Training & s Academic Year (2012-2013 to 2015-2016) Seme Name of the Nature of From To Industry ster Students Training Duration 2012-2013 1 04.06.12 11.06.12 A. Sharmila Renaatus projects Site work 8 days 2 15.06.12 26.06.12 S. Manju Sonia ACC Limited Site work 12 days 3 25.12.12 31.12.12 S. Manju Sonia Public Works Department Site work 7 days 4 15.06.12 30.06.12 R. Nandhini SS Builders Site work 1 5 04.06.12 11.06.12 A. Mythili Renaatus projects Site work 8 days 6 31.05.12 02.06.12 S. Sowmiya Sail Refractory Company Ltd Site work 3 days 7 31.05.12 02.06.12 S. Nithya Sail Refractory Company Ltd Site work 3 days 8 15.06.12 26.06.12 C.K.Abinaiya ACC Limited Site work 12 days 9 13.12.12 24.12.12 S.Gopinath Panchami Shree construction Ltd Site work 12 days 10 17.12.12 28.12.12 M.Samson Leo SG structural Engineers Site work 12 days 11 07.06.12 15.06.12 M.Samson Leo BCS Prokon ( India) Pvt. Ltd. Site work 9 days 12 17.12.12 28.12.12 K.Vimal Raj SG structural Engineers Site work 12 days 13 17.12.12 28.12.12 G.Gowthaman SG structural Engineers Site work 12 days 2013-14
Infosys Campus 1 28.10.13 05.11.13 A. Sharmila Connect A.Pradeep Sankar and 2 11.06.13 26.06.13 Anand Associates Neyveli Lignite 3 10.06.13 17.06.13 J. Chitra Devi Corporation 2014-15 SDS 1 17.12.14 19.12.14 P.Subashkumar Associates, Salem SDS 2 17.12.14 19.12.14 C.Sakthiganesh Associates, Salem 3 17.12.14 19.12.14 SDS A.M.samseraha Associates, med Salem 4 17.12.14 19.12.14 SDS G.S.Vigneshku Associates, mar Salem 5 19.12.14 22.12.14 T.M.Rahulgane design services sh 6 19.12.14 22.12.14 M.Revathi design services 7 19.12.14 22.12.14 Sangeethasivak umar design services Site work Site work Site work Preparation of planning drawing and estimation Preparation of planning drawing and estimation Preparation of planning drawing and estimation Preparation of planning drawing and estimation 9 days 1 8 days 3 days 3 days 3 days 3 days
8 19.12.14 22.12.14 Sangeethasenthi lkumar design services 9 19.12.14 22.12.14 M.Vishnupriya design services 10 19.12.14 22.12.14 A.Rajalakshmi design services 11 19.12.14 22.12.14 M. SreePoorani design services Mayflowers 12 25.12.14 27.12.14 RajishaVelluva ammakunnoth enterprises pvt.ltd of 3 days 13 25.12.14 27.12.14 K.PAppupreethi Mayflowers enterprises of pvt.ltd 3 days 14 19.12.14 22.12.14 A.G.Nisandhan design services 15 15.12.14 20.12.14 S.SabariSaravan Uthama of hostel an palayam 16 15.12.14 20.12.14 P.R.Jayabalaji Uthama of hostel palayam 17 15.12.14 20.12.14 K.Arunkumar Uthama
palayam 18 15.12.14 20.12.14 S.Aravind raj Uthama palayam 19 29.12.14 03.01.15 S.Swathi C.D.C.M.P. union ltd Skyline 20 15.12.14 22.12.14 Vime Gold foundations and structures pvt.ltd. 21 15.12.14 22.12.14 S.Gowsika RRThuklasi builders pvt ltd Devi 22 11.12.14 24.12.14 construction J.Koresh builders Solomon promoters pvt ltd 2015-16 1 14-12-15 19-12-15 Kanmani.J Government of Tamilnadu 2 14-12-15 19-12-15 Anithasri.R Government of Tamilnadu 3 14-12-15 19-12-15 Aishwarya.S Government of Tamilnadu 4 14-12-15 19-12-15 Abirami.K Government of of hostel of hostel Site familiarization Site familiarization of of 8days 8days 1
