Similar documents
Chapter 4 Airport Facility Requirements

Addendum - Airport Development Alternatives (Chapter 6)

CHAPTER 3 ALTERNATIVES CONSIDERED

Grove Field Airport Environmental Assessment

Tallahassee International Airport Master Plan. Technical Advisory Committee Meeting #2 October 19, 2016

Chapter 5 Airport Development Alternatives

What is an Airport Master Plan?

DRAFT MASTER PLAN UPDATE

print materials visit information on free live seminars, online courses, and

Appendix 6.1: Hazard Worksheet

Table of Contents. List of Tables. Cincinnati/Northern Kentucky International Airport 2035 Master Plan Update

6.1 INTRODUCTION 6.2 AIRSIDE ALTERNATIVES NORTH PERRY AIRPORT MASTER PLAN UPDATE RUNWAY LENGTH REQUIREMENTS SECTION 6: ALTERNATIVES ANALYSIS

MASTER PLAN CONCEPT 1 DRAFT

CHAPTER 2 ALTERNATIVES

Study Committee Meeting. September 2015

AIRPORT LAYOUT PLAN FOR FRIEDMAN MEMORIAL REPLACEMENT AIRPORT - SITE 12 FRIEDMAN MEMORIAL AIRPORT AUTHORITY INDEX OF SHEETS SHEET TITLE

TECHNICAL REPORT #7 Palm Beach International Airport Airport Layout Plan

The offers operators increased capacity while taking advantage of existing airport infrastructure. aero quarterly qtr_03 10

NOTICE OF OPPORTUNITY FOR PUBLIC COMMENT RELATED TO PASSENGER FACILITY CHARGE Posted March 25, 2019

Lopez Island Airport Master Plan Update. Public Meeting June 15, 2017

Public Information Meeting. September 2015

Summary of Committee Discussion/Questions Metropolitan Transportation Services Senior Planner Russ Owen presented this item.

Dallas Executive Airport

CHAPTER 3 FACILITY REQUIREMENTS

Airlake Airport 2035 Long Term Comprehensive Plan (LTCP)

Buchanan Field. Airport Planning Program. Steering Committee. December 14, Master Plan FAR Part 150 Noise Study Strategic Business Plan

Chapter 4 Facility Requirements

BNA Master Plan Update Community Advisory Committee Meeting No. 5

Correction to Council Resolution No , dated June 25, Please add the following correction as part of the permanent record:

CHAPTER 6 IDENTIFICATION AND EVALUATION OF ALTERNATIVES

PROPOSED HORIZONTAL LAYOUT FILLET DESIGN FOR ENTRANCE/EXIT TAXIWAYS

BNA Master Plan Update Public Meeting No. 2

4.0 AIRFIELD CAPACITY & FACILITY REQUIREMENTS

Appendix B PAVEMENT CONDITION AND HISTORY

Preliminary Findings of Proposed Alternative

Appendix A - Glossary

ICAO Recommended Airport Signs, Runway And Taxiway Markings. COPYRIGHT JEPPESEN SANDERSON, INC., ALL RIGHTS RESERVED. Revision Date:

Appendix D Airfield Ongoing Projects Alternatives

Draft Concept Alternatives Analysis for the Inaugural Airport Program September 2005

FINAL SUMMARY REPORT

ACTION TRANSMITTAL

1) Rescind the MOD (must meet the standard); 2) Issue a new MOD which reaffirms the intent of the previous MOD; 3) Issue a new MOD with revisions.

PORT OF PORTLAND. Chapter Seven CAPITAL IMPROVEMENT PROGRAM

MASTER PLAN UPDATE. Planning Advisory Committee (PAC) FRESNO YOSEMITE INTERNATIONAL AIRPORT. Meeting #4

OVERVIEW BASIC DESIGN FACTORS. Demand Determinants

Boeing Airplane Overview

FACILITY REQUIREMENTS SUMMARY OF KEY ISSUES OVERVIEW

Chapter 5 Airport Facility Requirements

Safety, Infrastructure, and Tenant Improvement Project. Public Hearing Informational Brochure February 26, 2013

Chapter 4 Airport Facility Requirements

New Opportunities PUBLIC WORKSHOP. Venice Municipal. Bringing g the pieces together

Technical Advisory Committee Meeting February 29, 2016

FORT LAUDERDALE-HOLLYWOOD INTERNATIONAL AIRPORT ENVIRONMENTAL IMPACT STATEMENT DRAFT

8.0 AIRPORT LAYOUT PLANS

Speaker: Jonathan Leach - Chicago Department of Aviation & Todd Merrihew, P.E. - Jacobs Date: February 22, 2017

