Key Tasks and Preliminary Findings

Similar documents
REGIONAL STRATEGY FOR SUSTAINABLE HYDROPOWER IN THE WESTERN BALKANS. Approach and Methodology

International Sava River Basin Commission - An example of EU/non EU country cooperation in water management

Public Seminar 30 October 2018, Lisbon. Water sector in B&H

PCN Annex: GEF Data Sheet

ACTION PLAN FOR THE PERIOD concerning the STRATEGY ON IMPLEMENTATION OF THE FRAMEWORK AGREEMENT ON THE SAVA RIVER BASIN

Terms of Reference (ToR) for a Short-Term assignment

Stability Pact for SEE. Working Table II. Sava River Basin Initiative

Framework Agreement on the Sava River Basin and its implementation

Scientific Support to the EU Strategy for the Danube Region and the Danube Water Nexus project

Workshop on WATER-FOOD-ENERGY-ECOSYSTEMS NEXUS ASSESSMENT IN THE SAVA RIVER BASIN. Sectoral goals in the Sava River Basin

Sava Commission Activities. DANUBE SKILLS KICK OFF EVENT, February 21, 2017, Bucharest

Project Fiche MASTER PLAN FOR DEVELOPMENT OF THE NAUTICAL TOURISM IN THE SAVA RIVER BASIN

Ohrid Lake and Prespa Lake, Sub basin s on Crn Drim river basin International Workshop, Sarajevo, Bosna and Hercegovina May 2009

Transboundary Water Management in Republic of Macedonia

Sava Commission Activities. KICK-OFF MEETING DANTE, February 17, 2017, Budapest

Danube River Basin. a source for transboundary cooperation. Exploring the Results and Potential for Transboundary Water Management Cooperation

The Sava and Drina River Corridor Initiative. Water Day European Commission/World Bank Brussels January 23, 2018

National and Regional Activities, Needs and Expectations

Regional Cooperation on Flood Management in the Sava River Basin

Overview. Sava River Basin. Sava River Basin. Sava River Basin

Catchment and Lake Research

PROGRAM FOR DEVELOPMENT OF FLOOD RISK MANAGEMENT PLAN IN THE SAVA RIVER BASIN. Draft 8

WORKSHOP ON THE TRANSPOSAL AND IMPLEMENTATION OF THE EU URBAN WASTE WATER TREATMENT DIRECTIVE (UWWTD 91/271/EEC) IN SERBIA

Presentation from 2015 World Water Week in Stockholm. The authors, all rights reserved. SIWI siwi.org

Ministry of Communications and Transport

ACTIVITIES ON FLOOD RISK MANAGEMENT AND CLIMATE CHANGE ADAPTATION IN THE SAVA RIVER BASIN

Gas network development in BiH

SUPPORT TO WATER RESOURCES MANAGEMENT IN THE DRINA RIVER BASIN DRAFT ROOF REPORT INTRODUCTION AND GENERAL APPROACH

The Potential of Renewable Energy Sources in Bosnia and Herzegovina

14 th Sava PEG RBM Meeting REPORT 1 Zagreb, Croatia September 29 th

TA Round 19 WBIF Steering Committee Paris, 18 June 2018

Implementation of WFD in Serbia and Montenegro

Danube River Basin District

Project Data Sheet BASIC PROJECT DATA. Rehabilitation and Development of Transport and Navigation on the Sava River Waterway. Full project title:

REPORT from the 47 th Session of the International Sava River Basin Commission

Bosnia and Herzegovina

Prof. Dr Željko Vaško Doc. Dr Tihomir Predić MSc Boris Marković

"Transboundary coordination according to the FD Directive in the shared river basins of Greece

112 SYSTEM IN BOSNIA AND HERZEGOVINA

Transboundary cooperation of Ukraine and Hungary in river basin and flood management in the framework of the EU Strategy for the Danube Region

Cross-border cooperation along the Serbian Bosnian border. Drina Euroregion

The UNDP/GEF Danube Regional Project

The Timok River Basin in Serbia

Hydropower development in Valbona VALLEY National Park IN Albania

Policy PL Date Issued February 10, 2014

International Conference on Sustainable Hydropower in the Dinaric Arc 07 Ocober 2009 Hotel Lapad, Dubrovnik, Croatia

What do local businesses expect from the cruise industry. The experience of the AIC Forum. Olympia, 23 th May 2015

Order of the Minister of Environment #39, August 22, 2011 Tbilisi

Sustainable development: 'Lanzarote and the Biosphere strategy'. LIFE97 ENV/E/000286

September Past issues IUMI Political Forum

PPCR/SC.4/5 October 9, Meeting of the PPCR Sub-Committee Washington, D.C. October 28, REVIEW OF ON-GOING WORK OF THE MDBs IN DJIBOUTI

