Urban Beach Demonstration Project: Annexure A (Specification)

Similar documents
T O U R I S M P L A N 2020

CONFERENCE SUPPORTERS PROSPECTUS

POLICY & STRATEGIES The Vancouver Park Board approves major changes in Vancouver parks, including the design and development of parks.

Brisbane Metro Infrastructure Association of Queensland 14 February 2018

Request for quotation

Implementation Strategy for the Lethbridge Destination Management Organization (LDMO)

Request for quotation

TOURISM PLAN

ICN Gateway Breakfast (SA) Jon Whelan A/Manager Project Delivery 9 July 2015

CAIRNS RECTANGULAR PITCH STADIUM NEEDS STUDY PART 1 CAIRNS REGIONAL COUNCIL DRAFT REPORT SEPTEMBER 2011

INLAND RAIL. Connecting Australia. 5 June 2018 National Infrastructure Summit inlandrail.com.au

Riverbank Precinct Footbridge

Industry briefing NOVEMBER 2017

Community Sports Hub

The 30-Year Plan for Greater Adelaide. ECONOMIC PRIORITY 8: Adelaide, the Heart of the Vibrant State FOREWORD RIVERBANK AUTHORITY.

PERTH AND KINROSS COUNCIL. 22 June 2016 DEVELOPING THE CULTURAL OFFER IN PERTH AND KINROSS UPDATE AND NEXT STEPS

Stakeholder Briefing The Bays Precint Urban Transformation Program

FEDERATION SQUARE MELBOURNE, AUSTRALIA CORPORATE PLAN

Part four. In this part you will find: The next steps to deliver the master plan

The Sunshine Coast is part of the global community and generates wealth through export, high-value industries and new investment.

WORLD WATER SKI CHAMPIONSHIPS INCREASING SOUTH AUSTRALIA S INTERNATIONAL EXPOSURE

This is a submission to Council s Delivery Plan and Operational Plan

Central Alberta Destination Management Plan. CARL Presentation May 14, 2016 Sylvan Lake, AB

Sunshine Coast Council Locked Bag 72 Sunshine Coast Mail Centre QLD Submitted via online portal. 2 June 2017.

Park Board Chair and Commissioners

CREATIVE. A city of authentic and internationally renowned experiences. Creative City of Adelaide Strategic Plan

to provide a stimulating, educational, comfortable and entertaining destination venue to Victorians, and to interstate and international visitors.

New free City connector bus service

Gold Coast. Rapid Transit. Chapter twelve Social impact. Chapter content

Hamilton City Council Transport Strategy

Mackay Region. Destination Tourism Strategy

Sunshine Coast Airport Master Plan September 2007

NSW PRE-BUDGET STATEMENT FUTURE ECONOMY FUTURE JOBS

Committee. Presentation Outline

3 The growth of Western Sydney

ADELAIDE OVAL REDEVELOPMENT

Sport Capital Improvement Plan. Paul Borci Manager, Campus Planning Property & Campus Services

Adelaide Shores. Presentation to Recreation and Parks Conference 8 April How to become a world class Tourism, Recreation and Sport precinct

BUISNESS EVENTS CASE STUDY Prepared by Klara Vida, Communications Manager, Gold Coast Convention and Exhibition Centre

Calderdale MBC. Wards Affected: Town. Economy and Investment Panel: 20 October Halifax Station Gateway Masterplan

The Strategic Commercial and Procurement Manager

AQUIS ENTERTAINMENT LIMITED 2016 HALF YEAR RESULTS PRESENTATION

ENVIRONMENT ACTION PLAN

Request for quotation

NANAIMO AIRPORT LAND USE AND DEVELOPMENT PRINCIPLES

Accountability Report

RECONCILIATION ACTION PLAN NOVEMBER 2017 NOVEMBER 2018

A Master Plan is one of the most important documents that can be prepared by an Airport.

EARTHCHECK + UAP CAPABILITY STATEMENT

MURRAY REGIONAL TOURISM BOARD. Destination Management Plan Presentation

ANNUAL BUSINESS PLAN

Fringe Club and Corner 2016 Feedback on an event licence application for the Park Lands

PART D: Stakeholder consultation

Request for Quotation Site Operations Services

Pattullo Bridge Replacement Project

World Design Capital Taipei 2016 International Design House Exhibition Exhibition Participation Procedures

TERMINAL DEVELOPMENT PLAN

CROWN PERTH Sponsorship Guidelines Commercial and Community

Request for quotation

Pattullo Bridge Replacement Project

DIGITAL WESTERN PARKLAND CITY

China Creek North Park Upgrades and Glen Pump Station. Park Board Committee Meeting Monday, July 10, 2017

Invitation to Sponsor, Support or Exhibit

PO Box 257 PO Box 257 PARRAMATTA NSW 2124 PARRAMATTA NSW 2124

Cirque du Soleil. Feedback on a proposed 10 year agreement. The Adelaide City Council invites engagement from the community about.

