Silver Line Rail Project Update

Similar documents
National Society of Professional Engineers. Charles S. Carnaggio, PE Project Director July 2, 2014

SECTION 106 ACTIVITIES ANNUAL REPORT

County of Fairfax, Virginia. Silver Line Update. Committee for Dulles March 2, Mark Canale Fairfax County Department of Transportation

Transportation Supporting Dulles Airport

NAIOP. Marcia McAllister Metropolitan Washington Airports Authority

Proposed Dulles Toll Road Rate Adjustments

Dulles Corridor Metrorail Project Update Dulles Area Transportation Association August 25, 2009

Report to the Dulles Corridor Advisory Committee

SECTION 106 ACTIVITIES ANNUAL REPORT

Dulles Toll Road Rate Setting Process

Metropolitan Washington Airports Authority (MWAA)

Silver Line Operating Plan

A New Era of Transportation Solutions

RECOMMENDATION TO THE DULLES CORRIDOR AND FINANCE COMMITTEES


Dulles Corridor Improvements. Drive to Ride

REPORT TO THE STRATEGIC PLANNING AND DEVELOPMENT COMMITTEE

2411 Dulles Corner Park Herndon, VA

ACI LEGAL COMMITTEE MEETING

Figure 2: Public Transit Systems Operating in Northern Virginia Operating Statistics and Performance Indicators, FY 2004

Understanding Your I-66 Trip

Item # 28. Chief Capital Management Officer Report. November 20, 2008

McLean Citizens Association Transportation Committee Project Briefing

Public Information Meetings. October 5, 6, 7, and 15, 2015

TransAction Overview. Introduction. Vision. NVTA Jurisdictions

REPORT TO THE DULLES CORRIDOR COMMITTEE

Zachary M. Schrag. References for Preface to the 2014 paperback edition of The Great Society Subway: A History of the Washington Metro.

Tier 2 Final Environmental Assessment I-66 Transit/TDM Technical Report. Appendix D. Existing Transit/TDM Provider Overviews

Fairfax County / Washington DC Transit Bus Advertising

Arlington County Board Meeting Project Briefing. October 20, 2015

Elected Officials and Media Briefing I-395 Express Lanes Northern Extension

Crystal City Station Improvements. Project Overview. Table 2: North Entrance. Table 1: South Entrance. 20th St. S 18th St. S.

ORANGE COUNTY TRANSPORTATION AUTHORITY. Go Local Fixed-Guideway Program History and Project Update. PowerPoint 3

METROPOLITAN WASHINGTON AIRPORTS AUTHORITY. January 1 through December 31, With

Evaluation of Significant Transportation Projects in Northern Virginia Transportation District. HB 599 Ratings Overview NVTA - January 22, 2015

Report to the Strategic Development Committee

Performance Measure Summary

Our Panelists SPEAKERS MODERATOR

INFORMATION PAPER TO THE STRATEGIC DEVELOPMENT COMMITTEE

Crenshaw/LAX Transit Project Construction Update Community Meeting. November 15, 2018

I-95/395 HOV/Bus/HOT Lanes Project Overview

Welcome Fairfax County Transportation Advisory Commission and FC-DOT Staff

METROPOLITAN WASHINGTON AIRPORTS AUTHORITY

Design Public Hearing

CONTACT: Michelle T. Holland

About the Airports Authority. Contents. Chairman s message

2018 Transit Summit. Board Room, First Floor, Government Center June 25, :00 PM

The following items were handed out at the January 4, 2018 NVTC Meeting.

Committee for Dulles. June 9, Jack Potter, MWAA President & CEO

Connecting Transportation and Economic Growth in Metropolitan Washington

NORTHERN VIRGINIA TRANSPORTATION AUTHORITY M E M O R A N D U M

3 ASSESSMENT OF THE CORRIDOR

Appendix 1: Phase I Strategies

IMPLEMENTATION OF COMPREHENSIVE DEVELOPMENT AGREEMENT (CDA) PROJECTS:

Report by Finance Committee (B) Washington Metropolitan Area Transit Authority Board Action/Information Summary

LOUDOUN COUNTY. Ashburn, VA

Basic Project Information

Important Lane Closures, April 3 9, 2011

Link Union Station (LINK US)

November 9, Society of American Military Engineers

RESIDENT ENGINEERING, CONSTRUCTION MANAGEMENT & QA/QC SERVICES (CONTINUOUS CONTRACTS FROM

Distinguished Budget Presentation

Technical Report Economic Impact Study

A DIALOGUE WITH THE NORTHERN VIRGINIA DISTRICT. Nicholas J. Roper, P.E. Northern Virginia District Project Development Engineer

TORONTO TRANSIT COMMISSION REPORT NO.

