Free Route Airspace Maastricht (FRAM)

Similar documents
Free Route Airspace Workshop Conclusions and Future Projects Outlook

POLFRA IMPLEMENTATION Progress Report FREE ROUTE AIRSPACE WORKSHOP

January 2018 Air Traffic Activity Summary

Network Manager Adding value to the Network 29 September 2011

Borealis Free Route Airspace ~ Concept of Operation ~ NM User Forum 28 January 2016

Dynamic Airspace Overview concepts, complexities, benefits and outlook

AIP ITALIA Servizio Informazioni Aeronautiche

Paolo Nasetti Head of En-route Operations. Bruxelles, 28 January 2016

Free Route Airspace Definitions

Alternate WX SIDs And Routes Ernst Potzel / Klaus Lang, DFS ACC Munich

Cross-border Free Route Airspace Implementation Workshop Conclusions and Recommendations

Case study London Heathrow & London Heathrow-Amsterdam

Forty years of vision. The EUROCONTROL Maastricht UAC story. years of vision EUROCONTROL MAASTRICHT UAC EUROCONTROL

International Civil Aviation Organization. Agenda Item 6: Free Route Airspace Concept implementations within the EUR Region FREE ROUTE AIRSPACE DESIGN

Network Operations Performance

STRATEGY/ACTION PLAN FOR IMPLEMENTATION OF REDUCED VERTICAL SEPARATION MINIMA IN THE AFRICA-INDIAN OCEAN REGION 22 NOVEMBER 2003

FABEC Operations. From a project-driven approach to continuous operational improvements

Introducing Free Route Airspace: Summary Paper from NEFAB Customer Consultation Days Helsinki, October 21, 2014 and Oslo, October 23, 2014

AIR GROUND DATA LINK IN SOUTH ATLANTIC REGION. NAM/ CAR/ SAM ATS DATALINK IMPLEMENTATION WORKSHOP (Philisburg, Sint Maarten, April 2016)

NAV CANADA and DATA LINK IMPLEMENTATION. Shelley Bailey NAV CANADA May 2016 Sint Maarten

APPENDIX E ACTION PLAN FOR THE IMPLEMENTATION OF ATFM AT SAM AIRPORTS A: AIRPORT. Task description Start End

InterFAB Cooperation: XMAN Implementing Extended Cross-Border Arrival Management. World ATM Congress Madrid, 8 March 2016

InterFAB Ops meeting Traffic volatility in Brussels hotspot sectors

Free Route Airspace (FRA) Application in NMOC - Guidelines

Dynamic Management. of the. European Airspace Network. ADR Data Catalogue. Annex A: Supported Services

SJC North and South Flow

Airspace User Forum 2012

Implementation of air traffic flow management (ATFM) in the SAM Region REVIEW OF THE ATFM ACTION PLAN. (Presented by the Secretariat)

ALTIMETER SETTING PROCEDURES

How CFSPs work. processes, requirements, difficulties. Tuesday, June 19th, 2018 CFPSG PRESENTATION FABEC SC OPS/AOG RADISSON ZURICH AIRPORT 1

UKRAINE SITUATION AND THE INFLUENCE ON THE TRAFFIC SHIFTS

Seychelles Civil Aviation Authority. Telecomm & Information Services Unit

F r o m B O B C AT t o C r o s s - B o r d e r AT F M

Implementation of SESAR Pilot Common Project. - expected effects

- Establish criteria and procedures providing for the creation and use of adjustable lateral and vertical limits of the airspace

9 ANSPs 3 FABs > 4M flights/year > 11,000 flights daily 39% of European traffic

Advisory Circular. File No.: Z U Issue No.: 01

FACT Sheet. General information. January Maastricht Upper Area Control Centre

Free Route Airspace (FRA) Application in NMOC - Guidelines

The Effects of the Introduction of Free Route (HUFRA) in the Hungarian Airspace

FREE ROUTE AIRSPACE IMPLEMENTATION IN ARMENIA (ARMFRA)

FLIGHT EFFICIENCY PLAN

Luxembourg TMA Contingency measures. Clear the sky procedure & Agreement on service continuity

PERFORMANCE REPORT CAPACITY

GEN 3. SERVICES GEN AERONAUTICAL INFORMATION SERVICES

DTTAS Quarterly Aviation Statistics Snapshot Quarter Report

DTTAS Quarterly Aviation Statistics Snapshot Quarter Report

DTTAS Quarterly Aviation Statistics Snapshot Quarter Report

2017 Overview and 2018 Outlook

Report for Jan-Nov-2006 pdf. General Statistics

AMAN RESEARCH IN SESAR

SSP progress in Latvia. Overview

The Network Manager tasks and the ASM improvement initiative

AIRSPACE STRUCTURE. In aeronautics, airspaces are the portion of the atmosphere controlled by a country above its territory.

