MAJOR REFIT OF R/V MARION DUFRESNE HÉLÈNE LEAU HEAD OF OCEANOGRAPHY DEPARTMENT INSTITUT POLAIRE FRANÇAIS, PAUL-EMILE VICTOR - IPEV

Similar documents
Coordination Center German Research Vessels

replacement SONNE status report

A project funded by the International Joint Ventures Fund of the Canada Foundation. for Innovation

The field program has two main components: Underway Geophysics and On-site Sample collection and detailed mapping.

U.S. Navy Global Class AGOR Mid-Life Refits Managed by the Office of Naval Research (ONR) UNOLS Annual Meeting November 1, 2018

The ship s keel has a diver-installed Multi-Beam Sonar mounting carriage located 1/3 length from the bow.

Using Victor 6000 on board R/ V Sarmiento de Gamboa

CORALFISH 2009 Cruise Report: CF0609. Eastern Ionian, Cephalonia and Zakynthos

R/V Maurice Ewing Replacement

NIOZ and OFEG Update 2010

DF-99 ANTARCTIC PENINSULA SEDIMENT TRAP DEPLOYMENT AND WATER CHEMISTRY CRUISE R/V N.B. PALMER (MAR 28, 1999 to APR. 12, 1999) David A.

OCEAN FACILITIES EXCHANGE GROUP update on. a bottom-up approach of research fleet. co-ordination & harmonisation

NIOZ Royal Netherlands Institute for Sea Research Ocean Facilities Exchange Group OFEG RV Newbuilds and plans elsewhere

Captain Will Whatley RRS Sir David Attenborough A new ship for the British Antarctic Survey

R/V «Dr. Fridtjof Nansen» - Fishery and oceanographic research vessel

Marcus Langseth Science Oversight Committee (MLSOC) Sunday December 8, 2013 JW Marriott Hotel 515 Mason St. San Francisco, California

R. Weller December 10, 2014 Version 1.3

Pre-Cruise Meeting 1400 Eastern Time (1100 Pacific), July 1, 2015

R/V NEW HORIZON Scripps Institution of Oceanography CRUISE PLAN 1 (Draft = 29 August 2004)

Mechanisms Controlling Hypoxia: Integrated Coastal Modeling Field Year 2010

Cruise Report. FDS Submarine Channels RV Koca Piri Reis. 9 th -26 th May 2010

GREEK ARGO PROGRAMME PRESENT STATUS AND FUTURE PLANS. G. Korres and D. Kassis HCMR March, 2015

ORV SAGAR KANYA CRUISE REPORT SK 324

Nature of MATE Internships in 2011 thru May UNOLS/USCG Interns

National Marine Facilities

ANNUAL REPORT

Fleet Improvement Committee 7/12/2012

PBVO. For Fish. Research) survey for herring and sprat

Summary THE FRAM STRAIT TOMOGRAPHY EXPERIMENT 2008

National Report by AUSTRALIA

NOTIFICATION OF PROPOSED RESEARCH CRUISE

Arctic Icebreaker Coordinating Committee (AICC) Summer Telcon- 9 June 2015 Draft Minutes- (ver17june2015)

OCIMF Report Template OVID OVPQ

L-DEO Office of Marine Operations: UNOLS Council and FIC Meetings June 5-7,2012 Boston, MA

Deepwater Horizon Oil Spill Principal Investigator One Year Update Workshop

120ft Motor Yacht Listing ID:

ANTARCTIC CROSSROAD OF SLOPE STREAMS expedition aboard B.O. HESPERIDES in the southwest Atlantic Ocean January-February, 2010

Cruise Plan Coastal Pioneer 7 Deployment

2008 Arctic Icebreaker and AICC Activities. Carin Ashjian, AICC Chair

O'Pati FOR SALE m (129'7"ft) Golden Yachts O'Pati. O'Pati is a 40m luxurious motor yacht built in 2011 by Golden Yachts.

Discover the epitome of luxury exploration... under the French flag.

Vripack 21.5m Sportfisherman

Study Visit in Nouvelle-Aquitaine. Bordeaux. 7th-9th November

MAIN AREAS OF EXPERTISE:

Ship based measurements on sea ice morphology during the CHINARE Antarctic and Arctic cruises

THE REAPPEARANCE OF THE DANTON

BRIESE Schiffahrts GmbH &Co KG Research Department

R/v Aranda Comeback to the Polar Seas Looking for International Co-operation

CORALFISH 2010 Cruise Report: CF0910-ROV. Eastern Ionian, Cephalonia Island

Cruise Report YK10-E02

YACHT charter brokerage construction...