Conexus is committed to innovation and bringing financial services to market with speed. We have a long history of innovation, including:

Park Board Chair and Commissioners

4 Transport projects underway in Western Sydney

TOR FOR THE DEVELOPMENT OF A ECOTOURISM BUSINESS PLAN FOR FAYOUM

TOWN PLANNING SUBMISSION TO THE GREATER SYDNEY COMMISSION LANDS AT ARTARMON

Terms of Reference: Introduction

ATTACHMENT A. P a g e 6 I t e m #

Perth and Kinross Council

The University of Melbourne Melbourne University Sport Club Support Report

For personal use only

Euroz Rottnest Investor Briefing

2 THE MASTER PLAN 23

General Issues Committee Item Transit Operating Budget Ten Year Local Transit Strategy

GOLD COAST CONVENTION AND EXHIBITION CENTRE NOVEMBER 2017 PARTNERSHIP PROSPECTUS

SERVICE LEVEL AGREEMENT (SLA) FOR THE DELIVERY OF TOURISM MARKETING SERVICES IN NEWQUAY

SANDY BAY RETAIL PRECINCT STREETSCAPE REVITALISATION - PALM TREES AND BANNER POLES - RESPONSE TO PETITION

Investing in Brampton s downtown

5 Rail demand in Western Sydney

NSW GOVERNMENT RESPONSE TO THE VISITOR ECONOMY TASKFORCE REPORT

Chancellery Projects. Melbourne Forum 4 May 2016 Vanessa Campbell, Director, Chancellery Projects

Signature Project Scheme in Central & Western District: Harbourfront Enhancement and Revitalisation ( HEAR ) at the Western Wholesale Food Market

Minister s Advisory Committee on Labrador Transportation

MEDIUM SIZE STADIUM STRATEGY

Draft Western District Plan

Conference, Events & Corporate Retreats BYRON AT BYRON RESORT & SPA

BRYAN REGIONAL PARK. Presented by: Burditt Consultants November 13, 2018

PLANNING THE SUNBURY GROWTH CORRIDOR

2.1 TITLE: VMC PARKS MASTER PLAN AND IMPLEMENTATION STRATEGY PROJECT UPDATE

Draft Planning Controls Planning Scheme Amendment GC81

Port Macquarie-Hastings Pedestrian Access and Mobility Plan. Working Paper COMMUNITY ENGAGEMENT

SUMMARY OF MEETING 1. Curtin Group Centre Master Plan. Community Panel - 25 July Attendees. Tuesday 25 July 2017, 6.30pm 8:30pm.

Creative Economy Plan

Keith Henry President & CEO, Aboriginal Tourism Association of Canada

2016 Emirates Melbourne Cup Tour

Friday 4 March Sunday 13 March MELBOURNE FOOD AND WINE FESTIVAL PARTICIPATION GUIDELINES

Transcription:

Urban Beach Demonstration Project: Annexure A (Specification) Prepared by: Keith Laird Place Manager Contact: keith.laird@sa.gov.au Telephone: 08 8207 0173 Date: 4 September 2017

Introduction Renewal SA is considering planning to create a temporary Urban Beach demonstration experience on the banks of River Torrens in the Adelaide Riverbank during November and December 2017, to test the viability of such a space on the banks of the river and explore suitable new non-immersive water activity. The concept of the demonstration project aligns with SA s economic priority to Broaden culture, economic and sporting activities in the city at all times of the week, throughout the whole year, for people of all ages. The Urban Beach is an extension of a suggested city pool next to the river as identified in the Greater Riverbank Precinct Implementation Plan (produced in 2013), and water/river activation to encourage people to spend time on and around the water is a key deliverable outlined in the Riverbank Authority s Our Strategic Vision document. A revitalized and activated Riverbank precinct is vital to the future growth and success of South Australia. Riverbank Authority Strategic Vision 2016 The Urban Beach demonstration project will aim to offer a new compelling and comprehensive offer to entice visitors and locals alike down to the Riverbank during the December 2017 and January 2018 summer period so they can embrace all the natural appeals this destination provides. It will offer a unique city experience with a cool urban summer appeal that will include a variety of day and night activities for families as well as the after work crowd. It is anticipated that there will be sand, on land water based play for children, outdoor activities for all ages, as well as high quality food and beverage offerings and more active sporting participation opportunities. Our Objectives Investigate whether an urban beach / city pool facility could be viable on the Adelaide Riverbank to inform further planning considerations. Challenge perceptions that the River Torrens is usable as a water destination. Positon the Adelaide Riverbank as a go-to destination for high quality recreation and entertainment at all times of the year. Link the Urban Beach with the longer term Place Strategy for the precinct. Support and encourage South Australian businesses and entrepreneurs. Provide opportunity for the broader Adelaide community to engage with the Adelaide Riverbank. Deliver a unique and high quality activated demonstration project that caters for people of all ages during both the day and night.

