Terminal- Area Opera.ons Prof. Hamsa Balakrishnan

Similar documents
Terminal- Area Opera.ons Prof. Hamsa Balakrishnan

Honeywell.com PBN Concepts Krakow, Poland

LOCALIZER I-SAM CH 28 VOR/DME SAC CH 98. CAUTION : ft Obstacle located R 245/12DME from VOR/DME. D2 (MAPt) GAFOA I-SAM (SDF) I-SAM

Standard Operating Procedures (SOPs) for BAGHDAD (ORBI)

PBN AIRSPACE CONCEPT WORKSHOP. SIDs/STARs/HOLDS. Continuous Descent Operations (CDO) ICAO Doc 9931

Standard Operational Procedures

Design Airspace (Routes, Approaches and Holds) Module 11 Activity 7. European Airspace Concept Workshops for PBN Implementation

The aim of any instrument approach is to allow the aircraft to safely descend to a low altitude in order to become visual.

AIP ENR JORDAN 01 MAY 2014

HOLDING PATTERN USING VOR

IVAO Nordic Region November 2018 PILOT BRIEFING ROVANIEMI X-MAS FLY-IN

GENERAL INFORMATION The aerodrome consists of three runways (04L-22R, 04R-22L, 12-30) and four aprons.

AD 2 AERODROMES EVLA AD 2.1 AERODROME LOCATION INDICATOR AND NAME EVLA AD 2.2 AERODROME GEOGRAPHICAL AND ADMINISTRATIVE DATA

Gleim Instrument Pilot FAA Knowledge Test 2012 Edition, 1st Printing Updates January 27, 2012

Denver ARTCC Colorado Springs ATCT & TRACON STANDARD OPERATING PROCEDURES

LZMC/MLC MALACKY 01 JAN IEff 01 FebI. MALACKY, SLOVAKIA Additional Airport Informations. 1. Services ATC and Meteo services available H24.

EVVA AD 2.1 AERODROME LOCATION INDICATOR AND NAME EVVA AD 2.2 AERODROME GEOGRAPHICAL AND ADMINISTRATIVE DATA

SECTION 4 - APPROACH CONTROL PROCEDURES

PORTUGAL DIRECÇÃO DE SEGURANÇA E DESEMPENHO OPERACIONAL AERONAUTICAL INFORMATION SERVICE APARTADO LISBOA CODEX

AD 2. AERODROMES FYWE AD 2.1 AERODROME LOCATION INDICATOR AND NAME. FYWE - Windhoek (Eros) Airport

ZTL ARTCC. Asheville Regional. Air Traffic Control Tower. Standard Operating Procedures AVL B. Effective: May 1, 2011

Application of Wake Turbulence Separation at London Heathrow. Paul Johnson Development Manager NATS Heathrow

S2 Tower Controller. Allama Iqbal Int l Airport Lahore ( OPLA ) June 2016 Pakistan vacc

OMURA AERODROME A-3 ABN A-2 APRON. MEHT 13.6m(44.6ft) PAPI Angle 3.0. MEHT 13.6m(44.6ft) PAPI Angle 3.0. is not visible from NAGASAKI Tower.

Number April 2016

RWY 24. Designator Route Remarks. All traffic shall initially climb to 4000FT QNH with climb gradient 3.3% MNM, unless instructed otherwise by ATC.

