Performance Based Communication and Surveillance in the ICAO North Atlantic Region. PBCS in NAT HLA

ADS-B Implementation and Regulation Meeting for the NAM/CAR/SAM Regions 26 to 30 November 2018 Mexico City, Mexico

ENAV experience on LPV implementation

EGNOS History, Status and Plans

ASSEMBLY 39TH SESSION

SBAS Frequently Asked Questions

MANAGING THE CHANGES AS A STATE CASE STUDY UAE Airspace Restructuring Project

PBN Implementation Stakeholder Readiness are we ready to go?

Trajectory-Based Operations (TBO)

ICAO PBN CONCEPTS, BENEFITS, AND OBJECTIVES

Module N B0-102: Baseline Ground-based Safety Nets

Advisory Circular. Automatic Dependent Surveillance - Broadcast

Update of ICAO DOC 8071 Volume 1

TERMS OF REFERENCE Special Committee (SC) 216 Aeronautical Systems Security (Revision 8)

TWELFTH AIR NAVIGATION CONFERENCE

Space Based ADS-B. ICAO SAT meeting - June 2016 AIREON LLC PROPRIETARY INFORMATION

AN-Conf/12-WP/162 TWELFTH THE CONFERENCE. The attached report

SOUTH AFRICA PBN NEAR TERM IMPLEMENTATION PLAN PROJECT

Report on Aviation User Needs and Requirements Outcome of the European GNSS User Consultation Platform

TERMS OF REFERENCE Special Committee (SC) 186 Automatic Dependent Surveillance Broadcast (ADS-B) Revision 22

Trajectory Based Operations (TBO)

International Civil Aviation Organization WORLDWIDE AIR TRANSPORT CONFERENCE (ATCONF) SIXTH MEETING. Montréal, 18 to 22 March 2013

AeroMACS. Why it is important for aviation. AeroMACS Open Day Firenze, 06/07/2018 Nikos Fistas and Víctor Flores EUROCONTROL

Navigation at the. Federal Aviation Administration Crossroads

International Civil Aviation Organization. Aviation System Block Upgrade (ASBU) Methodology An Overview

E GNSS in Aviation: status and trends, aviation grants Workshop Deployment of Galileo and EGNOS in Portugal

SESAR RPAS Definition Phase Results & Way Forward. Denis Koehl Senior Advisor SESAR Joint Undertaking

SESAR Active ECAC INF07 REG ASP MIL APO USE INT IND NM

SRC POSITION PAPER. Edition March 2011 Released Issue

Overview. ETSO Workshop 2008 New Developments in Avionic. Friedhelm Runge

SESAR Solutions. Display Options

SESAR Active ECAC ATC16 Implement ACAS II compliant with TCAS II change 7.1 REG ASP MIL APO USE INT IND NM

Excerpts from ICAO PBCS Manual

AeroMACS. Why it is important for aviation. AeroMACS Open Day Firenze, 06/07/2018 Nikos Fistas and Víctor Flores EUROCONTROL

Many thanks to our host

Bangkok, Thailand, July State PBN Plan and Status of PBN Implementation THAILAND PBN IMPLEMENTATION PLAN. (Presented by Thailand)

PBN Implementation Plan - Fiji Version 1 19 January 2010

Space Based ADS-B. Transforming the Way you See the Sky September 23, /22/2015

ICAO s Third Remotely Piloted Aircraft Systems (RPAS/3) Symposium Chengdu, Sichuan Province, China September 2018

RAAC/15-WP/14 International SUMMARY REFERENCES. A Safety

United States Aircraft Certification Standards and Guidance on ADS-B

Transcription:

A CONOPS for DFMC GNSS Dual Frequency Multi Constellation Global Navigation Satellite System GANIS Montreal, December 2017 Paco Salabert, EUROCONTROL The European Organisation for the Safety of Air Navigation

Outline CONOPS: Background, objective and timeline Introducing DFMC GNSS in aviation DFMC GNSS: Opportunities and challenges Implementation roadmap Way forward 2

CONOPS: Background and objective Background 2012: ICAO 12 th Air Navigation Conference Recommendation 6/6 to States and aircraft operators on the use of multiple constellations CONOPS objective To build up consensus among stakeholders on how new GNSS technology will be introduced in ATM in a safe and cost-efficient manner bringing operational benefits while addressing identified technical and institutional challenges and retaining backwards compatibility 3

CONOPS: a vehicle for building consensus ICAO States Service providers of GNSS systems ANSPs Aircraft & avionics manufacturers Aircraft operators 2014 NSP started CONOPS Dec 2016 NSP approved initial version 2017 CONOPS consolidation Consultation (25 groups + GANIS) April 2018 NSP to approve final version Oct 2018 13 th ANC

GNSS in aviation: much more than navigation GNSS Positioning: PBN, 4D NAV, GBAS CAT III, ADS-B and ADS-C, Enhanced Ground Proximity Warning Systems, Autonomous Distress Tracking,. GNSS: Distribution of synchronised time GNSS time used in many CNS and ATC ground systems: surveillance, communication networks, trajectory management, etc. Increased dependency on GNSS over time from the 90s to 2030 + DFMC GNSS could support all systems and applications based on GPS today 5

Introducing DFMC GNSS in aviation GPS L1 + RAIM, SBAS and GBAS DFMC GNSS: 4 constellations 8 signals + Advanced RAIM, DFMC SBAS and DFMC GBAS Operation al benefits and costs Avionics complexity ATM operational aspects GNSS elements Legal, political, and service provision A complex multi-disciplinary subject 6

Opportunities: operational benefits Technological and political push will improve performance and robustness BDS What operational benefits DFMC GNSS will bring to airspace users? 7

Opportunities: operational benefits IMPROVED 3D APPROACHES WORLDWIDE IMPROVED BUSINESS CONTINUITY FOR CNS APPLICATIONS INNOVATION Enable new concepts and applications. FLIGHT PLANNING No need for RAIM prediction REGULATORY COMPLIANCE with CNS requirements RATIONALIZATION OF AIRBORNE EQUIPMENT Operational benefits depends on aviation user group No single overarching benefit for all user groups Cost-efficiency challenge 8

Technical challenge: DFMC GNSS avionics 1. DFMC GNSS avionics will be more complex than current GPS L1 avionics to ensure global interoperability: Process more constellations: different signals, modulations and time Process DFMC SBAS, DFMC GBAS and A-RAIM augmentations of different combinations of constellations/signals 2. Potential capability to accommodate approvals of GNSS elements from States would further increase technical and operational complexity/costs 3. EUROCAE/RTCA are developing DFMC avionics standards (MOPS) and contributing to develop avionics section of the CONOPS Industry assessing options to limit complexity/costs without compromising operational benefits 9

Institutional challenge: approval of GNSS elements by States Different types of approvals Some States do not formally approve GPS in AIPs, but GPS is used worldwide Uncertainty on permissible use of other GNSS elements which may not be approved at the same time in different States Ongoing debate between States, industry, aircraft operators and ANSPs revolves around options on how DFMC avionics should consider the approval of GNSS elements by States 10

High level implementation roadmap Introduction of DFMC GNSS operations could start in 2025-2028 11

Way forward: Developing opportunities and overcoming the challenges ICAO GANIS event in December 2017 Continue iterations with RTCA SC159 and EUROCAE WG 62 NSP meeting in February 2018: paper to 13 th Air Navigation Conference NSP meeting in April 2018: approve CONOPS 13 th Air Navigation Conference in Oct 2018 12