Tamilnadu 5 14-12-15 19-12-15 Darshini.K Government of Tamilnadu Tuticorin 6 7-12-15 11-12-15 Akila.P Thermal power station, Tuticorin Tuticorin 7 7-12-15 11-12-15 Jeanne Greshma.L Thermal power station, Tuticorin 8 1-06-15 10-06-15 K.Abirami SreeDaksha properties 10 days 9 1-06-15 10-06-15 Aishwarya.S SreeDaksha properties 10 days 10 17-06-15 23-06-15 Akshaya.R Project management divisions 7 days 11 26-05-15 04-06-15 Akila.P Thoothukudi 10 days 12 26-05-15 04-06-15 Jeanne Greshma.L Thoothukudi 10 days 13 15-06-15 20-06-15 M.Saravabalaji SDS associates, salem 14 15-06-15 20-06-15 K.K.P.Sri Bhalaij SDS associates, salem
15 15-06-15 20-06-15 A.M.Samser Ahamed SDS associates, salem 16 15-06-15 20-06-15 R.Manojkumar SDS associates, salem 17 15-06-15 20-06-15 G.S.Vigneshku mar SDS associates, salem 18 06/10/15 15/06/15 Manikandan.K Architec Design, 9 days 19 12/07/15 17/12/15 Manikandan.K Dimensions, 20 12/07/15 16/12/15 Mohan.K Srinivasan Associates Pvt. Ltd., 21 26/05/15 30/05/15 Nandhini.J Prism Builders, 22 26/05/15 15/06/15 Priyanka.K G.SakthiConstrs, Chennai 21 days 23 15/06/15 26/06/15 Priyanka.K Ashokeon Builders, Chennai 12 days 24 26/05/15 15/06/15 Saranya.B G.SakthiConstrn s, Chennai 21 days 25 15/06/15 26/06/15 Saranya.B Ashokcon Builders, Chennai 12 days
26 29/12/14 01/02/15 Saranya.N Bannari Amman Institute 30 days 27 10/06/15 15/06/15 Sathish.R Architec Design, 28 08/12/15 19/12/15 Sathish.R URC,Erode 12 days 29 08/06/15 12/06/15 Suganya.A Govt. Project, Sivagangai 30 10/06/15 30/06/15 Suridhi.V Muthu Associates 20 days 31 10/12/15 18/12/15 Yuvaraj.C URC,Erode 8 days 32 15/06/15 30/06/15 Gowsika.S RJ Design Internship 1 33 29/05/15 30/05/15 Swathi S SVS College Internship 2 days 34 08/12/15 19/12/15 GokulNath.E URC,Erode Internship 11 days 35 08/12/15 14/12/15 Gowsika.S s Internship 7 days 36 8/06/15 18/06/15 Koresh DhakshaPromoto Solomon.J rs Internship 10 days 37 08/12/15 14/12/15 MahizhiniRaci s Internship 38 04/12/15 11/12/15 Priyanka.K SG Structurals Internship 7 days 39 08/06/15 18/06/15 Raghul.P.C DhakshaPromoto rs Internship 10 days 40 07/12/15 17/12/15 Rajesh.R Dimensions Internship 10 days 41 08/12/15 19/12/15 Sakthivel.S URC,Erode Internship 11 days 42 08/06/15 18/06/15 Sathasivam.C Dhaksha Promotors Internship 10 days 43 08/12/15 14/12/15 Suganya.A s, Internship