Airfield Capacity Prof. Amedeo Odoni

AREA NAVIGATION RNAV- MANAGEMENT

Airservices Australia 2016

Providence ATCT Standard Operating Procedures

AIP MACAO GUANG ZHOU FIR HONG KONG FIR AD2-VMMC-65 A STAR MACAO RWY SEP 2013 (BIGRO 6 A, NLG 5 A, CON 6 A, POU 6 A) CAT A, B, C, D

EKYT - AALBORG AIR BASE

JeppView for Windows. General Information. jep=jeppesen. Runway: 17R. Length x Width: 9843 ft x 148 ft. Location: ISTANBUL TUR. Surface Type: concrete

SkyHoppers Aerial Adventures Instrument Ground School Mid-Term Exam A. R. Dilworth, CFII Flight Instruments

Standard Operational Procedures

Standard Operating Procedures (SOPs) for UAE Centre (OMAE)

Jordan Airspace Manual. Prepared by: Aboud Horani & Mahmoud Odeh XM-AOC / XM-ADIR

Effective: GOLD COAST (YBCG) NEW PROCEDURES FOR INTRODUCTION OF ILS ON RWY 14

EVTA AD 2.1 AERODROME LOCATION INDICATOR AND NAME EVTA AD 2.2 AERODROME GEOGRAPHICAL AND ADMINISTRATIVE DATA

Piedmont Triad International Airport

AIP Georgia AD 2.UGTB-RSID-13R 18/09/2014 STANDARD DEPARTURE ROUTES INSTRUMENT (SID) RWY 13R SID ROUTING AND ALTITUDES MIN. CLIMB GRAD. LAMUS 6A LAMUS

AD 2. AERODROMES VAKS AD 2.2 AERODROME GEOGRAPHICAL AND ADMINISTRATIVE DATA

AD 2-LGPL-1 GREECE 04 JAN 2018 LGPL AD 2.1 AERODROME LOCATION INDICATOR AND NAME LGPL ASTYPALAIA

Cape Area Airports Standard Operating Procedures

CAUTION: WAKE TURBULENCE

HOLDING STACK MANAGEMENT

Don-Jacques OULD FERHAT VP Airspace and Airlines Services. Airbus. PBN Safety programs

Feasibility and Benefits of a Cockpit Traffic Display-Based Separation Procedure for Single Runway Arrivals and Departures

UDSG Gyumri. UDSG AD 2.1 Aerodrome location indicator and name. UDSG AD 2.2 Aerodrome geographical and administrative data N E

Chapter 6. Nonradar. Section 1. General DISTANCE

Continuous Descent? And RNAV Arrivals

CHAPTER 5 SEPARATION METHODS AND MINIMA

LGAV LTAI Real Flights Event Partnership EUROPE. PILOT's BRIEFING. March 7 th 2009 Event time: 1200z 2200z. 1 Athens FIR Guide 2 LGAV Procedures

Learning. Goals. Patterns HOW WHEN. Holding. at the. that case. Page 1 of 19. Document : V1.1

IVAO Switzerland Division

Gleim Instrument Pilot FAA Knowledge Test 2015 Edition, 1st Printing Updates April 2015

AD 2-OERY-1 7 JAN 16 OERY AD 2.1 AERODROME LOCATION INDICATOR AND NAME. OERY - RIYADH/ King Salman Air Base

Navigation at the. Federal Aviation Administration Crossroads

Greenville Spartanburg International

APPENDIX B DRO INSTRUMENT APPROACH CHARTS & DEPARTURE PROCEDURES

THE TOWER CONTROL POSITION (TWR)

Annecy Airport IFR briefing For indication only

AIP AD SEYCHELLES 03 APR 14

RNAV - RNP. July 2010

Annecy Airport IFR briefing For indication only

Federal Aviation Administration. Air Traffic 101. By: Michael Valencia & Dianna Johnston Date: Feb. 26, 2017

AIP ENR JORDAN 12 DEC 2013 RADAR SERVICES AND PROCEDURES

Albany ATCT Standard Operating Procedures

GEN 0.2 Record of AIP Amendments

Standard Operating Procedures Atlanta Intl Airport (ATL) Air Traffic Control

Controller Training Case Study Implementation of new RNP AR APCH for RWY07 (North Circuit) at HKIA

