Free Route Airspace Workshop Conclusions and Future Projects Outlook

Similar documents
Free Route Airspace Maastricht (FRAM)

POLFRA IMPLEMENTATION Progress Report FREE ROUTE AIRSPACE WORKSHOP

Cross-border Free Route Airspace Implementation Workshop Conclusions and Recommendations

Network Manager Adding value to the Network 29 September 2011

Monitoring Report: AIRAC March March No 03/1203. Edition: AIRAC 1203

Dynamic Airspace Overview concepts, complexities, benefits and outlook

FREE ROUTE AIRSPACE IMPLEMENTATION IN ARMENIA (ARMFRA)

Conditions of Application of the Route Charges System and Conditions of Payment

International Civil Aviation Organization. Agenda Item 6: Free Route Airspace Concept implementations within the EUR Region FREE ROUTE AIRSPACE DESIGN

How CFSPs work. processes, requirements, difficulties. Tuesday, June 19th, 2018 CFPSG PRESENTATION FABEC SC OPS/AOG RADISSON ZURICH AIRPORT 1

Monitoring Report: AIRAC July August No 03/1203. Edition: AIRAC 1203

EUROCONTROL. Visit of the Transport Attachés. 10 April Frank Brenner. Director General EUROCONTROL

Legal and Institutional Aspects of ATM in Europe. Roderick D. van Dam Head of Legal Service EUROCONTROL

Dynamic Management. of the. European Airspace Network. ADR Data Catalogue. Annex A: Supported Services

Case study London Heathrow & London Heathrow-Amsterdam

FABEC Operations. From a project-driven approach to continuous operational improvements

User Forum FPL adherence campaign Lessons learned & discussion. Chris BOUMAN, Head of Network Development Unit EUROCONTROL Network Management

FRA AIP publication and EAD data provision. Asa STANDAR

Introducing Free Route Airspace: Summary Paper from NEFAB Customer Consultation Days Helsinki, October 21, 2014 and Oslo, October 23, 2014

Monitoring Report: AIRAC October November No 03/1203. Edition: AIRAC 1203

Implementation of SESAR Pilot Common Project. - expected effects

The Effects of the Introduction of Free Route (HUFRA) in the Hungarian Airspace

Network Operations Performance

SWISS Proposals SJU Large Scale Demonstration Timeline Eric Nantier, Operations Research and ATM, May 2014

Implementation of air traffic flow management (ATFM) in the SAM Region REVIEW OF THE ATFM ACTION PLAN. (Presented by the Secretariat)

Monitoring Report: AIRAC March March No 03/1203. Edition: AIRAC 1203

Introduction. European Airspace Concept Workshops for PBN Implementation

InterFAB Cooperation: XMAN Implementing Extended Cross-Border Arrival Management. World ATM Congress Madrid, 8 March 2016

The Network Manager tasks and the ASM improvement initiative

Borealis Free Route Airspace ~ Concept of Operation ~ NM User Forum 28 January 2016

BUSINESS AVIATION TRAFFIC TRACKER EUROPE. September 2018

BUSINESS AVIATION TRAFFIC TRACKER EUROPE. April 2017

APPENDIX E ACTION PLAN FOR THE IMPLEMENTATION OF ATFM AT SAM AIRPORTS A: AIRPORT. Task description Start End

Civil-Military Cooperation. Advanced Flexible Use of Airspace

Hosted by General Civil Aviation Authority (GCAA)

European Performance Scheme

ICAO ATFM SEMINAR. Dubai, UAE, 14 December 2016

BUSINESS AVIATION TRAFFIC TRACKER EUROPE. June 2018

SES Performance Scheme

Monitoring Report: AIRAC March April No 03/1203. Edition: AIRAC 1203

BUSINESS AVIATION TRAFFIC TRACKER EUROPE. May 2018

EUROCONTROL. Centralised Services Workshop. Peter Matern CS#5 EAIMS 5 March 2014

Follow up to the implementation of safety and air navigation regional priorities XMAN: A CONCEPT TAKING ADVANTAGE OF ATFCM CROSS-BORDER EXCHANGES

BUSINESS AVIATION TRAFFIC TRACKER EUROPE. January 2018

Network Management, building on our experience of flow management and network planning.

