Project Update 3. Carpentaria Rail. Port Carpentaria Railway Project. Carpentaria Rail. 21 Second Ave, Mount Isa, Queensland, Australia, 4825

Similar documents
Townsville Portlandia 2020

Building the future trade potential of the Wide Bay Burnett

9 November, Defence White Paper 2015 R1-3-A135 Russell Offices Department of Defence PO Box 7901 CANBERRA BC ACT 2610.

port of brisbane Information Guide

BUSINESS CASE EXECUTIVE SUMMARY CHANNEL CAPACITY UPGRADE

Number 1 Gross Regional Product per capita in Queensland

Department of Employment, Economic Development and Innovation. Current Queensland coal infrastructure developments

RE: SUBMISSION TO THE JOINT SELECT PARLIAMENTARY COMMITTEE INQUIRY ON NORTHERN AUSTRALIA

Great Barrier Reef Ports Strategy Have your say

The Coalition s Policy

For personal use only

Smart Cities Plan IMPLEMENTATION. Townsville City Deal. April 2017

PORT OF TOWNSVILLE NORTHERN AUSTRALIA S TRANSPORT LINK TO THE WORLD TOWNSVILLE PORT EXPANSION PROJECT MAGNETIC ISLAND KNOWLEDGE FORUM 29 APRIL 2017

BRIEFING PAPER APRIL 2002 MINING AREA C DEVELOPMENT PORT HEDLAND PORT & CAPACITY EXPANSION

PRESENTATION ON CAIRNS SHIPPING DEVELOPMENT PROJECT

Harbourmaster s Office

CHINGOLA-SOLWEZI-JIMBE RAILWAY LINE

GLADSTONE. Australia s premier manufacturing and industrial location

INFRASTRUCTURE NORTHERN QUEENSLAND. Bruce Highway. Infrastructure initiatives to enable economic growth DID YOU KNOW

For personal use only

Public Submissions in response to the Bill closed on 2 July 2015 and Council lodged a copy of the submission provided as Attachment 1.

3 Pilbara ports provide gateways

Panama Canal Stakeholder Working Group Meeting

Mine Production and Shipping

Port of Tallinn Estonia s Biggest Maritime Gateway

APPENDIX 20 EFFECTS ON NAVIGATIONAL SAFETY

JUNE 2017 QUARTERLY ACTIVITIES REPORT

Waterways Council November 10, 2017

NSW PRE-BUDGET STATEMENT FUTURE ECONOMY FUTURE JOBS

TERMINAL DEVELOPMENT PLAN

Finding the Next Generation of Marine Pilots

Benefits and costs of tourism for remote communities

EQUATORIAL LAUNCH AUSTRALIA

Introduction. Ichthys LNG Project 2014 highlights. INPEX.com.au

Development Projects. Turner River Hub Project. centralised processing facility drawing feed from nearby satellite mines.

GLADSTONE - Australia s Model 21 st Century Sustainable Region

RDA Update 2 July, Presented by: Cr Greg Jones RDA Townsville and North West Queensland Committee Member

TOWNSVILLE NORTH QUEENSLAND IN FOCUS LIVEABLE THE LARGEST CITY IN NORTHERN AUSTRALIA

Infrastructure Priority List. Infrastructure Priority List Printed as at 28 April

MIAMI INTERNATIONAL REAL ESTATE CONGRESS ERIC OLAFSON MANAGER TRADE DEVELOPMENT

CAIRNS A STRATEGIC PORT

MoorMaster, automated mooring for ports automation

Regional planning in Queensland

For personal use only

Building the future trade potential of the Wide Bay Burnett

UK Port Infrastructure Project Pipeline Analysis Report

Overview. Mining projects map

December 2017 Quarterly Activities Report

Ohio Freight Conference Great Lakes Commercial Navigation

ASX Announcement. Company Update

Port of Newcastle Schedule of Port Pricing

INNOVATE RECONCILIATION ACTION PLAN

ARTC & INLAND RAIL 14 NOVEMBER 2017 SIMON THOMAS, PROGRAMME DIRECTOR ARTC INLAND RAIL

WICET WIGGINS ISLAND COAL EXPORT TERMINAL

FUTURE AIRSPACE CHANGE

Online Report Alpha wins approval for $10 bln Aussie coal mine, rail project

Roberts Bank Terminal 2 Project

SAMOA PORTS AUTHORITY

Auckland Port and the Unitary Plan Dr Douglas Fairgray

TECHPORT AUSTRALIA - AUSTRALIA S PREMIER NAVAL INDUSTRY HUB

Distinguished guests, parliamentary colleagues, ladies and gentlemen.