Letter of Agreement by and between Jacksonville ARTCC and Miami ARTCC

AD 2-LGAD-1 GREECE 08 JAN 2015 AD 2. AERODROMES LGAD AD 2.1 AERODROME LOCATION INDICATOR AND NAME LGAD - ANDRAVIDA

Instrument Proficiency Check Flight Record

Atlanta NextGen PBN Activities

SIMULATION USE ONLY. DO NOT USE FOR REAL WORLD NAVIGATION N IVAO HONG KONG

GEORGIA. Georgian Air Navigation Sakaeronavigatsia Ltd. AERONAUTICAL INFORMATION SERVICE. TBILISI/Tbilisi Airport, 0158 Tbilisi, Georgia

EXPLANATION OF TPP TERMS AND SYMBOLS

DIRECCION DE PERSONAL AERONAUTICO DPTO. DE INSTRUCCION PREGUNTAS Y OPCIONES POR TEMA

VCCC - RATMALANA/Colombo

Partnership for AiR Transportation Noise and Emissions Reduction. MIT Lincoln Laboratory

04 Installed on TWY T Installed on TWY T2 THRU T4 22 Installed on TWY T5

AD 2-LGSO-1 GREECE 04 JAN 2018 GSO AD 2.1 AERODROME LOCATION INDICATOR AND NAME LGSO SYROS / DIMITRIOS VIKELAS

PLAN Anoka County - Blaine Airport

Burlington ATCT Standard Operating Procedures

VATSIM JORDAN vacc QUICK REFERENCE HANDBOOK QUICK REFERENCE - STANDARD FORMATS FOR COMMUNICATION

Learning Objectives. By the end of this presentation you should understand:

Course Rules NAS Whiting Field Ops. Created: 27 Aug 11 Last Updated: 24 Nov 15

ATMM. Air Traffic Management Manual. Air Traffic Management Manual VACC AUSTRIA LOVV ATMM Air Traffic Management Manual

San Juan CERAP. Standard Operation Procedures. Version 2.2 May 5th, Welcome to San Juan CERAP (ZSU ARTCC, TJZS FIR)

Approach (TMA) Air Traffic Control. An Introduction to Approach/Departure Control Airspace and Operating Positions... 2

Chapter 6. Airports Authority of India Manual of Air Traffic Services Part 1

Wake Vortex R&D. Status Briefing. NBAA Convention. Federal Aviation Administration. By: Steve Lang Date: September 2007


VATUSA PHOENIX TRACON and VATUSA PHOENIX ATCT LETTER OF AGREEMENT. SUBJECT: Interfacility Coordination Procedures

Standard Operating Procedures (SOPs) for Arabian Control (OGCC)

PILOT BRIEFING GENEVA RFE 2018

Following supplement is issued for information, guidance and necessary action. [EFFECTIVE DATE: 1 JULY 2010] RGI AIRPORT, SHAMSHABAD

ENR 1.2 VISUAL FLIGHT RULES

IFR FLIGHT BRIEFING. This IFR flight briefing presentation has been made concise and simple in order to easily handle the IFR flight preparation.

Transcription:

Terminal- Area Opera.ons Prof. Hamsa Balakrishnan Istanbul Technical University Air Transporta,on Management M.Sc. Program Air Transporta,on Systems and Infrastructure Strategic Planning Module 8 : 26 May 215

Terminal areas Terminal airspace control: Terminal Radar Approach Control (TRACON) Handle arrivals and departures Transition between airspace and airport Interact with en route controllers and local controllers (Air Traffic Control Towers) Future concepts related to terminal-areas Super-density operations Metroplexes 2

Terminal area congestion and delays Traffic Management System 62, flights delayed in 26 because of terminal-area congestion 3

TRACONs 4

Arrival fixes Also called gates Metering points at which aircraft enter the TRACON Denver ARTCC (ZDV) Denver TRACON 5