Forty years of vision. The EUROCONTROL Maastricht UAC story. years of vision EUROCONTROL MAASTRICHT UAC EUROCONTROL

Doing things differently

DMEAN. Dynamic Management of the European Airspace Network. European Medium-Term ATM Network Capacity Plan Assessment

Free Route Airspace ASM Dimension. Giuseppe Acampora

Agenda Item 8: RNAV routes data quality monitoring status report

Modernising UK Airspace 2025 Vision for Airspace Tools and Procedures. Controller Pilot Symposium 24 October 2018

PERFORMANCE REPORT CAPACITY

Delivering Free Route Airspace for Northern Europe ~ Progress to date. Branka Subotić, Executive Director

The Single European Sky and SESAR, the European ATM modernisation programme. Patrick Ky, Executive Director 26 May 2010

ELEVENTH AIR NAVIGATION CONFERENCE. Montreal, 22 September to 3 October 2003

AIP ITALIA Servizio Informazioni Aeronautiche

Issues related to the provision of surveillance service

PERFORMANCE REPORT CAPACITY

NAV CANADA and DATA LINK IMPLEMENTATION. Shelley Bailey NAV CANADA May 2016 Sint Maarten

Centralised Services 4 Advanced Flexible Use of Airspace Service

Free Route Airspace (FRA) Application in NMOC - Guidelines

March 2015 compared with February 2015 Volume of retail trade down by 0.8% in euro area Down by 0.6% in EU28

Workshop. SESAR 2020 Concept. A Brief View of the Business Trajectory

Morocco ASBU Implementation

EUROCONTROL EUROCONTROL AT WORLD ATM CONGRESS SUPPORTING EUROPEAN AVIATION. 6-8 March 2018, Madrid

Civil/Military Cooperation ICAO Workshop. Civil/Military Cooperation in Ukraine

PERFORMANCE REPORT CAPACITY

STRATEGY/ACTION PLAN FOR IMPLEMENTATION OF REDUCED VERTICAL SEPARATION MINIMA IN THE AFRICA-INDIAN OCEAN REGION 22 NOVEMBER 2003

NEFAB Annual Report 2016

UKRAINE SITUATION AND THE INFLUENCE ON THE TRAFFIC SHIFTS

Next Generation Airspace Developments: Key Operational Trends and Enablers

Paolo Nasetti Head of En-route Operations. Bruxelles, 28 January 2016

2017 Overview and 2018 Outlook

THIRTEENTH AIR NAVIGATION CONFERENCE

LETTER OF AGREEMENT BETWEEN BODØ FIR AND MURMANSK FIR

Free Route Airspace Definitions

Monitoring Report: AIRAC June July No 03/1203. Edition: AIRAC 1203

Flight Efficiency Initiative

Demand capacity balancing in a dynamic fashion. Sonke Mahlich, EUROCONTROL Experimental Centre

The European Experience Flexible Use of Airspace (FUA)

Hotel Booking Category Overview

European General Aviation Conference Schonhagen Airport. Martin Robinson CEO AOPA UK Deputy Vice President IAOPA Europe Berlin 15 th May 2006

AMAN RESEARCH IN SESAR

EUROCONTROL REVIEW OF CIVIL MILITARY COORDINATION AND COOPERATION ARRANGEMENTS

TWENTY-SECOND MEETING OF THE ASIA/PACIFIC AIR NAVIGATION PLANNING AND IMPLEMENTATION REGIONAL GROUP (APANPIRG/22)

REG ASP MIL APO USE INT IND NM

Air Space Management - ASM Workshop March 2013 Rabat, Morocco. Advanced Flexible Use of Airspace. Presented by Petri Hartikainen, Integra A/S

Seychelles Civil Aviation Authority. Telecomm & Information Services Unit

Technical Resources - Automation European AIS Database (EAD)

Free Route Airspace (FRA) Application in NMOC - Guidelines

European Network Operations Plan

NEFAB Project Feasibility Study Report Operational Concept

Civil and Military Use of Airspace in France

EUROPEAN ORGANISATION FOR THE SAFETY OF AIR NAVIGATION EUROCONTROL. Draft. COMMISSION REGULATION (EC) No /.. DD/MM/YYYY

Civil-Military ATM Coordination. Edgar REUBER EUROCONTROL/DECMA/CMC/ARD September, 12th 2018

SIMULATION OF BOSNIA AND HERZEGOVINA AIRSPACE

Civil and military integration in the same workspace

InterFAB Ops meeting Traffic volatility in Brussels hotspot sectors

Capacity Planning and Assessment Network Operations Planning

Directorate Network Management Monthly Network Operations Report Analysis - June 2012

Transcription:

Free Route Airspace Workshop Conclusions and Future Projects Outlook FRA Workshop EUROCONTROL HQ, Brussels 24-25 May 2018 Razvan Bucuroiu Head of Network Strategy and Development & Operations Planning 25 MAY 2018

FRA Workshop Conclusions Network Evolutions and Coordination A single NM system FRA model based on significant points characteristics and oriented towards the full FRA model Full observance of the NM documentation on FRA Re-enforcement of the provisions in the NM FRA documentation Implementations based on those provisions Good and efficient process from CONOPS/Airspace design into implementation Enlarged and earlier participation of AOs/CFSPs in the full process for individual FRA projects from CONOPS/Airspace design into implementation, including prevalidations Additional participation in RNDSG possible Additional resources and automation for FRA/airspace pre-validations Additional automation for ASM data for FRA/airspace pre-validations Implementation of the foreseen FRA NM systems evolutions over the next two NM releases Early involvement with AIS in FRA developments, AIRAC adherence, follow the harmonising FRA publication guidelines. ERNIP Part 1 6.5 - FRA Checklist Identify appropriate means to continuously communicate with the entire AOs/CFSPs community on FRA implementation progress 2

FRA Workshop Conclusions FRA Network Implementation Expansion of cross-border FRA to maximise benefits and increase flexibility for AOs Based on FRA, not published DCTs Lower the FRA level implementation to the maximum possible, based on operational requirements, preferably down to the TMA levels Ensure continuity in vertical connectivity Ensure appropriate TMA connections Removal of ATS route network desirable within full FRA airspace volumes There is no particular requirement to maintain the ATS route network within the FRA airspace volumes Synchronisation of adjacent FRA implementations and involvement of all neighbouring areas during development and implementation Maintain a grid of published significant points to facilitate flexible flight planning Gradual evolution towards the utilisation of lat/long depending on the evolution of local ATM systems and datalink implementation Request from airspace users that FRA projects are urgently initiated in all remaining parts of the European airspace 3

FRA Workshop Conclusions AOs/CFSPs FRA Evolutions Good progress on flight planning system current and planned evolutions noted Further automation and optimisation tools evolutions required Be able to evaluate ATFCM situation B2B service enabling 4D trajectory exchange between NM and AOs/CFSPs required as well as the planned FF-ICE evolutions Dynamically respond to the eaup/uup Are company routes still a viable option in a dynamic network? Probably as a last resort Availability/utilisation of trajectory visualisation tools through CFSPs or NM tools Earlier data availability to AOs/CFSPs Requires strict observance of the data publication timelines by the AIS data originators/rad coordinators/env coordinators Free flight functionalities should consider other network constraints CFSPs Best Practices to be also promoted 4

FRA Workshop Conclusions RAD RAD decreasing in FRA areas NM to provide evaluations in this respect RAD evolutions considered in general as adding significant complexities, in most of the cases in non-fra areas RAD network approach based on inputs from AOs/CFSPs/ANSPs required Simplification and harmonisation Focus on the operational goal not on adding significant number of restrictions Network effects unknown locally RAD workshop to be organised to address a new approach to RAD 5

FRA Implementation - end 2018 6

FRA Implementation - end 2019 7

FRA Implementation - end 2020 8

FRA Implementation - end 2021 9

FRA Implementation - end 2022

Planned Projects Confirmed Implementation Dates

FRAS Seasonal (FRA Sofia) Phase 2 Bulgaria Date: 11 OCT 2018 Laterally: AoR of Sofia ACC Vertically: FL175 - FL660 Time: 05:00-23:00 (04:00-22:00) 23:00-05:00 (22:00-04:00) SEEN FRA ATS route network: Available Evolution: FRAS Night (BGR) - 14 NOV 2013 N-FRAB Night (ROU) - 11 DEC 2014 HUFRA H24 (HUN) - 05 FEB 2015 Cross-border FRA HUN / ROU Night - 20 AUG 2015 SEEN FRA Night - 30 MAR 2017 FRAS Seasonal Phase 1-1 FEB 2018 FRAS Seasonal Phase 2-11 OCT 2018 SEEN FRA Night Expanded - 06 DEC 2018 SEE FRA - 07 NOV 2019 Airspace Volume: ATC Unit Airspace - AUA Model: FRA with Intermediate points (FRA - IP) Currently not foreseen. The First Seasonal period was: 1 FEB 2018-23 MAY 2018. The Second Seasonal period is 11 OCT 2018-22 MAY 2019 but the FRA might continue during Summer 2019 and merge with SEE FRA H24 planned for 7 NOV 2019.