Cruise Plan Coastal Pioneer 3 Deployment Leg 2: R/V Knorr Cruise KN December 2014

FOR SALE m (154'2"ft) Perini Navi Andromeda La Dea

Project: Profiling Float Observations in the Aegean Sea

Dominique Buestel & Marc Taquet 11ème Inter-congrès des Sciences du Pacifique 02 au 06 mars 2009 Tahiti Polynésie française

Exploration Updates. Spring Issue 1

67.55m Icebreaker Listing ID:

For Immediate Release September 3, CONSTRUCTION BEGINS ON NEW CABLE FERRY Special steel cutting ceremony held at shipyard

Prévision opérationnelle de trajectoires de gliders en mission

Great Lakes Association of Science Ships Annual Meeting, Traverse City, MI 11 Jan 11

R/V BELGICA Update 2008

Number 162. Underwater bow thruster replacement in harsh conditions Fast underwater hull repairs save time and money for ship owners..

The RV Mt. Mitchell. Port of Registry Ketchikan, AK

system: with specific focus to the Mediterranean, the Black Sea and the Southern Seas (Antarctic) sponsored by MUIR since 2011 (0.

Long Range Motor Yacht - Price Reduced! Listing ID:

PRINCESS 85 MOTOR YACHT 2010 PRICE: 2,490,000 EX VAT. Ref:PB PRINCESS 85 MOTOR YACHT FOR SALE FITTED WITH:

Cruise Plan Coastal Pioneer 2 Deployment R/V Knorr Cruise KN April 2014

CRUISE REPORT. R/V Seward Johnson Cruise No. SJ RAPID/MOCHA Program September 25 October 12, 2006 Ft. Pierce to Ft. PIerce, Florida, USA

Falcon 115 (GRP) Number: Yachts Invest - Jean Lacombe. Prestige Yachts Investment, La Croisette, Port Canto, Cannes 06400, France

PRINCESS V PRICE: 890,000 INC VAT. Ref:PB MODEL PRINCESS V62 SPORTS YACHT FOR SALE, FITTED WITH:

2002 BOMBARDIER GLOBAL EXPRESS

CHARACTERISTICS. STABILIZERS Rolls Royce zero speed (retractable) BUILDER Golden Yachts. CRUISING SPEED 12.5 knots YEAR REBUILT 2004

69' (21.20m) FERRETTI

Performance. Aircraft System

TUGS TOWING & OFFSHORE NEWS SPECIAL

Marine Consultants & Specialist Brokers. We are exclusively authorized to offer : WORK BARGE MAJOR

Cruise Report for NSF OCE : R/V Endeavor Cruise 531

MV ANSCHÜTZ FOR SALE

Underwater hull repairs save time and money

HIMIOFoTS - Hellenic Integrated Marine Inland water Observing, Forecasting and offshore Technology System

On Board Presentation. Copyright 2008 INTERNATIONAL ARMOUR Co. All rights reserved

MAIN SPECIFICATIONS Euros VAT PAID. Schiffswerft Maschf. Max Sieghold / Bremerhaven, Germany. BEAM 9 m ASKING PRICE GUEST CABINS

THE RHONE TRAFFIC MANAGEMENT CENTER. AIPCN-PIANC Marseille May

The Past, Present, and Future of Nortek and Glider Measurements

56m Multipurpose Vessel / Icebreaker Listing ID:

WORLD LARGEST VISITS SINGAPORE

400 Man / 8 Point / 300MT+25MT Crane / Accommodation/Work Barge

Monitoring the marine environment

Bahamas (BMA) Flag. Eagle Shipping Ltd

Short Cruise Report Schiff und Fahrt - Nr. MSM 79-2

Aeros 40D Sky Dragon. TYPE CERTIFIED BY: United States Federal Aviation Administration Civil Aviation Authorities: Europe and Asia

55 Meter (180ft) World Explorer motoryacht

BUILDER FLAG TYPE LENGTH MODEL BEAM YEAR DRAFT ACCOMMODATION CONSTRUCTION LOCATION ENGINES FIPA GROUP Sales Dept.:

Marine Exchange of Alaska Port of Juneau Navigation Study

TOGO OIL & MARINE (TOM) DEEP SEA TOWING & SALVAGE

114 Encyclopedia of Ship Knowledge. Collar. Illustrations courtesy of Wärtsilä Corporation. Wärtsilä 9L46C 9450 kw. Pod 12,000 kw

M/Y SPIRIT OF THE C S

LOA 46, LWL 41, Beam 13.8, Draft 6.1, Displacement 28,500 lbs Designer: J Boats Built 2003 by Tillotson Pearson Inc.

