CHISINAU AIRPORT ID CARD Chisinau Airport is the biggest and main airport of Moldova (lata : KIV, ICAO : LUKK), Eastern Europe; Location -14 km south of Chisinau; Area -480 ha; Terminal -built in 1970 and upgraded in 2000; Processing capacity -1.2 M passengers/year; Open 24/7; Concrete Runway 08-26: length of 3,590 m and a width of 45 m; Runway strength-pcn 59/R/B/X/T; Taxiway system- with taxiways A1, A2, B1, B2, C1, C2, D and E; Aprons area -with aircraft parking places, cargo/passenger pads, small repair and maintenance area, aircraft de-icing area, fire fighting station, etc.; Category 4C; Emergency protection Services Level 6; Aircraft parking stands 33. Member of Airport Association of CIS Civil Aviation, Member of ACI (Airports Council International), Member of SMAG ACI (Small & Medium Airport Group), Member of Alfa ACI (L association des Aeroports de Langue Francaise Associes a l Aeroports Council International) It was awarded the Certificate for the Quality Management System according to ISO 9001:2000 requirements, in 2008 It won the nomination of the Best CIS Airport - 2007, 2008, 2009, awarded by the Airport Association of CIS Civil Aviation.
EQUIPMENT AND TRAINING FOR EMERGENCY Airport Fire-Fighting category Chisinau Airport is classified as category 6 as per Annex 14 ICAO and Airport Service manual Part 1, Firefighting. The existing equipment meets the requirements of category 7. The rescue team encompasses one ambulance, one medical kit, one technical kit and one emergency operation centre. The fire fighting team consists of two new and three old fire fighting trucks. Training and Emergency - Safety management system (manuals and procedures concerning the safety of airport operations ) - Annual emergency simulation situations - Emergency Plan
FIRE-FIGHTIND AND RESCUE SERVICE
ANNUAL EMERGENCY TRAINING
ANNUAL EMERGENCY TRAINING
ANNUAL EMERGENCY TRAINING
+ Argumentarea NEW AIRLINES Proiectului 2010
THE MOST POPULAR DESTINATIONS IN 2010 Antalya 7% Frankfurt 5.6% Verona 6.3% Istanbul 13.3% Timişoara 4.9% Moscova 24.3% Athens Bucharest Budapest Frankfurt Istanbul Larnaca Lisbon London Madrid Milan Moscow Paris Prague Riga Rome St Petersburg Tel Aviv Timisoara Verona Vienna Antalya Kiev Munich Surgut Bodrum Sabiha Sharm el Sheikh Sofia
NEW DESTINATIONS IN 2010 BODRUM, KIEV,ISTANBUL SABIHA,VARNA, SOFIA,SHARM EL SHEIKH MUNICH ANTALYA KIEV ISTANBUL SABIHA SURGUT
PASSENGER FLOW IN 2000-2010 1000000 900000 800000 700000 600000 500000 400000 300000 200000 100000 0 +8.1% +7.9% +15.3% +14.7% +13.6% +23.2% +25.6% +23.1%-4.6% 1 2 3 4 5 6 7 8 9 10 11 Year 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 In 2010, it served 937037 passengers, which is 15.8% more than in the previous year. +15.8% PAX 254178 274662 296431 341695 421011 482741 548331 688782 847881 809072 937030
Cargo and Mail Indicators 2003-2010 Cargo and Mail Indicators 2003-2010 2000 1500 1000 500 0 2003 2004 2005 2006 2007 2008 2009 2010 Cargo 965 1050 1348 1497 1856 1931 1631 1816 Mail 320 336 377 343 468 538 403 584 Import and export cargo services constitutes 1816 tons of cargo and 584 tons of mail.
PASSENGER FLOW FORECAST Passenger movements are estimated to record 1.3 million in 2014, representing an average annual growth of 7.4%p.a between 2008 and 2014. In 2025 KIV is estimated to handle almost 2.7 million passengers, representing an average annual growth of 6.7%p.a between 2014 and 2025
II Modernization II Project Modernization of the Chisinau Project Airport loan of EUR 45.5 mln + grant of EUR 1.75 mln for technical cooperation funds for assistance with the preparation of the Airport Master Plan and for Project Implementation Assistance and Supervision Services contributed by EU s Neighbourhood Investment Facility to refinance EUR 6.5 mln credit of the Airport, offered by the local bank for the implementation of the Integrated Security System to finance the rehabilitation and upgrade of the Airport infrastructure and related equipment.
Main components of the Chisinau Airport Modernization Project II: reconstruction and extension of the airside facilities including: - runway - taxiways -apron refurbishment and modernisation of aviation ground lighting, including apron power supply and installation of stationary aerodrome power supply for aircrafts; electrical equipment modernisation of the transformer substations and modernisation of the drainage system procurement of aerodrome equipment