DOWNTOWN BRT ALTERNATIVE - 19th AVE

Similar documents
Travel Time Estimates

Main Line System Recommendations

SCOPING INFORMATION PACKET

Head to University Avenue and save!

SECTION 106 ACTIVITIES ANNUAL REPORT

Construction underway. STATUS: 229 5,190 5,419 5,305 STIP REFERENCE #FR /01/2013

Macleod Trail Corridor Study. Welcome. Macleod Trail Corridor Study Open House. Presentation of Proposed Design Concepts

INTERSTATE 10 AND INTERSTATE 17 SPINE WORKSHOP

ORANGE COUNTY TRANSPORTATION AUTHORITY. Go Local Fixed-Guideway Program History and Project Update. PowerPoint 3

A VISION FOR EL MIRAGE

Street Affected Delayed/ Closed From To Time Closed Time Open. Quarry Ln 58th Ave Lake Cahuilla Pilot Car 6:30AM 58th Ave ( Closed) Van Buren

2011 Illinois Department of Transportation. I-290 PHASE I STUDY Additional Round 1 Alternatives Descriptions

Airport Planning Area

DEMOGRAPHICS AND EXISTING SERVICE

METRO Green Line ridership has already exceeded expectations in its first month.

Stage 2 ION: Light Rail Transit (LRT) from Kitchener to Cambridge

DENISON STREET EXTENSION. Transportation Committee. January 14, Feasibility Study

East Link Project Update. Maintenance of Traffic During Construction. April 21, 2015

5.1 Traffic and Transportation

These elements are designed to make service more convenient, connected, and memorable.

Managed Lanes, Transit Access, and Economic Development: Implementing the Region s First Highway BRT Corridor

CENTRAL AND EAST CORRIDORS

I-66 Inside the Beltway Feasibility Study

Memorandum / Letter of Intent

Site Location and Setting

Chicago St. Louis High-Speed Rail. Enos Park Neighborhood Association May 13, 2014

City of Sacramento Sacramento Intermodal Transportation Facility Draft WP # 3 Transit Operational Requirements

23,760 SF ASSEMBLAGE ZONED LR2

The Benefits of a Whittier Blvd. Alignment for the Metro Eastside Extension

MONARK CENTER NORTH GREENWAY HAYDEN LOOP SCOTTSDALE, ARIZONA. Michael Kitlica Senior Director

SECTION 106 ACTIVITIES ANNUAL REPORT

10 Free Airport Flyer: Santa Clara Transit Center to Metro Airport LRT Station via San Jose International Airport Effective Date 10/9/2017 Route Map

Project Advisory Group. May 23, 2013

Planning for RAV: Lon LaClaire, Transportation Engineer Anita Molaro, Development Planner CITY OF VANCOUVER

Figure San Dimas Bonita at San Dimas Avenue (view looking west)

Lake Erie Commerce Center Traffic Analysis

PRESENTATION TO THE RICHMOND REGIONAL TRANSPORTATION PLANNING ORGANIZATION: JUNE 2, 2016 BRT CONNECTIVITY AND LAND USE ANALYSIS PLAN JOSH MALLOW

Interstate 90 and Mercer Island Mobility Study APRIL Commissioned by. Prepared by

DULLES AREA HIGHLIGHTS. Gary Garczynski Commonwealth Transportation Board Northern Virginia District. Committee for Dulles August 4, 2016

Pedestrian Safety Review Spadina Avenue

DOWNTOWN EAST RESTAURANT AND RETAIL SPACE. Matt Friday. Senior Vice President

Southwest LRT Alignment Video Narration

Understanding Your I-66 Trip

CHAPTER 1 TRANSIT MARKET AREAS AND EXISTING SERVICE

Cell: (408) Release MA June 25, 2012

405 TERMINAL AVENUE OTTAWA, ON

Basic Project Information

Changes in TIP projects Draft vs. Final Draft

Experience the environment

SOUTH INTERCHANGE AREA

PUBLIC INFORMATION SESSION #2

Alternate Access Routes to/from:

East Farmingdale Fire Department 930 Conklin Street. Source: Parsons Brinckerhoff

Fremont-South Bay Corridor

Non-Motorized Transportation

Connecting Cleveland 2020 Citywide Plan Transit Improvement Recommendations

Welcome. Green Line in Your Community

Prime Retail Space Available for Lease in Downtown Phoenix 45 WEST JEFFERSON PHOENIX, AZ LUHRSCITYCENTER.COM

BENEFITS OF YOUR FUTURE RIDE

KING STREET TRANSIT PILOT

First rail. August 2011

Gardner: overview. Santa Fe, Oregon, and California National Historic Trails UNINCORPORATED JOHNSON COUNTY OLATHE UNINCORPORATED JOHNSON COUNTY

HDR itrans Consulting Inc. 100 York Blvd., Suite 300 Richmond Hill, ON L4B 1J8 Tel: (905) Fax: (905)

1.0 Purpose and Organization of the Community Impact Assessment Addendum

The vision for enhanced service on Riverside between downtown and the airport is not a new concept.