HISTORY OF THE CENTRAL EYRE IRON PROJECT (CEIP)

Strategic Plan. Regional Opportunity. Strong For Generations

Table of Contents. CMA CGM Mozambique Profile

American Institute of Marine Underwriters

Uniquely positioned to be Australia s next coal producer

Alexandria Port, Egypt

NEW TECHNOLOGIES AND THEIR IMPACT ON PORT DEVELOPMENT IN JAMAICA. Christopher Hamilton May

Eleven community groups to benefit from Glencore s community program

Capability Statement. Connecting global markets

The Danube A Stream of Energy

Jamaica Investment Forum 2018 th. Montego Bay

It s Time to Facilitate Growth. Global Eco Asia-Pacific Conference Ms Karla Way-McPhail Director, NAIF

Walvis Bay and its role as a logistics hub for the SADC region. Christian Faure Executive: Marketing and Strategic Business Development

COMMONWEALTH OF THE BAHAMAS MINISTRY OF PUBLIC WORKS & TRANSPORT NASSAU HARBOUR PORT IMPROVEMENT PROJECT. Nassau Harbour Port Improvement Project

Infrastructure Developments in Brazil s Northern Arc

$1.3 million in Glencore community funding to support more projects than ever before

Outlıne of the Presentatıon

Regional Roadmap Executive Summary. Mackay-Isaac-Whitsunday


INLAND RAIL. Connecting Australia. 5 June 2018 National Infrastructure Summit inlandrail.com.au

(Incorporated in the Republic of Singapore) (Company Registration No H)

CAIRNS A STRATEGIC PORT

Appendix 3-B. Phase 2 - Recent Consultation

NEGOTIATING FOR SUCCESS IN THE COMPETITIVE PORT AND MARINE TERMINAL INDUSTRY

5 Rail demand in Western Sydney

capability profile PO Box 8102 Suite 4, Level 2, 85 Lake St Cairns QLD 4870 Phone

Engagement Summary Report. Trans-Canada Highway 1 RW Bruhn Bridge Replacement Project. Community Engagement November 15, 2016 to January 15, 2017

InchgreenDryDock. More than Ports. Sat Nav: PA15 2NA

For personal use only

Park Board Chair and Commissioners

Atlas Lifts Production Guidance and Lowers Cost Forecast After Record September Quarter

Draft Marine and Harbour Facilities Strategy

29 December Canada Transportation Act Review Secretariat 350 Albert Street Ottawa ON K1A 0N5

Photo list of facilities built under the projects of CJSC "HT Morstroy" Design Institute in

Corporate Presentation 5 March 2003

For personal use only

ILLAWARRASHOALHAVEN ECONOMIC OUTLOOK

F AR N ORTH Q UEENSLAND MARINE INDUSTRIES C APABILITY P ROFILE

Calgary River Access Strategy Priority Sites and Proposed Funding

Transcription:

Project Update 3 Carpentaria Rail Port Carpentaria Railway Project Carpentaria Rail 21 Second Ave, Mount Isa, Queensland, Australia, 4825 Tel 0413178182

