Bridgeport Port Authority Executive Director, Joseph A. Riccio Jr.

Similar documents
Bus Shelter Advertising Programs

JAMAICA S MARITIME SECURITY LANDSCAPE

Serving the Tampa Bay Maritime Community Since Celebrating over 125 Years of Service

Panama Canal Stakeholder Working Group Meeting

Air Transport Safety & Security Checklist

South Norfolk Jordan Bridge a private proposal by FIGG Bridge Developers. Chesapeake City Council Update June 23, 2009

WATERBORNE TRANSIT. April 21, 2010

SUMMARY OF THE MEETING OF THE WOODS HOLE, MARTHA S VINEYARD AND NANTUCKET STEAMSHIP AUTHORITY. September 25, 2018

Opportunities in Non-Container Trade and the Expanding Cruise Industry

BOARD OF TRUSTEES OF THE GALVESTON WHARVES Tariff Circular No. 6

World-Class. World-Wide.

BOARD OF TRUSTEES OF THE GALVESTON WHARVES Tariff Circular No. 6

Grade Crossings in High Speed Rail Corridors

JOHN WAYNE AIRPORT SECURITY

CORPS OF ENGINEERS ALASKA DISTRICT Dredging Projects. Michael Tencza, PE Operations Project Manager November 4, 2015

Explore the Benefits. At a Major Intersection. Easy Access from the Entire Region. Norwalk, CT

Los Angeles International Airport (LAX) Airside $907M

NEW RETAIL OPPORTUNITIES

SALE ACRES Development Site For Corporate Offices 4 Riverview Drive Danbury, Connecticut 06810

Addendum 2 2/19/2018

A GUIDE TO THE ROSE BARGE LINE COLLECTION P-30. Copyright The St. Louis Mercantile Library Association. St. Louis, Missouri

1 Terminal Street and 5 Terminal Street South Boston, MA Latitude Longitude Address. Site Size

John Wood Chairman. Port of Brownsville

National Harbor Safety Committee

Traditional and Alternative Financing of Cruise Terminals

RETAIL LEASING OPPORTUNITIES

Massachusetts Port Authority Sustainable Design Standards and Guidelines. AAPA Annual Convention Galveston, TX October 28, 2009

Welcome to the Galveston Ferry Operation. Presented by Captain William P. Mallini Ferry Operation Manager

Work Zone. Steve Hubbard: Lane Construction Safety Training Manager. Michael Grey: Rea Contracting Project Superintendent

C I T Y O F S A L E M

PORT OF CORPUS CHRISTI BUILDING FOR THE FUTURE

1. Introduction. 2. Overview of Existing Conditions

Staff Report. Re: National Park Service Ferry Landing Facilities at Piers 31, 31½ and 33 Joint Meeting with BCDC Design Review Board

Port of Pensacola WHSE 8 83,000 SF WHSE +/-

American Institute of Marine Underwriters

Nassau County Bridge Authority (N.Y. Public Authorities Law 651) 2011 Annual Report

Virgin Islands Port Authority, VI

Port of Pensacola - WHSE 9 & 10 52,500-92,500 SF WHSE +/-

MARIGOT SUNSHINE LIMITED

HARBOR INFRASTRUCTURE INVENTORIES Buffalo Harbor, New York

709 & 711 ADMIRAL CALLAGHAN LANE

On Board Presentation. Copyright 2008 INTERNATIONAL ARMOUR Co. All rights reserved

Martha s Vineyard & Nantucket

CONSTRUCTION + FENCE + PARKING QUESTIONS

REDEVELOPMENT HIGHLIGHTS

Inner Harbor 2.0. The resulting Inner Harbor 2.0 Plan provides a road map for a more sustainable, attractive and active Inner Harbor.

Martha s Vineyard & Nantucket

THE PLUS INDUSTRIAL MANUFACTURING EMPLOYER OF THE YEAR USACE BUFFALO DISTRICT BARGES MILLER BOAT LINE FERRY WILLIAM MARKET RYBA MARINE BARGES & TUG

NOMADIC. Tender to TITANIC. Synopsis

1. Overview of Atlantic Highlands and Its Waterfront

Virgin Islands Port Authority Hurricane. Recovery Update. March 2018

Virgin Islands Port Authority Marine Tariff Rate Amendments August 30, 2017 Public Hearing

Philadelphia Regional Port Authority. Channel Deepening Briefing to the Delaware Valley Goods Movement Task Force Our Port Our Legacy

Click to edit Master title style

TARIFF OF HARBOUR DUES

Ohio Freight Conference Great Lakes Commercial Navigation

Ferry System Governance. Presented By: EBDG Presented To: Statewide Ferry Summit Date: August 20, 2016

U.S. Coast Guard - American Waterways Operators Annual Safety Report

PORT OF GALVESTON PORT DIRECTOR S REPORT. May 22, 2018

The safeguarding of South Africa s most visited destination. Deon Sloane Senior Manager - Operations September 2015

Globus Maritime Limited Trading Update and Financial Highlights for the Three Months and Nine Months Ended September 30, 2007.

