International Assistance Request

Similar documents
Implementation Status & Results Colombia Colombian National Protected Areas Conservation Trust Fund (P091932)

State of Conservation of the Heritage Site. City of Potosí (Plurinational State of Bolivia) (ID Nº 420) (ii), (iv) y (vi)) EXECUTIVE SUMMARY

Implementation Status & Results Colombia Colombian National Protected Areas Conservation Trust Fund (P091932)

UNEARMARKED FUNDS TO REPAY DREF ARE ENCOURAGED.

Implementation Status & Results Colombia Colombian National Protected Areas Conservation Trust Fund (P091932)

Implementation Status & Results Colombia Colombian National Protected Areas Conservation Trust Fund (P091932)

1. Title: Instrumental development of the fire service for disaster prevention and technical rescue

Implementation Status & Results Colombia Colombian National Protected Areas Conservation Trust Fund (P091932)

WFP Chad SPECIAL OPERATION SO

Order of the Minister of Environment #39, August 22, 2011 Tbilisi

COMMISSION OF THE EUROPEAN COMMUNITIES. Draft. COMMISSION REGULATION (EU) No /2010

THIS PRELIMINARY APPEAL SEEKS CHF 2,009,000 IN CASH, KIND AND SERVICES TO ASSIST THE VICTIMS FOR 2 MONTHS

PCN Annex: GEF Data Sheet

Assessment of Environmental Impacts of the proposed Sectoral Operational Programme for Tourism and Spa Industry

CUBA: HURRICANE IRENE

Project Planning, Compliance, and Funding

PERU: COLD WAVE. In Brief. The Situation. 28 July 2004

KNOWLEDGE NOTE 1-3. Hydro-meteorological Disasters Associated with Tsunamis and Earthquakes. CLUSTER 1: Structural Measures

High-Level Roundtable on International Cooperation for Sustainable Development in Caribbean Small Island Developing States

AIR Citizen s Summary

Month June 2011 South America (except Colombia for HA) Date of submission 01/07/11 MONTHLY REPORT

Project Data Sheet BASIC PROJECT DATA

Striving for resilience in the face of climate change

Feb 6 th, 2007 Japan Airlines Corporation

PPCR/SC.4/5 October 9, Meeting of the PPCR Sub-Committee Washington, D.C. October 28, REVIEW OF ON-GOING WORK OF THE MDBs IN DJIBOUTI

Garapuà beach. Eco-Tourism Project. Morro de San Paolo - Bahía Nord Est del Brasile

SOME EXAMPLES OF PLAN AND ACTIVITY IN RE-CONSTRUCTION FROM THE 2011 GREAT EAST JAPAN EARTHQUAKE. Mitsuru Kawamura Nihon Sekkei, Inc.

Satoquo SEINO (Graduate School of Engineering, Kyushu University, Japan)

Competence Requirements for eronautical eteorological ersonnel

Understanding Risks and Local Capacity Tools

Welcome to AVI AFRIQUE 2017

Terms of Reference (ToR) for a Short-Term assignment

COMMISSION IMPLEMENTING REGULATION (EU)

MULTILATERALISM AND REGIONALISM: THE NEW INTERFACE. Chapter XI: Regional Cooperation Agreement and Competition Policy - the Case of Andean Community

ANNUAL REPORT DALLAS LOVE FIELD AIRPORT. April 23, 2008

Colombia (South America) Water use and drainage in Colombia. Case Study: The Stormwater Challenge in Barranquilla. Humberto Avila.

