Let's get moving with the affordable medium-speed alternatives to the old dream of high-speed rail

Similar documents
The Asian evolution of high speed rail

The Coalition s Policy to Build Melbourne s East West Link

4 Transport projects underway in Western Sydney

Why does Sydney need a new fast Metro to the West? A fast Metro to the west is a vital component of this Plan

Infrastructure Priority List. Infrastructure Priority List Printed as at 28 April

Economic Performance of Australia s Cities and Regions Embargoed until Tuesday 5 December 2017

Comments on the High Speed Rail Phase-2 Report

2017 Major Projects Pipeline Report Adrian Hart, Senior Manager Infrastructure & Mining

The Coalition s Policy to Build the Swan Valley Bypass and Perth Gateway

5 Rail demand in Western Sydney

NSW PRE-BUDGET STATEMENT FUTURE ECONOMY FUTURE JOBS

Paul Fletcher Minister for Urban Infrastructure and Cities Launch of Infrastructure Australia Future Cities Paper. Fri 23 February 2018

Parallel Deployment of Superconducting Maglev on the Chuo Shinkansen and the Northeast Corridor

AUSTRALIAN TRAVEL TIME METRIC 2017 EDITION

Is uneven economic growth dividing Australian society? 14 March 2017

What is Rail Futures?

NSW Budget Highlights

Western Sydney Australia's development site

The Coalition s Policy

INLAND RAIL. Connecting Australia. 5 June 2018 National Infrastructure Summit inlandrail.com.au

NICKI KENYON GENERAL MANAGER CONSUMER MARKETS VISIT VICTORIA. VICTORIAN TOURISM CONFERENCE 25 July 2017

IN FOCUS NSW. Developing Western Sydney

Home About us Contact

New South Wales: state economy and State Budget,

Politics, Finance and Transport: Megaprojects in Australia. Scott Elaurant and Jennie Louise Infrastructure Symposium, Brisbane 2015

Transport in Melbourne s Westen Suburbs: Alternatives to the Westgate Tunnel

GTO SCENariOS TO 2020

New South Wales: State Economy and State Budget,

Growing Regional Victoria 2018 Victorian Election Priorities GROWING REGIONAL VICTORIA 2018 VICTORIAN ELECTION PRIORITIES

LABOR S INFRASTRUCTURE POLICY

Perth's urban rail renaissance

Shaping the Future of Railway Institute of Railway Technology

SIT BACK AND WATCH THE WORLD GO BY. FROM A CORNER THAT S ALL YOUR OWN.

Reimagining Central Station Precinct

ARTC. Melbourne-Brisbane Inland Rail Alignment Study Final Report July 2010 Appendix N Stakeholders Consulted

Stakeholder Briefing The Bays Precint Urban Transformation Program

Submission to Infrastructure Victoria s Draft 30-Year Infrastructure Strategy

V/Line Asset Management

3 The growth of Western Sydney

Institute of Transport and Logistics Studies (ITLS) Transport Opinion Survey (TOPS) Quarter 1, March 2017

Public Transport for Perth in 2031

SYDNEY S SECOND AIRPORT

Australia s Cities: Opportunities & Challenges

Page 1 of 7 FULL TRANSCRIPT: WESTERN SYDNEY AIRPORT ANIMATION VIDEO

Committee for Melbourne Briefing Note Victorian State Budget Overview of Key Announcements

Roads and Maritime Services Presentation to Local Government NSW Annual Conference October 2014

PLANNING THE SUNBURY GROWTH CORRIDOR

For personal use only

Treasury Circular Industrial Relations NSWTC August 2015

BENCHMARKING THE PERFORMANCE OF THE NATIONAL ROAD SAFETY STRATEGY

STUDY ABROAD & EXCHANGE SYDNEY, AUSTRALIA

Kilometres. Blacktown. Penrith. Parramatta. Liverpool Bankstown. Campbelltown

Anaesthetic Job Vacancies

Expenditure Share of Visitors Visitor Expenditure expenditure nights per visitor

INTERIM REVIEW OF AUSTRALIAN CONSTRUCTION MARKET CONDITIONS JULY 2015

Labor s plan to support art and culture throughout NSW

State of the States October 2017 State & territory economic performance report. Executive Summary