Issues related to the provision of surveillance service

Airspace Organization and Management

LIZ Air traffic statistics

ATFM Procedure using the Bay of Bengal Cooperative ATFM System

Hosted by General Civil Aviation Authority (GCAA)

Single European Sky Awards Submission by the COOPANS Alliance. Short description of the project. (Required for website application)

SYSTEM BRIEF DAILY SUMMARY

FRA AIP publication and EAD data provision. Asa STANDAR

Operational Service and Environment Definition (OSED)

Letter of Agreement. between. and

EUROCONTROL General Presentation

GEN 3.3 Air Traffic Services

EUROCONTROL. Visit of the Transport Attachés. 10 April Frank Brenner. Director General EUROCONTROL

ATFM delay report October Air Traffic Flow Management (ATFM) delay ATFM measures in Europe (Data source: NM statistics)

ATFM delay report December Air Traffic Flow Management (ATFM) delay ATFM measures in Europe (Data source: NM statistics)

ATFM delay report November Air Traffic Flow Management (ATFM) delay ATFM measures in Europe (Data source: NM statistics)

ATFM delay report February Air Traffic Flow Management (ATFM) delay ATFM measures in Europe (Data source: NM statistics)

LIZ Air traffic statistics

International Virtual Aviation Organisation. Letter of Agreement. between. and. Effective: 15/05/2017 Edition: 2

LIZ Air traffic statistics

THE AREA CONTROL CENTRE (CTR) POSITION

LIZ Air traffic statistics

LIZ Air traffic statistics

LIZ Air traffic statistics

ATFM delay report July Air Traffic Flow Management (ATFM) delay ATFM measures in Europe (Data source: NM statistics)

Letter of Agreement. between. and. Effective: 01-OCT-2016 / 1610 Edition: 3.0

LIZ Air traffic statistics

ATFM delay report November Air Traffic Flow Management (ATFM) delay ATFM measures in Europe (Data source: NM statistics)

ATFM delay report February Air Traffic Flow Management (ATFM) delay ATFM measures in Europe (Data source: NM statistics)

Thailand ATFM Operations at Sub- Regional Level

This Bulletin may be updated, as necessary, as progress is made toward the start date for Phase 2b of the NAT DLM.

ATFM delay report January Air Traffic Flow Management (ATFM) delay ATFM measures in Europe (Data source: NM statistics)

ATFM delay report April 2018

NATS. SAIP AD3 Jersey Interface Change Stage 1 Assessment Meeting. Friday 2 nd February x NATS presenters.

ATFM delay report August Air Traffic Flow Management (ATFM) delay ATFM measures in Europe (Data source: NM statistics)

Disruptive Technologies in Air Traffic Management (ATM) - Example: flight centric operations (sectorless ATM)

SOUTH AFRICA PBN NEAR TERM IMPLEMENTATION PLAN PROJECT

Standard Operating Procedures (SOPs) for UAE Centre (OMAE)

LETTER OF AGREEMENT BETWEEN NORWAY FIR AND DENMARK FIR

Civil-Military Cooperation. Advanced Flexible Use of Airspace

i4d A MANUFACTURING INDUSTRY PERSPECTIVE GROUND AND AIRBORNE ASPECTS Michel Procoudine Lionel Rouchouse Thales

LETTER OF AGREEMENT BETWEEN BODØ FIR AND MURMANSK FIR

PERFORMANCE REPORT CAPACITY

Safety / Performance Criteria Agreeing Assumptions Module 10 - Activities 5 & 6

Morocco ASBU Implementation

Operational implementation of new ATM automated systems and integration of the existing systems ADS-B IMPLEMENTATION IN GUYANA. (Presented by Guyana)

