From AIS To AIM. Agenda. Agenda. Jack Hsu Mark Varellas

Similar documents
AERONAUTICAL INFORMATION DIGITAL DATBASES INTERGATION AND QUALITY MANAGED MIGRATION

From AIS to AIM. COMSOFT AIS to AIM Lima, Peru Context and Overview Isabel Zambrano Rodriguez

AIXM/WXXM CONFERENCE 2010

TANZANIA CIVIL AVIATION AUTHORITY AIR NAVIGATION SERVICES INSPECTORATE. Title: CONSTRUCTION OF VISUAL AND INSTRUMENT FLIGHT PROCEDURES

The Importance of AIM and the Operational Concept

MIDAD Project IDS Vision

ICAO GANP Requirements and Evolution

INTERNATIONAL CIVIL AVIATION ORGANIZATION AFI REGION AIM IMPLEMENTATION TASK FORCE. (Dakar, Senegal, 20 22nd July 2011)

DP-7 The need for QMS controlled processes in AIS/AIM. Presentation to QMS for AIS/MAP Service Implementation Workshop Dakar, Senegal, May 2011

Amendment 37,38 to Annex 15 Amendment 57 to Annex 4

QMS for AIS/MAP Service Implementation Workshop

From AIS to AIM. Paul Bosman, Head of Aviation Cooperation and Strategies, EUROCONTROL

Quality Assurance. Introduction Need for quality assurance Answer to the need of quality assurance Details on quality assurance Conclusion A B C D E

Advisory Circular. File No.: Z U Issue No.: 01

Seychelles Civil Aviation Authority. Telecomm & Information Services Unit

Implementation of PBN in Armenian airspace

Development of the Global AIM Strategy (AIM Projects)

AIS Basics - NOTAM, AIP, Amendments, Supplements, Circulars, Charts, and NOTAM Putting the basics in place

Avitech GmbH AIXM Capabilities & Experiences

FLIGHT OPERATIONS PANEL (FLTOPSP)

User Forum AIM/EAD Evolutions. Thanos PAPAVRAMIDIS, Head of Airspace and AIS Data Management EUROCONTROL Network Management

AERONAUTICAL SURVEYS & INSTRUMENT FLIGHT PROCEDURES

Work Programme of ICAO Panels and Study Groups

GANP 2019/ASBUs. Olga de Frutos. Marrakesh/10 th December Technical Officer Air Navigation

Singapore s Journey to Implement ASBU B-0 & B-1 Modules in PIA-2

Federal GIS Conference February 10 11, 2014 Washington DC. ArcGIS for Aviation. David Wickliffe

This working. Action by the - AIS/MAP. TF/6 Report Report changes as. monopoly 1.3. The establishment SUMMARY REFERENCES.

Navigation Data Chain Certification

FLIGHT PATH FOR THE FUTURE OF MOBILITY

Flight Procedure Design and Cartography

30 SEP - 02 OCT, 2014

AERONAUTICAL SERVICES ADVISORY MEMORANDUM (ASAM) Focal Point : Gen

Overview ICAO Standards and Recommended Practices for Aerodrome Safeguarding

Airport AIM as a Service Presented at World ATM Congress 2016

Introduction to Amendment 40 to Annex 15

On Time. Total Airspace Management. 8 th Global ATFM Conference Cancun - Mexico. 12/30/2014 Commercial-in-Confidence 1

ATIEC Presented by: D. Cowell (FAA) & E. Porosnicu (EUROCONTROL)

4.1 This document outlines when a proposal for a SID Truncation may be submitted and details the submission requirements.

SESAR Active ECAC INF07 REG ASP MIL APO USE INT IND NM

AIS-AIM Study Group Working Status

AFI Plan Aerodromes Certification Project Workshop for ESAF Region (Nairobi, Kenya, August 2016)

IRELAND SAFETY REGULATION DIVISION

AIXM Coding guidelines for the ICAO data sets

Aerodrome Obstacle Survey Information Checks

Airport Safety Management Systems: Integrating Planning Into the Process

AIS/AIM System in South Africa (ATNS)

RNP AR APCH Approvals: An Operator s Perspective

A NO COUNTRY LEFT BEHIND Initiative:

Global ATM System. ~ Performance framework ~ H.V. SUDARSHAN, Technical Officer International Civil Aviation Organization