Economic Stimulus Plan A progress report. Investing in Australia s Future

Announcing the Box Hill Project (provisional name) First Large-Scale Residential Housing Joint Development Project in New South Wales, Australia

InterCity and AirTrain The Rail Futures blueprint for faster and better regional trains in Victoria and re-balancing population growth

Higher Education and Research in regions and for residents of the regions

The Hon Paul Fletcher MP. Minister for Urban Infrastructure and Cities. CEDA 2018 State of the Nation. Tuesday 26 June 2018

AUSTRALIAN YOUTH UNEMPLOYMENT: SNAPSHOT - March 2014 COUNTING THE COSTS BROTHERHOOD OF ST LAURENCE

FUTURE TRANSPORT STRATEGY AND GREATER SYDNEY SERVICES AND INFRASTRUCTURE PLAN. Western Parkland City

The major parties key coastal policy initiatives

THE CONSTRUCTION INDUSTRY OUTLOOK

DOMESTIC TOURISM REPORT: OVERVIEW OF ACCOMMODATION PERFORMANCE

HSR the creation of a mega-project

Industry briefing NOVEMBER 2017

Victoria s International Tourism Performance

Inland Queensland Roads Action Plan

IN SUMMARY. Sydney is growing; but the South is not included. A strategic hub?

TRANSPORT AFFORDABILITY INDEX

Intergovernmental Partnerships Project. Partnering for prosperity: a collaborative governance approach for Greater Newcastle and the Hunter

Australian Accommodation Monitor Summary. Financial-year performance:

ARTC & INLAND RAIL 14 NOVEMBER 2017 SIMON THOMAS, PROGRAMME DIRECTOR ARTC INLAND RAIL

Infrastructure Risks: Megaprojects in Australia. Scott Elaurant and Jennie Louise Project Management Institute, Adelaide 2015

DAVID SHELDON Chair Australian Regional Tourism Network (ARTN inc 2001)

ILLAWARRASHOALHAVEN ECONOMIC OUTLOOK

Infrastructure Policy Priorities for New Zealand

10 Ideas for the NSW Budget to Kick-start Jobs in Western Sydney

Shaping the Future of the Railway

PERTH-ADELAIDE CORRIDOR STRATEGY

SIT BACK AND WATCH THE WORLD GO BY. FROM A CORNER THAT S ALL YOUR OWN.

Land area 1.73 million km 2 Queensland population (December 2015) Brisbane population* (June 2015)

Northern Territory Property Report July 2014

Distinguished guests, parliamentary colleagues, ladies and gentlemen.

PAUL SCULLY Labor candidate for Wollongong

GREATER SYDNEY SUPPLY & DEMAND. Tourism Accommodation Australia 31 May 2017

Shareholders Preliminary Final Report 1998

National Overview. NSW/ACT Property Report July 2014

Urban Transport and the Australian Mega-City Can we cope?

A competitive interstate rail freight and passenger network

Roads Australia Industry Presentation 12 March 2015

Moving Brisbane is the Newman Liberal team s blueprint for a modern and efficient transport system.

Annual overnight visitor numbers to the region

Concord Road Interchange. Standard hours of work

Australian Cities Accounts Estimates. December 2011

QANTAS DELIVERS STRONG FIRST HALF RESULT DESPITE HIGHER FUEL BILL

MISSING PIECES. PCEC Expansion DESTINATION PERTH. Developing Perth s Visitor Economy MAY Image courtesy Perth Convention & Exhibition Centre

Transcription:

