Southwest LRT Alignment Video Narration

Similar documents
Corridor Management Committee Meeting. April 2, 2014

Extending TRACKS. Design and engineering effort nears completion. Animation shows how light rail will operate in Hopkins

Experience the Southwest Corridor

CHAPTER 1 TRANSIT MARKET AREAS AND EXISTING SERVICE

APPENDIX A Route Maps and Schedules

First rail. August 2011

Meeting Summary. 1. Welcome and Review of Meeting Summary

METRO Green Line ridership has already exceeded expectations in its first month.

The Atlanta BeltLine. Project Overview Map

DOWNTOWN EAST RESTAURANT AND RETAIL SPACE. Matt Friday. Senior Vice President

Active Living Partners. Trails. Hennepin County. Bloomington. Brooklyn Park. Crystal. Excelsior. Golden Valley. Hopkins. Independence.

5101 Shady Oak Road. Shady Oak Road. Lake Views

2009 Regional Solicitation Selected Projects*

5101 Shady Oak Road MINNETONKA, MN. Shady Oak Road. Lake Views

The Optum Experience Center Visitor s Guide

SCOPING INFORMATION PACKET

Airport Planning Area

Head to University Avenue and save!

Clackamas County Development Agency

// LEARN // ENGAGE // VOLUNTEER // DONATE // PROJECT OVERVIEW MAP

108 miles/1,427 Average ADT miles/613 Average ADT miles/1,851 Average ADT

MPRB: Southwest LRT Community Advisory Committee Issues and Outcomes by Location Current to: 12 November 2010

COMPLETE TRANSPORTATION GUIDE TO SUPER BOWL LII IN THE BOLD NORTH

NFTA Access Enhancement Study for Canalside and Cobblestone Alternatives Discussion. Alternative A South Park Avenue

DULLES AREA HIGHLIGHTS. Gary Garczynski Commonwealth Transportation Board Northern Virginia District. Committee for Dulles August 4, 2016

Bonita to Bridgeport January 24, 2019

DEMOGRAPHICS AND EXISTING SERVICE

Northeast Corridor Transportation Update

RETAIL / RESTAURANT EXPERIENCE

East Link Extension. Redmond stations Open House November 17, 2016

A History of the Construction of the Radial Expressway System in Cook County

SOUTHEAST BOULEVARD Planning Study Washington, DC. Progress Drawings October 6, 2014

Northern Beaches Transport Action Plan

1.2 Corridor History and Current Characteristics

Lake Erie Commerce Center Traffic Analysis

Kilometres. Blacktown. Penrith. Parramatta. Liverpool Bankstown. Campbelltown

Site Location and Setting

Directions. IBM Recovery Center One Evertrust Plaza Jersey City, NJ From World Trade Center site (Downtown New York City):

Building the transportation network we need for the future in Niagara Region

COMMUNITY PROFILE Uptown, Minneapolis

Table 2 SIP Project Description Summary

Hennepin County 2040 Bicycle Transportation Plan. Appendix D. Full list of planned bikeway system corridors

Aurora Hills. Getting There

A VISION FOR EL MIRAGE

DOWNTOWN BRT ALTERNATIVE - 19th AVE

NAIOP. Marcia McAllister Metropolitan Washington Airports Authority

Freeway Volume-Crash Summary

DRAGON DOOR PUBLICATIONS

Westbrook Station. Transit Oriented Development Opportunity

ORANGE COUNTY TRANSPORTATION AUTHORITY. Go Local Fixed-Guideway Program History and Project Update. PowerPoint 3

SOUTHEAST CORNER OF HIGHWAY 36 & FAIRVIEW AVENUE NORTH ROSEVILLE (MINNEAPOLIS MSA), MN

Section 4(f)/6(f) Determination Technical Report for Park and Recreational Lands

A CASE FOR COMPLETING THE JORDAN RIVER PARKWAY: A

Part Three : COMMUNITY PLAN AREAS AND SPECIAL STUDY AREAS SACRAMENTO 2030 GENERAL PLAN. Introduction

e: w: remingtoncorp.com Quarry Park News More on page 1 & 2.

National Society of Professional Engineers. Charles S. Carnaggio, PE Project Director July 2, 2014

NEW YORK CITY TRANSIT AND INFRASTRUCTURE THE G LOOP

METRO Orange Line Update Metro Transit, BRT/Small Starts Projects Christina Morrison & Natalie Westberg Transportation Committee July 10, 2017

DEVELOPMENT OPPORTUNITY 630 Central Park Yonkers, NY 10704

INTERNATIONAL PLAZA 7900 INTERNATIONAL DRIVE BLOOMINGTON, MN

MTA Bus Network Improvement Project July 22, 2013

4 Transport projects underway in Western Sydney

HYATT REGENCY MINNEAPOLIS 1300 Nicollet Mall Minneapolis, MN USA. T F minneapolis.hyatt.com

Webinar Series for Comprehensive Plan Updates. Making Your Plan a Walk in the Park

Providing public transportation since 1999 between Washington and Milwaukee Counties

The Optum Experience Center Visitor s Guide. A new place of discovery

A number of goals were identified during the initial work on this Big Lake Transportation Plan.