Aeronautical Information Management

DP-3 ICAO Electronic Terrain and. Amendments 33 & 36

AERONAUTICAL INFORMATION SERVICES TO AERONAUTICAL INFORMATION MANAGEMENT STUDY GROUP (AIS-AIMSG)

WORKING TOGETHER TO ENHANCE AIRPORT OPERATIONAL SAFETY. Ermenando Silva APEX, in Safety Manager ACI, World

TWENTY-SECOND MEETING OF THE ASIA/PACIFIC AIR NAVIGATION PLANNING AND IMPLEMENTATION REGIONAL GROUP (APANPIRG/22)

COMMISSION OF THE EUROPEAN COMMUNITIES. Draft. COMMISSION REGULATION (EU) No /2010

AIM in support of ATM

ICAO EUR Region Performance Framework

Initiated By: AFS-400

Spatio-temporal Data Analysis and Visualization in Enterprise Level Automated Application

IATA FUEL EFFICIENCY CAMPAIGN

EUROPEAN COMMISSION DIRECTORATE-GENERAL FOR MOBILITY AND TRANSPORT

The support of an European ANSP

Introduction to the Data Catalogue

Agenda Item 6: Aviation Security and Facilitation

Terms of Reference for a rulemaking task

COMMISSION IMPLEMENTING REGULATION (EU)

Saint Petersburg-Clearwater International Airport. Airspace & Instrument Approach Analysis

Lufthansa Systems AIM from a navigation data house perspective

Procedures for Air Navigation Services Aerodromes (PANS-AGA) ICAO Doc. 9981

Data Origination, Management and WGS 84. ICAO PBN Seminar Data Origination & Management and WGS 84

1.0 BACKGROUND NEW VETERANS CHARTER EVALUATION OBJECTIVES STUDY APPROACH EVALUATION LIMITATIONS... 7

Andres Lainoja Eesti Lennuakadeemia

REGULATORY APPROACH FOR THE

Screening Chapter 14 Transport. Single European Sky (SES) 18 December Transport

Sharing UAE experience in. AIM implementation

CIVIL AVIATION AUTHORITY, PAKISTAN OPERATIONAL CONTROL SYSTEMS CONTENTS

Official Journal of the European Union L 7/3

AIRPORTS GIS UPDATE. Federal Aviation Administration.

AFI Region AIXM-e AIP Implementation Workshop Dakar, Senegal, 3-5 October 2016

Session 2.2 Data Catalogue

FAA GBAS Program Update January 29, 2010

SAMPLE TEMPLATE APPENDIX 3.5C-1

Combined ASIOACG and INSPIRE Working Group Meeting, 2013 Dubai, UAE, 11 th to 14 th December 2013

ICAO Aerodrome s Manual. AERODROME S INSPECTOR WORKSHOP St. Maarten, MAHO June 2012

Paperless Aircraft Operations - IATA s Vision and Actions - Chris MARKOU IATA Operational Costs Management

DEPARTMENT OF CIVIL AVIATION Airworthiness Notices EXTENDED DIVERSION TIME OPERATIONS (EDTO)

Aerodrome Manual. ICAO/FAA Comprehensive Aerodrome Certification Inspector Workshop. Presented To: Caribbean States By: FAA Office of Airports

Flight Operations Briefing Notes

Aeronautical Information Services Issue 1 30 May 2012

This document is meant purely as a documentation tool and the institutions do not assume any liability for its contents

AERONAU INFORMATION MANAGEM. International TENTH MEETING THE QUALITY OF SUMMARY. such quality added). global ATM 1.3. regard, the.

SUMMARY REPORT ON THE SAFETY OVERSIGHT AUDIT FOLLOW-UP OF THE DIRECTORATE GENERAL OF CIVIL AVIATION OF KUWAIT

DRAFT COMMISSION REGULATION (EU) / of XXX. laying down rules and procedures for the operation of unmanned aircraft

Implementation of the Performance-Based Air Navigation Systems for the CAR Region ICAO Regional TC Project RLA/09/801 Agenda Item 6 WP/14

Required Navigation Performance (RNP) in the United States

AUGUST 2017 GNSS REVIEW. Survey Economics Chances of success. Mobile Mapping Airport scanning. Stag s Leap Winery Pre-construction plan

AIM WG: Contributing to ATM Success. Roland Baumann Head Planning & Development AIM skyguide

COMMISSION REGULATION (EU) No 255/2010 of 25 March 2010 laying down common rules on air traffic flow management