Washington Dulles Overview Loudoun Chamber of Commerce

Transportation Management Program Office Newsletter J A N U A R Y

EXECUTIVE DIRECTOR. The Potomac Rappahannock Transportation Commission is seeking an ABOUT THE ORGANIZATION

A retrospective look at work program counting activities since 2001 is found in Table 8, on the last page of this document. Hours of Operation

APPENDIX B. Arlington Transit Peer Review Technical Memorandum

DULLES AREA HIGHLIGHTS. Gary Garczynski Commonwealth Transportation Board Northern Virginia District. Committee for Dulles August 4, 2016

Evaluation of Significant Transportation Projects in Northern Virginia Transportation District

NOTICE OF OPPORTUNITY FOR PUBLIC COMMENT RELATED TO PASSENGER FACILITY CHARGE Posted March 25, 2019

EXHIBIT 1. BOARD AUTHORIZATION FOR PUBLIC HEARING AND SUBSEQUENT ISSUANCE OF A JOINT DEVELOPMENT SOLICITATION

THE OPPORTUNITY SUMMARY OF FACTS

MANASSAS. From Manassas To Pentagon and Downtown Washington. Potomac River E ST. EXPWY I-66. Theodore Roosevelt Memorial Bridge I-66.

THE OPPORTUNITY SUMMARY OF FACTS

Transform66 Transportation Management Plan: Transit & TDM Strategies

Report to the Finance Committee Comprehensive Annual Financial Report. Prepared by the Office of Finance April 2017

Northern Virginia District State of the District. Helen L. Cuervo, P.E. District Engineer October 18, 2017

The Dulles Loop. Route 606. Route 28. Route 50

Claremont Project Background and Update Community Meeting September 11, 2017

THE OPPORTUNITY SUMMARY OF FACTS

Air Service Development Information Report and Proposed 2015 Annual Air Service Plan

FACT SHEET. Owner / Master Developer: Macerich. Development Manager: Hines. Architect: Gensler. Master Planner: RTKL. Exclusive Leasing Agent: CBRE

Jess Linn Principal Planner, Development Services Division Miami-Dade Regulatory and Economic Resources

Dulles Area Association of Realtors

Huntington Metro Station Joint Development

2011 WASHINGTON-BALTIMORE REGIONAL AIR PASSENGER SURVEY

FULL BUILDING HEADQUARTER OPPORTUNITY IN DULLES TECHNOLOGY CORRIDOR

Crenshaw/LAX Transit Project Construction Update Community Meeting September 27 th, 2017

REPORT TO THE BOARD OF DIRECTORS RECOMMENDATION TO AWARD CONTRACTS FOR TAXICAB CONCESSIONS AT WASHINGTON DULLES INTERNATIONAL AIRPORT

Washington Metropolitan Area Transit Authority Services Utilization Study

Fairfax County Transportation Advisory Commission (TAC)

Washington-Baltimore Regional Airport System Plan Ground Access Element Update

ARLINGTON COUNTY, VIRGINIA. County Board Agenda Item Meeting of February 22, 2014

NORTHERN VIRGINIA TRANSPORTATION AUTHORITY

P D E C. Establishment of Opening Dates for New Carrollton Yard and College Park and New Carrollton Parking Garages

Metro Gold Line Eastside Extension Review Advisory Committee October 9, 2008

West Santa Ana Branch Transit Corridor. Community Meetings March 12, 13, 17 & 19, 2018

Transcription:

Silver Line Rail Project Update April 2013

Project Map 2

Silver Line, Phase 1 Service Pattern 3

Project Overview Silver Line Dulles Metrorail is a 23-mile extension of the existing Orange Line Total Project Cost = $5.6B to $6B Fairfax County Funding = over $900M 11 Stations, 6 Parking Garages 8 Stations in Fairfax County 4 in Tysons Corner and 4 Dulles Corridor 3 Parking Garages in Fairfax County Constructed in 2 Phases Phase 1 East Falls Church to Wiehle Avenue/Reston, (5 Stations, 1 Parking Garage) Phase 2 Wiehle Avenue/Reston to Dulles Airport and stations 2 stations in Loudoun County, (6 Stations, 5 Parking Garages) Funding Partners Federal, Virginia, Fairfax County, Loudoun County, MWAA, Dulles Toll Road users Metropolitan Washington Airports Authority is managing the construction 4

Phase 1 McLean Station Tysons Corner Station Greensboro Station Spring Hill Station Wiehle - Reston East Station 5

Phase 1 Rail Project Update April 2013 Guideway / trackway: 100% Utility relocation: 100% Track work: 100% Systems: 51% Stations: McLean: 80% Spring Hill: 65% Tysons Corner: 75% Wiehle: 84% Greensboro: 65% Overall 90% complete 6

Phase 1 Rail Project Update 03/2013 - First two trains to operate under third rail power along the new N-Line in Falls Church. Photo courtesy Stephen Barna, Dulles Corridor Metrorail Project (DCMP). 7

