MUNICIPALITY OF MURRYSVILLE Policy # 20-05

Similar documents
ADOPT-A-TRAIL MANUAL C. Bailey-May

APPENDIX D: SUSTAINABLE TRAIL DESIGN. APPENDICES Town of Chili Parks and Recreation Master Plan Update

Kennesaw Mountain Trail Club. Trail Skills Workshop ~ Dips and Drains. Presented by: Jay M Dement

Snowmobile GUIDELINES FOR TRAIL SIGNING

INTRODUCTION. Mailing address: Burke County Community Development Attn: Tim Johnson P. O. Box 219 Morganton, NC

DATE: 23 March, 2011 TO: Communities FROM: BlazeSports America. RE: Accessible Trails Checklist 1

TRAIL MAINTENANCE AND CONSTRUCTION MANUAL

GOLDEN EARS PROVINCIAL PARK

Project Planning, Compliance, and Funding

Decision Memo for Desolation Trail: Mill D to Desolation Lake Trail Relocation

Sandbag Barrier. Suitable Applications Sandbag barriers may be suitable: As a linear sediment control measure:

City of Durango 5.8 FUNDING TRAILS DEVELOPMENT

Marilla Reservoir to Chestnut Ridge via Marilla Trails and Bullis Hollow Trail east to west

Request for Proposal National Tropical Botanical Garden Lower Limahuli Preserve Emergency Stream Debris Removal

Property access tracks

211: BASIC TRAIL MAINTENANCE For The Florida Trail A How To Guide For New Trail Maintainers

Trail Assessment Report

K SIGNAGE & TRAFFIC CONTROL. Table of Contents

KENNESAW MOUNTAIN TRAIL CLUB WORKDAY

Appendix A Appendix A (Project Specifications) Auk Auk / Black Diamond (Trail 44) Reroute

CONSERVATION VOLUNTEERS INTERNATIONAL PROGRAM VOLUNTEER TRIP TO TORRES DEL PAINE NATIONAL PARK, PATAGONIA, CHILE DECEMBER 2010

TRAILS INTERSECTION SIGNS

Non-motorized Trail Plan & Proposal. August 8, 2014

Understanding user expectations And planning for long term sustainability 1

MORGAN CREEK GREENWAY Final Report APPENDICES

CRAZY HORSE TRAIL GUIDE

Camp Jack Wright PERMANENT ORIENTEERING COURSE (2004)

What are you getting into?

Crew Chief: Start Date: Completion Date: T & A Code:

EDGEWILD TRAIL Non Motorized Trail PROPOSED DEVELOPMENT PROJECT

American Conservation Experience

5 MAP SPECIFICATION FOR SKI-ORIENTEERING

Aspen Skiing Company Policy for Use of Other Power-Driven Mobility Devices And Service Animals

NATIONAL PARK SERVICE CERTIFICATION OF COMPLETED SEGMENTS OF THE NORTH COUNTRY NATIONAL SCENIC TRAIL

General Design Guidelines & Schedule of Design Elements For the Haw River Trail

Stephens State Park Trails

CHAPTER III: TRAIL DESIGN STANDARDS, SPECIFICATIONS & PERMITS

Specification for Grip blocking using Peat Dams

Procedure for the Use of Power-Driven Mobility Devices on Mass Audubon Sanctuaries 1 September 17, 2012

Note: This form applies to campgrounds and trailer courts only, not to work camps or youth camps as defined in , MCA.

Bradley Brook Relocation Project. Scoping Notice. Saco Ranger District. United States Department of Agriculture Forest Service

Site Coordinator Guide

Important: Before using the Blackline Standard Model, read this instruction manual in its entirety.

Trans Canada Trail Signage Guidelines MADE BY CANADA

Section 61 Recreational Vehicle Park / Campground (Bylaw No. 2012/10)

Project Report Volunteer Trip Torres del Paine National Park, Patagonia, Chile December 3-15, Executive Summary

Orienteering. The fundamental outdoors skill!