RISING PERFORMANCE. Civil aviation is an outlier. It s BY ERIK DAHLBERG

VALUE PROPOSITION FOR AIRPORT AUTHORITIES A White Paper on Electronic Terrain & Obstacle collection

Transcription:

Agenda Agenda From AIS To AIM 1. Introduction to MDA 2. What is AIS to AIM? 3. FAA Approach to AIM 4. AIM Transition Planning 5. ext Steps 1. Introduction to MDA 2. What is AIS to AIM? 3. FAA Approach to AIM 4. AIM Transition Planning 5. ext Steps Jack Hsu Mark Varellas 1

Information Systems Corporate Background Global and orth American Presence Overview Mission-critical operational focus Strong backlog, stable customers Space Missions Capability foundation for the Company Worldwide customer base Founded in 1969 Major projects and businesses around the world Over 2,200 employees Revenues FY10 CAD$ 689M Integrated Information Solutions Geospatial Services Use, duplication or disclosure of this document or any of the information contained herein is subject to the restrictions on the title page of this document. 4 2

Stable and Growing Company Year ended December 31 In Aviation For Over 30 Years We have over 100 staff dedicated to aviation systems development MDA s experience and capabilities include: Air Traffic Control Systems Flight Briefing Systems OTAM Systems Flight Procedure Design Systems Aeronautical Information Management Systems Engine-out procedure design and take-off performance Airport Surveys (through MDA GSI) Aviation Business Solution Analysis (BSA) Agenda 1. Introduction to MDA 2. What is AIS to AIM? 3. FAA Approach to AIM 4. AIM Transition Planning 5. ext Steps We work extensively with the FAA and US Air Force 3

Icon Legend The AIS World Is Product-Centric The AIM World is Data-Centric Aeronautical Assets (eg. avaids) Products Products Obstacles AIP AIP Terrain OTAM OTAM Flight Procedures Briefings Briefings Charts Digital OTAMs OTAMs Focus on Products (product/paper-centric) Often duplication of data. o single truth Data often varies in accuracy and precision Similar data often lives in silos/compartments Focus on Digital Data and Products One truth correct and consistent One owner for each data type Data is shared Electronic Charts Future Products 4

Key Driver: Satellite Based avigation ICAO Roadmap AIS to AIM PB/RP/RAV requires greater accuracy and integrity than ever in Aeronautical Information Information Management Moving from AIS to AIM is a business change ot (just) a technology change Benefits Implementing PB Enhanced safety Increased System capacity Reduced fuel consumption More efficient use of airspace Environmental benefits Reduction in cancellations Going Digital Consolidation Step 1 Vision and Plan 5

What is in the Vision and the Plan? Example: Organizational Responsibility Agenda Who? Does what? When? Using what? Metrics? Processes People/Organizations Business Strategy ICAO Compliance Budgets and Funding Short Term Objectives Long Term Objectives Organizational Responsibility Role Definitions & Job Descriptions Training Information & Data What is data? Whose data? Where resides? Access rights? Associations? Identification? Quality? Org. 1 Org. 2 Org. 3 1. Introduction to MDA 2. What is AIS to AIM? 3. FAA Approach to AIM 4. AIM Transition Planning 5. ext Steps Schedule Intended Use? Metrics Format? Metrics? Org. 4 Current Systems COTS Software Custom Software Sizing Metrics Facilities Platforms Systems 6

Within extgen the Enterprise is the FAA s answer to AIS to AIM FAA Enterprise The Enterprise is a single source of aeronautical information to Government & Commercial Consumers Within the AVIS DB roles & responsibilities are clearly defined Aero. Info. Mgmt Group Aero. Info. Products Group Procedure Designers Aero. Data Specialists Obs. Specialists Cartographers AVIS DB Geo. Specialists OTAM Office OTAM Specialist AIXM 5 Web Services Flight Briefing Office Airport Authority ATM System Other ASP AVIS DB 7

Each type of data is managed by a Data Steward MDA s AIRAV is the database used to manage aeronautical data The quality & integrity of the data is checked on a number of different levels Data input Aero. Info. Mgmt Group Aero. Info. Products Group Integrity & quality verification Understands & maintains data relationships 1: Completeness 2: Self consistency 09 27 090.56 270.15 Aero. Data Specialists Procedure Designers Cartographers Aero. Data Specialists AIRAV Audit trail Data sheet generation lat/long 09 27 lat/long length Obs. Specialists Google Maps visualization Geo. Specialists OTAM Office Versioning & temporality Workflow model 3:Consistency with other data in AIRAV 3:Associations with other databases OTAM Specialist Supports future development 09 27 09 27 AVIS DB AIXM 5 web services 8