European Aviation Safety Agency 1 Sep 2008 OPINION NO 03/2008. of 1 September 2008

THE CARICOM REGIONAL IMPLEMENTATION PLAN

Explanatory Note to Decision 2015/001/R. Update of CS ADR-DSN.D.260 Taxiway minimum separation distance CS-ADR-DSN Issue 2

ECOREGIONAL ASSESSMENT EQUATORIAL PACIFIC EXECUTIVE SUMMARY

MEETING MINUTES Page 1 of 5

OneDollarGlasses Lentes al instante

Bosnia and Herzegovina: Heatwave

UNITED NATIONS EDUCATIONAL, SCIENTIFIC AND CULTURAL ORGANIZATION CONVENTION CONCERNING THE PROTECTION OF THE WORLD CULTURAL AND NATURAL HERITAGE

LATIN AMERICA / CARIBBEAN COIBA NATIONAL PARK PANAMA

The results of the National Tourism Development Strategy Assessments

PORT OF SEATTLE MEMORANDUM. COMMISSION AGENDA Item No. 4g ACTION ITEM Date of Meeting February 9, 2016

Brain Wrinkles. Africa: The impact of location, climate, & physical characteristics on where people live, the type of work they do, & how they travel

LOCATION, LOCATION, LOCATION! Mexico, Venezuela, Cuba, and Brazil

INTERNATIONAL CIVIL AVIATION ORGANIZATION

International Civil Aviation Organization SECRETARIAT ADMINISTRATIVE INSTRUCTIONS ON THE IMPLEMENTATION OF THE ICAO CIVIL AVIATION TRAINING POLICY

ACTION PLAN FOR THE PERIOD concerning the STRATEGY ON IMPLEMENTATION OF THE FRAMEWORK AGREEMENT ON THE SAVA RIVER BASIN

COLOMBIAN SPACE COMMISSION: AN STRATEGY FOR THE SUSTAINABLE DEVELOPMENT OF COLOMBIA


Public Works Research Institute

Latin America and The Caribbean. A Closer Look.

DROUGHT AND SCARCITY PLANS IN THE BRAVO RIVER BASIN

Implementation Status & Results Argentina AR Basic Municipal Services Project (P060484)

TANZANIA CIVIL AVIATION AUTHORITY AIR NAVIGATION SERVICES INSPECTORATE. Title: CONSTRUCTION OF VISUAL AND INSTRUMENT FLIGHT PROCEDURES

Historic Centre of Santa Cruz de Mompox, Colombia, a World Heritage Site

MEETING CONCLUSIONS. Andean South America Regional Meeting Lima, Peru 5-7 March ECOTOURISM PLANNING

Class F3K Hand Launch Gliders 5.7. CLASS F3K - HAND LAUNCH GLIDERS

En Terreno. WCS Colombia Newsletter November No

GROWTH, CONFIDENCE AND OPPORTUNITIES TO INVEST

Safety and Airspace Regulation Group

Implementation Status & Results Argentina National Urban Solid Waste Management Project (P089926)

RESILIENT CITIES IN LATIN AMERICA AND THE CARIBBEAN: Key concepts, experiences and projections CONFERENCE PROGRAMME

Post Intervention Report

Caribbean Development Bank s Climate Change Initiatives

Applicant Details Form Arts and Literary Arts Residency

Planning and Policy Tourism Vice Ministry Sustainable Tourism Planning Direction General International Expert Workshop on Biodiversity Mainstreaming

Safety Management 1st edition

UNITED STATES DEPARTMENT OF AGRICULTURE FOOD SAFETY AND INSPECTION SERVICE WASHINGTON, DC

EMERGENCY INTERVENTION AFTER ECUADOR EARTHQUAKE

L 342/20 Official Journal of the European Union

THE SAN JUAN RIVER BASIN PROJECT

SUMMER VILLAGE OF SILVER SANDS. Municipal Development Plan

EU/EFTA service providers in Switzerland Note relating to individuals providing services as. Hiking guides

MANAGING FRESHWATER INFLOWS TO ESTUARIES

TOR FOR THE DEVELOPMENT OF A ECOTOURISM BUSINESS PLAN FOR FAYOUM

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE March 2009 Report No.: AB4607 Project Name

Andean Mountain Initiative. World Mountain Forum 2018 Bishkek, October 23th, 2018

(Geneva, Switzerland, 2-3 October 2018) The sustainability of international civil aviation is a key priority for ICAO and its Member States today.