WELCOME AND AGENDA DOWNTOWN REDMOND LINK EXTENSION

SR 934 Project Development And Environment (PD&E) Study

3. COLTA / HUGA CONNECTIONS - PRELIMINARY

Restoration of Historic Streetcar Services in Downtown Los Angeles

Mount Pleasant (42, 43) and Connecticut Avenue (L1, L2) Lines Service Evaluation Study Open House Welcome! wmata.com/bus

MARTA & City of Atlanta Sales Tax Referendums. Public Hearings May 25 & 26, 2016 June 1 & 2, 2016

A Presentation to: Project Advisory Group Meeting #6

Memorandum. To: From: cc: Date: November 7, Re: 1.0 Purpose and Organization of this Addendum. 2.0 Project Description

Technical Advisory Committee. May 14, 2013

Northwest Corridor LRT Line to Irving/DFW

West Santa Ana Branch Transit Corridor. Community Meetings March 12, 13, 17 & 19, 2018

2016 Regional Transportation Alternatives Program (TAP) Grant Application

A retrospective look at work program counting activities since 2001 is found in Table 8, on the last page of this document. Hours of Operation

Exposition Corridor Transit Project Phase 2

THE WORLD BANK Washington, DC

Public Information Meetings. October 5, 6, 7, and 15, 2015

Area Surrounding Maplewood Manor

1.2 Corridor History and Current Characteristics

York Region Rapid Transit Corporation. City of Vaughan Committee of the Whole June 1, 2016

University Region Non-Motorized Plan 2015

- Countywide - Roadway Cone Zone / Lane Closure / Sidewalk Repair Schedule

HOV LANE PERFORMANCE MONITORING: 2000 REPORT EXECUTIVE SUMMARY

SANDAG s Regional Transportation Plan

Metro ExpressLanes April 5, 2011 Community Meeting re: Adams Blvd Improvements

Transportation Supporting Dulles Airport

LANCASTER CORRIDOR REDEVELOPMENT ROSEDALE STREET REDESIGN PEACH STREET RAILROAD CROSSINGS

FEASIBILITY STUDY REFINED CONCEPT 1 PROJECT A

A number of goals were identified during the initial work on this Big Lake Transportation Plan.

FROM THE SEATAC AIRPORT (509 NORTHBOUND - ALTERNATE ROUTE)

THE STATE OF GRAYSLAKE

Northern Beaches Transport Action Plan

2017 TBARTA Future Regional Priority Projects Adopted by TBARTA Board, December 9, 2016

TORONTO TRANSIT COMMISSION REPORT NO.

South Bay Metro Light Rail Extension. Summer/Fall 2017 Project Briefings

THE RICHMOND REGION Transportation Priority Projects

Transcription:

DOWNTOWN BRT ALTERNATIVE - 9th AVE New Route and Increased Service in Mixed Traffic Existing Route and Service in Mixed Traffic Light Rail Line / New Route and Increased in Exclusive Guideway Existing Route and Service in Exclusive Guideway Looking northbound on 9th Avenue from Van Buren Street St Matthew Church Phoenix City Hall Note. Street cross section concepts are are based on preliminary information and are not intended to reflect final conditions.

DOWNTOWN BRT ALTERNATIVES - I-7 New Route and Increased Service in Mixed Traffic Existing Route and Service in Mixed Traffic Light Rail Line / New Route and Increased Service in Exclusive Guideway Existing Route and Service in Exclusive Guideway St Matthew Church St Matthew Church Phoenix City Hall Phoenix City Hall Exclusive Guideway Mixed Traffic Looking northbound on I-7 from Van Buren Street Looking northbound on I-7 from Van Buren Street Note. Street cross section concepts are are based on preliminary information and are not intended to reflect final conditions.

DOWNTOWN LRT ALTERNATIVE - 9th AVE At Grade - Ground Level Grade Change Bridge Looking northbound on 9th Avenue from Van Buren Street St Matthew Church Note. Street cross section concepts are are based on preliminary information and are not intended to reflect final conditions.

DOWNTOWN LRT ALTERNATIVE - I-7 EAST OR WEST SIDE Looking northbound at I-7 from Van Buren Street At Grade - Ground Level Grade Change Bridge Railroad underpass option at 9th Avenue St Matthew Church Railroad overpass option at 9th Avenue Note. Street cross section concepts are are based on preliminary information and are not intended to reflect final conditions.

ADAMS-JACKSON DOWNTOWN LRT ALTERNATIVE Van Buren St. Monroe St. Adams St. Phoenix City Hall Washington St. Jefferson St. Jackson St. 9th Ave. 5th Ave. 0th Ave. 9th Ave. 7th Ave. 5th Ave. rd Ave. st Ave. Ave. Adams Street, west of Adams Street, to 9th Avenue Jackson Street, east of 9th Avenue Looking eastbound Road Note: Street cross section concepts are based on preliminary information and are not intended to reflect final conditions.

