ACTIVITIES RELATED TO THE WFD IMPLEMENTATION IN SERBIA AND MONTENEGRO WB, HMWB AND AWB - PRELIMINARY IDENTIFICATION

Similar documents
ANNEX IV. Heavily Modified Surface Water Bodies in Serbia and Montenegro

Implementation of WFD in Serbia and Montenegro

WORKSHOP ON THE TRANSPOSAL AND IMPLEMENTATION OF THE EU URBAN WASTE WATER TREATMENT DIRECTIVE (UWWTD 91/271/EEC) IN SERBIA

The Danube-Tisa-Danube Canal System in a Community Setting

Water Management in Serbia

Development of a MIKE11 Model of the Danube, Tisa and Sava Rivers in Serbia

The Danube Experience

The Timok River Basin in Serbia

PUBLIC COMPANY VODE VOJVODINE NOVI SAD WATER MANAGEMENT

Outline. The main objectives. The main objectives. Distribution of stable isotopes in the Sava River in Serbia

REPUBLIC OF SERBIA IRRIGATION AND DRAINAGE REHABILITATION PROJECT (P087964) (Credit No 4105YF and Loan No 7467YF)

1. PROJECT TITLE LOWER DRINA HYDROPOWER PLANTS

STATUS QUO REPORT ON HYDROGRAPHICAL ACTIVITIES

BRIEF HISTORY OF WATER MANAGEMENT CONDITIONS FROM 16 th TO 21 st CENTURY IN SERBIAN PROVINCE OF VOJVODINA

SPATIAL PLANNING ASPECTS OF MUNICIPAL WASTE MANAGEMENT IN AUTONOMOUS PROVINCE OF VOJVODINA - OPPORTUNITIES AND PROBLEMS -

Implementation of the Water Convention, including its complementary role to the EU Water Framework Directive

Decision on the amount of fees for state road usage

International Sava River Basin Commission - An example of EU/non EU country cooperation in water management

Presentation from 2015 World Water Week in Stockholm. The authors, all rights reserved. SIWI siwi.org

Danube Facts and Figures. SERBIA (September 2006)

Danube River Basin. a source for transboundary cooperation. Exploring the Results and Potential for Transboundary Water Management Cooperation

ABOUT SRBOBRAN. No of Companies in Srbobran. No of Entrepreneurs in Srbobran

JP TRANSNAFTA PETROLEUM PRODUCTS PIPELINE SYSTEM THROUGH SERBIA. October 2017

2. SECTOR Energy 1. PROJECT TITLE LOWER VRBAS HYDROPOWER PLANTS

The Sava and Drina River Corridor Initiative. Water Day European Commission/World Bank Brussels January 23, 2018

SUPPORT TO WATER RESOURCES MANAGEMENT IN THE DRINA RIVER BASIN DRAFT ROOF REPORT INTRODUCTION AND GENERAL APPROACH

Land Consolidation in Serbia

PCN Annex: GEF Data Sheet

Framework Agreement on the Sava River Basin and its implementation

Sava Commission Activities. DANUBE SKILLS KICK OFF EVENT, February 21, 2017, Bucharest

Danube River Basin District

Danube River Basin District

2014 floods in Serbia

GEOPOETIC OF DANUBE BASIN

AN EXPERT SYSTEM FOR COMBATING FLOOD CRISIS AND ARIDITY ON EXAMPLE VOJVODINA'S VATER TRANSPORT SYSTEM IN SERBIA

Overview. Sava River Basin. Sava River Basin. Sava River Basin

Ongoing and planned activities of the Sava Commission related to the scope of EUSDR PA5

Common Principles and Technical Requirements for Pan-European River Information Services (RIS)

THE DANUBE IN SERBIA

NATIONAL PLAN FOR IWW MAINTENANCE IN THE REPUBLIC OF SERBIA

Management of a Large The Danube. Mr. Mitja Bricelj ICPDR President Perth,13 October 2010

Hidrološki model za potrebe analize klimatskih scenarija u slivu rijeke Save

EU Strategy for the Danube Region framework for development of inland navigation

Sava River Basin Analysis Summary

Transboundary River Management in the Danube Basin

Ministry of environment, mining and spatial planning activities and methane action plan of republic of Serbia Dragana Mehandžić Ministry of

INTERNATIONAL SAVA RIVER BASIN COMMISSION. Sava River Basin Analysis Report

Cooperation in the Danube River Basin

Sava Commission Activities. KICK-OFF MEETING DANTE, February 17, 2017, Budapest

Key Tasks and Preliminary Findings

October 17-19, 2011 Maria Laach, Germany. 2 nd CGS Europe Knowledge Sharing Workshop Natural Analogues