FRAU (FRA Ukraine) (Sc 1b) Ukraine Date: 08 NOV 2018 Laterally: AoR of L viv ACC Vertically: FL275 - FL660 Time: H24 ATS route network: Available Evolution: FRAU Sc 1a - 05 MAR 2015 FRAU Sc 1b - 08 NOV 2018 Airspace Volume: ATC Unit Airspace - AUA Model: FRA with Intermediate points (FRA - IP) Currently not foreseen

BELFRA (FRA Belarus) (non-ecac area) Belarus Date: 08 NOV 2018 Laterally: AoR of Minsk ACC Vertically: FL305 - FL660 Time: 23:00-05:00 (22:00-04:00) ATS route network: Available Evolution: No - single FRA area Airspace Volume: Not managed by NM Model: Not managed by NM Currently not foreseen as in majority of cases issues can be managed by the adjacent States, except Russian Federation limitations.

SEEN FRA (South East Europe Night FRA) Bulgaria/Hungary/Romania/Slovakia Date: 06 DEC 2018 Laterally: AoR of Budapest ACC, Bucuresti ACC, Sofia ACC, Bratislava ACC Vertically: 9500FT / FL105 / FL175 / FL245 - FL660 Time: 23:00-05:00 (22:00-04:00) ATS route network: Withdrawn / Available / Available / Withdrawn At least one FRA significant point per FIR Evolution: FRAS Night (BGR) - 14 NOV 2013 N-FRAB Night (ROU) - 11 DEC 2014 HUFRA H24 (HUN) - 05 FEB 2015 Cross-border FRA HUN / ROU Night - 20 AUG 2015 SEEN FRA Night - 30 MAR 2017 FRAS Seasonal Phase 1-1 FEB 2018 FRAS Seasonal Phase 2-11 OCT 2018 SEEN FRA Night Expanded - 06 DEC 2018 SEE FRA - 07 NOV 2019 Airspace Volume: FRA airspace (ERAS or CRAS) - t.b.d. Model: FRA with Intermediate points (FRA - IP) Currently not foreseen - Requirement for at least one FRA significant point per FIR will be managed by EURO restrictions (AIP publication) with reference to Bucuresti CTA and Budapest CTA.

ARMFRA (FRA Armenia) Armenia Date: 06 DEC 2018 Laterally: AoR of Yerevan ACC Vertically: FL195 - FL660 Time: H24 ATS route network: Available Evolution: ARMFRA Night - 07 DEC 2017 ARMFRA H24-06 DEC 2018 FRA SC H24-07 NOV 2019 Airspace Volume: FRA airspace (ERAS) - t.b.d. Model: FRA with Intermediate points (FRA - IP) Currently not foreseen

MUAC FRA (FRA Maastricht UAC) Belgium/Germany/Luxembourg/Netherlands Date: 06 DEC 2018 Laterally: Part of AoR of Maastricht UAC Vertically: FL245 - FL660 Time: 23:00-05:00 (22:00-04:00) and Weekends ATS route network: Available Evolution: MUAC FRA Phase 1-07 DEC 2017 MUAC FRA Phase 2-06 DEC 2018 Airspace Volume: FRA airspace (CRAS) Model: FRA with Intermediate points (FRA - IP) Currently not foreseen

POLFRA (FRA Poland) Poland Date: 28 FEB 2019 Laterally: AoR of Warszawa ACC Vertically: FL095 - FL660 Time: H24 ATS route network: Available Evolution: No - single FRA area Airspace Volume: FRA airspace (ERAS) - t.b.d. Model: FRA with Intermediate points (FRA - IP) Currently not foreseen

FRABRA (FRA Bratislava) Slovakia Date: 28 MAR 2019 Laterally: AoR of Bratislava ACC Vertically: FL245 - FL660 Time: 05:00-23:00 (04:00-22:00) ATS route network: Withdrawn Evolution: SEEN FRA Night Expanded - 06 DEC 2018 FRABRA - 28 MAR 2019 Airspace Volume: FRA airspace (ERAS) - t.b.d. Model: FRA with Intermediate points (FRA - IP) Currently not foreseen 23:00-05:00 (22:00-04:00) SEEN FRA

