REPUBLIC OF SERBIA IRRIGATION AND DRAINAGE REHABILITATION PROJECT (P087964) (Credit No 4105YF and Loan No 7467YF)

Similar documents
ANNEX IV. Heavily Modified Surface Water Bodies in Serbia and Montenegro

PUBLIC COMPANY VODE VOJVODINE NOVI SAD WATER MANAGEMENT

2014 floods in Serbia

WORKSHOP ON THE TRANSPOSAL AND IMPLEMENTATION OF THE EU URBAN WASTE WATER TREATMENT DIRECTIVE (UWWTD 91/271/EEC) IN SERBIA

Water Management in Serbia

ACTIVITIES RELATED TO THE WFD IMPLEMENTATION IN SERBIA AND MONTENEGRO WB, HMWB AND AWB - PRELIMINARY IDENTIFICATION

Presentation from 2015 World Water Week in Stockholm. The authors, all rights reserved. SIWI siwi.org

REPUBLIC OF CROATIA MINISTRY OF MARITIME AFFAIRS, TRANSPORT AND INFRASTRUCTURE AGENCY FOR INLAND WATERWAYS

BRIEF HISTORY OF WATER MANAGEMENT CONDITIONS FROM 16 th TO 21 st CENTURY IN SERBIAN PROVINCE OF VOJVODINA

JP TRANSNAFTA PETROLEUM PRODUCTS PIPELINE SYSTEM THROUGH SERBIA. October 2017

The Danube-Tisa-Danube Canal System in a Community Setting

SERBIA FLOODS 2014 Worst flooding in over a century

Development of a MIKE11 Model of the Danube, Tisa and Sava Rivers in Serbia

Outline. The main objectives. The main objectives. Distribution of stable isotopes in the Sava River in Serbia

1. PROJECT TITLE LOWER DRINA HYDROPOWER PLANTS

Local Energy Planning In Serbia

Project Data Sheet BASIC PROJECT DATA. Rehabilitation and Development of Transport and Navigation on the Sava River Waterway. Full project title:

KNOWLEDGE NOTE 1-3. Hydro-meteorological Disasters Associated with Tsunamis and Earthquakes. CLUSTER 1: Structural Measures

PCN Annex: GEF Data Sheet

SERBIA AND MONTENEGRO: FLOODS/LANDSLIDES

October 17-19, 2011 Maria Laach, Germany. 2 nd CGS Europe Knowledge Sharing Workshop Natural Analogues

2. SECTOR Energy 1. PROJECT TITLE LOWER VRBAS HYDROPOWER PLANTS

Main Features Location. 2 EUROPEAN CORRIDORS Koridor VII Danube River 22km of riverbank, road bridge, Smederevo Fortress monument of culture

Rehabilitation and development of navigation on the Sava river

LIST OF REFERENCE PROJECTS

ESTIMATES OF ENDANGERMENT AND PROTECTION FROM TORRENTIAL FLOODS ON SMEDEREVO TERRITORY

DaHar Danube Inland Harbour Development

AMENDMENTS TO THE DECISION 14/12 ON ADOPTION OF CLASSIFICATION OF THE SAVA RIVER WATERWAY

Belgrade Belgrade Date submitted to OIE 12/04/2017

OPEN DAYS 2015 LOCAL EVENTS COUNTRY LEAFLET REPUBLIC OF SERBIA

SPATIAL PLANNING ASPECTS OF MUNICIPAL WASTE MANAGEMENT IN AUTONOMOUS PROVINCE OF VOJVODINA - OPPORTUNITIES AND PROBLEMS -

Project Data Sheet BASIC PROJECT DATA

STATUS QUO REPORT ON HYDROGRAPHICAL ACTIVITIES

National and Regional Activities, Needs and Expectations

Stability Pact for SEE. Working Table II. Sava River Basin Initiative

Decision on the amount of fees for state road usage

Public Seminar 30 October 2018, Lisbon. Water sector in B&H

SECTION 3 GENERAL DESCRIPTION OF THE RIVER BASIN

The Study on Master Plan for Promotion of Mining Industry in Republic of Serbia Final Report (Summary)

GENERAL DESIGN WITH PRE FEASIBILITY STUDY FOR THE REGULATION OF THE JUŽNA MORAVA RIVER FROM GRDELICA TO PREŠEVO TERMS OF REFERENCE

WATER MANAGEMENT IN ROMANIA. Elisabeta CSERWID National Institute of Hydrology and Water Management ROMANIA

The Danube Experience

MLADI BORAC JSC Sonta

Implementation of WFD in Serbia and Montenegro

Final Drainage Letter Pikes Peak Community College Downtown Parking Lot Colorado Springs, Colorado

Sremska Mitrovica has great potential. It is related to both natural and human resources to which we are very proud of.