Watershed: Natural Scene for Integrated Water Resource Management in the jurisdiction of Corantioquia Antioquia, Colombia. SA

Slum Situation Analysis

Colombia - Crossing Colombia from the Mountains to the Coast Road Cycling Tour (2017) Guided 14 days/13 nights

Parque Bicentenario Av. Amazonas & Av. de la Prensa, Quito, Ecuador

Nature Conservation Agency (NCA) Salacgrīva 05/07/2018

Ecosystem context in the Environmental Impact Assessment of the Dredging Operations in the Argentina s Santa Fe

September. ECHO Quito team MONTHLY REPORT

2012. Proceedings of the 11 European Geoparks Conference. AGA Associação Geoparque Arouca, Arouca, 5-6.

Regional Economic Report July- September 2014

e 2 design season three New Orleans: The Water Line Episode Summary

TERMS OF REFERENCE. Drone Advisory Committee (DAC) Role Name or Title Organization. Director, UAS Integration Office. Director, UAS Integration Office

COUNTRY CASE STUDIES: OVERVIEW

Wilderness Research. in Alaska s National Parks. Scientists: Heading to the Alaska Wilderness? Introduction

URBAN FLOODS IN SOUTH AMERICA

Baku, Azerbaijan November th, 2011

Demand perspective: Measuring flows of visitors/ trips/ expenditure and their characterization in each form of tourism

The Tourism Market Trends, 2003 Edition series...7. I Main Features: The World II Quantitative Analysis of Tourism Results: World Overview...

Transcription:

International Assistance Request ref: 2289 Consolidation and Protection of the Walls of the Albarrada of the Historical Sector of Santa Cruz Summary State Party: Colombia Properties: Historic Centre of Santa Cruz de Mompox Type of Assistance: Cultural / Emergency World Bank: LMIC Reference: 2289 Process Steps Submitted on Jan 6, 2011 Approval by Chairperson on Apr 5, 2011 1. State Party Colombia 2. Title of project Consolidation and Protection of the Walls of the Albarrada of the Historical Sector of Santa Cruz 3. Type of assistance Culture Nature Mixed 4. Project location Emergency assistance Preparatory assistance a) Will the project be implemented at a World Heritage property? Yes No Historic Centre of Santa Cruz de Mompox b) Will the project include a field component? Conservation and management Yes No c) If the project is being implemented at a World Heritage property, indicate whether it will also benefit other World Heritage properties, and if so, which ones and how? 5. Timeframe for the implementation of the project Start date: January 15, 2011 End date: July 15, 2012 Duration: 18 months

6. The project is: Local National Subregional Regional International 7. Justification of the project a) Explain why this project is needed. N/A b) List all supporting documents submitted, if applicable. 8. For emergency assistance only a) Describe the actual or potential threat/danger affecting the property The proximity of the Historical Centre of Mompox to the river makes it particularly prone to floods caused by torrential rains. Since mid-2010, due to La Niña phenomena, rains have increased more than the historical average, especially in the Andean region and on the Caribbean coast of the country, largely affecting cities such as Mompox, both in its rural and urban parts and especially all the parts of the Historical Centre facing the Rio Magdalena. The latest weather forecasts from the Centro de Predicción Climática NCEP/NWS in August indicated that La Niña will intensify and will be affecting the country until the first trimester of 2011. This means that the two rainy seasons of 2010 (March - April - May and September - October -November) will be combined with the first rainy period of 2011, causing a significant rise in the levels of the rivers. This would increase the risk of slow flooding, quakes in the high slopes areas, and an enhancement of the risks of earthquakes and hurricanes in the Atlantic. The departments that have been most affected by the winter season are: Bolívar, Magdalena, Sucre, Córdoba and Cesar. The following chart shows the damages reported in each department according to the numbers from the National System for the Prevention and Attention to Disasters (SIGPAD). (See Figure 1 of Annex 1) As of today the most affected regions are: the Mojana, the Depresión Momposina and the Magdalena Department in its entirety. The Historical Centre of Santa Cruz de Mompox is in the Bolivar Department in the region known as Depresión Momposina. This region includes the three lowest branches of the San Jorge, Cauca and Cesar Rivers and its confluence with the Magdalena River, in the Córdoba, Sucre, Bolívar, Magdalena and Cesar Departments. According to the regional authorities, the Regional Commission for the Attention and Prevention of Disasters (Comité Regional para la Atención y Prevención de Desastres CREPAD-), damages to both the Historical Centers and the rural areas were reported in the following cities: Mompox, Pinillos, Margarita, El Peñón, Talaigua Nuevo and San Zenón. The floods are affecting the contentive walls separating the largest part of the Historical Centre from the river and all the public spaces around the Historical Centre, as well as the constructions bordering the river (See Figure 2 of Annex 1). b) Indicate how it might affect the property s Outstanding Universal Value One of the most important areas of the Historical Centre of Mompox is the branch of the Magdalena River, along which the city was born and has developed. The river is the basis of the city s establishment in a unique natural environment, which gave rise to its creation and its later separation from development, allowing an extraordinary level of conservation. Approximately 70% of the Municipality area corresponds to water bodies of different nature, such as swamps, and water jets that are fueled by the Magdalena River, therefore their conditions depend on the river s behavior. The high taxes as a result of humidity, as well as the characteristics of the biodiversity of