CHAPTER 1 BACKGROUND AND PROPOSED ACTION

FACILITY REQUIREMENTS

COMMERCIAL AND GENERAL AVIATION Historic and forecast FDOT aviation activity information on file for Pensacola Regional Airport:

Runway and Taxiway Marking

Chapter 4 Airport Capacity Assessment and Identification of Facility Needs

PUBLIC NOTICE. Table 1 Projects Proposed by Amendment

Chapter 4. Development Alternatives

CHICO MUNICIPAL AIRPORT NON-MOVEMENT AREA DRIVER TRAINING PROGRAM

Chapter Four ALTERNATIVES

chapter 5 Recommended Master Plan Concept airport master plan MASTER PLAN CONCEPT

PORT OF PORTLAND. Chapter Six AIRPORT PLANS

Appendix D August 2001 RUNWAY SAFETY Revised March 2002 AREA DETERMINATION RUNWAY 17-35

Lake Tahoe Airport Master Plan

4. Demand/Capacity Assessment and Facility Requirements

Lake Tahoe Airport Master Plan Public Meeting March 16, 2015

Airport Master Plan. Rapid City Regional Airport. October 2015 FAA Submittal

Capacity Analysis & Facility Requirements

Contents 3.0 FACILITY REQUIREMENTS... 3

FORECASTING FUTURE ACTIVITY

Chapter 4.0 Alternatives Analysis

Ref. AIM Para AOPA Air Safety Foundation Supported by the FAA Ref. AIM Para Supported by the FAA

Chapter 4 AIRPORT DEVELOPMENT ALTERNATIVES

JACIP-AIRPORT PROJECT DETAIL REPORT August 15, 2007

Airport Design-3 Geometric Design

LOS ANGELES INTERNATIONAL AIRPORT MAY 2014

AIRPORT MASTER PLAN UPDATE

For additional information on the eligibility for federal funding, please refer to Order , Airport Improvement Program Handbook.

II. Purpose and Need. 2.1 Background

Airport Master Plan. Brookings Regional Airport. Runway Runway 17-35

Planning & Development Group

Nantucket Memorial Airport Commission. Master Plan Workshop. October 26, 2012

Update on the Aspen/Pitkin County Airport Improvements

This advisory circular (AC) contains the Federal Aviation Administration (FAA) standards for markings used on airport runways, taxiways, and aprons.

RECOMMENDED MASTER PLAN CONCEPT

Blue Grass Airport (LEX) serves the needs of a multi-county area that

Airfield Design. Public Review Draft OVERVIEW BASIC DESIGN FACTORS. Airport Role

CHAPTER FOUR AIRPORT ALTERNATIVES

PULLMAN-MOSCOW REGIONAL AIRPORT Runway Realignment Project

105 SKY KING TAXI-WAY - SPICEWOOD, TEXAS

Chapter 9 - AIRPORT SYSTEM DESIGN

Punta Gorda Airport Master Plan Update

Chapter Six ALP Drawings. Tacoma Narrows Airport. Master Plan Update

Funding Package TOTAL $15,172,000

Chapter Three AIRPORT FACILITY REQUIREMENTS/ALTERNATIVES

Facility Requirements

Transcription:

BRL LEGEND Airport Property Boundary Airfield Ramp, Taiway & shoulders Runway Pavement OFA RPZ Building Restriction Line Holding Position Object Free Area Runway Protection Zone Buildings Etended Clear Zone Dual Air-Carrier Runways (D-IV) Threshold at T/W D Eisting Threshold Displaced Threshold Full Runway Shift T/W D End Around Taiway Center Parallel Taiway Outboard Parallel Taiway Runway L - 29R Runway R - 29L Runway Centerline Separation (ft.) 0,996 0,996 8,408 6,998 706.5 - For Air Carrier Runway (Aircraft Design Group (ADG) IV) Master Plan Update TUCSON INTERNATIONAL AIRPORT DRAWING SCALE: " = 250' DATE: May, 203 FIGURE 5-

BRL POTENTIAL IMPROVEMENTS Round out pavement at end of T/W A; Relocate run-up ramp entrance 2 Remove T/W A5 & A6 between runways 3 Modify T/W A4 to have one lead-in line, not three 4 Remove in-line Runway taiways 5 Staighten T/W D2 6 Reconfigure T/W A8 7 Add second R/W L access with additional T/W 5 4 3 7 6 2 4 LEGEND Airport Property Boundary Airfield Ramp, Taiway & shoulders Eisting Runway Pavement OFA RPZ Building Restriction Line Holding Position Object Free Area Runway Protection Zone Buildings Proposed Removal Proposed Airfield Enhancement Etended Clear Zone Dual Air-Carrier Runways (D-IV) Threshold at T/W D Eisting Threshold Displaced Threshold Full Runway Shift T/W D End Around Taiway Center Parallel Taiway Outboard Parallel Taiway Runway L - 29R Runway R - 29L Runway Centerline Separation (ft.) - For Air Carrier Runway (Aircraft Design Group (ADG) IV) 0,996 0,996 8,408 6,998 706.5 Master Plan Update TUCSON INTERNATIONAL AIRPORT DRAWING SCALE: " = 250' DATE: May, 203 FIGURE 5-2