Port Carpentaria community consultation commenced in March 2012. Based on this community and industry feedback the project is progressing. Further submissions can still be made or request our community update. Contact Details: Carpentaria Rail 21 Second Avenue, Mt Isa, 4825, Queensland, Australia Phone: 0413178182 Email: info@carpentariarail.com or all general inquires community@carpentariarail.com for community inquires commercial@carpentariarail.com for commercial inquires Facebook: www.facebook.com/carpentariarail Twitter: www.twitter.com/miepc0 Website: www.carpentariarail.com Carpentaria Rail Table of Contents Table of Contents... 2 Introduction... 3 Project Description... 3 Mount Isa and Cloncurry extensions... 4 Gulf connection... 4 Croydon connection... 4 Burketown connection... 4 Proposed Operational Date... 4 Project Rationale... 5 Financial Rationale... 5 Appendix 1 Route maps... 6 Carpentaria Rail Page 2 of 7 11 December 2012

Introduction Carpentaria Rail proposes the construction of a new deep water bulk minerals export port on the lower Gulf of Carpentaria with an associated all weather road and rail infrastructure connection from the port to the major towns North Western Minerals province. The Port Carpentaria Railway project is based on the principles of: Economic viability Environmental Sustainability Cultural sensitivity Local empowerment Improving the access to port and rail infrastructure in the North West Minerals Province will lead to increased mining activities and opportunities within the region. Reduced export costs will also sustain the viability of existing operations in times of moderating world commodity prices and increased international competition. Growth over time will lead to increasing rail activity and linkages across the state and country and reduced east coast shipping activity in the Great Barrier Reef area. Constraints on existing infrastructure make the development of new facilities more economically viable than upgrading existing infrastructure. This project will lead to sustainable jobs and increased regional development and services in the lower Gulf. The separation of the route from existing communities means there will be no adverse impact on existing communities and amenity. In addition it reduces potential risk to the Great Barrier Reef from existing operations. Project Description The proposal of a new bulk minerals handling export port and rail link involves the revitalisation of the 151km Normanton to Croydon railway line, construction of 450km of narrow gauge, on dual gauge sleeper, new railway construction, 40 km of trolley tramway jetty on screw piles above the estuarine marine environment and an artificial loading island in up to 25 m of water. The Jetty will be developed in stages to allow earlier loading of shallower draft vessels and extended to meet demand with multiple loading berths along the jetty. Early operation will use a floating harbour transhipment vessel, shuttle barges and some trucking before the completion of the jetty. Due to the curvature of the earth, you will not able to see the end of the jetty or the export vessels from the shore with no impact on the Karumba community. The jetty will be available for public access and fishing. It is envisaged that the jetty will be of cyclone rated minimal construction for maintenance access and the support of the tramway and include facilities for the passage of fishing vessels. The trolley tramway jetty will pass over the estuarine marine environment with minimal impact upon it to the rail unloading facilities located on high country 15 km inland. The jetty will be designed for a corrosive marine environment with stringent environmental regulation. The trolley tramway consists of sealed skip cars giving no possibility of any spillage at all. Each trolley carries 10 tonnes and the total consist length is 2.5km. On shore facilities include a balloon loop and rail unloader with dedicated covered storage for each company using the port. High environmental standards are built in to the project. Carpentaria Rail Page 3 of 7 11 December 2012

This project will lead to sustainable jobs and increased regional development and services in the lower Gulf. The separation of the route from existing communities mean there will be no adverse impact on existing communities and amenity. This buffer could also allow the transport of hazardous materials if required with no potential impact on community safety. The project route options map is detailed in Fig. 1 of Appendix 1. Mount Isa and Cloncurry extensions The heart of the project is a rail connection north of Mt Isa and also north of Cloncurry to give access to major current and proposed projects in the region. This will significantly reduce heavy haulage on public roads and reduce transport costs. Initially the existing Mt Isa to Cloncurry railway line will be used and when additional capacity is required a more direct route from Calton Hills to Kajabbi will be investigated. Gulf connection It is proposed to go north from Cloncurry via the old Kajabi rail alignment, following the Burke development road to the west of Normanton. A major road and rail bridge will be constructed at the Flinders River. Then travel north to the coast at Alligator Point west of Karumba with a 40 km of trolley tramway jetty to reach the existing Karumba loading area. This will provide permanent all weather access to Normanton and Karumba, via a barge on the Norman River and will see Normanton develop as a regional infrastructure hub. This connects the lower Gulf region to the rest of Australia by linking to the national rail network at Cloncurry giving rail access to and from the region. Croydon connection The connection to Normanton also connects to the existing Normanton to Croydon railway line and will lead to the revitalisation of the line with possible further extension to the North East Minerals province and Galilee basin. Burketown connection As a subsequent stage it is proposed to also connect Burketown to Normanton utilising the existing Century mine pipeline and infrastructure corridor alignment. Proposed Operational Date The Port Carpentaria railway will commence operation in 2016 and may include some interim trucking measures. In the early stages of operation a floating harbour transhipment vessel will undertake the loading activities. This will be supplied by smaller barges shuttling from the loader to the initial loading facilities on the western side of the Norman River close to the rail unloading facilities. This incremental development approach will allow a short lead time to commencement, leveraging on the back of existing agreements and approvals and will allow the project to grow viably as demand increases. Carpentaria Rail Page 4 of 7 11 December 2012