York Region Rapid Transit Corporation. York Region Council Presentation April 23, 2015 York Region Administrative Building Council Chambers

SWD Sport and Wellness of Danbury (formerly Beaver Brook), 17 Starr Rd, Danbury

Financial Feasibility Analysis Terminal Programming Study Des Moines Airport Authority

FOR LEASE. 900 NORTH GREENFIELD PARKWAY Garner, North Carolina CONTACT: Jackson Rives

SUMMARY OF THE MEETING OF THE WOODS HOLE, MARTHA S VINEYARD AND NANTUCKET STEAMSHIP AUTHORITY. November 21, 2017

Airport Passenger Conveyance Benchmarking Discussion

MASSACHUSETTS PORT AUTHORITY REQUEST FOR LETTERS OF INTEREST DEVELOPMENT OF THE MASSPORT MARINE TERMINAL

CAPTAIN NICHOLAS J. LEWIS Marine Expert

Bigger, Deeper, Wider

HUDSON VALLEY - INTERSTATE 84 & U.S. RT WESTAGE BUSINESS CENTER DRIVE, FISHKILL, NY 12524

TURKISH SHIPBUILDING/ RECYCLING INDUSTRIES AND NATIONAL POLICIES SUPPORTING GREENER SHIPPING

Oak Creek Assembly of God FOR YOUR SAFETY

Port Everglades 2014 Master/Vision Plan Update

Delivering the Goods: Ports in the South

NASA Motor Vessel (MV) Retriever

Virgin Islands Port Authority

Port of Long Beach 2012 Capital Program Update. G.J. Cardamone, PE, FCMAA Director of Construction Management

Virgin Islands Port Authority

Jason J. Hull, P.E. Director of Engineering. Port Freeport 1100 Cherry Street Freeport, Texas

Ship Owner Expectations

Dulles Corridor Metrorail Project Update Dulles Area Transportation Association August 25, 2009

HARBOR INFRASTRUCTURE INVENTORIES Erie Harbor, PA

THE FAIRHAVEN OPTION

March 4, Mr. H. Dale Hemmerdinger Chairman Metropolitan Transportation Authority 347 Madison Avenue New York, NY Re: Report 2007-F-31

Bonne Shipyard (Belgium) Pictures showing the application of Zinga by roller to the blasted hull of a typical fishing vessel.

Port Everglades Overview

BUILDING THE CAPACITY FOR GREATNESS 2019 STATE OF THE PORT

D-STAR Engineering Corporation, 4 Armstrong Road, Shelton, CT

REAL ESTATE TRANSACTION ADVISORY SERVICES

Hampton Roads Passenger Rail Task Force. February 29, 2012

Port Everglades Master/Vision Plan Update

II. Terminology and Basic

555 LONG WHARF DRIVE NEW HAVEN, CONNECTICUT 110,524 SF AVAILABLE FOR LEASE

Our contemporary civil planning ideas along with the use of modern technologies we managed to turn a deprived area of Rhodes in a recreational and

HIGHLIGHTS OF JAZZLAND

ACEC/MW and ACEC/MD. Maryland Port Administration. Steve Johnson. June 6, 2017

Port Handbook SANSOUCI PUERTO SANTO DOMINGO

Ferry Good Deeds NY Waterway's Record of Rescues Underscores Riverine Revival

Newburyport Waterfront Trust

Transcription:

Bridgeport Port Authority Executive Director, Joseph A. Riccio Jr. February 16, 2005 American Association of Port Authorities Cruise Workshop Niche Markets

Created in 1993 City of Bridgeport transferred ownership of the Water Street Dock Transfer triggered Connecticut state law forming a Port Authority Purpose of transfer to reconstruct Water Street Dock and build a ferry terminal on the site

-Primary tenant is Bridgeport-Port Jefferson Steamboat Company ( Ferry Co. ) -Under lease agreement with Ferry Co. -Year round passenger and vehicular service provided between Bridgeport and the Village of Port Jefferson, Long Island (NY); a distance of 14 miles. -1 hour by boat & at least 2.5 hours by car (120 miles)

Surrounding Regions Bridgeport, CT is located in Fairfield County County population of 882,567 Long Island, New York Suffolk County has a population of 1,419,369 Nassau County has a population of 1,334,544 All three counties are among the highest in personal income & median household income in the United States

Beyond the Ferry Marine link between Interstate 95 (CT) and the Long Island Expressway (Interstate 495) Bridgeport Harbor is centrally located to Interstate 95, State highways 25 & 8, the Merritt and Wilbur Cross Parkways. Train and bus terminals located within minutes from Bridgeport Harbor (by foot) Bridgeport Harbor is located within 60 miles of New York, 150 miles of Boston

A Look Back...BPA History Bridgeport-Port Jefferson Steamboat Company providing ferry service from Bridgeport Harbor to Long Island since 1883 One of the original founders was P.T. Barnum A resident of Bridgeport, P.T. Barnum was the first President of the Steamboat Company

A Need for Modernization 1994 Ridership: 593,000 2 aging vessels Minimal growth Conditions not passenger friendly Existing site not adequate No room for staging No amenities Need to separate passengers and vehicles BPA policy They are our passengers also.