Phase 1 Rail Project Update McLean kiss and ride. Photo courtesy Stephen Barna, DCMP. 8

Phase 1 Rail Project Update McLean Station looking west. Installation of the pedestrian bridge wire mesh nearing completion. Photo courtesy Stephen Barna, DCMP. 9

Phase 1 Rail Project Update McLean Station looking north. The station curtain wall and V framing nearing completion. Photo courtesy Stephen Barna, DCMP. 10

Phase 1 Rail Project Update McLean Station looking northeast. Street level entrance/curtain wall nearing completion. Photo courtesy Stephen Barna, DCMP. 11

Phase 1 Rail Project Update McLean Station mezzanine to platform escalators and curtain wall nearing completion. Photo courtesy Stephen Barna, DCMP. 12

Phase 1 Rail Project Update McLean Station looking east. Canopy complete; ceiling panel/concrete paver work remains. Photo courtesy Stephen Barna, DCMP. 13

Phase 1 Rail Project Update Outbound tunnel. Photo courtesy Stephen Barna, DCMP. 14

Phase 1 Rail Project Update Wiehle Station. Concrete tile like platform surface. Photo courtesy Stephen Barna, DCMP. 15

Phase 1 Rail Project Update East-looking view of Wiehle Station (summer 2012). Photo courtesy Stephen Barna, DCMP. 16

Phase 1 Rail Project Update Wiehle Station looking southwest. Bus lane and first bus bay construction. Photo courtesy Stephen Barna, DCMP. 17

Phase 1 Rail Project Update Wiehle Station looking west, north side pedestrian plaza. Steel-framed glass structure enclosing the elevators and escalators to the bus plaza below. Photo courtesy Stephen Barna, DCMP. 18

Phase 1 Bus Service Coordination among all service providers: Fairfax Connector Loudoun County (LCT & VRT) Metrobus PRTC MWAA-Washington Flyer NOTE: Based on draft service plans except for Metrobus. 19

Fairfax Connector in Tysons Routes 401/402 422 423 424 432 462 463 574 721 724 734 NOTE: Map does not include routes 495F,G,J,M. 20

Metrobus in Tysons Routes 2T 3T 15M 23A,T 28A,X 21

Loudoun County in Tysons Route Loudoun - Tysons Express 22

PRTC in Tysons Routes Linton Hall Rd Manassas Woodbridge - Tysons Express 23

Phase 2 Reston Town Center Station Herndon Station Innovation Center Station - - - - - - Dulles Airport Station Route 606/Moran Road Station Route 772/Ashburn Station 24

Phase 2 Status Procurement process continues among five selected bidders Packet A Final RFP issued Feb 6, 2013 Packet A Contract Award May 2013 Packet A Notice to Proceed June 2013 5 Bid Packages: Packet A Rail Line, Station, and Systems (includes Innovation Center Station) Packet B Yard and Shop Packet C (may not be issued) Parking Garages Packet D ROW Packet E Utilities Fairfax County working to fund & construct Herndon and Innovation Center garages outside of project 25

Schedule Phase 2 Status Substantial completion: summer 2018 Revenue service: late 2018 Budget (est.) Cost: $3.093 billion Cost with value engineering and alternative funding for garages and Innovation Center Station: $2.7 billion Cost to build Fairfax County parking garages: $105 million Fairfax County s share range: $433 - $498 million Phase 2 Tax District capped at $330 million 26

Past Year Milestones 100 PE work complete Phase 2 Status All funding partners committed to Phase 2 Commonwealth commits $150M to help toll rates FTA oversight of Phase 2 under discussion TIFIA Letter of Interest submitted; process is ongoing WMATA s Art in Transit program - public submissions were due to WMATA February 15, 2013 3,000 submissions received 27

Cost Reductions Value Engineering and Memorandum of Agreement Aerial Station at Dulles Airport Shorten tail tracks at end of line Reduced Rail Yard Capacity Canopy Reductions Best efforts to fund garages outside of project (Fairfax and Loudoun) Best effort to fund Route 28 Station outside of project (Fairfax) 28

Cost Allocation Funding Agreement distribution of project cost Fairfax County 16.1% Loudoun County 4.8% MWAA 4.1% Other (Federal, State, Tolls) 75.0% Projected Distribution of project costs Phase 1 & 2 (assumptions: no new State or Federal money in Phase 2, project cost = $5.994B) Fairfax County 16.1% Loudoun County 4.8% MWAA 4.1% Federal ($975M Phase1) 16.3% State ($200M Phase 1 & 2) 3.3% DTR Tolls 55.4% 29

Reston Town Center Station 30

Herndon Station (North, Town of Herndon) 31

Herndon Station (South, Fairfax County) 32

Innovation Center Station 33

Questions / Comments? FCDOT Dulles Rail Mark Canale Nick Perfili 703-877-5600 www.fairfaxcounty.gov/fcdot/dullesmetro/ 34