GSP TERMINAL IMPROVEMENT PROGRAM PRESS KIT

Similar documents
Current and Forecast Demand

Public Notice of Opportunity to Comment on Los Angeles World Airports Passenger Facility Charge Application at Los Angeles International Airport

Savannah / Hilton Head International Airport Master Plan Update

Elevating the Upstate

Brief Recap of Project to Date

Tampa International Airport Master Plan Update. December 12, 2012

Kansas City Aviation Department. Update to Airport Committee Customer Service

Hartsfield Jackson Update prepared for:

Greenville-Spartanburg International Airport RFP - Janitorial Services Contract Space Exhibits 8/22/17

NOTICE OF OPPORTUNITY FOR PUBLIC COMMENT RELATED TO PROPOSED PASSENGER FACILITY CHARGE APPLICATION NOVEMBER 9 TH, 2018

Greenville-Spartanburg International Airport WINGSPAN Project. ACI-NA Airport Capital Projects Showcase Presentation. September 18, 2017

TABLE OF CONTENTS. Airport Master Plan Update Manchester-Boston Regional Airport. W:\ _Manchester\MPU\Final\Executive Summary.

PUBLIC NOTICE AND OPPORTUNITY FOR COMMENT PASSENGER FACILITY CHARGE NEW PFC APPLICATION #11 JUNE 28, 2017

BNA Master Plan Update Community Advisory Committee Meeting No. 5

TRACK: B TERMINAL/LANDSIDE

Norfolk International Airport History

Los Angeles International Airport (LAX) Airside $907M

Kansas City Aviation Department. August 25, 2015

CHAPTER 4: ALTERNATIVES

Birmingham Airport 2033

GREATER ORLANDO AVIATION AUTHORITY

SouthwestFloridaInternational Airport

NOTICE OF OPPORTUNITY FOR PUBLIC COMMENT RELATED TO PASSENGER FACILITY CHARGE Posted March 25, 2019

IRREGULAR OPERATIONS AIRPORT CONTINGENCY PLAN

AIRPORT MASTER PLAN UPDATE

Greater Orlando Aviation Authority

STUDY WORK GROUP MEETING No. 4. July 12, 2017

DEVELOPMENT OF TOE MIDFIELD TERMINAL IROJECT CAPACITY ENHANCEMENT REPORT DEPARTMENT OF AVIATION TOM FOERSTER CHAIRMAN BARBARA HAFER COMMISSIONER

Charles H. Ada II Executive Manager A.B. Won Pat International Airport Guam

Master Plan Phase 2 Workshop

TERMINAL DEVELOPMENT PLAN

Alternatives Analysis EXECUTIVE SUMMARY

Westshore Development Forum Presented by: Alice J. Price, AICP, Senior Project Director

Norfolk International Airport

Planning, Development and Environment Committee

Kansas City Aviation Department. Community Listening Session

BNA Master Plan Update Public Meeting No. 2

CVG Overview Connect with CVG March 29, 2017

1.0 Project Background Mission Statement and Goals Objectives of this Sustainable Master Plan

Love Field Modernization Program Update: Master Planning Recommendations

New Orleans Aviation Board unveils $826 million overhaul of Louis Armstrong Airport

Gerald R. Ford International Airport Authority Master Plan Update A World Class Gateway

PITTSBURGH INTERNATIONAL AIRPORT TERMINAL MODERNIZATION PROGRAM

Appendix F International Terminal Building Main Terminal Departures Level and Boarding Areas A and G Alternatives Analysis

What is an Airport Master Plan?

Kansas City Aviation Department. Airport Committee July 19, 2018

Airports of the Future Taking the Terminal to the Traveler

Norfolk International Airport Overview Updated January 12, 2016

14 C.F.R. Part 158. Passenger Facility Charge Program Logan International Airport. Public Notice

Master Plan Update Community Advisory Committee Kick-off Meeting

PFC Quarterly Status Report September 30, 2016

What is the ABIA 2040 Master Plan?