FRA Morocco Morocco Date: 28 MAR 2019 Laterally: AoR of CasablancaACC ATC Sectors Oceanic and West Vertically: FL195 - FL660 Time: Night - t.b.d. ATS route network: Available Evolution: No - single FRA area Airspace Volume: FRA airspace (ERAS) - t.b.d. Model: FRA with Intermediate points (FRA - IP) Currently not foreseen

Cross-border FRA MUAC/DFS FRA/DK-SE FAB Belgium/Germany/Luxembourg/Netherlands/Denmark/Sweden Date: most probably 28 MAR 2019 (to be confirmed) Laterally: AoR of Maastricht UAC and AoR Danish / Swedish ACCs AoR of Karlsruhe UAC (North Cells) and AoR Danish / Swedish ACCs (No cross-border operations between FRA MUAC and DFS FRA) Vertically: FL245 / FL285 / FL315 - FL660 Time: Night / Weekends / H24 ATS route network: Available / Depending on FRA cell - Withdrawn / Available FPL requirements: FRA (I) definition by geographical coordinates - Allowed and Not Allowed Evolution: DK/SE FAB FRA 1 (DNK/SWE) - 17 NOV 2011 DK/SE FAB FRA 2 (DNK/SWE) - 14 NOV 2013 MUAC FRA Phase 1-07 DEC 2017 DFS FRA Solution 1-01 MAR 2018 MUAC FRA Phase 2-06 DEC 2018 DFS FRA Solution 2-05 DEC 2019 Airspace Volume: FRA airspace (CRAS) - t.b.d. Model: Full FRA - FRA with Intermediate points (FRA - IP) with open border Due to different FRA Models applied implementation postponed to Spring 2019

SEE FRA (South East Europe H24 FRA) Bulgaria/Hungary/Romania Date: 07 NOV 2019 Laterally: AoR of Budapest ACC, Bucuresti ACC, Sofia ACC Vertically: 9500FT / FL105 / FL175 - FL660 Time: 05:00-23:00 (04:00-22:00) ATS route network: Withdrawn / Available / Available At least one FRA significant point per FIR Evolution: FRAS Night (BGR) - 14 NOV 2013 N-FRAB Night (ROU) - 11 DEC 2014 HUFRA H24 (HUN) - 05 FEB 2015 Cross-border FRA HUN / ROU Night - 20 AUG 2015 SEEN FRA Night - 30 MAR 2017 FRAS Seasonal Phase 1-1 FEB 2018 FRAS Seasonal Phase 2-11 OCT 2018 SEEN FRA Night Expanded - 06 DEC 2018 SEE FRA - 07 NOV 2019 Airspace Volume: FRA airspace (ERAS or CRAS) - t.b.d. Model: FRA with Intermediate points (FRA - IP) Currently not foreseen - Requirement for at least one FRA significant point per FIR will be managed by EURO restrictions (AIP publication) with reference to Bucuresti CTA and Budapest CTA. 23:00-05:00 (22:00-04:00) SEEN FRA

FRASC (South Caucasus Area FRA) Armenia/Georgia Date: 07 NOV 2019 Laterally: AoR of Yerevan ACC, Tbilisi ACC Vertically: FL195 - FL660 Time: H24 ATS route network: Available Evolution: FRAG - 25 MAY 2017 ARMFRA Night - 07 DEC 2017 ARMFRA H24-06 DEC 2018 FRA SC H24-07 NOV 2019 Airspace Volume: FRA airspace (ERAS or CRAS) - t.b.d. Model: FRA with Intermediate points (FRA - IP) Currently not foreseen

FRA Malta Malta Date: 23 MAY 2019 Laterally: AoR of Malta ACC Vertically: FL195 - FL660 Time: H24 ATS route network: Available Evolution: FRA Malta H24 FL335-08 DEC 2016 FRA Malta H24 FL305-24 MAY 2018 Airspace Volume: FRA airspace (ERAS) - t.b.d. Model: FRA with Intermediate points (FRA - IP) Currently not planned

FRAU (FRA Ukraine) (Sc 1b) Ukraine Date: 23 MAY 2019 Laterally: AoR of Kyiv ACC, Dnipropetrovs k ACC (excl. Sector DVB) Vertically: FL275 - FL660 Time: H24 ATS route network: Available Evolution: FRAU Sc 1a - 05 MAR 2015 FRAU Sc 1b1-08 NOV 2018 FRAU Sc 1b2-23 MAY 2019 Airspace Volume: ATC Unit Airspace - AUA Model: FRA with Intermediate points (FRA - IP) Currently not foreseen