TRACON ~ 4 miles 6

Terminology Airport with four well-defined (approximately equidistant) arrival fixes: Corner-post arrangement Arrangement of arrival fixes depends on the airport For example, Denver International Airport (DEN) and Atlanta Hartsfield-Jackson (ATL) have 4 arrival gates Boston Logan International Airport (BOS) has two arrival positions and one final control position Enroute Arrival control (TRACON) Final control (TRACON) Final control positions handle merging and spacing, using the downwind and base legs Timing (for spacing) achieved by altering length of trajectory è Trombone approaches è Approach fans 7

Schematic of terminal-area arrivals Sequencing areas Downwind leg Final approach Base leg Base leg Downwind leg Sequencing areas 8

Atlanta Hartsfield-Jackson International Airport (ATL): Corner-post example

Airport Arrival Demand Chart (AADC) [www.fly.faa.gov/products/aadc/aadc.html] 1

Example terminal-area trajectories: Antalya Airport (AYT)" Arrivals Departures miles km 4 7 http://www.aytport.com/ 11

Path stretching for spacing 12

Procedures: STARs Standard Terminal Arrival Routes Describe common arrival procedure Via the Pechy Three Arrival 13

354º º ' 174º 174º 174º AIP TURKEY STANDARD ARRIVAL CHART INSTRUMENT (STAR) - ICAO DHMI - ANKARA TRANSITION ALTITUDE 1 FT AIRAC AMDT 1/1 ' 352 º ACC :11.3-132.4-1.15-243.- 362.3 APP : 121.1-12.5 TWR : 257.8-1.1-121.8-122.325-1.575 AD 2 LTBA STAR- 3 21 OCT 1 ÝSTANBUL / ATATÜRK INTERNATIONAL RWY 17L/R Procedures: IST STARs CHANGE: RWY ID º ' 28º ' 41º ' 4º ' L/UL 66 G/UG 8 G/UG 12 M/UM 63 VOR 116.3 EKI CH 11 X 4º57'3"N - º25'34"E W/UW 2 N/UN 64 G/UG 8 ULMAR N TEKIRDAG LT - P2 (IAF RWY 17) VURAL 8DME 3º N/UN 6 G/UG 8 282º 6 12º ' N/UN 6 G/UG 8 3º º 8' ' 21º º 174º IST R- 354 HOLDING OVER VURAL 3 FT 354 º 6 ULMAR 1B 33 ' EKI R- 83 CORLU NDB 426 CRL 41º7'54"N - º54'37 E BIG R- 47 BIGA VOR 116. BIG CH 116 X 4º17'3"N - º21'55 