Project Rationale With increased mineral export volumes projected from the North West Minerals Province and North East Minerals Province, it is more economically viable to build a new port on the Gulf of Carpentaria rather than expand the capacity of the Townsville railway line and port. A port on the Gulf of Carpentaria is 450 km closer to Mt Isa than the port at Townsville. Without any additional new rolling stock the Gulf line would have twice the capacity and half the carbon footprint of the Townsville line. Better loading and unloading technologies and a shorter distance give a turnaround time from mine to the gulf port of 24 hours as opposed to the current 4 days to Townsville. A port on the Gulf of Carpentaria is three or four days closer to Asia than Townsville with savings in demurrage and shipping costs. Vessels would not have to traverse the Torres Straight or Great Barrier Reef reducing environmental risk with savings in navigational and piloting costs and removing the current 12.2m draft restriction. Even with major expansion and investment Townsville will remain a small harbour, close to the CBD, constrained by area and requiring constant dredging to remain in operation. Once the offshore depth is achieved at Port Carpentaria, the gulf is a huge natural harbour with no navigational hazards and capable of accommodating Cape, New Panamax, Suezmax and Chinamax vessels and almost unlimited room to move. Due to NW Queensland s proximity to the Northern Territory it is proposed to build the railway in narrow gauge but on dual gauge concrete sleepers to allow for easy conversion to standard gauge in the future and achieve better track quality. The shorter route length has a lower fuel cost and lower carbon liability. Possible future electrification of the Port Carpentaria Railway would reduce carbon liabilities further and improve the competitive advantage of mining in the region. It is envisaged to utilise 50% to 100% local and indigenous personnel across all levels of the company and provide substantial training and mentoring to achieve this goal. At all stages of the project and operation, the aim is to maximise the long term value to the local communities, augment the value for shareholders and customers, while broadening environmental, native title and cultural protection. This project will harness value for local people, which currently flows to the east coast and in the longer term grow the operations of all the existing players. Financial Rationale The Port Carpentaria Railway is a $1.5B project aimed at increasing export productivity and lowering export costs from the North West and North East minerals provinces. Carpentaria Rail is an alliance between the local aboriginal native title owners and MIEPCO Pty Ltd, the lead project manager, for approximately 7% or $100M of the project value. Carpentaria Rail seeks to form an alliance between mining companies, operators, suppliers, customers or investors of $100M to $700M each for the $1.5B price tag. The project has a design capacity of 10MTpa. At this capacity the project gives a return of 8%, at 5MTpa the return is 4%. Above 10MTpa the return will be capped at 8% for the short term with higher internal investment in growth capacity. Carpentaria Rail Page 5 of 7 11 December 2012

It is anticipated that this port will start as a small 10 MTpa port and grow to be the highest value bulk minerals and general access port in Australia with considerable export cost efficiencies to Asia. Appendix 1 Route maps Fig. 1 - Route detail. Carpentaria Rail Page 6 of 7 11 December 2012

Fig. 2 - Location map. Carpentaria Rail Page 7 of 7 11 December 2012