ANGLIAN WATER GREEN BOND

TOR FOR THE DEVELOPMENT OF A ECOTOURISM BUSINESS PLAN FOR FAYOUM

APAT Italian National Agency for the Protection of the Environment and for Technical Services CAMPING SITE SERVICE EU ECO-LABEL AWARD SCHEME

IONIAN ADRIATIC PIPELINE IAP

Towards practical Guidance for Sustainable Sediment Management using the Sava River as a showcase

TRANSBOUNDARY COOPERATION ON WATER MANAGEMENT

Arrangements for the delivery of minor highway maintenance services by Town and Parish Councils

Cumulative Investments by Sector. Cumulative Investment by Country. Industry, Commerce & Agribusiness 18% Transport 30% Natural Resources 2%

The Strategic Commercial and Procurement Manager

The Danube Experience

EU Strategy for the Danube Region framework for development of inland navigation

CO-OPERATION IN DANUBE RIVER BASIN - THE ROLE OF SHMI SLOVENSKÝ HYDROMETEOROLOGICKÝ ÚSTAV

Ministry of environment, mining and spatial planning activities and methane action plan of republic of Serbia Dragana Mehandžić Ministry of

12th Sava PEG FP Meeting REPORT 1 Zagreb, Croatia October 20-21, 2009

The results of the National Tourism Development Strategy Assessments

Evian Encounter 2006 The Carpathian Wetland Initiative

IEEJ: June 2010 JICA JFY 2010 Energy Policy (B) NO. J / ID Country Report: Bosnia and Herzegovina March 2010 Prepared by JICA trainee

AFI AVIATION SECURITY MEETING. Dakar, Senegal, 28 May 2014 AN AFRICAN PLAN FOR ENHANCING AVIATION SECURITY AND FACILITATION. (Presented by Uganda)

Rehabilitation and development of navigation on the Sava river

Euromed Civil Aviation II project

Third Environmental Performance Review of Bosnia and Herzegovina: recommendations

Managing environmental risks in the Danube Region

PASSENGER SHIP SAFETY. Damage stability of cruise passenger ships. Submitted by the Cruise Lines International Association (CLIA) SUMMARY

Development of RBMP s In Republic of Macedonia

PRESENTATION OF THE ICT-KOSEU Project. Presentation by: e.g.mr. Nikos ZAHARIS Date: dd/mm/2012 Event:

Integrated Management of Shared Lakes Basins. Ohrid and Prespa Lake -Transboundary Cooperation-

Danube River Basin District

TWINNING EGYPT ITALY STRENGTHENING THE AVIATION OVERSIGHT STANDARDS OF THE EGYPTIAN CIVIL AVIATION AUTHORITY

Danube River Basin District

Danube River Basin District

Workshop on Guiana Shield Biodiversity Corridor to streamline support for the achievement of the Aichi Biodiversity Targets

2. SECTOR Energy 1. PROJECT TITLE LOWER VRBAS HYDROPOWER PLANTS

Implementation of the Water Convention, including its complementary role to the EU Water Framework Directive

Short Project Summary Cebren & Galiste Hydropower Project Republic of Macedonia

Project Data Sheet BASIC PROJECT DATA

Technical Progress Report

We are IntechOpen, the world s leading publisher of Open Access books Built by scientists, for scientists. International authors and editors

2014 floods in Serbia

Common Principles and Technical Requirements for Pan-European River Information Services (RIS)

Transboundary River Management in the Danube Basin

4 Rights and duties in connection with the conduct of petroleum activities

Recommendations on Consultation and Transparency

1. PROJECT TITLE LOWER DRINA HYDROPOWER PLANTS

Project Data Sheet BASIC PROJECT DATA. Improvement of the systems for navigation and topo-hydrographic measurements on the Danube River

1. TITLE OF THE PROJECT HYDROPOWER SYSTEM UPPER HORIZONS. 2. SECTOR Energy

The Single European Sky and SESAR, the European ATM modernisation programme. Patrick Ky, Executive Director 26 May 2010

Development of the Danube River Basin District Management Plan

Country report: Kosovo

SMILEGOV Islands fostering multi-level governance for sustainable energy planning

Transcription:

This project is funded by the European Union REGIONAL HYDRO MASTER-PLAN (Hydropower Development Study in the Western Balkans) Key Tasks and Preliminary Findings Martyn Osborn - Key Expert, Energy Marko Kosir - Senior Project Manager & Team Leader 3rd Energy Summit, Neum, 4-6 April 2017 The contents of this presentation are the sole responsibility of the Mott MacDonald IPF Consortium and can in no way be taken to reflect the views of the European Union.