DFS FRA (FRA Germany) Solution 2 Germany Date: 05 DEC 2019 Laterally: South West - core area FRA cells based on AoR of Karlsruhe UAC, Munchen ACC, Bremen ACC Vertically: FL245 - FL660 Time: H24 ATS route network: Depending on FRA cell - Withdrawn / Available Evolution: DFS FRA Solution 1-01 MAR 2018 DFS FRA Solution 2-05 DEC 2019 Airspace Volume: FRA airspace (CRAS) Model: FRA with Intermediate points (FRA - IP) Currently not foreseen

HELLAS FRA (FRA Hellas UIR) Greece Date: 30 JAN 2020 Laterally: AoR of Athinai ACC, Makedonia ACC Vertically: FL355 - FL460 Time: 21:00-04:00 ATS route network: Available Evolution: No - single FRA area Airspace Volume: FRA airspace (ERAS or CRAS) - t.b.d. Model: FRA with Intermediate points (FRA - IP) CONOPs coordinated with NM, coordination and work on the project will be initiated in Autumn 2018. Lower vertical limit FL355 is currently under consideration and discussion by Hellenic CAA and NM

Scottish FRA (Borealis FRA) UK Date: 03 DEC 2020 Laterally: AoR of Scottish ACC ATC Sectors - Rathlin, Central, Hebrides, Moray High, Part of Tyne, Montrose North Sector, Part of Dean Cross North Vertically: FL255 - FL660 Time: H24 ATS route network: Withdrawn Evolution: Part of Borealis FRA phased developments Airspace Volume: FRA airspace (CRAS) Model: FRA with Intermediate points (FRA - IP) Work in progress

HELLAS FRA (FRA Hellas UIR) Greece Date: 28 JAN 2021 Laterally: AoR of Athinai ACC, Makedonia ACC Vertically: FL355 - FL460 Time: H24 ATS route network: Available Evolution: HELLAS FRA Night - 30 JAN 2020 HELLAS FRA H24-28 JAN 2021 Airspace Volume: FRA airspace (ERAS or CRAS) - t.b.d. Model: FRA with Intermediate points (FRA - IP) CONOPs coordinated with NM, coordination and work on the project will be initiated in Autumn 2018 Lower vertical limit FL355 is currently under consideration and discussion by Hellenic CAA and NM

FRAPRA (FRA Praha) Czech Republic Date: 02 DEC 2021 Laterally: AoR of Praha ACC Vertically: GND - FL660 Time: H24 ATS route network: Available - t.b.d. FPL requirements: FRA (I) definition by geographical coordinates - t.b.d. Evolution: No - single FRA area Airspace Volume: FRA airspace (ERAS or CRAS) - t.b.d. Model: t.b.d. Coordination and work on the project will be initiated at meeting between NM and Czech Republic on 11 OCT 2018.

Proposed Projects No confirmed Implementation Dates

Proposed FRA Projects Morocco: Night / Week-end within South and East Sectors, FL195 - FL660 - Summer 2019; Ukraine: H24 FRA within Odesa ACC Odesa ACC (excl. Sectors OVS, OVL, OVU), FL275 - FL660 - Winter 2019/2020; Morocco: H24 FRA within Casablanca ACC - Oceanic and West Sectors, FL195 - FL660 - Spring 2020; Maastricht UAC: FRA H24 - Spring 2020; Turkey: Night FRA (23:00-05:00), FL285 - FL660 - Summer 2020; Switzerland: Structurally limited H24 FRA, FL195 - FL660 in skyguide's AoR - Spring 2021; France: FRA in Brest ACC - Spring 2021; Turkey: H24 FRA, FL285 - FL660 - Summer 2021; Ukraine: H24 FRA within Lviv ACC, Kyiv ACC, Odesa ACC and Dnipropetrovs k ACC, FL275 - FL660-2021; France: H24 FRA in Bordeaux ACC - Winter 2021/2022; UK: H24 FRA AoR of Prestwick ACC FL255 - FL660 and parts of AoR of London ACC FL335 - FL660 - Winter 2021/2022; UK: H24 FRA within the whole London ACC AoR - Winter 2021/2022; Cyprus: H24 FRA in AoR of Nicosia ACC, FL285 - FL660 - Summer 2022; France: H24 FRA in Reims ACC - Autumn 2022; France: H24 FRA in Paris ACC - Autumn 2022; Ukraine: Cross-border H24 FRA in entire Class C Airspace - 2023.