The Brief We invite you to provide a response for activation of the Urban Beach that delivers an outcome to achieve the demonstration project objectives and creates the desired experience for the Riverbank Authority. Curate and deliver a program of complementary and supportive activations in the Urban Beach operating under a self-sustaining and commercial business model; Work with Renewal SA s selected Urban Beach infrastructure provider; Present a world class experience that is unique to South Australia, that mandates the delivery of a program of summer beach/river bank related activities incorporating Renewal SA s beach area, that may include (but is not limited to); o staging and operation of appropriate physical games and non-immersive water activities; o a bar including summer cocktails; o food stalls which cater for a range of budgets and tastes; and o staging for music performances. Theme and dress the Urban Beach infrastructure with atmospheric lighting and appropriate theming to create an inviting, fun and relaxed summer recreational space; Deliver the full program of supporting summer activations in the defined area for the duration of 30 November 2017 through to 31 January 2018; Cater for both children and adults alike through a program of activities that will showcase the Adelaide Riverbank as a world-class destination; Provide upfront and ongoing activation consultation and management for the duration of the activations; Suggested activation program could include; o DJ and live music performances; o sand based activations such as dinosaur dig, sandcastle building competitions, beach volleyball, beach cricket, swing ball tennis, beach soccer, lifesaving skills; o non-immersive water based activities such as zorbing, kayaking, dragon boat racing, paddle boats; o all-ages family focused entertainment; and o wellness activities such as yoga, Pilates or Tai Chi. Work with key providers including peak sporting associations/clubs for the development and delivery of activities such as beach volley ball; and Work with existing Adelaide Riverbank stakeholders to integrate their offer into the Urban Beach demonstration project such as BBQ Buoys, Popeye, Paddleboats etc.

Urban Beach Demonstration Project Creative Execution The Urban Beach demonstration project will entice visitors and locals alike down to the Riverbank during the December and January summer period by offering a unique city experience with a cool urban summer appeal that could include: relaxing hammocks, deckchairs, sun lounges; beach bar, fresh summer food menu; atmospheric lighting in the trees; umbrellas, parasols; potential adult and family zones; and DJ booth and live music staging.

Reference Images

Reference Images (continued)

Urban Beach day time entertainment Look and Feel.

Location The host location for the activation is Pinky Flat which is situated next to Morphett Street Bridge and War Memorial Drive, demonstrated in the following images. 1.) Site overview highlighting the approximate location for the Beach. (Approx 80 m in length x 13 m in width) 2.) View from Morphett Street Bridge 3.) View from the Pinky Flat boat ramp

Scope of Work and Budget Stage 1: Concept Phase Interested Proponents will have a period of four (4) weeks to prepare a concept design and supporting business proposal. Concept design proposal, to include: 1. concept statement including explanatory text; 2. response to the brief; 3. concept design sketches and/or benchmarking images; 4. site layout 5. business model; and 6. timelines outlining estimated time required to undertake installation on site. Note: Renewal SA is under no obligation to accept/approve the concept proposal. Stage 2: Installation & Activation Management Following approval, the successful Proponent will be required to work with Renewal SA and the provider of the Urban Beach facility to aid with the installation and setup of the activation. The proponent will then be responsible for the ongoing management and operation of the activation. The successful proponent will liaise at all times with the nominated Project Team member. They will also be required to develop a detailed risk management plan, including an outline of safe work methods and public liability insurance certificates for approval prior to bump in. Operational Dates The Urban Beach will be operational from 30 November 2017 to 31 January 2018 Stage 1: Concept Phase (September 2017) Concept Design Development 4 weeks Concept Proposal deadline 2.00pm 29 September 2017 Assessment and contracting 2 weeks Stage 2: Installation & Activation Management (November- February 2017) Suggested Activation Dates 30 November 2017 31 January 2018 Suggested Bump in/out 22 November 2017-7 February 2018

Project Administration Project Management Throughout the project the successful Proponent will liaise with Keith Laird, Place Manager, Renewal SA, who is responsible for management of the demonstration project. The successful Proponent will be invited to attend the project management group responsible for delivering the activation and will be expected to work closely with Renewal SA and the successful proponent for the Urban Beach Demonstration Project infrastructure to ensure that all elements of the activation are integrated and successfully delivered. Contact Details: Keith Laird, Place Manager Email: keith.laird@sa.gov.au Telephone: 08 8207 0173 Contract: On commencement of the project a Service Level Agreement will be exchanged between Renewal SA and the successful Proponent, this brief will form a schedule of the contract.