BPA Under Construction

Big Changes at BPA Former Ferry Terminal New Ferry Terminal

More Changes at BPA Former Waiting Room New Waiting Room

The Bottom Line Ferry Terminal cost total $4.2 million 1.86 federal/ 1.35 state/640 City /350 BPA Water Street Dock initial repairs and reconfiguration in 2000/01 total $2,092 mm 1.65 federal/ 289 state/151 BPA New Access Road for boarding vehicles completed in 1997/8 at cost of 1.535mm (CDOT monies). Proposed Parking Garage on site estimated cost to be 6.45 mm Total of $7,827,000 invested in Water Street Dock facility to date, with additional $6.45 mm planned

Ferry Ridership -Overall crossing traffic has increased 51% from 1997-2004 -Passenger only traffic increased 48.36% from 1997-2004 -2004 passengers exceeded 900,000 -All vehicle traffic increased 56.43% from 1997-2004 -2004 passenger vehicle traffic exceeded 450,000 vehicles -2004 truck traffic exceeded 10,000 (truck traffic increased 19% from 2003; since 1997 truck traffic increased over 179%) 1 Passenger Activity 1994-2004 0 100,000 200,000 300,000 400,000 500,000 2004 2003 2002 2001 2000 1999 1998 1997 1996 1995

Ferry Ridership (cont.) Ferry services like the Bridgeport-Port Jefferson Ferry provide a local transportation alternative Passengers typically include business commuters, travelers and those who simply want to enjoy a relaxing ride on the water Highest passenger only traffic remains from May through September. Typical summer traveler comes to Bridgeport for a ballgame, concert and restaurants to Port Jeff for boutique shops and restaurants 2004 Ridership: 1.39 million passengers and vehicles

BPA Today 1999 new investment of $14 million for the M/V P.T. Barnum Addition of this vessel increased the total fleet number to 3 vessels providing daily route service In 2003 replaced aging vessel with new M/V Grand Republic, costing approx. $15 million 14-16 Round Trips daily (6am-9pm) Year-round service Formula for success: Amenities, Staging, and Frequency of trips

Ferry Industry (U.S.) 677 Vessels 35 States 224 Ferry Operators 487 Non-stop routes 578 Terminal locations 113,000,000 Passengers (1999-2000) 150,000,000 Passengers (2004 Estimate)

Maritime Security Maritime Security Levels (MARSEC) Security improvements made in 1999 -Video surveillance, extra lighting -Level 1: 24 hour staffed security and video surveillance, City of Bridgeport marine patrol unit on hand 15 hours per day -Level 2: Vehicles are inspected by City of Bridgeport Police. 24 hour coverage by Marine patrol unit. Escort ferries to state line in Long Island Sound -Level 3: Facility and ferries are shut down

Maritime Security Continued On 9/11, ferry was the only open and operating transportation service between New York and Connecticut BPA awarded $2.9mm grant ($1.3mm to the Water Street dock) -Grant monies can be used to acquire/install security measures such as lighting in/around facility, perimeter detection devices, CCTV monitoring system, fencing, card reader/identification systems, security booths/gates, reduce sight impairments (vegetation), and provide staff training.

Maritime Security Continued U.S.C.G. has placed high risk assessment on high capacity ferries Greater than container ships Greater than cruise ships Each vessel with capacity greater than 150 passengers must have a Vessel Security Plan Must be coordinated with Landside Facility Security Plan

Bridgeport Harbor Underutilized but growing! Channel depth is 35 ft New business includes Derecktor Shipyards Construction of new vessels, repair and service of all types of vessels Shipyards includes 600 metric ton travel lift

Bridgeport Harbor Future Barge Feeder Service To operate between Bridgeport and the ports of New York and New Jersey RFP process underway; actual operation expected to commence by summer 2005 Proposed High Speed Ferry Service Project funded by FHW/Ferry Boat Discretionary funds Currently feasibility study underway Planned to operate between Bridgeport, Stamford and New York

Bridgeport Port Authority Executive Director, Joseph A. Riccio Jr. February 16, 2005 American Association of Port Authorities Cruise Workshop Niche Markets