Ocean Gliders and the Argo float program Breck Owens WHOI. for INMARTECH Conference, Oct 06

CONSTRUCTION Motor Yacht with flying bridge Planning hull design GRP construction Teak laid decks

Transcription:

MAJOR REFIT OF R/V MARION DUFRESNE HÉLÈNE LEAU HEAD OF OCEANOGRAPHY DEPARTMENT INSTITUT POLAIRE FRANÇAIS, PAUL-EMILE VICTOR - IPEV

IPEV FRENCH POLAR INSTITUTE & OCEANOGRAPHY DEPARTEMENT The French Polar Institute National support agency For implementation of research programs in Arctic, Antarctic, Sub-Antarctic regions and on board vessels. A PUBLIC agency Gathering 9 organisms : MENESR, CNRS, Employing 50 permanents, > 200 contracts in land bases The Oceanography department: 10 persons (3 IR, 4 IE, 2 AI, 1 TCE) 40% of total budget (26 MM ) Missions: Préparation and implementation of scientific cruises on board R/V Marion Dufresne R&D Sediment Coring Worldwide Record of lentgth of sediment core rerieved Paléoclimatology 107 cruises since 1995 400 researchers, technicians and students per year 3700 publications from cruises data Feeding IPCC (Intergovernmental panel on climate change)

217 days / an Scientific activity 120 days / an Logistic activity Operator 48 crew THE R/V MARION DUFRESNE Length: 120 m Width 20.5 m Draft: 7 m Displacement: 10380 t Passengers: 110

MARC-JOSEPH MARION DU FRESNE (MARION-DUFRESNE) French explorator : 22 mai 1724 (St Malo) 12 juin 1772 (Baie des îles, NZ) 1972:During an exploration voyage to New-Zealand, he discovered Marion and Prince Edward s islands (RSA) as well as Crozet archipelago (France) 12 juin 1772 At anchor for repairs in «Baie des îles» NZ, kidnapped by Maoris and probably victim of canibalism

MARION DUFRESNE SPECIFICITIES One of the longest vessel of the European research fleet Multisicplinaty cruises nb / type operations nb scientists (large parties) Fit for southern ocean navigation Giant sediment corer CALYPSO (International leasdership) Home port La Réunion, Indian ocean Education «Floatting universities» Unité Mixte de Service FOF: IPEV, Ifremer, CNRS-INSU, IRD

Cruises worldwide, but ice covered ocean Routes of cruises 1995-2014 All cruises «Mission Specific Platform» (MSP) in program

MAJOR REFIT - 2015

SYNTHESIS OF IPEV ACTIONS Hydrologic system (winch, gantry, rooms) «Clean» CTD capacity Sicnetific premises, IT, VSAT: Upgrade of data transfer Coring winch, coring A frame, coring booms, bulkward Upgarde of coring facilities, up to 75 m long cores Acoustic equipments (incl. SMF et SBP) gondola mounted Upgrade of geosciences capacity + biology

R/V MARION DUFRESNE REFIT PROJECT EquipEX CLIMCOR: 2 M upgrade of deep tow winch (coring) EquipEX CLIMCOR-Marion Dufresne: 13M upgrade / renew of all other scientific equipment TAAF: 10 M non-scientific work: Hull & Machinery, «public» premises, cabins, galley, etc. Funding voted in november 2012, actually received in 2014 18 months project

SCHEDULE February 2015: 1 month transit out (Réunion to Dunkerque) - Preparation DAMEN shiprepair de Dunkerque 20 weeks Dry dock: 6 weeks Sea trials (mainly vessel): 2 weeks August 2015: 1 month transit home (Dunkerque to Réunion) incl. some scientific equipment SAT TAAF OP2: 1 month operation (logistic supply french sub-antarctic islands) No supply of islands from Dec 2014 to August 2015 Scientific equiment SAT: 6 weeks l st january 2016: First IPEV cruise