BRL POTENTIAL IMPROVEMENTS Round out pavement at end of T/W A; Relocate run-up ramp entrance 2 Add second R/W L access with additional T/W 3 Maintain T/W A5 & A6 between runways 4 Modify T/W A4 to have one lead-in line, not three 5 Etend T/W A4 to R/W R-29L 6 Widen R/W R-29L (Group IV capable) 7 Move R/W L & R landing threshold to T/W D 8 Etended Blast Pad 4 2 7 5 3 6 8 LEGEND Airport Property Boundary Airfield Ramp, Taiway & shoulders Eisting Runway Pavement Eisting Building OFA Building Restriction Line Holding Position Object Free Area Runway Protection Zone Proposed Runway Pavement Proposed Removal Proposed Airfield Enhancement Etended Clear Zone Dual Air-Carrier Runways (D-IV) Threshold at T/W D Eisting Threshold Displaced Threshold Full Runway Shift T/W D End Around Taiway Center Parallel Taiway Outboard Parallel Taiway Runway L - 29R Runway R - 29L Runway Centerline Separation (ft.) - For Air Carrier Runway (Aircraft Design Group (ADG) IV),330,330,330,330 706.5 Master Plan Update TUCSON INTERNATIONAL AIRPORT DRAWING SCALE: " = 250 DATE: May, 203 FIGURE 5-3

BRL POTENTIAL IMPROVEMENTS Round out pavement at end of T/W A; Relocate run-up ramp entrance 2 Add second R/W L access with additional T/W 3 Maintain T/W A5 & A6 between runways 4 Modify T/W A4 to have one lead-in line 5 Etend T/W A4 to R/W R-29L and around to T/W D 6 Shift landing threshold to allow B-II aircraft to tai on T/W D upon an aircraft's approach to R/W L & R A distance of,220' is required between the T/W D centerline and landing threshold; actual shown is,680' to be aligned with T/W A6. 7 Widen R/W R-29L (Group IV capable) 8 Etended Blast Pad 4 2 5 3 6 7 8 LEGEND Airport Property Boundary Airfield Ramp, Taiway & shoulders Eisting Runway Pavement Eisting Building OFA Building Restriction Line Holding Position Object Free Area Runway Protection Zone Proposed Runway Pavement Proposed Removal Proposed Airfield Enhancement Etended Clear Zone Dual Air-Carrier Runways (D-IV) Threshold at T/W D Eisting Threshold Displaced Threshold Full Runway Shift T/W D End Around Taiway Center Parallel Taiway Outboard Parallel Taiway Runway L - 29R Runway R - 29L Runway Centerline Separation (ft.) - For Air Carrier Runway (Aircraft Design Group (ADG) IV) (B-II) 0,807 9,68 0,807 9,68 706.5 Master Plan Update TUCSON INTERNATIONAL AIRPORT DRAWING SCALE: " = 250 DATE: May, 203 FIGURE 5-4

BRL POTENTIAL IMPROVEMENTS 2 3 4 5 6 Round out pavement at end of T/W A; Relocate run-up ramp entrance Remove T/W A5 Etend T/W A4 to R/W R-29L and around to T/W D Remove portion of inactive T/W C Construct new center and outboard T/W Maintain T/W centerline to R/W centerline separation requirement of 400'. Construct new Runway R-29L (Group IV capable) 7 Etended Blast Pad 8 Added second R/W L access with additional T/W 4 LEGEND Airport Property Boundary Airfield Ramp, Taiway & shoulders Eisting Runway Pavement Eisting Building OFA Building Restriction Line Holding Position Object Free Area Runway Protection Zone Proposed Runway Pavement Proposed Removal Proposed Airfield Enhancement Etended Clear Zone Dual Air-Carrier Runways (D-IV) Threshold at T/W D Eisting Threshold Displaced Threshold Full Runway Shift T/W D End Around Taiway Center Parallel Taiway Outboard Parallel Taiway Runway L - 29R Runway R - 29L Runway Centerline Separation (ft.) - For Air Carrier Runway (Aircraft Design Group (ADG) IV) 0,996 0,996 0,996 0,996 800 Master Plan Update TUCSON INTERNATIONAL AIRPORT DRAWING SCALE: " = 250' DATE: May, 203 FIGURE 5-5