Trade Union of Workers in Construction and Industry of Construction Materials of Serbia

Common Principles and Technical Requirements for Pan-European River Information Services (RIS)

Towards practical Guidance for Sustainable Sediment Management using the Sava River as a showcase

AN ANALISIS OF CITIES ENDANGERMENT OF FLOODS ON THE EXAMPLE OF NOVI SAD

Sava Commission Activities. DANUBE SKILLS KICK OFF EVENT, February 21, 2017, Bucharest

GEOPOETIC OF DANUBE BASIN

Welcome to Kučevo. March Reasons for investing in Kučevo LOCAL ECONOMIC DEVELOPMENT OFFICE

Danube Facts and Figures. SERBIA (September 2006)

Doc. Dr Goran Vujic A dialogue between countries on the path towards sustainable waste practices

Projects for RE population implemented by Help. 31. May Hotel Princess, Bar

Outline of the Shinryu Head Works

Implementation Status & Results Serbia SERBIA ROAD REHABILITATION AND SAFETY PROJECT (P127876)

International Sava River Basin Commission - An example of EU/non EU country cooperation in water management

Figure Huong River Irrigation Scheme. The Study on Nationwide Water Resources. in the Socialist Republic of Vietnam. Development and Management

1. TITLE OF THE PROJECT HYDROPOWER SYSTEM UPPER HORIZONS. 2. SECTOR Energy

Slobomir Company Inc. Slobomir, Bijeljina,Bosnia and Hercegovina. OPPORTUNITY TO INVEST IN AQUA CITY - Aqua Park in Slobomir, Bijeljina

DATA BOOK IV : COST ESTIMATE

There are several legends about the origin of the name of Vračar. According to the oldest one, the name originates from vrapčija (sparrow) fields,

Overview. Sava River Basin. Sava River Basin. Sava River Basin

Sub-Basin Level Flood Action Plan - Sava River Basin

EU PRO 2018/2019 Calendar Competition What could Serbia bring to the EU?

STATUS QUO REPORT ON WATERWAY MAINTENANCE

NATIONAL PLAN FOR IWW MAINTENANCE IN THE REPUBLIC OF SERBIA

Sava Commission Activities. KICK-OFF MEETING DANTE, February 17, 2017, Budapest

Danube River Basin District

GENERAL NATIONAL REPORT: 2012 MOTORWAY DEVELOPMENT IN SERBIA

SEVERTRANS JSC Sombor

NEEDS FOR NEW CADASTRAL SURVEYING BUILDING REGION IN THE TOWN OF BAČKA PALANKA

Implementation of the Water Convention, including its complementary role to the EU Water Framework Directive

Ministry of Communications and Transport

REPUBLIC HYDROMETEOROLOGICAL SERVICE OF SERBIA. MEDARE 3 rd Expert Group Meeting Istanbul, Turkey September 2012

The Sava and Drina River Corridor Initiative. Water Day European Commission/World Bank Brussels January 23, 2018

REPUBLIC OF SERBIA CASE PRESENTATION ON ERW

HILLSBOROUGH COUNTY, FLORIDA AND INCORPORATED AREAS

Transboundary Water Management in Republic of Macedonia

Legal Briefing. Serbia: Infrastructure

Principle Causes of Dam Failures. Structural failure. Cracking. Stability failure. BIA Summer Water Resources Training Dam Safety Inspections

The Lower Prut Floodplain Natural Park (Romania)

Solid Waste Management in Republic of Serbia

Vision. MEGA programme Marth 1 st 2010, Belgrade. Presented by: Agency for Local Economic Development. Vladimir Kostic.

This is the small motorway Kikinda Ada Novi Sad Sremska Mitrovica and Loznica. It is, again, the small motorway Požarevac Krusevac Majdanpek Negotin.