the Mompox Island and of the Depresión Momposina, allow Mompox to have flourishing vegetation contrasting with the buildings, the streets and the squares of the city. This contributes to making the high temperatures that characterize the city more bearable (they can reach 40.7 C). Along the coast of the Magdalena River in the Mompox area there is a large amount of trees of considerable dimension, generating a peculiar landscape and a specific micro-climate. These special conditions can disappear or be damaged because of the several erosive processes on the river banks and its shore each time winter comes. At present, there is a high risk of flooding on the riverside of the Magdalena River in Mompox. The Albarrada (a stone wall used as city walls or contentive walls) was used to protect the Historical Centre against the river, as the only means of defense against yearly flooding, and it now reports serious damages. The state of conservation of the wall is critical as it presents water infiltrations (through cracks in the wall and stiff floors) mainly caused by detachments in the coating, which are mostly made in argamaza (mix of sand, water and lime). Also, there are possible problems in the differential settlements on a structural level in many parts of it. These pathologies could be mitigated taking the right actions in the shortest time delay. The action plan to recover the structural conditions of the walls and its protection function include: 1) Structural consolidation 2) Elimination of the existing water infiltration 3) Protective interventions for its improvement and maintenance c) Explain how the proposed project will address the threat/danger The project aims to recover the walls known as the Albarrada, the only system of defense against the floods which the Historical Centre of the City of Santa Cruz de Mompox has. If the walls are not functioning adequately to mitigate the impacts of the rising river, the risk of structural damages to the buildings of the Historical Centre increases dangerously. The constructions of the Historical Centre are part of the cultural value of the city, however the flooding will cause damages also to the foundations of the buildings, the public transports and to the settlements, reducing the structural capacity of the loadbearing walls and generating humidity problems in all of the buildings. 9. Objectives of the project GENERAL OBJECTIVE: Consolidate and protect the Albarrada of the Historical Centre of the city of Mompox, as a way to protect the city against flooding. SPECIFIC OBJECTIVES: Complete the technical studies needed for the realization of the consolidating works for the Albarrada, specifically: - STRUCTURAL DRAWINGS : studies and structural drawings, structural drainage, retaining walls and complementary works - GEOTECHNICAL STUDY: geotechnical analysis of the grounds and soils in order to prepare action plans for restoration, reconstruction, consolidation, retaining and complementary works. - HYDROMORPHOLOGIC ANALYSIS AND LANDSCAPE DESIGN : a. Drawings and recommendations on the basis of the hydrological and geomorphologic characteristics of the area b. Drawing of vegetation, referring to the concept of urban ecosystem, establishing simultaneously its living conditions and flexibility of uses, while guaranteeing its integration, connectivity and complimentarily with the surrounding sites and the rest of the municipality c. Bioclimatic studies Realize the intervention works: restoration, reconstruction, consolidation, defense and complementary works to control flooding.