44 08/12/15 14/12/15 Saranya.B s Internship 45 07/12/15 17/12/15 Sheik Imran S Dimensions Internship 10 days 46 08/12/15 19/12/15 Sugumar.C.M. URC,Erode Internship 11 days 47 08/12/15 19/12/15 Sundharesan.K URC,Erode Internship 11 days 48 08/12/15 14/12/15 Suridhi.V s, Internship 7 days 49 08/12/15 14/12/15 SwethaSree.V s Internship 7 days 50 15/12/14 24/12/14 VimeGold.V Trivandram Internship 10 days 51 08/06/15 18/06/15 Ranjith DhakshaPromoto Kumar R rs Internship 10 days 52 07/12/15 17/12/15 Sathish Kumar S J Dimensions Internship 10 days 53 08/06/15 18/06/15 Sathish DhakshaPromoto Kumar S J rs Internship 10 days 54 07/12/15 10/12/15 Swathi S SG Structurals, Internship 55 07/12/15 17/12/15 Ranjith Kumar R Dimensions Internship 10 days 56 10/06/15 15/06/15 Sheik Imran S Dimensions Internship 57 07/12/15 17/12/15 Sugumar.C.M. URC,Erode Internship 10 days 58 07/12/15 16/12/15 Sundharesan.K URC,Erode Internship 10 days 59 26/05/15 30/05/15 Suridhi.V s, Internship
60 26/05/15 30/05/15 SwethaSree.V s Internship 61 15/06/15 26/06/15 VimeGold.V Trivandram Internship 12 days 62 29/12/15 02/01/15 Ranjith DhakshaPromoto Kumar R rs Internship 63 15/06/15 26/06/15 Sathish Kumar S J Dimensions Internship 12 days 64 29/12/15 02/01/15 Sathish DhakshaPromoto Kumar S J rs Internship 65 10/06/15 15/06/15 Swathi S SG Structurals, Internship 66 08/12/15 19/12/15 Ranjith Kumar R Dimensions Internship 12 days 67 22.6.15 17.7.15 Arul Vikram.M Kiruthiga Associates 27 days 68 20.6. 15 15.7. 15 Balavinayag.M Immunel& co 27 days 69 22.6.15 20.7. 15 Dhivya.S Sona Builders 30 days 70 22.6. 15 17.7. 15 Ganesh PTK Architects Kumar.S 27 days 71 24.06.15 18.07. 15 Gayathiri.U Rasi 2 72 23.6. 15 18.7. 15 Kannan.P Simplex Infrastructure Pvt Ltd 27 days 73 22.6. 15 18.7. 15 Kaveen.S VVR Pvt Ltd, 28 days
74 22.6. 15 17.7. 15 Manigandan.N PTK Architects 75 29.6.15 24.7.15 Rajesh Kumar.A TNPL 76 22.6.15 18.7.15 Roja.M SJ Structurals 77 22.06.15 18.7.15 Shree Raja Gopal.T.G Annai Builders 78 22.6. 15 18.7. 15 Shyamala.R SJ Structurals 79 22.6. 15 18.7. 15 Sivasankari.P SJ Structurals 2 27 days 28 days 28days 28 days 28 days s Name of Sem From To the ester Students Industry 2012-2013 Common Effluent of VI 08.02.13 08.02.13 67 Treatment Plant, Tiruppur. Fabrication of VII Prestressed Precast 18.09.12 18.09.12 66 Concrete Poles at EB Yard, Sulur, V 26.09.12 26.09.12 67 EASA Yoga Center, 2013-2014 Rehabilitation of VII 26.07.13 26.07.13 Structures at 68 Ramakrishna Nature of Training Duration
Polytechnique College V 13.08.13 13.08.13 71 Pothanur Railway Station V 05.09.13 05.09.13 71 Pillur Dam III 11.10.13 11.10.13 67 ACC Cement Factory 2014-2015 II-A 4.9.14 4.9.14 64 Aliyar Dam VI 3.9.14 3.9.14 67 Podanur Railway Station II-B 13.9.14 13.9.14 63 Aliyar Dam VI 6.2.15 6.2.15 67 CTEP, Tirupur Structural Engineering III Research Centre M.E. 13.11.14 15.11.14 13 Chennai [CE& Fishery Harbour M] Chennai III-A, Built Expo 2015 III-B, 07.02.14 07.02.14 193 CODISSIA Trade Centre V,VII 2015-2016 Built Mat Expo V- Venkatalakshmi 11.07.15 11.07.15 126 A & B Kalyanamandapam. Three days V - A 15.07. 15 15.07.15 64 Commercial Centre
Building Sri Ramakrishna Advanced Training V - B 24.07.15 24.07.15 62 Institute Vattamalai palayam N.G.G.O Colony post,,.