Freezer Vessel Hygiene Checklist

Marin County Fire Department. Fire Protection Standard 119. Tents and Awnings

Region 1 Piney Woods

ARTICLE 7 MOBILE HOME AND RECREATIONAL VEHICLE PARKS AND CAMPGROUNDS

Rule Governing the Designation and Establishment of All-Terrain Vehicle Use Trails on State Land

Appendix C. Tenderfoot Mountain Trail System. Road and Trail Rehabilitation Plan

Proposed Peninsula Bay Bike Track Development

Sunday / Monday - Osceolas

Other Agencies and Organizations

Mt. Hood National Forest

Decision Memo Sun Valley Super Enduro & Cross-Country Mountain Bike Race. Recreation Event

Guidelines for Snowmobile Trail Signing and Placement STOP SLOW

Peace Project Water Use Plan

Axe and Saw Permit: Safe Use of Axes

RIO VISTA MUNICIPAL AIRPORT

INTERPRETING TOPOGRAPHIC MAPS (MODIFIED FOR ADEED)

AGENDA LANARK COUNTY MUNICIPAL TRAILS CORPORATION BOARD OF DIRECTORS

Wooden Koi/Octagonal Pond Instruction Manual

White Mountain National Forest Saco Ranger District

Porter Fk. #1. All unauthorized items removed as per FS & Rec Res guidelines. Footbridge may be needed for wheel chair access and for safety

Building Permit Application

Lake Wissota Access Locations within the LaFayette Township. By Chad Martin

West Trails Trek Guide. Chief Pontiac Trail Credential Hikes

Axe Safety Coaching Certification

Vermont Cows by Peter Salmon

TRAIL MANAGEMENT GUIDELINES

Suggested Day Hikes. Mount Greylock State Reservation 3, 4 1, 2. Take a Hike! Things to remember:

Tallahassee-St. Marks Historic Railroad Trail

Therme storage water heater. Table of contents. Symbols used. Symbols used Symbol indicates a possible hazard. Installation instructions

Runway Roughness Evaluation- Boeing Bump Methodology

Conway Snowmobile Club. Grooming Procedures, Policies, and Training

3. COLTA / HUGA CONNECTIONS - PRELIMINARY

SWAN CREEK VILLAGE HOMEOWNERS ASSOCIATION. P.O. Box Bountiful, UT

DECISION MEMO North Zone (Legacy Trails) Trail Stabilization Project

50miler.com Outing Resource Center on Facebook

Appalachian Power Company Smith Mountain Hydroelectric Project FERC No Debris Management Plan

Temporary Structure/Use Checklist

Antenna Tower Positioning System

ORDINANCE NO. JACKSON TOWNSHIP, CAMBRIA COUNTY

Assembly Manual. OLM Retractable Canopy for 12X20 Breeze Pergola by Outdoor Living Today. Revision #11 October 5, 2017

Permeable RECREATIONAL TRAILS

No 30 x 48 space is provided for a wheelchair under the picnic table.

Arrowhead Park Flow Trail Construction 16 April 2018 SPECIFICATIONS AND SCOPE OF WORK ARROWHEAD PARK FLOW TRAIL CONSTRUCTION

MPRB: Southwest LRT Community Advisory Committee Issues and Outcomes by Location Current to: 12 November 2010

Supplemental No. 8 AGENDA ITEM #6.B Distributed 9/19/17

The Appleton Wetland; Its Decline, Cause and Recommended Action. Appendix K: Wetland Inspection

USDA TRAILS STRATEGY PROGRAM

ROAD AND TRAIL PROJECT APPROVAL

EAST DON TRAIL ENVIRONMENTAL ASSESSMENT. Community Liaison Committee Meeting #3 July 15, :30 to 8:30 pm Flemingdon Park Library

When complete, send this document to the local sanitarian and to DPHHS/FCSS, PO Box , Helena, MT

Mountain Valley Pipeline, LLC Mountain Valley Pipeline Project Docket No. CP

Backpacking and Hiking LEAVE NO TRACE

CIRRUS AIRPLANE MAINTENANCE MANUAL MODELS SR22 AND SR22T CHAPTER 56-20: CABIN GENERAL. Cabin 56-20: CABIN. 1. General

Transcription:

MUNICIPALITY OF MURRYSVILLE Policy # 20-05 04/11/05 SPECIFICATIONS FOR CONSTRUCTION AND MAINTENANCE MANUAL FOR HIKING, BICYCLING AND CROSS-COUNTRY SKIING TRAILS 1. INTRODUCTION This document provides guidelines for the construction and maintenance of trails by volunteers in the parks, nature reserves, or other properties owned by the Municipality of Murrysville; also for Municipal trails located on private lands. Approvals - where indicated - are the responsibility of the Director of Public Works and Parks acting upon recommendations from the Parks and Recreation Commission; in this it is assumed that the area in which the trail will be located is pre-approved for such use, e.g. an existing park or nature reserve that already has trails; or land in a subdivision that has been dedicated to the Municipality; or private land on which the owner has dedicated a right-of-way for a community trail. Excluded from these guidelines are large bicycling trails (such as the Duff Park trail), horseback riding trails, and ADA accessible trails; these require more detailed planning and design and their construction is likely beyond the capability of volunteers. 2. CONSTRUCTION The following steps provide a logical progression in the process of constructing a trail and reflect the experience - good and bad - with existing trails in Murrysville, which have almost exclusively been built by volunteers. Step 1. Walk the area and prepare a rough outline of the proposed trail on a contour map. Identify the purpose of the trail (hiking, bicycling, cross-country skiing) and mark points of interest such as vistas, historical markers, special plants or trees, etc. Include a suggested name for the trail and indicate signs and trail markers that will be installed. Identify features that may not be in compliance with this document (e.g. slopes in excess of recommend values) and provide rationale for their inclusion. Submit this outline for approval. Step 2. Following permission to proceed, establish a detailed routing of the trail in the field; this is preferably done between November and April when the leaves are down. Mark the intended location of the trail with surveyor's tape. Avoid the following: 1