10. Expected results Clearly state the results expected from the project and define the indicators and means of verification which can be used to assess the achievements of these results Expected results Technical studies Intervention works N/A 11. Work plan Indicators (1) Structural drawings (2) Geotechnical study (3) Hydromorphologic analysis (1) Construction of dams in M1 (2) Consolidation of the existing walls in M2 (3) Restoration of the existing wall in M2 (4) Structural reinforcement of the walls in M1 (5) Construction of drainage systems and rainy water management systems in M2 Means of verification Studies done and revised by a specialized team Final report and inventory Report of the visit to the historical centre of Mompox Activities Time Frame (in month) Year 1 Months 1 2 3 4 5 6 7 8 9 10 11 12 Please see annex 5 attached Elaboration of Structural drawings Elaboration of Geotechnical study Elaboration of Hydromorphologic analysis Intervention works - These go from month 4 to 18 12. Evaluation and reporting A report corresponding to the execution of the studies and works will be sent by the Municipality of Mompox via the Ministry of Culture. 13. Profiles of specialists, trainers, technicians and/or skilled labour, if the project foresees the participation of such people CVs of specialists have been attached 14. Key target audiences, including profiles of trainees / participants, if the project foresees the participation of such people Structural Engineers, Hydraulics and Electrical Engineers, Budget Advisors 15. Budget breakdown Items Items Description Amount x Total Amount Requested to the World Heritage Fund States party Funds Organisation Venue 19x75 1,450 1,450 0 0 Day Office Expense 1,160x1 1,160 1,160 0 0 Secretarial Assistance 30x75 Day 2,219 2,219 0 0 Translation 5x75 Day 348 348 0 0 Audio Visual Equipment 22x75 Day 1,653 1,653 0 0 Total 6,829 6,829 0 0 Other

Items Items Description Amount x Total Amount Requested to the World Heritage Fund States party Funds Personnel / Consultancy service (fees) National Expert 2334.50 per 2,335x12 28,014 28,014 0 0 week Week Coordinator 435 per week 435x12 Week 5,220 5,220 0 0 Other 863.96 864x12 Week 10,368 10,368 0 0 Total 43,602 43,602 0 0 Travel Domestic travel cost 4,072x1 4,072 4,072 0 0 Daily Subsistence allowance Accommodation Accommodation Equipment Sub Soil Exploration Laboratory Trials Evaluations Total 4,072 4,072 0 0 407x5 2,036 2,036 0 0 407x5 2,036 2,036 0 0 Total 4,072 4,072 0 0 114x104 11,822 11,822 0 0 32x104 3,311 3,311 0 0 Total 15,133 15,133 0 0 0x1 0 0 0 0 Total 0 0 0 0 Miscellaneous Other 1,293x1 1,293 1,293 0 0 N/A Total 1,293 1,293 0 0 Total Total 75,000 75,000 0 0 b) Specify whether or not resources from the State Party or other sources are already available or when they are likely to become available. In 2011 the Ministry of Culture will invest 2.000.000.000.000, 00 Colombian pesos in intervention works on the public spaces of the urban axes of the Albarrada in Mompox. Other 16. In kind contributions from the state party and other agencies a) National agency(ies) Support and technical supervision of a specialized professional from the Heritage Commission of the Ministry of Culture b) Other bi/multi lateral organizations, donors, etc We are currently requesting from the Cultural Emergency Fund from the Netherlands. A technical application was sent on the 10th November 2010. We will have an answer in the week of the 20/24 December 2010 17. Agency(ies) responsible for the implementation of the project Municipality of Mompox with the technical support of the Ministry of Culture

18. Signature on behalf of state party Full name: XXXX Title: Ministry of Culture 19. Annexes Documents ANNEX 1 Annex 2 Mompox Photographs Annex 3 Project Breakdown Annex 4 International Assistance Application Spanish and English Annex 5 Project Activities Budget.xlsx CV Expert 1 CV Expert 2 CV Expert 3 CV Expert 4 CV Expert 5 FICHA TECNICA OPUS DIC 10.xls REGISTRO FOTOGRAFICO A DICIEMBRE DE 2010 Signed request-16 December 2010