E CRL R- 3 CORLU CORLU VOR 114.8 CRL CH 5 X BIG R- 55 BRG and TRACKS are MAG ELEV, ALT and HGT in FEET MSL DIST in NM VAR 4º ' E ( 24 ) ISTANBUL 41º'8"N - º56' E ' 6 BIG 1C 68 6 EKI 1C 5 ' 6 BIG 1F 55 LT - R 3 ÇORLU CTR 4 FT AMSL SFC CRL R- 7 ' (IAF RWY ) CEKMECE NDB 328 CEK 41º'21"N - 28º31'41 E 47º BANDIRMA LT - D 4 LT - D 5 NDB 36 IS 41º3'26"N - 28º48'23 E ' 6 ULMAR 1B 4 83º 55º HEZARFEN CTR 15 FT AMSL SFC º 5' º IST R- 235 ÝMREN FL 165 ISTANBUL TMA 15 FT AMSL LT - P7 1 EKÝ R- 6 HEZARFEN 5' BIG 1F LT - R 4 ÝSTANBUL VOR 112.5 IST CH 72 X 4º57'45"N - 28º48'35 E UNSAV 2º ' 41º28 42 N- 28º47 23 E IST R- 354/ 31 FATIH 6 YASEN-GAYEM 1F YAA 1R 16 YEÞÝLKÖY CTR ATATÜRK 15 FT AMSL SFC 28º ' 2º ' 7º 3º 354 174º 5' - 5' EKI-BIG 1C 15 55º 5' BIG 1F 16 5' UNSAV 1 G IST R- 354 ' R- 287 NOTE: AVAILABILITY OF BIG- 1F SUBJECT TO PRIOR COORDINATION BTN IST ATC AND BANDIRMA MILITARY ATC IF MILITARY ACTIVITES NOT PERMIT FOR BIG 1 F BURSA IST ATC TO USE BIG- 1C ONLY SPEED CONTROL 23 YALOVA VOR 117.7 YAA CH 124 X 4º28'3"N - 2º12' E 1) GENERAL RULE: MAX IAS 25 KT AT OR BELOW 1' WITHIN TMA 2) ARRIVING AIRCRAFT: - MAX IAS 25 KT AT 4 NM FROM IST VORTAC - MAX IAS 21 KT AT 15 NM FROM IST VORTAC - MAX IAS 16 KT UNTIL 5 NM FROM TRESHOLD - SPEED ACCURACY SHALL BE WITHIN 1 KT 54º YAA 1T-YAA1R 3 352º 4' 234º BKZ R-1726 (IAF RWY 17) BEYKOZ VOR 117.3 BKZ CH 12 X YASEN 41º11'56"N- 2º3'58 E BKZ R-7 1/ D R-71 BKZ R-8 YAA R- 352 YENISEHIR VOR 115.3 BRY NDB 352 BRY CH 1 X 4º15'48"N - 2º35'4 E 41º7'37"N - 2º8'34 E ' 7 YASEN 1F 17 7 GAYEM 1F 23 SABIHA GOKCEN ' 251º SABIHA GOKCEN CTR 25 FT AMSL SFC YENISEHIR CTR 8 FT AMSL SFC NOT TO SCALE 352º 6' 172º 8º L/UL 61 W/UW 72 GAYEM 41º2'45"N- 2º37'48 E BKZ R- 8/ D23 SABIHA GOKCEN VOR 18.8 SBH NDB 347 SAB CH 25 X 4º53'58"N - 2º1'13 E YALOVA YENISEHIR LT - D 1 36º º 3' 35' º º 3' 5' MSA 25 NM IST VORTAC LT - P5 L/UL 61 L/UL 62 A/UA 16 L/UL 615 A/UA 4 41º ' L/UL 614 G/UG 8 4º ' 14