Project Synopsis Client: European Commission, DG NEAR Contractor: WBIF-IPF3 Consortium Expert team: 30 experts (EU and WB6) and 2 subcontractors Duration: Scoping Phase (May-June 2016 + Study Phase (Oct. 2016 June/August 2017) Deliverables: 9 technical Background Reports, Final Report, 1 conference, 2 workshops, results-dissemination tour, inputs to the next MC-WB6 meeting (Trieste, 12.7.2017) Objective: Contribute to fostering the harnessing of environmentally and climate change sustainable hydropower generation in the WB6 region in line with strategic objectives of the European Union and the ECT obligations of its Contracting Parties. Purpose: Development of a study determining a list of hydro power project (HPP) development priorities by (i) river basin, (ii) type of planned HPP facilities (storage, run-of-river, reversible), through which the remaining hydro-power potential in the region will be evaluated. Aiming at utilising the entire hydropower potential, the following priorities shall apply: 1. Repair, refurbishment, upgrade and rehabilitation of existing HPPs 2. Sustainable greenfield HPPs

Key Activities and Preliminary Findings (1 of 9) 1. Status of 31.12.2016: 442 HPPs in WB6 (82 HPPs or 19% in BiH), 55 HPPs of more than 10 MW represent 12% in terms of the number. These large HPPs represent 93% in the overall capacity of 8,585 MW (BiH: 2,081 MW or 25%) and generated 97.5% of electricity (24 TWh/a) on average (BiH: 23% or 5.6 TWh/a) in the last 15 years in WB6. 2. Historic commissioning of HPPs (1955-2016): Average HPP-capacity addition achieved during 1955-1990 was 202 MW per annum while in the period 1990-2015 it dropped to mere 32 MW per annum. Period MW % MW/a Before 1955 678 7,9 During 1955-1990 7.081 82,5 202,3 During 1991-2016 825 9,6 31,7 Total 8.585 100,0 Reasons can be attributed to: Best HPPs already implemented, Disintegration of former SFRJ followed by wars in the 90s, End of central planning and coordinated water management, lack of cooperation between newly established states, Lack of financial capacity of power utilities / states for investment intensive projects, Growing investment risks in emerging market conditions, and Continued unresolved transboundary issues

Key Activities and Preliminary Findings (2 of 9) 3. Electricity demand development to 2050: in all WB6 countries, electricity consumption will grow during 2020-2050, in total for WB6, from 67.4 TWh in 2020 to 104.3 TWh in 2050. Average annual growth from 2020-2025 (1.69%) will however gradually decrease to 1.17% (2045-2050). 4. Gaps in institutional-organisations and legal regulatory (IOLR) framework: 7 detailed IOLR flow diagrams for 6 WB6 countries (2 for FBIH and RS in BiH) developed, analysed and conclusions / recommendations drawn: WB6: IOLR framework reasonably developed and functional but insufficiently tested in practice WB6: Severe lack of formal cross-sectoral (energy, flooding, irrigation, fishery, tourism etc.) integrated coordination (except in Kosovo) BiH: Streamline the process and limit / shorten the duration of the permitting procedures. BiH: Ensure consistency over application of relevant regulations and permitting procedures across different government levels in each entity (particularly in FBIH). BiH: Improve standard contracts and legislation enabling project financing BiH: Simplify HPP development process by reconsidering some of the requirements arising out of the applicable legislation (FBIH: Electricity Law, Law on Expropriation). 120.0 100.0 80.0 60.0 40.0 20.0 0.0 67.4 Electricity demand forecast by WB6 country (TWh) 73.3 79.9 86.4 92.6 98.4 104.3 2020 2025 2030 2035 2040 2045 2050 ALB BiH KOS MKD MNE SER Total WB6 Examples of IOLR flow diagrams RS BFiH

Key Activities and Preliminary Findings (3 of 9) Unique classification of hydrographic elements in WB6 basis for GIS and river basin based approach (WFD) applied in the Study WB6: (4) drainage basins, (13) watersheds, (17) river basins, (10) (sub)river basins, (26) rivers, BiH example (77) tributarie1, and (25) tributaries 2. DRAINAGE BASIN (DB) BLACK SEA ADRIATIC SEA WATERSHED (WS) River Basin (RB) (Sub) River Basin (SRB River Tributary 1 Tributary 2 ALB BIH KOS MKD MNE SER DANUBE TREBIŠNJICA NERETVA Sava /BIH, CRO, MNE, SER/ Increasing distance from the Sea (DB) to the Tributary Trebišnjica /BIH, CRO/ Neretva /BIH,CRO/ Drina /BiH, MNE, SER/ Bosna /BiH/ Vrbas /BiH/ Una /BIH, CRO/ Drina Piva Tara Bosna Vrbas Una Trebšsnjica Neretva Rastošnica Osanica Bistrica Čehotina Lim Vrbnica Tusina Bukovica Bijela Željeznica Kozica Babina r. Fojnička r. Krivaja Spreča Bistrica Jezernica Sana Tihaljina Rama Djurička Grnčar Kaludarska Ljesnica Sekularska Trebačka Uvac Visočica Zlorečica Strupčanica Bioštica Orlja Affiliation to WB6-countries