Implications of Construction Cost Escalation

GLOBAL CONGRESS PANEL DISCUSSION. Phil Brown Executive Director, Greater Orlando Aviation Authority August 18, 2015

City of Tallahassee, FL Department of Aviation

CHAPTER 5: Landside Facility Requirements and Development Concepts

Irregular Operations (IROPS) Contingency Plan

JANUARY MODERNIZATION UPDATE: MAJOR PROJECTS ON TAP AT LAX AS NEW YEAR BEGINS

Salt Lake City International Airport April 23, 2013 Budget Briefing. Page 1

BURLINGTON INTERNATIONAL AIRPORT

Lake Tahoe Airport Master Plan

Lake Tahoe Airport Master Plan Public Meeting March 16, 2015

Norfolk International Airport Overview Updated September 26, 2017

Westover Metropolitan Airport Master Plan Update

SLC Airport Project Adds New Scope; Teams Scramble to Stay on Schedule

Norfolk International Airport Overview

RAPID CITY REGIONAL AIRPORT

FORECASTING FUTURE ACTIVITY

Airport Master Plan. Rapid City Regional Airport. October 2015 FAA Submittal

ENVISIONING AUSTIN s Airport of the Future

RNO Master Plan Approved Alternatives, Financial Analysis, and Facilities Implementation Plan

AIRPORT TERMINAL BUILDING EXPANSION FAQs

July 21, Mayor & City Council Business Session KCI Development Program Process Update

TERMINAL 3. tour guide booklet. April 2012

2018 Accomplishments

State of Hawaii Dept. of Transportation Airports Division Capital Improvement Program Update

The CLE Master Plan Includes:

Feasibility Study Federal Inspection Service Facility at Long Beach Airport

Challenges and Changes! Jeff Hamiel! Metropolitan Airports Commission!

City of Austin Department of Aviation Austin Bergstrom International Airport 2040 Master Plan. Public Workshop #2 April 19, 2018

Aviation Operating Administration/Executive

Huntsville International Airport Master Plan Update

The Future of Aviation for Central New Mexico

2012 AIRPORT MASTER PLAN 2016 ADDENDUM VOLUME 1 SUBMITTED ON: SEPTEMBER 22, 2017

Dallas Love Field Update. Dallas City Council Briefing February 18, 2015

PORT OF SEATTLE MEMORANDUM. COMMISSION AGENDA Item No. 6a ACTION ITEM Date of Meeting August 23, 2016

SAN JOSÉ INTERNATIONAL AIRPORT

Aviation Operating Administration/Executive

Master Plan Phase 2 Building on Partnerships

MASTER PLAN UPDATE. Planning Advisory Committee (PAC) FRESNO YOSEMITE INTERNATIONAL AIRPORT. Meeting #4

TRBUSINESS. It was also driven by an increase of long-haul destinations, and expanded short haul networks.

Kansas City International Airport Airport Terminal Advisory Group Airport Benchmarking. February 11, 2014

Appendix. Gatwick Airport Ltd - Further information on Gatwick s revised phasing strategy (including Programme) Gatwick Airport Limited

IAH Terminal Redevelopment Project. Memorandum of Agreement with United Airlines

PROMOTION CONFERENCES ADDITIONAL BENEFITS COMPLIMENTARY PUBLICATIONS

CLASS SPECIFICATION 5/12/11 SENIOR AIRPORT ENGINEER, CODE 7257

VIRGI ISLA DS PORT AUTHORITY

Document prepared by MnDOT Office of Aeronautics and HNTB Corporation. MINNESOTA GO STATE AVIATION SYSTEM PLAN

State of the Airport Robert S. Bowen, Executive Director October 18, 2018

Table E-3 Phased Capital Improvement Program...E - 11

Transcription:

About GSP MISSION STATEMENT At Greenville-Spartanburg International Airport (GSP), we begin each day fully committed to finding new ways to achieve our mission to provide the citizens of Upstate South Carolina with the safest, most efficient and user-friendly airport in the world. OVERVIEW Greenville-Spartanburg Jetport, which later became Greenville-Spartanburg International Airport Roger Milliken Field, opened in 1962. Today, GSP currently accommodates 1.8 million passengers in a terminal building that has in excess of 226,000 square feet of space and 13 departure gates. GSP hosts six major airlines offering more than 50 non-stop daily departures to 18 major cities across the US, allowing easy access to the world. Two Federal Inspection Stations (FIS), consisting of Customs, Immigrations and Agriculture, are located at GSP. The first FIS facility, located under the south concourse, is designed to handle 250 international passengers per hour. The second FIS location on the north cargo ramp is designed to handle cargo and corporate aircraft that require international clearance. The latest runway extension, completed in June 1999, extended the runway to 11,001 feet, making it possible for GSP to accommodate any aircraft in operation today. The north end of the airport is home to a 120,000 square-foot FedEx facility. This facility, completed late summer of 2001, provides FedEx with the capability to sort up to 3,000 packages per hour, up from the previous capacity of 1,000 per hour. 2

WINGSPAN OVERVIEW WINGSPAN, the GSP Terminal Improvement Program, will take place over the next four years and will be the second and most substantial wave of renovations in the airport s history. WINGSPAN will: Increase Capacity Improve Efficiency Incorporate Safety Processes Integrate Sustainable Practices Impact Economic Landscape WINGSPAN is a $115 million program. Airport funds will cover 80 percent of the program, and the remaining 20 percent of funding will come from a combination of the Federal Aviation Administration s (FAA) Airport Improvement Program Fund and the Transportation Security Administration (TSA). No local taxpayer dollars will be used to fund any portion of the program. The terminal will remain operational throughout the duration of the program. Some historical elements, including the airside garden and all water features, will be preserved and integrated into the new architectural design. KEY PARTNERS Jacobs Engineering is serving as Program Manager. Skanska Moss, a joint venture between Skanska USA Building and local contractor Moss & Associates, is serving as Construction Manager at Risk for the entire length of the program. RS&H is the lead Architect / Engineer for the new facilities. 3

WINGSPAN continued... MILESTONES WINGSPAN is scheduled to take 48 months and will include three primary phases: PHASE 1: Enabling Work Mechanical and electrical systems overhaul will be completed throughout each phase of the program. 1A: Enabling Projects Rental Car Customer Center relocation Concourse A & B expansion for restrooms and food, beverage and retail concessions Construction of the North Wing for temporary airline facilities Utility/infrastructure relocations 1B: Baggage Claim Renovations New baggage claim carousels Construct canopy on curbside for loading/unloading in front of baggage claim Covered walkway to Garage A New glass front on the Terminal in front of baggage claim PHASE 2: Building Core Construction Grand Hall Development including new food, beverage, and retail concessions area Renovation of the existing ticketing lobby New Customer Service booths Complete new canopies on curbside for loading/unloading New Landside Garden New baggage screening equipment and facilities Security Checkpoint Consolidation & Relocation Concourse A and B Renovation Complete new glass front on the Terminal PHASE 3: Project Wrap Up Construction of the new Administrative Office for GSP Construction of the Conference Center 4