Danube River Basin District

The Lower Prut Floodplain Natural Park (Romania)

ICPDR FP-EG project overview

International Sava River Basin Commission

WASTE MANAGEMENT FOR INLAND NAVIGATION ON THE DANUBE

ICPDR organisation and work in the field of accidental water pollution Examples of transboundary cooperation

REPORT from the 11 th Special Session of the International Sava River Basin Commission

Paper 87 - INTERNATIONAL COLLABORATION CONCERNING THE USE OF THE DANUBE RIVER IN ROMANIA

Public Seminar 30 October 2018, Lisbon. Water sector in B&H

RS - Serbia. Date of entry into force 1st November Territorial application Customs territory

ESTIMATES OF ENDANGERMENT AND PROTECTION FROM TORRENTIAL FLOODS ON SMEDEREVO TERRITORY

SEVERTRANS JSC Sombor

REGIONAL STRATEGY FOR SUSTAINABLE HYDROPOWER IN THE WESTERN BALKANS. Approach and Methodology

Safer with insurance Company Profile

OICE (Roma) & ANCE (Salerno) delegation in visit to Bucharest Camber of Commerce

SERBIA FLOODS 2014 Worst flooding in over a century

Solid Waste Management in cross-border rural and coastal areas of South Eastern European region

The UNDP/GEF Danube Regional Project

CONSERVATION OF HYDRO(GEO)LOGICAL HERITAGE SITES FOR PROTECTION OF PLAINS ENVIRONMENT (THE MOSTONGA EXAMPLE, WESTERN BAČKA)

NEEDS FOR NEW CADASTRAL SURVEYING BUILDING REGION IN THE TOWN OF BAČKA PALANKA

Terms of Reference (ToR) for a Short-Term assignment

Serbia. National Guaranteeing organization. Chamber of Commerce and Industry of Serbia (Please see World Directory for detailed contact information)

Vojvodina: Exploring the Economic Potential. of available sites in Backi Petrovac. Bratislava Belgrade Novi Sad June December 2004

CO-OPERATION IN DANUBE RIVER BASIN - THE ROLE OF SHMI SLOVENSKÝ HYDROMETEOROLOGICKÝ ÚSTAV

12th Sava PEG FP Meeting REPORT 1 Zagreb, Croatia October 20-21, 2009

Complex of flood control structures of Saint Petersburg Facility S1, Saint Petersburg, Russia

AN EXPERT SYSTEM FOR COMBATING FLOOD CRISIS AND ARIDITY ON EXAMPLE VOJVODINA'S HYDROLOGY SYSTEM IN SERBIA

Transboundary Water Management in Republic of Macedonia

REPUBLIC OF CROATIA MINISTRY OF MARITIME AFFAIRS, TRANSPORT AND INFRASTRUCTURE AGENCY FOR INLAND WATERWAYS

GENERAL DESIGN WITH PRE FEASIBILITY STUDY FOR THE REGULATION OF THE JUŽNA MORAVA RIVER FROM GRDELICA TO PREŠEVO TERMS OF REFERENCE

DaHar Danube Inland Harbour Development

DriDanube project overview

TID Inglostadt Sf. Gheorghe

14 th Sava PEG RBM Meeting REPORT 1 Zagreb, Croatia September 29 th

OPEN DAYS 2015 LOCAL EVENTS COUNTRY LEAFLET REPUBLIC OF SERBIA

Sub-Basin Level Flood Action Plan - Sava River Basin

The First Radon Map of Vojvodina

Cross-border cooperation along the Serbian Bosnian border. Drina Euroregion

REPORT ON THE ICE EVENT 2017 IN THE DANUBE RIVER BASIN

EPCG is seated at the address no 2 Vuka Karadžića St. in Nikšić

FLOOD RISK MANAGEMENT PLAN FOR THE SAVA RIVER BASIN DRAFT

The role of Serbia in the security of supply in Europe

IV International Symposium Agrosym /AGSY M NATURAL RESOURCES AND THE ENVIRONMENT OF UPPER DANUBE

ENTOMOLOŠKO DRUŠTVO SRBIJE ENTOMOLOGICAL SOCIETY OF SERBIA

MLADI BORAC JSC Sonta

PROJECT INFORMATION SHEET RIVER BASIN MANAGEMENT PRODUCTS AND ACTIVITIES

ACTION PLAN FOR THE PERIOD concerning the STRATEGY ON IMPLEMENTATION OF THE FRAMEWORK AGREEMENT ON THE SAVA RIVER BASIN

UTILISATION OF GEOTHERMAL WATERS AND GEOTHERMAL ENERGY IN VOJVODINA

REPORT from the 47 th Session of the International Sava River Basin Commission

Transcription:

ACTIVITIES RELATED TO THE WFD IMPLEMENTATION IN SERBIA AND MONTENEGRO WB, HMWB AND AWB - PRELIMINARY IDENTIFICATION Slobodan Petković, Marina Babic Mladenovic,, Bruno Jurak and Dragana Ninkovic Institute for Development of Water Resources Jaroslav Cerni - Belgrade

Preparation of Roof Report 2004 12 river basins > 4000 km 2 50 WB identified (9( at Danube, 41 at tributaries) HMWB due to main uses and significant physical alterations HMWB Candidate more precise data after future investigations HMWB planned reservoirs or flood protection and river training works planned Natural WB AWB Danube-Tisza Tisza-Danube hydrosystem (incl. Bega river)

DANUBE RIVER

DANUBE RIVER Danube Section Types

DANUBE RIVER CS_D3 CS_D4 CS_D5 DJERDAP GORGE LEVEES 80 75 70 65 60 IRON GATE I DAM 2 3 3' 2' NERA R. MORAVA R. SAVA R. Elevation (m.a.s.l.) 55 50 45 40 1 35 30 25 20 15 LEGEND: 1 - RIVER BOTTOM 2 - IMPOUNDED LOW WATER LEVEL 3 - IMPOUNDED HIGH WATER LEVEL 2' - NATURAL LOW WATER LEVEL 3' - NATURAL HIGH WATER LEVEL 940 960 980 1000 1020 1040 1060 1080 1100 1120 1140 1160 1180 Distance (km) TYPE 8 TYPE 7 TYPE 6

DANUBE RIVER

DANUBE RIVER Danube WB

DANUBE RIVER common WB with Romania CS_D1 (km 845-862.8) CS_D2 (km 862.8-943) CS_D3 (km 943-1075)

DANUBE RIVER CS_D3- deep part of HPNS Iron Gate I Reservoir (km 943-1075)

DANUBE RIVER CS_D4 CS_D7 shallow parts of HPNS Iron Gate I Reservoir CS_D4 (km 1075 1105) V. Morava R. CS_D5 (km 1105 1170) Sava R. CS_D6 (km 1170 1215) Tisza R. CS_D7 (km 1215 1255) backwater end CS_D4 CS_D5 CS_D6

DANUBE RIVER CS_D8 - HMWB (km 1255-1382) flood protection & training of the river channel common WB with Croatia

DANUBE RIVER CS_D9 - HMWB (km 1382 1433) flood protection & training of the river channel common WB with Croatia

SAVA RIVER CS_SA3 (km 179-209) CS_SA2 (km 102- km 179) OBEDSKA MARSH CS_SA1 (km 0-km 102) CS_SA3 upstream end at the CS-HR state border (coordinated with HR)

SAVA RIVER CS_SA1 (km 0 - km 102) CS_SA2 (km 102 - km 179) CS_SA314 (km 179-209)

DRINA RIVER CS_DR1, CS_DR2, CS_DR4 HMWB CS_DR3 HMWB planned HPP planned in WMP of Serbia CS_DR1 (km 0-91) CS_DR2 (km 91-120) CS_DR3 (km 120-199.5) CS_DR4 (km 199.5-256.3) HPP Zvornik HPP Bajina Basta HPP Visegrad

DRINA RIVER CS_DR1 (km 0-91) CS_DR2 (km 91-120) CS_DR3 (km 120-199.5) CS_DR4 (km 199.5-256.3)

VELIKA MORAVA RIVER CS_VM1 (km 0-21.7) Iron Gate I reservoir CS_VM2 (km 21.7-98) CS_VM3 (km 98-174)

ZAPADNA MORAVA RIVER CS_ZM1, CS_ZM2 natural WB CS_ZM3 HMWB CS_ZM3 (km 155-194) CS_ZM2 (km 93-155) CS_ZM1 (km 0-93)

ZAPADNA MORAVA RIVER CS_ZM1 (km 0-93) CS_ZM2 (km 93-155) CS_ZM3 (km 155-194) Type change (km155)