Key Activities and Preliminary Findings (4 of 9) 9 Specific Transboundary Cases identified, analysed and discussed in the Background Report (BR-4) 1. Drini i Bardhe/White Drin/Beli Drim River System - HPP Zhur (KOS-ALB) 2. Trebišnjica Hydropower Scheme HPP Dubrovnik 2 (CRO-BIH-MNE) 3. Vardar River System - HPP Lukovo Pole (ALB-MKD-GRE) 4. HPP Buk Bijela (BIH-MNE-SER) 5. Drina River Basin - HPP Koštanica (MNE-BIH-SER) 6. Ćehotina River Basin - HPP Chain on the Ćehotina River (MNE-BIH) 7. Drina River System - HPPs along Middle Drina River (SER BIH) 8. Drini River System - HPP Skavica (ALB-KMD) 9. Vjosa River Basin - HPP Chain on Vjosa River (GRE-ALB)

Key Activities and Preliminary Findings (5 of 9) 6. Platforms for assisting WB6 in resolving transboundary issues: Transboundary issues in hydropower have two potential resolution platforms: 1) Legal act which provides regulation in a planning phase i.e. EU Water Framework Directive (WFD); and 2) Legal platform for resolving transboundary issues within Energy Community action, administered by the Energy Community Secretariat. European Commission should join forces with the Energy Community Secretariat and make a compelling offer to the WB6 countries and territories involved.. 7. Changed focus in transboundary issues in WB6: Until present, transboundary issues predominately dealt with water quality aspects and to some extent biodiversity; The greatest omission noted is in sharing hydropower potential, so transboundary cases remained as they were or at best went to worse by sizing down of best reservoir locations (like Buk Bijela or Skavica) that could enable regulation of floods on Drina and Drini Rivers.

Key Activities and Preliminary Findings (6 of 9) 8. Transmission network: Transmission network capacities and facilities will never be a constraint for HPP projects. All new HPP projects connected to the transmission network: increase overall stability of the regional power system operations, improve power system control capacities, and increase opportunities for integration of other RES generation facilities, such as wind and solar PV generation. 9. Distribution network: Capacity of the distribution networks in the region is insufficient to facilitate growing demand for connection of small HPPs. Distribution networks require significant reinforcements in: o o o Network facilities Control facilities, Human resources Distribution Codes are getting improved, but still underdeveloped

Key Activities and Preliminary Findings (7 of 9) 10. HMP-DB developed supported by web-gis application: on greenfield HPP projects over 10MW, on the following: general, technical, environmental & social, hydrology & water management, economic & financial, maturity Total 480 projects (total =100%) over 10 MW identified. 154 (32%) projects eliminated due to: i) insufficient data, ii) alternative projects. Total 326 projects (75% from total) selected for further analysis ( Screening ), of which in ALB (232), BIH (37) MNE (16), MKD (17), KOS (3) and SER (21). 118 (33%) projects passed. Total 118 projects (25% from total) passed MCA Level 1 Note: ROR (Run-off river), RES (Reservoir), REV (Reversible).

Key Activities and Preliminary Findings (8 of 9) 11. Environment (conducted activities): Analysis of national SEA/EIA legal procedures / practices in WB6 countries, Description of protected areas, Baseline description of important features of chosen (25) river basins, GIS data collected for environmental analysis: protected areas, Corine land cover, settlements, river basins, Fish fauna inventory and residual flow legislation analysis, GIS layers with species distribution. 12. Ichtyology: List of threatened species was prepared (41 species) key species for the Study. By drainage basins: Black Sea (10 species), Adriatic Sea (29 species), Ionian Sea (2 species), Aegean Sea (6 species). WB6 region is ichtyologically insufficiently investigated. Spatial analysis map example

Key Activities and Preliminary Findings (9 of 9) Multi-Critera Assessment (MCA) of greenfield HPP projects Assessment Approach and Methodology (3-step, each next step more detailed and data intensive) Step 1: Screening 1 indicator Maturity HPP candidates identified in Task 6 Step 2: MCA Level 1 4 key indicators Mat, Env, Tech, Econ Short listed HPP candidates HPP candidates for further development Step 3: MCA Level 2 50+ indicators Tech, Env, Soc, Econ, Mat Outstanding HPP candidates threshold Less recommended HPP candidates threshold Highly recommended HPP candidates Recommended HPP candidates Outcome: HPP candidates ranked into groups

WBIF-IPF 3 Consortium Thank you for your attention! www.wbif.eu