Changes to the aeronautical data are managed in time There is an integrated Work Flow model Within AIRAV there are 3 models of the airspace Publication Future Test 9

Products are created based on the aeronautical data MDA s GPD is the procedure design platform used by the FAA GPD is a fully integrated decision making environment Procedure Design Specialists Verifies quality of aero. data Aero. Info. Mgmt Group Aero. Data Specialists Aero. Info. Products Group Procedure Designers IFP GPD Rich geospatial environment Supports RAV & RP criteria Detects deviations from criteria Cartographers Generates digital data products Obs. Specialists OTAM Office Geo. Specialists OTAM Specialist AVIS DB 10

Change detection is an essential part of AVIS Agenda A Solution is more than a System People Aero. Info. Mgmt Group Aero. Info. Products Group Procedure Designers 1. Introduction to MDA 2. What is AIS to AIM? 3. FAA Approach to AIM 4. AIM Transition Planning 5. ext Steps Business Processes Information & Data Aero. Data Specialists * Cartographers Obs. Specialists OTAM Office Geo. Specialists OTAM Specialist AVIS DB Systems 11

BSA - Part of MDA s Solution Engineering Lifecycle MDA s BSA Methodology BSA Example #1: Instrument Procedure Development at the FAA 1. Discover 2. Frame 3. Detail Problems: Step Define Business Context Define Current Situation Define eeds & Objectives Define Solution & Options Update Business Case & Plan > 20,000 conventional IPs Push for RAV & RP Scope Mission & Vision Marketplace Stakeholders Influential Factors Differentiators Objectives Strategy / Plan KPIs / Metrics People & Org. Business Processes Info Model Systems Data Infrastructure Financial Legal & other factors Modernisation Objectives eeds Problems Opportunities Priorities Boundaries People & Org. Business Processes Info Model Systems Data Infrastructure Financial Legal & other factors Plan Long Term: high-level ext Phase: detailed Transition Budget / Cost Business Case Costs Benefits Business Drivers: Enhanced safety Increased productivity Leveraged investments Results Sufficient to direct Modernisation Objectives Sufficient to support Solution Definition Sufficient to direct Solution Definition Sufficient to plan next phase & direct System Specification Sufficient to meet budgetary accuracy Improved services Enhanced partnerships 12

A wide range of stakeholders contributed to the Working Groups In 2005/2006 MDA lead a 6 month BSA with the FAA The result a clear vision for the Instrument Procedure design business at the FAA 2005 2006 Oct ov Dec Jan Feb Mar Vision Plan Aviation System Standards Flight Standards Agency Flight Procedures Group Flight Procedures Mgmt Team Flight Inspection Operations Group ational Aeronautical Charting Group RP Office IT Development Team Flight Standards Agency Flight Procedures Group Develop Plan WG #1 WG #2 WG #3 WG #4 Review Delivery 13

BSA Example #2: Obstacle Evaluation at the FAA A range of stakeholders contributed to the Working Groups The result was a clear vision for the Obstacle Evaluation business at the FAA Problems: Increased demand Inconsistent responses to proponents Adverse affect on IPs Vision Plan Aviation System Standards Flight Standards Agency Business Drivers: Replace current tool Cope with increased demand Flight Procedures Office ational Aeronautical Charting Group IT Development Team Flight Procedures Group Flight Procedures Office Air Traffic Control Improved quality & accuracy Respond in a timely manner Leveraged investments OE Specialists OE Results DB OE DB 14

Agenda The ext Steps 1. Introduction to MDA 2. What is AIS to AIM? 3. FAA Approach to AIM 4. AIM Transition Planning 5. ext Steps MDA has extensive experience in planning business change in the Aviation domain MDA is supporting the FAA in their AIS to AIM transition Time is short. ICAO is pushing AIS to AIM transition through SARPS. Annex 15 Amendment 36 is applicable now. Annex 15 Amendment 37 is applicable 2013. MDA can support or lead the development of an AIS to AIM Plan involving stakeholders from all aviation agencies The plan can be incrementally developed and funded 15