NEW ACOUSTICS EQUIPMENT FITTED ON GONDOLA

Gondola design Step 1: Hydrodynamic simulation with various cases (swell, speed, load) Use of 1993 model results for validation the computations

Hull scientific equipment Gondola mounted 2 multibeam echo-sounders KONGSBERG: EM122 & EM710 Sediment profiler KONGSBERG SBP120 Fisheries echo-sounder KONGSBERG EK80 (5 freq: 18, 38, 70, 120 and 200 khz) ADCP : RDI 38, 75 & 150 khz Naca profiles USBL IXBlue Posidonia Loch Acoustic transponder Underwater camera On board scientific equipment Surface continuous recorder (thermosal, fluorimeter, Oxygen, etc.) 2 inertial navigation system (INS) IXBlue HYDRINS Synchronisation for MBES, SBP, ADCP, EK80 : KONGSBERG K-SYNC New weather station Upgrade of the gravimeter to MGS XRF in MSCL system

BUIDLING THE GONDOLA IN WORKSHOP

LOWERING THE GONDOLA IN THE DOCK

INSERTING THE ANTENNAS

GONDOLA FINISHED

GONDOLA CABLES ROUTE DESIGN Cable pipes in yellow

ELECTRONIC ROOM CREATED IN FORWARD HOLE 1

INSTRUMENTATION ON NACA PROFILES View of the CTD caroussel from underwater camera set on portside Naca profile

CARTE BATHYMETRIQUE ACQUISE PENDANT CAMPAGNE CTBTO

Courtesy: SHOM, Y. Le Faou DATA EXAMPLE : SBP 120

NEW HYDROLOGY SYSTEM (ILOT)

New sheltered room for sampling Gantry for deployment Polymères pulleys and synthetic cable for «clean» CTD operation Dual capstan technpology for special cable use NEW HYDROLOGY SAMPLING SYSTEM

IMPACT ON 6 CABINS STRUCTURAL REINFORCEMENT

INSTALLATION NEW DRUMS Designed in «one go» for easy integration

Inside view of ILOT: left, one of the bi-capstan

CTD and carrousel deployment (right: maintenance gallery)

UPGRADE OF CORING SYSTEM

1- NEW DEEP SEAWINCH AND CORING CABLE 45 TONS PULLING STRENGTH WINCH 75 METRES LONG CORES 7200 METRES HIGH STIFFNESS CORING CABLE VERY HIGH QUALITY CORES

Deep sea winch SIAMOIS 3 drums amongst them one quipped with textile cable New bi-capstan 45 tons SWL

Special design of braiding of Dynalight cable Ø35mm as stiff as possible

2- NEW CORING A FRAME NEW CORING A-FRAME : 45 TONS SWL INTEGRATED HANDLING WINCH NEW ERGONOMICS

INTEGRATION OF CORING A-FRAME

Coring A-frame : SWL 45T, top frame shifted, integrated handling winch

3- NEW HANDLING BOOMS 4 NEW TELESCOPIC BOOMS 2 TONS SWL INTEGRATED SENSORS & AUTOMATION

Load tests for telescopic booms for long core handling

4- NEW SHIP DESIGN IMPROVE LONG CORE DEPLOYMENT : CLEAR WAY FOR 50 METRES LONG PIPES

75 M LONG SEDIMENT CORERS GIANT KULLEMBERG CORER CALYPSO

OTHER TYPES OF AVAILABLE SEDIMENT CORERS CASQ CALYSPO SQUARE (GRAVITY) GRAVITY MULTITUBE & VIDEO (INTERFACE) BOX CORE (INTERFACE)

IT AND SCIENTIFIC PREMISES REFURBISHMENT

REFIT OF SCIENCE ROOM Artist view Real life

REFIT OF LABORATORIES AND CABIN-LAB BAD «SURPRISES» IN WET LABS

REFITTED LABS

CREATION OF AN IT ROOM (CLOSED, AIR CONDITIONNED)

TAAF PUBLIC PREMISES RENOVATED CORRIDORS, COLD ROOMS

TAAF PUBLIC PREMISES RENOVATED RESTAURANT AND FORUM