University of Wollongong Research Online Faculty of Engineering and Information Sciences - Papers: Part B Faculty of Engineering and Information Sciences 2018 Let's get moving with the affordable medium-speed alternatives to the old dream of high-speed rail Philip G. Laird University of Wollongong, plaird@uow.edu.au Publication Details Laird, P. (2018). Let's get moving with the affordable medium-speed alternatives to the old dream of high-speed rail. The Conversation, 14 May 1-4. Research Online is the open access institutional repository for the University of Wollongong. For further information contact the UOW Library: research-pubs@uow.edu.au

Let's get moving with the affordable medium-speed alternatives to the old dream of high-speed rail Abstract More than half a century has passed since high-speed rail (HSR) effectively began operating, in Japan in 1964, and it has been mooted for Australia since 1984. I estimate that the cost of all HSR studies by the private and public sectors in Australia exceeds $125 million, in today's dollars. But the federal government is now less interested in high-speed rail (now defined as electric trains operating on steel rails at maximum speeds of above 250km per hour), and instead favours "faster rail" or medium-speed rail. Disciplines Engineering Science and Technology Studies Publication Details Laird, P. (2018). Let's get moving with the affordable medium-speed alternatives to the old dream of highspeed rail. The Conversation, 14 May 1-4. This journal article is available at Research Online: http://ro.uow.edu.au/eispapers1/1461

1 of 4 15/05/2018, 4:22 pm Academic rigour, journalistic flair May 14, 2018 6.29am AEST Victoria has led the way in upgrading intercity rail services with medium-speed VLocity trains that have a cruising speed of 160km/h. Joe Castro/AAP May 14, 2018 6.29am AEST More than half a century has passed since high-speed rail (HSR) effectively began operating, in Japan in 1964, and it has been mooted for Australia since 1984. I estimate that the cost of all HSR studies by the private and public sectors in Australia exceeds $125 million, in today s dollars. But the federal government is now less interested in high-speed rail (now defined as electric trains operating on steel rails at maximum speeds of above 250km per hour), and instead favours faster rail or medium-speed rail. The 2017 federal budget provided $20 billion over the next 10 years for rail, with more allocated in the 2018 budget. It is now time for Australia to commit to medium-speed rail (trains operating on new or existing tracks at speeds of between 160km and 250km/h). Author Philip Laird Philip Laird is a Friend of The Conversation. Honorary Principal Fellow, University of Wollongong Indeed, three states have made progress in developing trains at 160km/h, with Victoria leading the way. New South Wales has failed to keep up with these states. What happened to high-speed rail in Australia? The first high-speed rail system dates back to 1964 when the Tokaido Shinkansen started operating between Tokyo and Osaka. At first, it took four hours to travel 515 kilometres; now some trains take two-and-a-half hours. Japan s system has an impeccable safety record and the network extends for over 3,000km. France was next in 1981 with its TGV trains. In 1984, highspeed rail was first proposed for Australia. This was the CSIRO s Very Fast Train proposal to link Sydney, Canberra and Melbourne using TGV trains. At all levels, government was not supportive. The private

2 of 4 15/05/2018, 4:22 pm sector, after a series of studies, found it was viable and could An image prepared in 1984 by the late Phil work with different taxation arrangements. This was not Belbin of what the Very Fast Train south of forthcoming and work stopped in 1991. Canberra could look like. Courtesy of Railway Digest (ARHS/NSW) June 2004, A more modest proposal, called Author provided Speedrail, to connect Sydney and Canberra was proposed in the mid-1990s. With some federal government encouragement, it was studied, with detailed design. It was costed at about $4.5 billion, with finance arranged for some $3.5 billion. The Howard government would not fund the balance and commissioned yet another HSR study. An image from the 1990s of a SpeedRail train at Central Station. Courtesy of Railway Digest (ARHS/NSW), Author provided Read more: Can Australian high speed rail overcome its bumpy history? More studies have followed. One study in 2013 put a price tag of $23 billion on a Sydney-Canberra line involving much tunnelling in Sydney. This was part of a 1,750km high-speed rail corridor linking Brisbane, Sydney, Canberra and Melbourne. The total estimated cost was A$114 billion. Despite many studies recommending the need to identify and protect a corridor for a future highspeed rail network, government has failed to reserve any land corridors (with the exception of part of a future Melbourne outer metropolitan ring road). What about the alternatives? Many countries do not have high-speed rail, but have medium-speed rail (MSR) instead. These countries include Sweden, Switzerland, the United States and Canada. Three Australian states have trains operating at 160km/h. These are Queensland, starting in 1998 with its Electric Tilt Train service between Brisbane and Rockhampton, Victoria, with its Regional Fast Rail project using V/Locity diesel multiple units, and Western Australia, with the Prospector train. Victoria s service originated in 1999 when the then Labor Queensland s Tilt Train intercity service has been running for nearly 20 years. opposition promised a new deal for regional Victoria, which QRtrains/Wikimedia, CC BY-SA included new trains and upgraded tracks on four lines to Bendigo, Ballarat, Geelong and Gippsland. The ALP won government that year. By 2006 the track upgrades were delivered along with new trains made in Victoria. People liked the faster trains. Patronage went up by more than 15% in each of the first three years of