JUZNA MORAVA RIVER CS_JM1 (km 0-17) CS_JM2 (km17-80) CS_JM3 (km 80-100) CS_JM4 CS_JM5 CS_JM6 CS_JM4 (km 100-149) CS_JM5 (km 149-181) CS_JM1 CS_JM2 CS_JM3 CS_JM6 (km 181-228) Type change km 100

NISAVA RIVER CS31 CS_NIS1 HMWB CS_NIS2, CS_NIS3 natural WB CS_NIS1 km (0 30) CS_NIS2 (km 30-47) CS_NIS3 (km 47-101) upstream end at CS-BG state border CS32 (Sicevo gorge) Type change km 30 beginning of Sicevo gorge end of Sicevo gorge

LIM RIVER CS_LIM1 (km 42 53.6) CS_LIM2 (km 53.6-71) CS_LIM3 (km 71-111) CS_LIM1, CS_LIM3, CS_LIM4 natural WB CS_LIM2 HMWB (HPP Potpec reservoir) CS_LIM4 (km 111-193) CS-BIH state border 435.6 Type change km 111 HPP POTPEC

CS_IB1 CS_IB1 (km 0 20) IBAR RIVER CS_IB2 (km 20 77) CS_IB3 (km 77-167) CS_IB4 (km 167-197) CS_IB5 (km 197-225) CS_IB6 (km 225-275) Type change km 167 Type change km 225 HPP GAZIVODE RESERVOIR CS_IB1, CS_IB2, CS_IB3, CS_IB4 & CS_IB6 natural WB CS_IB5 HMWB (Pridvorica and Gazivode reservoirs)

TIMOK RIVER CS_TIM1 (km 0-40) CS_TIM2 (km 40-59) CS_TIM3 (km 59-78) CS_TIM4 (km 78-90) HPP Sokolovica CS_TIM1, CS_TIM2 HMWB candidates CS_TIM3 HMWB CS_TIM4 planned HMWB (river training works)

TAMIS (TIMIS) RIVER CS_TAM2 CS_TAM1 CS_TAM2 (km 80.9 117.3) -Section upstream of the Tomasevac weir - levees & change in hydrological regime -upstream end at CS-RO state border CS_TAM1 (km 0 80.9) - multipurpose system Donji Tamis weirs: Pancevo, Opovo, Centa CS_TAM2 CS_TAM1

TISZA RIVER CS_TIS2 Section upstream of the Dam on Tisza - reservoir & levees Upstream end CS-HU state border CS_TIS2 (km 63-161) CS_TIS2 CS_TIS2 CS_TIS1 mouth to the Dam on Tisza - shallow part of the Iron Gate reservoir & levees CS_TIS1 (km 0-63) CS_TIS1

DANUBE-TISZA-DANUBE CHANNEL NETWORK - AWB MULTIPURPOSE SISTEM 1. Drainage 2. Irrigation 3. Water supply 4. Receiving used waters 5. Navigation 6. Conveyance of transit waters 7. Forestry 8. Fisheries 9. Tourism and recreation The DTD Project, one of the biggest multi-purpose systems in Europe, is covering about 20.000km 2 of lowland area, linking or incorporating many rivers and channels. Furthermore, the Project set up new connections of the Danube and the Tisza in the Backa and the Banat region. A flexible system, accomplished by the coupling of rivers into a network, enables the choice of the water conveyance direction. The DTD Project consists of the channel network, the Dam on the Tisza near Novi Becej and many supplementary objects (25 weirs, 5 pumping plants and 17 navigation locks). The primary channel network is 695 km long (totaling 930 km with intercepted rivers), while navigation is enabled on 600 km. Primary channels, which have the role both in the water supply and drainage, are divided with 27 steps, forming 14 basins. The water flow in primary channels is gravitational, with dictated levels. The major structure of the DTD Project is the Dam constructed on the 63rd km of the Tisza River. The dam enables the gravitational entry of 120 m 3 /s of water into the channel network and the irrigation of of agricultural land in the Banat and the northern part of the Backa region.

DANUBE-TISZA-DANUBE CHANNEL NETWORK - AWB Canal Backa region Becej-Bogojevo Vrbas-Bezdan Novi Sad-Savino Selo Bajski kanal Odzaci-Sombor Backi Petrovac-Karavukovo Prigrevica-Bezdan Kosancic-Mali Stapar Total lenght in Backa region Banat region Banatska Palanka-Novi Becej Bega Navigable Bega Kikindski kanal Total lenght in Banat region Total Total lenght (km) 90,20 80,90 39,10 12,70 27,90 52,00 31,70 21,10 355,60 147,00 34,80 30,25 32,00 244,05 599,65

Thank you