Standard Instrument Departures (SIDs) 15

AIP TURKEY STANDARD DEPARTURE CHART INSTRUMENT (SID) - ICAO DHMI - ANKARA TRANSITION ALTITUDE 1 FT TWR :257.8-1.1-121.8-122.325-1.575 APP : 121.1-12.5 ACC :11.3-132.4-1.15-243.- 362.3 AD 2 LTBA SID- 3 21 OCT 1 ÝSTANBUL / ATATÜRK INTERNATIONAL RWY 17L/R AIRAC AMDT 1/1 IST SIDs CHANGE: RWY ID º ' 28º ' BRG and TRACKS are MAG ELEV, ALT and HGT in FEET MSL DIST in NM VAR 4º ' E ( 24 ) CORLU 41º ' L/UL 66 G/UG 8 N G/UG 12 M/UM 63 TEKIRDAG VOR 116.3 EKI CH 11 X 4º57'3"N - º25'34"E LT - P2 CORLU NDB 426 CRL CORLU CTR 4 FT AMSL 41º7'54"N - º54'37 E SFC N/UN 6 G/UG 8 VOR 114.8 CRL CH 5 X 41º'8"N - º56' E CORLU BIG 2S L/UL 61 A/UA 16 FENER 41º17'11"N- 28º21'28"E IST R-3/ D28 CRL R- 11 EKI 2S CRL 2 S BIG 2S CEKMECE NDB 328 CEK FENER 2S IST R- 267 IST R- 254 41º'21"N - 28º31'41 E FL 165 ISTANBUL TMA 15 FT AMSL LT - D 5 HEZARFEN CTR 15 AMSL SFC HEZARFEN 333º LT - P7 LT - R 4 2º ' ERTAS 41º'41"N - 2º8'48 E BKZ R-356/ D2 ÝSTANBUL VOR 112.5 IST CH 72 X 42º 4º57'45"N - 28º48'35 E YEÞÝLKÖY CTR 15 FT AMSL SFC ATATÜRK IST R- 177 ERTAS 1S 5 DME YAA 2S BKZ R- 27 ERTAS 1T BKZ R- 172 BKZ R- 356 YAA R- 32 YAA R- 352 BEYKOZ VOR 117.3 BKZ CH 12 X 41º7'37"N - 2º8'34 E YASEN 41º11'56"N- 2º3'58 E BKZ R-7 1/ D BKZ R- 71 YASEN 1S BKZ R- 8 GAYEM 1S YALOVA L/UL 61 W/UW 72 GAYEM 41º2'45"N- 2º37'48"E BKZ R- 8/ D23 SABIHA GOKCEN VOR 18.8 SBH NDB 347 SAB CH 25 X 4º53'58"N - 2º1'13 E LT - D 1 36º º 3' 35' º º 3' 5' MSA 25 NM IST VORTAC LT - P5 L/UL 615 A/UA 4 41º ' L/UL 614 G/UG 8 4º ' W/UW 2 N/UN 64 G/UG 8 N/UN 6 G/UG 8 BIG R- 38 BIGA VOR 116. BIG CH 116 X 4º17'3"N - º21'55 E BANDIRMA LT - R 3 LT - D 4 YALOVA VOR 117.7 YAA NDB CH35 124YAA X CH 124 X 4º33'54"N 4º28'3"N - 2º22'17 E 2º12' E 28º ' 2º ' BURSA YENISEHIR CTR 8 FT AMSL SFC YENISEHIR VOR 115.3 BRY NDB 352 BRY CH 1 X 4º15'48"N - 2º35'4 E NOT TO SCALE YENISEHIR L/UL 61 L/UL 62 A/UA 16 4º ' 16

Example: Go-around 17

Boston Instrument Landing System (ILS) approaches 15R ILS to visual 4L

Holding patterns Fix end Holding side Outbound Outbound end Fix Inbound Non-holding side Holding course Holding instructions need to include: direction of holding from fix; name of holding fix; radial, course, bearing, azimuth, route on which aircraft is to hold; direction of turns if not standard (standard = right-hand); Length if nonstandard (1 min inbound leg length); expected further clearance time 1

Airport and surrounding terminal area [Idris et al. 2, Carr 24] 2

Terminal-area separation: Wake vortex separation Aircraft are trailed by their wake vortices Each wing produces a vortex (that is, there are two counter-rotating vortices behind each aircraft) Strength of the vortex is a function of aircraft weight, speed and shape of the wing of the leading aircraft Maximum vortex generation occurs when aircraft is heavy and slow Therefore takeoffs and landings are particularly susceptible Small aircraft encountering the wake of a heavy aircraft may become uncontrollable Wake vortex separation is a fundamental bottleneck to airport and terminal-area capacity 21

Wake-vortex separation" [www.oea.larc.nasa.gov] 22

Airport runway configuration" Selection of runways used for landings and takeoffs! N" LGA" SFO" arrival runways" R1, R2 R3, R4" departure runways" 23

Runway configuration example" arrival on runway 22" N" departure on runway 22" 22 22" 24

Factors influencing runway configuration selection" Factors that potentially influence configuration selection Wind speed Wind direction Visibility Airport arrival demand Coordination with nearby airports Noise mitigation Difficulty of switching around airport Desire to stay in same configuration LGA" 25

Runway configuration switch" 26

Multi-airport terminal-areas or Metroplexes [Bonnefoy & Hansman]

New York metroplex trajectories [Figure courtesy of Leo Prusak, Manager NorthEast Tactical Operations, FAA] 28