Long, straight sections (unless there is an existing path). Potential displacement of native plants and trees. Inclines that are perpendicular to the contour lines. Steep inclines (>15% for hiking; >20% for bicycling; >5% for cc-skiing). Narrow switchbacks (these are an invitation to shortcuts) Areas prone to drainage problems, e.g. depressions, gullies, wet areas. Encroachment within 15 ft. of a stream (except for crossings). Provide the opportunity to the Director of Public Works and Parks or his designated replacement to inspect the detailed routing of the trail. Step 3. Clear a 4 ft. wide by 8 ft. height trail space which encompasses the trail plus sufficient room to accommodate one year's growth of the vegetation along the trail; use loppers or a saw as required. Scatter the debris on both sides of the trail; locate the cut ends of small trees and larger branches away from the trail. Dig up invasive plants within 4 ft. of the trail space, especially multiflora roses. Dispose of these by placing them in trees so that they do not take root again. Cut down dead trees that may fall onto the trail, thereby endangering users. Leave logs on trails that are to be used for hiking only, but cut out a notch if they are too large to step over (>12 inch). Remove logs on trails that are to be used for bicycling and cc-skiing since they would impede or even endanger the users. Step 4. Construct the treadway, which should be 2 to 3 ft wide (if the trail parallels a very steep slope this may be reduced to 1.5 ft). Do not dig up stumps, but cut them off as close as possible to the surface of the treadway; the roots will help in stabilizing the surface of the treadway. If filler material is needed, do not use topsoil since it easily washes off; instead rely on base material that can often be found in or near the root mass of toppled trees. Given the prevailing terrain in Murrysville, most of the trail will parallel slopes of varying steepness; this provides opportunities to channel water off the trail thereby mitigating the potential for erosion of the treadway. For that reason, the following should be adhered to: Slope the treadway by 2 to 3 in. towards the downhill side (Figure 1). Interrupt trail inclines with dips spaced 30 to 50 ft. a part (Figure 2); make sure that the dips drain readily to the downhill side. If dips are not practical, install water bars (Figure 3) using stones or hardwood (locust, oak, ash, etc.) timbers. Prior approval must be sought for the use of treated timbers since they may not be environmentally friendly. If locally the incline of a hiking trail exceeds 15 percent, install steps, again using stones or timbers (see above for choice of wood). Locate the treadway on the uphill side of an established tree; avoid the downhill side because roots will interfere (Figure 4). If narrow switchbacks cannot be avoided, place debris such that shortcuts are uninviting. 2

Stream crossings are inevitable. In case of small streams (less than 1 ft. wide at late spring level), install a 4 ft. section of pipe (at least 10 in. diameter) and add fill around it; place a few large stones at the outlet of the pipe to break up the flow of water. For larger and deeper streams, options are as follows: install steps on both sides to protect the banks from erosion; if necessary, place large stepping stones in the water course itself. construct a bridge, preferably a simple one consisting of two parallel beams 2 to 3 ft. apart in the direction of the trail with planks on top; consider the effect of flooding of the stream. however, if the treadway is elevated more than 30 in. relative to the normal water surface, municipal regulations require the bridge to have a railing with balusters. Although wet areas are to be avoided, this may not always be possible. The simplest solution is to place large stepping stones. If this is not effective, other measures such as drainage trenches, pipes below the trail, or a boardwalk should be considered. Bridges and boardwalks are permanent structures; their design must be submitted to the Municipal Engineer for review and approval. They are excellent candidates for group projects (scouts, churches, etc.). Step 5. Install blazes which neatly and unambiguously mark the trail such that a hiker unfamiliar with the area can follow it with ease. The following requirements apply: Blazes should be 2 in. wide and 4.5 in. tall. They are to be installed at a height of 5 to 6 ft on live trees that are clearly visible and located within 1 to 3 ft. of the right hand side of the treadway. Preferably, blazes are to be painted on trees. In case of thick, rough bark the area for the blaze should first be smoothed with a paint scraper (do not cut through the bark because the tree will "bleed" and cause the paint to run). With smooth trees, simply rub the area with a nylon dish pad or canvas gloved hand to remove dirt, lichen and loose bark. Once the surface is prepared, use latex paint and a template to make the blaze. Follow the directions on the paint container regarding temperature, humidity, etc. If it is judged that painted blazes require too much maintenance, approval may be sought for the use of vinyl or aluminum blazes. These should be fastened with two aluminum nails; when installed, the nails should protrude 3/4" to1" in order to allow for tree growth. Use blazes sparingly; generally, no more than a single blaze should be visible from any position on the trail (typically 100 to 150 ft. spacing). Place a double blaze (vertically spaced by 4 in.) just ahead of abrupt turns, including those at junctions. Next, place a blaze on the continuation of the trail 25 to 50 ft. beyond the turn such that it is clearly visible from the point where the trail turns. If the park or nature reserve has two or more distinct trails, it is recommended that different colors be used for the blazes of each trail. 3