Field excursion 2: ERRC2014 SEE River Project Final Event

International Sava River Basin Commission

Project Data Sheet BASIC PROJECT DATA. Improvement of the systems for navigation and topo-hydrographic measurements on the Danube River

ANNEX II. Significant Point Sources of Pollution and Emis Inventory in Serbia and Montenegro

PORTISHEAD BRANCH LINE PRELIMINARY ENVIRONMENTAL INFORMATION REPORT VOLUME 4 APPENDIX Water Receptors

Roads Company Belgrade JSC Belgrade

PPCR/SC.4/5 October 9, Meeting of the PPCR Sub-Committee Washington, D.C. October 28, REVIEW OF ON-GOING WORK OF THE MDBs IN DJIBOUTI

ACTION PLAN FOR THE PERIOD concerning the STRATEGY ON IMPLEMENTATION OF THE FRAMEWORK AGREEMENT ON THE SAVA RIVER BASIN

RUSSSIA EFTA USA. Duty-free export to over 1 billion consumer base. Belarus. Pan-European Corridors. 142 mil 13 mil 317 mil. 16 mil. 505 mil.

The Danube A Stream of Energy

Flood Risk Reduction Strategies and the Early Warning Systems for Alerting the Population in Western Balkan Countries

Implementation of ESPOO Convention in Republic of Serbia

Bosnia and Herzegovina

Transcription:

REPUBLIC OF SERBIA IRRIGATION AND DRAINAGE REHABILITATION PROJECT (P087964) (Credit No 4105YF and Loan No 7467YF) Component 1 Progress of Rehabilitation Summary Report Table 1 Completed s (Status as of March 31, 2014) No. 1 2 3 9 4 6 Rehabilitation of drainage system - Bavanistanski canal VV Rehabilitation of drainage system - Novoknezevacki canal- VV Rehabilitation of flood protection levees in "Zapadna Backa" sector (left bank of Danube river) at km 37+300 - km 37+380, km 39+550 - km 39+650 and km 56+780 - km 56+840 - VV Rehabilitation of Danube s bank Mladenovo from km 39+450 to km 39+750 VV Rehabilitation of Danube left bank stone revetment in "Zapadna Backa" sector between km 1431+060 and km 1430+740 VV Reconstruction of pump station Novi Knezevac VV 08/06 10/06 02/07 08/06 10/06 07/07 04/08 05/08 08/08 07/08 09/08 11/08 04/08 05/08 09/08 07/08 07/08 10/08 5 16 8 12 14 10 Rehabilitation of drainage system - COK Reconstruction of concrid bridge over the main canal Plavna system - VV Reconstruction of already regulated Jasenica river and dyke from km 0+000 to km 10 +235 (Velika plana district) Rehabilitation of the Tovarnik canalsecondary canal VV Rehabilitation of the gates Berava, Brzava and Karasica, Plavna canal - VV Rehabilitation of Danube s left bank from km1401 +400 to km1401 + 479 VV 03/07 06/07 05/09 02/09 04/09 05/09 08/08 09/08 05/09 02/09 04/09 08/09 02/09 04/09 07/09 07/08 10/08 10/09 Page 1 of 5

15 7 Rehabilitation of the groyn on the left bank on the Danube river by Glozan - VV Rehabilitation of drainage system "Plavna" VV 02/09 04/09 10/09 06/08 07/08 01/10 13 Rehabilitation of drainage system Plavna secondary canal VV 02/09 04/09 01/10 11 Rehabilitation of the Tovarnik canalmain canal VV 02/09 04/09 04/10 17 Rehabilitation of canal Kupusina - VV 11/08 08/09 08/10 22 21 24 26 32 Reconstruction of the concrete bridge over the river Plazovic/Construction of the bridges over Jegricka reka, drainage system Lanka-Birda, drainage system Kaveraca and Plazovic-VV Drina river and tributaries Flood Protection Areas: Rehabilitation of the Flood Protection System for municipalities and agriculture complex near Jadar river:(protected Area "Drina Gornji Dobric"): reconstruction of already regulated Jadar river and dike Phase 1.: km 2+610 (Jelava bridge) to km 8+393 (railway bridge) - Supply of mobile equipment for flood protection for the city of Novi Sad-VV Construction of the Juzna Morava river and tributaries defense systems: (Flood protection area Nis )-regulation of the Gabrova river from km 0+000 to km 1+660- Construction of storage facility for mobile equipment for flood protection-vv 05/10 07/10 09/10 01/10 02/10 12/10 06/10 06/10 10/11 01/10 02/10 02/11 12/10 02/11 10/11 33 Rehabilitation of main dranage system Kikinda-VV 02/11 04/11 10/11 27 23 on reinforcement of the embankment of the right bank of the Begej canal on the section from km 0+000 to km 8+850 Rehabilitation of riverbank protective work on the left side of riverbed Danube in Apatin, on the sections from rkm 1401+479 to rkm 1401+624 and from rkm 1401+624 to rkm 1401+770 -VV 09/10 10/10 11/11 05/10 06/10 09/11 Page 2 of 5