WINGSPAN continued... ECONOMIC IMPACT GSP has always had a major economic impact on the Upstate of South Carolina. WINGSPAN further enhances economic growth at the airport and throughout the region. Many local contractors and vendors are participating in this program thereby ensuring the circulation of local dollars within the community. No local taxpayer dollars are being used to fund the program, and GSP does not have Passenger Facility Charges (PFCs). GSP has been a draw to the Upstate for many large companies in the past. An improved airport facility will help ensure continued growth and development of the Upstate. SUSTAINABILITY Long-term sustainability initiatives are a key part of the WINGSPAN renovations, which include: Solar Hot Water The sun s energy will be used to heat water for hand washing in restrooms and concessions. There will be a backup water heater in the event that it is needed. Rain Water Harvesting Rain water will be collected for non-potable use to reduce reliance on the city water system. Regional Materials GSP will source products and materials found within the region. Day-lighting System The size and number of windows will be increased to allow more natural lighting, resulting in a reduction in electrical requirements. Automation System Proximity detection systems will be installed in certain areas, which are designed to automatically shut off lights if no movement is detected. 5

The New GSP: Enhancements OVER THE COURSE OF WINGSPAN, THE FOLLOWING IMPROVEMENTS AND ADDITIONS WILL BE MADE TO THE GSP TERMINAL: TSA checkpoints will be consolidated into one checkpoint for access to both concourses post screening. Canopies will be installed in front of the terminal providing covered loading/unloading areas and walkways from parking garages. The baggage claim area will include a new, third baggage carousel. New public meeting and conference spaces will be included for business travelers in the terminal. New GSP International Airport District offices will be added. A new, one-stop Rental Car Customer Center will be constructed within Garage A. New technology will be incorporated throughout the terminal. Ultra day-lighting with extensive use of windows will be used throughout the terminal. New food, beverage, and retail concession areas will be located throughout the terminal. 6

GSP History 1961 The airport s groundbreaking ceremony was held at 11:00am on July 7th. 1962 The airport opened October 15th, becoming the first non-military airport to have a runway center line lighting system. 1988 A parking garage was constructed, adding an additional 1,600 new parking spaces and bringing the total to more than 3,000 parking spaces. 1989 An expansion project was completed, increasing the airport terminal and passenger waiting areas by 140,000 square feet. Boarding bridges were also added for passenger access. New lounge and dining facilities were added as well as a travel agency located inside the terminal building. 1995 The runway was extended from 7,600 feet to 9,000 feet. The airport s name was changed to Greenville-Spartanburg International Airport, achieving international status because it houses two Federal Inspection Stations (FIS) consisting of Customs, Immigration and Agriculture. Per hour, 250 international passengers could be cleared through Customs at GSP. 1998 A second parking garage was constructed, adding 1,500 new parking spaces, and bringing the total number of parking spaces to 4,500. 1999 The second runway expansion project was completed, increasing the runway to 11,001 feet. 7

GSP History continued... 2001 Over 13,000 square feet of new terminal space was opened, increasing the available number of boarding gates to 13 total. Five new rental car service facilities were also constructed. 2004 Security fencing and access control equipment was expanded and updated to improve access control to the airfield and passenger loading areas. Two new passenger-boarding bridges needed to accommodate additional airlines were purchased and installed. The airfield was renamed after founder Mr. Roger Milliken, the only Chairman of the Airport Commission until his passing on December 30, 2010. Mr. Milliken s vision and dedication to GSP has made this airport one of the best and safest airports in the nation. 2005 The airport entrance road was widened to accommodate additional vehicle traffic. This project was advanced several years in order to take advantage of the South Carolina Department of Transportation s decision to close and improve the airport interchange from Interstate 85. 2010 Approximately ten acres were purchased along Interstate 85 for the future construction of an overpass bridge to northbound traffic on the interstate. 2011 Southwest Airlines arrived at GSP. Passenger traffic at GSP increased more than 38% in 2011 to 1,755,509 customers, compared to 1,268,202 customers in 2010. 2012 Phase One of WINGSPAN began in June with the Rental Car Customer Center enabling project. 8

Press & Media Contacts SOURCES FOR CONSTRUCTION UPDATES Greenville-Spartanburg International Airport @GSPAirport blog.gsptip.com If you re interested in learning more about the program, or if you have any questions, please contact: Nisha Patel WINGSPAN Communication Contact (864) 232-2302 nisha@crawfordstrategy.com 9