4 04/11/05 Once blazing has been completed, the temporary markings using surveyor's tape should be removed. Step 6. An accurate routing of the trail should be established using a GPS instrument; the trail routing should be added to a detailed drawing of the park or nature reserve, e.g. a survey map. 3. MAINTENANCE Following are the main items to be inspected and maintained at least once a year: Trail Space. Reestablish the 4 ft. by 8 ft. space in accordance with the directions given in Step 3 of "Construction" above. Pay particular attention to protruding new growth that poses an eye hazard. Treadway. Over time, the treadway takes on the shape shown in Figure 5 because of use and erosion. Remove the slough and berm material and reestablish the desired out slope of 2 to 3 inches (refer to Step 4 of "Construction" above). If the area around stumps has been eroded, cut them again to be flush with the surface. Trees. Treat newly fallen trees in the same manner as described under Step 2 above. Erosion. Inspect all erosion control devices; clean out pipes and trenches; repair or replace steps and water bars as necessary. Install additional devices such as pipes, trenches or water bars in those areas where excessive erosion has occurred. Blazes. The following is recommended: (i) Walk the trail in late summer and make sure that the blazing is adequate; add or relocate blazes as needed. Remove branches that prevent the blazes from being seen. (ii) Walk the trail in winter when there is snow on the ground. What was an obvious trail in summer may not be so in winter; add blazes, if this is the case. (iii) Redo painted blazes every 2 to 3 years; replace vinyl or aluminum blazes that are damaged or that are being imbedded in the bark because of tree growth. (vi) If it is necessary to eliminate blazes because a section of the trail has been relocated, cover painted blazes with a dark neutralizing paint; remove vinyl or aluminum blazes. 4. TRAIL MAP A trail map should be posted on a sign located in the parking lot(s) near the trail head (the beginning of the trail). The sign should include a telephone number and/or an E-mail address where problems encountered by users of the trail can be reported.

In case of multiple trails within a single park or nature reserve, it is recommended that trail maps be made available to users. These should include the color scheme used for the blazes of the different trails. 5. VOLUNTEERS Use common sense and respect nature. Dress appropriately for the job at hand and the weather, and wear work gloves. Do not use equipment that may damage the treadway such as tractors. Rely on chainsaws sparingly since the bar oil is a pollutant. Follow safety precautions when using power equipment. And remember that permanent improvements (e.g. boardwalks and bridges) as well as the use of treated wood require prior approval. 6. REFERENCES Most of the above is based on the following references: (1) "Trail Construction and Maintenance Notebook", USDA Forest Service, October 1996 (Revised February 1999). (2) " Appalachian Trail Design, Construction, and Maintenance", Second Edition, 2000. Throughout, the material was condensed and requirements that were judged not to be applicable in Murrysville were deleted. In case of more challenging projects such as the construction of steps and boardwalks it is recommended that these References be consulted. ATTACHED: DESCRIPTIVE DRAWINGS FOR PROJECTS 5

THIS POLICY ORDAINED AND ENACTED AT A REGULARLY CONSTITUTED, DULY CONVENED MEETING OF THE COUNCIL OF THE MUNICIPALITY OF MURRYSVILLE, THIS DAY OF, 2005 COUNCIL OF THE MUNICIPALITY OF MURRYSVILLE Lawrence Keller, President Donald C. Pepe, Chief Administrator (Seal) APPROVED/REJECTED: Joyce K. Somers, Mayor Dated:, 2005 Member Yes No Absent Abstain Jack Bankoske Robert J. Brooks Joan C. Kearns Lawrence W. Keller Dennis Pavlik Theo van de Venne 6