BRL POTENTIAL IMPROVEMENTS Round out pavement at end of T/W A; Relocate run-up ramp entrance 2 Add second R/W L access with additional T/W 3 4 5 6 7 8 9 Remove T/W A5 between R/W L-29R & R-29L Widen T/W A5 between T/W A & R/W L-29R Etend T/W A4 to R/W R-29L and around to T/W D Remove portion of inactive T/W C Construct new center and outboard T/W Maintain T/W centerline to R/W centerline separation requirement of 400'. Construct new Runway R-29L (Group IV capable) Shift landing threshold to allow B-II aircraft to tai on T/W D upon an aircraft's approach to R/W L & R A distance of,220' is required between the T/W D centerline and landing threshold. Etended Blast Pad * Includes near-term safety and operational efficiency improvmements recommended in the 20 Airfield Safety Enhancement (ASE) Study, number not depicted on drawing. 2 4 5 9 3 8 7 6 LEGEND Airport Property Boundary Airfield Ramp, Taiway & shoulders Eisting Runway Pavement Eisting Building OFA Building Restriction Line Holding Position Object Free Area Runway Protection Zone Proposed Runway Pavement Proposed Removal Proposed Airfield Enhancement Etended Clear Zone ASE Safety Enhancements Dual Air-Carrier Runways (D-IV) Threshold at T/W D Eisting Threshold Displaced Threshold Full Runway Shift T/W D By-pass Taiway (B-II) Center Parallel Taiway Outboard Parallel Taiway Runway L - 29R Runway R - 29L Runway Centerline Separation (ft.) 800 Notes: - Recommended projects from the Airfield Safety Enhancement (ASE) Study 2 - For Air Carrier Runway (Aircraft Design Group (ADG) IV) 2 2 2 2 0,996 0,096 0,996 0,096 Master Plan Update TUCSON INTERNATIONAL AIRPORT DRAWING SCALE: " = 250' DATE: May, 203 FIGURE 5-6

BRL POTENTIAL IMPROVEMENTS Round out pavement at end of T/W A; Relocate run-up ramp entrance 2 Remove T/W T/W A5 & A6 3 4 5 6 Widen T/W T Remove T/W A7, A8 & A9 Construct new T/W A4 near new outboard T/W Remove portion of inactive T/W C 7 Construct new center and outboard T/W Maintain T/W centerline to R/W centerline separation requirement of 400'. 8 Construct new Runway R-29L (Group IV capable) 9 0 Shift landing threshold to T/W D Etended Blast Pad 2 3 9 4 5 8 0 7 6 LEGEND Airport Property Boundary Airfield Ramp, Taiway & shoulders Eisting Runway Pavement Eisting Building OFA Building Restriction Line Holding Position Object Free Area Runway Protection Zone Proposed Runway Pavement Proposed Removal Proposed Airfield Enhancement Etended Clear Zone Dual Air-Carrier Runways (D-IV) Threshold at T/W D Eisting Threshold Displaced Threshold Full Runway Shift T/W D End Around Taiway Center Parallel Taiway Outboard Parallel Taiway Runway L - 29R Runway R - 29L Runway Centerline Separation (ft.) - For Air Carrier Runway (Aircraft Design Group (ADG) IV),330,330,330,330 800 Master Plan Update TUCSON INTERNATIONAL AIRPORT DRAWING SCALE: " = 250' DATE: May, 203 FIGURE 5-7

BRL POTENTIAL IMPROVEMENTS 2 3 Displace R/W L & R to allow end-around tai on T/W D Construct two new Group IV capable runways Etended Blast Pad 3 2 3 LEGEND Airport Property Boundary Airfield Ramp, Taiway & shoulders Eisting Runway Pavement Eisting Building OFA Building Restriction Line Holding Position Object Free Area Runway Protection Zone Proposed Runway Pavement Proposed Removal Proposed Airfield Enhancement Etended Clear Zone Dual Air-Carrier Runways (D-IV) Threshold at T/W D Eisting Threshold Displaced Threshold Full Runway Shift T/W D End Around Taiway Center Parallel Taiway Outboard Parallel Taiway Runway L - 29R Runway R - 29L Runway Centerline Separation (ft.) (D-IV) 0,996 0,996 0,996 0,996 800 - For Air Carrier Runway (Aircraft Design Group (ADG) IV) Master Plan Update TUCSON INTERNATIONAL AIRPORT DRAWING SCALE: " = 250' DATE: May, 203 FIGURE 5-8