Managed Lanes, Transit Access, and Economic Development: Implementing the Region s First Highway BRT Corridor

Town of Markham Yonge and Steeles Corridor Study and City of Vaughan Yonge Street Area Study

Stage 2 ION: Light Rail Transit (LRT) from Kitchener to Cambridge

Metropolitan Parks and Open Space Commission Subject District(s), Member(s): Policy/Legal Reference: Staff Prepared/Presented: Division/Department:

Transportation TRANSPORTATION PROJECTS

The Missouri Department of Transportation is proposing to amend the state's five-year Statewide Transportation Improvement Program (STIP).

Cell: (408) Release MA June 25, 2012

THREE RIVERS PARK DISTRICT

TORONTO TRANSIT COMMISSION REPORT NO.

Macleod Trail Corridor Study. Welcome. Macleod Trail Corridor Study Open House. Presentation of Proposed Design Concepts

Crystal City Station Improvements. Project Overview. Table 2: North Entrance. Table 1: South Entrance. 20th St. S 18th St. S.

Post Oak Blvd & San Felipe St

CITY OF CHASKA PEDESTRIAN MOVEMENT / TRAILS PLAN FINAL CHAPTER 7 PEDESTRIAN MOVEMENT / TRAILS PLAN. Page 1 of 19, Chapter 7

Why the. Building for growth. West Metro. is vital

Approval of August 2019 Service Changes

TRAIL ANNUAL REPORT

ACTION TRANSMITTAL

OFFERING MEMORANDUM East Arapahoe Road, Greenwood Village, CO. JEFF HALLBERG PRINCIPAL

US287 Asset Inventory FLEX Routes. Figure 3-1 FLEX Routes and Stops

2017 TBARTA Future Regional Priority Projects Adopted by TBARTA Board, December 9, 2016

PARK AND RIDE FROM THE GOLDEN TRIANGLE (DOWNTOWN) GARAGES WITH CONVENIENT SHUTTLE BUSES

DEVELOPMENT OPPORTUNITY 630 Central Park Yonkers, NY 10704

Design Charrette Public Meeting

CREATING CONNECTIONS IN CLARINGTON

FORT YORK PEDESTRIAN & CYCLE BRIDGE

Executive Summary. See Figure ES-5 on page 9. Figure ES-6: Typical At-Grade Alignment. Figure ES-7: Typical Underground Alignment

LAS VARAS RANCH CA COASTAL TRAIL PROPOSED ALIGNMENT

FORT WORTH DISTRICT. Springtown Area Projects. Loyl C. Bussell, P.E. Acting District Engineer. Thursday, February 8, 2018 Date.

LIGHT RAIL TRANSIT DRIVES TRANSFORMATION

Figure San Dimas Bonita at San Dimas Avenue (view looking west)

Segment 2: La Crescent to Miller s Corner

Basic Project Information

PCAL Case Study Retail Areas: Rouse Hill Town Centre

Transcription:

Southwest LRT Alignment Video Narration September 2015 Southwest Light Rail Transit, a proposed extension of the METRO Green Line, will serve Minneapolis, St. Louis Park, Hopkins, Minnetonka and Eden Prairie. It will be part of an integrated system of transitways including connections to the METRO Blue Line, the Northstar Commuter rail line, local bus services and proposed future transitways. The 15 new stations along the 14 and a half mile line will provide access to nearly 200,000 existing jobs, and other services and destinations, and attract new residential and commercial development. SouthWest Station (00:05 01:35) The line s western end is SouthWest Station in Eden Prairie, a major park-and-ride connection for express bus service. The existing park and ride will be expanded and the passenger drop-off area will be reconfigured. Leaving the station, the line will travel east on a bridge parallel to and then over Prairie Center Drive, passing the site of a planned future station near the Eden Prairie Center shopping mall. Underground infrastructure for this deferred station will be constructed along with the rest of the Southwest LRT Project, with the station platform and facilities added at a later date. The line will continue along Eden Road and Flying Cloud Drive, cross Technology Drive at grade, and pass over I-494 on a new bridge. 1

East of I-494, the line will run northeast between Flying Cloud Drive and Highway 212, crossing over Prairie Center Drive and the Highway 212 ramps on a new bridge, and continuing along Highway 212. A new bridge will carry the light rail line over Nine Mile Creek and Flying Cloud Drive as it approaches the Golden Triangle area. Golden Triangle Station (1:35 2:12) Golden Triangle Station will serve the greater Golden Triangle employment area and planned redevelopment. A park-and-ride facility, passenger drop-off and bus connection area are included. The line will continue north on a new bridge, crossing over the Shady Oak Road Highway 212 interchange. It will parallel the west side of Highway 212 on its way to City West Station. City West Station (2:12 2:31) City West Station will provide access to United Health Group s Optum campus and its 66- hundred new employees. The station will include a park and ride facility and passenger drop-off area. From here the line will pass under Highway 62 in a new tunnel and enter Minnetonka. It will proceed north along Yellow Circle Drive and Bren Road East to Opus Station. Opus Station (2:31 3:29) Opus Station will include a park and ride facility, passenger drop-off area and bus connections, and will support large office developments and housing. North of Opus Station, the line will cross Bren Road West at grade, and turn northwest. 2