25 Construction of the flood protection system of the River Zapadna Morava and its tributaries - Protection Area Guca Regulation of the Bjelica River through Guca from km 1+043 to km 2+357, including works on securing of the channel flow capacity at the downstreem (km 0+000 to km 1+043) and upstream (km 2+357 to km3+489) sections - 09/10 10/10 11/11 31 Rehabilitation of the traffic route along the crown on the left bank of the Tisa levee from the bridge in Zabalj to Babatovo (km 37+288 to km 43+403)- VV 11/10 04/11 12/11 37 34 28 35 Rehabilitation of drainage system Cerski obodni kanal- COK secondary network Rehabilitation of drainage systems, the main drainage canals and the secondary network, Godominska area, Smederevo- Construction of the protective embankment of the Mlava river within the section from km 0+000 to km 3+154 and construction of the system for protection of the lower settlements parts from ground and surface waters - Protection area Stari Kostolac- Rehabilitation of the main drainage canal K and secondary network Negotin depression, Negotin- 04/11 06/11 01/12 02/11 04/11 04/12 09/10 10/10 10/11 06/11 07/11 06/12 20 Regulatory works on the Mlava River (from km 5+470 to km 8+649) and its tributary - the Grabovacki creek from km 0+000 to km 0+741-09/10 10/10 06/12 36 Regulation of the Vrnjacka reka river, reconstruction of the structures within the already regulated river bed through Vrnjacka Banja from km 2+ 744,80 do km 3+615,20 and ensuring of channel flow capacity on the upstream (km 0+544,00 km 2+744,80) and downstream (km 3+615 do km 5+916,80) sections- 05/11 06/11 08/12 39 18 Protection of the right side embankment of the Sava River on location of sewage pump station "Glavna" in Sabac Construction of flood protection and control system in the river basin of the Kolubara river tributary-the Tamnava river from km 13+700 to km 19+364-08/11 09/11 09/12 09/10 10/10 09/12 19 Protection of the Sava River littoral area Macva Reconstruction of the Sava River right-bank embankment from km 8+560 to km 18+029-09/10 10/10 09/12 Page 3 of 5

40 29 41 on rehabilitation of the bank revetment on critical spots at the Tisa River right bank on section I (from km 36+360 to km 35+530) and section II (from km 34+029 to km 33+349)- VV Protection of Ub Settlement from the Ubaca River High Waters works on reconstruction of regulated river channel via the settlement (km 9+600 - km 11+300) including securing of the flow capacity at the downstream (km 8+600 - km 9+600) and upstream section (km 11+300-12+300) - " on reconstruction of the system for protection against high water level of the Danube River in the area "Golubac"" 12/11 01/12 05/13 06/11 06/11 05/13 03/12 04/12 06/13 42 on rehabilitation of the Bank revetment on critical spots of the Tisa River right bank on section III (from km 25+915 to km 25+375) and section IV (from km 21+682 to km 21+238) 03/12 05/12 09/13 38 43.2 45 30 Construction of pump of sewage pump station "Glavna" in Sabac Lot 2 Section II: from km 6+800 to km 8+560 (1,76 km) Regulation of Pusta River from Kocanska petlja to village Pukovac (km 0+000 - km 5+508) on reinforcement and superelevation of the embankment at the Tisa River left bank on the section from km 10+400 to km 28+546-VV 11/11 12/11 10/13 01/13 02/13 11/13 06/13 06/13 11/13 05/11 10/11 03/14 Page 4 of 5

43 43.1 Table 2 - Status as of March 31, 2014 Flood protection Macva (Sava-Drina): East area: on reconstruction of the right side of Sava River upstream from Sabac Lot 1 Section I: from km 2+336 to km 6+100 (3,76 km) planned to be Status as of March 31, 2014 n/a n/a n/a n/a 01/13 02/13 Extended to 03/14 Progress 70% Component 3 - Institutional Strengthening and Capacity Building Table 1 - Ongoing s (status as of March 31, 2014) No. planned to be Supply of a Meteorological Doppler Weather Radar System 06/10 07/11 04/11 Delivered Page 5 of 5