Transcription:

Free Route Airspace Maastricht (FRAM) Maastricht Upper Area Control Centre Dirk De Herdt Airspace and Network Planning 24 th 25 th May 2018

MUAC implements FRA on behalf of four countries MUAC FRA is laterally available in the: Brussels UIR Amsterdam FIR Hannover UIR Parts of the Rhein UIR (where the provision of ATS is delegated to Maastricht UAC) Vertical Limits are FL245 FL660 FRA trajectories can utilize up to 220 FRA points Free Route Airspace Maastricht

The MUAC Concept of Operations for Free Route Airspace Free Route Airspace with Intermediate waypoints Traffic remains subject to general rules, procedures and agreements with adjacent / subjacent ATC units Lateral connectivity via E / X points Trajectories shall not plan closer than 2.5nm to the FRA border Vertical connectivity via A / D points Connecting Routes for main departure / arrival flows Free Route Airspace Maastricht 3

Free Route Airspace at MUAC is implemented in three Phases Phase 1 FRA at Night Phase 2 FRA at Night and Weekend Phase 3 FRA H24 07-DEC-2017 23:00 05:00 (22:00-04:00) ATS-Routes remain 06-DEC-2018 Spring 2020 H24 MON - THU 23:00-05:00 (22:00-04:00) and FRI 23:00 (22:00) - MON 05:00 (04:00) ATS-Routes remain ATS-Routes removed Free Route Airspace Maastricht 4

The MUAC Development Cycle for each FRAM Phase Safety Assessment ANSP coordination Real Time Simulations Airspace Design AIC AIP and RAD NM validation CFSP validation (19 21 Sep 2018) ATCO training NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC Implementation Date 06DEC2018 Free Route Airspace Maastricht 5

Challenges for the implementation of Free Route Airspace at MUAC Maintaining Capacity and finding the balance with Flight Efficiency ATM Systems of ANSPs which can not process flight plans following the FRA concept Capacity ATM System Limitations Cross-Border Publication Airspace Management Ensuring the consistency of information in three national AIPs Making the transition from route- to airspace management Free Route Airspace Maastricht 6

Acceptance of MUAC FRA by the AO community About 60% of all flights crossing MUAC use DCT segments. More than 500 DCT segments were already available before the implementation of FRA. Each Night, about 20 40 flights use new opportunity's along DCT segments which were made available by FRA. MUAC regularly analyses these new routings to verify the FRA concept. MUAC proactively approaches individual AOs with FRA flight planning suggestions. AOs and CFSPs are very helpful to further improve MUAC FRA Free Route Airspace Maastricht 7

Concept for a first implementation of Cross-Border FRA MUAC, Naviair, LFV and DFS are working together on an initiative to offer cross-border FRA between*: Maastricht UAC and Copenhagen ACC Karlsruhe UAC and Copenhagen ACC Karlsruhe UAC and Malmö ACC Eligible are flights departing / arriving at aerodromes within the DK-SE FAB. These FPLs do not require a boundary waypoint between the respective ACCs. Maastricht UAC DK-SE FAB Karlsruhe UAC EDUUN FRA Cell * Between Maastricht UAC and Karlsruhe UAC at a later stage Flights overflying DK-SE FAB are not eligible for cross-border FRA with MUAC or DFS. These FPLs have to file a boundary waypoint between the respective ACCs (same as today). Free Route Airspace Maastricht 8

Fields for development towards Cross-Border FRA Delegated Areas NM Systems Publication Publication of FRA in delegated areas between Germany and Denmark / Sweden. Currently, a gap exists where flights have to use ATSroutes or published DCTs to transit the delegated areas. Cross-border FRA between DK-SE FAB and Maastricht / Karlsruhe UAC requires an evolution of NM systems which is planned for release NM 22.5. Development of solutions to publish cross-border FRA between four ACCs with specific FRA characteristics. It is allowed to file LAT/LONG in DK- SE FAB FRA which is no option for Maastricht and Karlsruhe UACs. First implementation foreseen Spring 2019 Free Route Airspace Maastricht 9

Thank you vey much for your interest in FRAM Find more information on: http://www.eurocontrol.int/free-route-airspace-maastricht-uac/ Free Route Airspace Maastricht 10