The LRT line will pass under Feltl Road and Smetana Road then turn due north along the Hopkins-Minnetonka border. The line will travel on a new bridge over wetlands and the Canadian Pacific freight tracks and pass the new LRT operations and maintenance facility. Entering Hopkins, the line will cross K- Tel Drive at grade and arrive at Shady Oak Station. Shady Oak Station (3:29 3:52) Shady Oak Station will include a large park-and-ride facility, a passenger drop-off area and access to the Minnesota River Bluffs LRT regional trail and Cedar Lake LRT regional trail. From the station, the line will turn northeast and cross Eleventh Avenue at grade to reach Downtown Hopkins Station. Downtown Hopkins Station (3:52 4:36) At Downtown Hopkins Station, plans call for a pedestrian-friendly connection to Mainstreet with a plaza, passenger drop-off area and bus connections. The line will cross Fifth Avenue at grade and pass under Highway 169, running parallel to the Canadian Pacific freight line. The LRT line will cross Excelsior Boulevard on a new bridge, while the freight line will remain at grade. East of Excelsior Boulevard, the freight tracks will move to the north so that the LRT line can run south of the trail and freight tracks. Blake Station (4:36 5:18) 3

Blake Station will include a park and ride facility, passenger drop-off area and new access road with bus connection. The line will cross Blake Road at grade and travel northeast along an existing embankment. It will cross Minnehaha Creek on a new bridge. Approaching Louisiana Station, the line will cross Louisiana Avenue on a new bridge and descend from the embankment. Louisiana Station (5:18 5:39) Louisiana Station will include a park and ride facility, passenger drop-off, and bus connections. A new southbound freight rail connection will maintain the link between the two freight lines. The LRT line will continue northeast and travel at grade across Wooddale Avenue to Wooddale Station. Wooddale Station (5:39 6:07) Wooddale Station will include a passenger drop-off and bus connections. Recent transitoriented residential development has already transformed this area. From the station, the line will cross over Highway 100 and travel at grade across Beltline Boulevard to Beltline Station. Beltline Station (6:07 6:37) Beltline Station will include a park-and-ride facility, passenger drop-off and bus connections. The station will support a mix of businesses and housing, potential new development and the Excelsior and Grand area less than a mile to the south. The Cedar Lake LRT Regional Trail will 4

cross to the south on a new bridge over the freight rail and LRT lines. East of the station, the line will gently curve north to leave St. Louis Park and reach West Lake Station in Minneapolis. West Lake Station (6:37 7:15) West Lake Station will be below the West Lake Street Bridge, with elevator and stairway connections to the street, a passenger drop-off and frequent bus service. The area has a mix of higher-density housing and retail and office uses. The line will enter a shallow tunnel under the Kenilworth Trail and Cedar Lake Parkway and emerge to cross the Kenilworth Channel on a new bridge. The line will continue at grade and pass under the Burnham Road Bridge to reach 21st Street Station. 21 st Street Station (7:15 7:36) Just east of Cedar Lake, 21st Street Station will be a gateway to the regional trail network. Bus connections will be available. The line will cross West 21st Street at grade and parallel the existing freight rail line and the Kenilworth Trail. Penn Station (7:36 8:05) Penn Station will be alongside the Cedar Lake Regional Trail, and a new pedestrian bridge will connect the station, a passenger drop-off and a bus stop at the top of the bluff. Continuing northeast, the line will cross under I- 394 to Van White Station. Van White Station (8:05 8:34) 5

Van White Station will be under the Van White Memorial Boulevard Bridge, with passenger drop-off, elevator and stair connections to the roadway, and bus connections to serve existing destinations and a future mix of housing and employment. The station will connect to the Luce Line Trail and the Cedar Lake LRT Regional Trail. Continuing east, the line will pass under I-94. It will cross Glenwood Avenue and Holden Street at grade before entering Royalston Station. Royalston Station (8:34 8:50) Royalston Station will serve the Minneapolis Farmers Market, the North Loop neighborhood and future redevelopment. Leaving Royalston, the line will cross over Fifth Avenue and Seventh Street on a new bridge to reach Target Field Station. Target Field Station (8:50 9:33) At Target Field Station, Southwest LRT trains will continue east as the METRO Green Line. Without changing trains, passengers will be able to reach Green Line destinations in downtown Minneapolis, the University of Minnesota, St. Paul s Midway area, the State Capitol and downtown St. Paul. Riders will also be able to connect to the Northstar Commuter Rail line and major bus routes, as well as proposed future transitways and bus lines. At any of the five downtown stations, riders will be able to transfer to the METRO Blue Line to reach destinations in south Minneapolis, the airport and the Mall of America. The Southwest LRT Project will provide improved access to job centers and slow the growth of traffic congestion. Project funders include the Federal Transit Administration, the Counties 6

Transit Improvement Board, the State of Minnesota and the Hennepin County Regional Railroad Authority. For more information, visit www.swlrt.org. 7