3 of 4 15/05/2018, 4:22 pm operation. More trains were ordered and further major track upgrades followed. Victoria was assisted by $3 billion in federal funding for a Regional Rail Link program. This was to provide new intercity tracks in Melbourne so suburban trains did not slow down regional trains. Due to good ongoing planning attracting more federal funding, further track upgrades are under way. The 2017 Victorian Infrastructure Plan outlines priorities and funding for projects over the next five years, with longer-term policy directions. So what s going on in NSW? Questions are now being asked as to why Victoria and WA are doing do well with federal funding for passenger rail at the expense of NSW. The rail situation in Australia s most populated state is not good for its regions. By far the most NSW government attention and funding has gone into the Greater Sydney region. Between the 2011 and the 2016 Censuses, Greater Sydney s population (including Gosford) grew some 10% from 4.39 to 4.82 million. Rail patronage on the Sydney and intercity network had even stronger growth of some 15% from 2011 to 2016. To try to cope with this increasing demand for rail a new Metro section is due to be completed in 2019. Light rail is also being introduced in Sydney, Newcastle and Parramatta. Sydney continues to have serious road traffic problems, which are unlikely to be solved by WestConnex Stages 1 and 2 that are now under construction. The proposed Stage 3 received over 7,000 objections, including a sensible alternative proposal by the City of Sydney, but the NSW government has approved Stage 3 and even more motorways. This is despite overseas experience for cities the size of Sydney pointing to the best solution being a much-improved rail system with road congestion pricing. Read more: Road user charging belongs on the political agenda as the best answer for congestion management Regional NSW is also growing in population, albeit not as quickly as Sydney. In spring 2017, Transport for NSW released a draft regional servicea and infrastructure plan not for the next five years, but out to 2056. However, these plans were very vague as to what may be delivered in the next five or even ten years. The plans also omitted earlier Infrastructure NSW goals for Sydney-Gosford and Sydney-Wollongong trains to take one hours (instead of one-and-a-half) and Sydney-Newcastle trains to take two hours. In addition, there are calls for more and faster trains linking to each of Goulburn/Canberra and the Central West of NSW.

4 of 4 15/05/2018, 4:22 pm NSW is getting new intercity trains, but not upgraded tracks that will enable them to go faster than the present slow services. NSW government/aap Clearly, NSW is facing major transport challenges to overcome rail infrastructure backlogs and meet the needs of a growing population. The state government is getting new intercity electric trains and has committed to buying new regional trains. But it s yet to commit to track upgrades to help the new trains go faster than the present slow ones. The NSW ALP opposition is also yet to present detailed policies of how it would meet the transport challenges in Sydney and in regional NSW. The people of NSW must hope the state budget due June 19 and the opposition leader s reply will address these issues. Transport Cities Western Australia Rail High speed rail Victoria Queensland New South Wales rail transport Cities & Policy Transport planning help us thrive. Tax deductible. We produce knowledge-based, ethical journalism. Please donate and Make a donation Drag to outliner or Upload Close