ADAMS/MONROE COUPLET DOWNTOWN LRT ALTERNATIVE Van Buren St. Monroe St. Adams St. Washington St. Phoenix City Hall Jefferson St. Jackson St. 9th Ave. 5th Ave. 0th Ave. 9th Ave. 7th Ave. 5th Ave. rd Ave. st Ave. Ave. Adams Street, west of Adams Street, to 5th Avenue Adams Street, 5th Avenue to METRO starter line Looking eastbound Looking eastbound Road Note: Street cross section concepts are based on preliminary information and are not intended to reflect final conditions.

JEFFERSON-JACKSON DOWNTOWN LRT ALTERNATIVE Van Buren St. Monroe St. Adams St. Phoenix City Hall Washington St. Jefferson St. Jackson St. 9th Ave. 5th Ave. 0th Ave. 9th Ave. 7th Ave. 5th Ave. rd Ave. st Ave. Ave. Jefferson Street, West of 0th Avenue Jackson Street, East of 0th Avenue Looking eastbound Road Note: Street cross section concepts are based on preliminary information and are not intended to reflect final conditions.

WASHINGTON/JEFFERSON COUPLET DOWNTOWN LRT ALTERNATIVE Route Optional Route Van Buren St. Monroe St. Phoenix City Hall Adams St. Washington St. Jefferson St. Jackson St. 9th Ave. 5th Ave. 0th Ave. 9th Ave. 7th Ave. 5th Ave. rd Ave. st Ave. Ave. Jefferson, west of Jefferson Street, to METRO starter line Washington Street, to METRO Starter Line Looking eastbound Looking eastbound Looking eastbound Road Road Left turn road Note: Street cross section concepts are based on preliminary information and are not intended to reflect final conditions.

LIGHT RAIL TRANSIT - EAST/WEST ALTERNATIVES Capitol Elementary Phoenix City Hall Light Rail Line / Note: Alignments are two-way except where indicated Jefferson St. (two track) Washington St. / Jefferson St. Couplet Adams St. (via Jackson St.) Alternate Connection Options Adams St. / Monroe St. Couplet st St. Turnaround Option

MAINLINE STATION OPTIONS I-0 Mainline Section Location Option Recommended for Further Evaluation Activity Center Target Area - 5th Ave/9th Ave Target Area - 4rd Ave/5st Ave/59th Ave Target Area - 6rd Ave/67th Ave 79th Ave 6rd Ave 9th Ave Arterials Evaluated 5th Ave. 9th Ave. 4rd Ave. 5st Ave. 59th Ave. 6rd Ave. 67th Ave. Pros 5th Ave., an expansive north-south arterial, provides opportunity for enhanced regional mobility. 5th Ave. results in fewer land use compatibility issues and property impacts. A station at 5th Ave. could serve Hayden High. A station at either 5st or 59th Ave. would provide a direct connection to the Secondary Urban Village Cores affiliated with Estrella and Maryvale. A station at either 5st or 59th Ave. is more likely to attract commuters from the proposed South Mountain Freeway compared to 4rd Ave. Vacant parcels adjacent to the 59th Ave. location could support a mid-corridor parkand-ride. 67th Ave., an expansive north-south arterial, provides opportunity for enhanced regional mobility. Vacant parcels adjacent to the 67th Ave. location could provide potential park-and-ride locations. Cons 9th Ave., as a smaller collector street, does not readily allow direct LRT/ BRT to local bus connection. Due to dense housing surrounding 9th Ave., acquisition of developed property would be unavoidable. A station at 9th Ave. would require diversion of more bus routes compared to 5th Ave. A station at 4rd Ave. would not directly serve either Maryvale or Estrella Urban Village Cores. Mobility along 4rd Ave. and 59th Ave. is hindered compared to 5st Ave. A station at 5st Ave. would likely require acquisition of an adjacent business due to dense development. Mobility along 6rd Ave., an intermittent collector street north and south of I-0, would be hindered compared to 67th Ave. A station at 6rd Ave. would require diversion of more bus routes compared to 67th Ave. A station at 6rd Ave. could hinder proposed residential and school expansion plans. Arterial(s) Recommended for Further Evaluation 5th Avenue as a Neighborhood Walk-Up 5st and 59th Avenues as a Mid-Corridor -and-ride 67th Avenue as a Mid-Corridor -and-ride Note: The I-0 West AA/EIS Study terminates at the 79th Ave. -and-ride.

I-0 WEST LRT/BRT - CROSS SECTIONS McDowell Rd.. I-0. Van Buren St. 75th Ave. 67th Ave. 59th Ave. 5st Ave. 4rd Ave. 5th Ave. 7th Ave. I-7 Typical Light Rail Transit Cross Section on I-0 Typical Bus Rapid Transit Cross Section on I-0 Traffic Barrier Traffic Barrier Traffic Barrier Traffic Barrier Traffic Barrier Existing Westbound I-0 HOV Shoulder 50 Shoulder Existing Eastbound I-0 HOV Existing Westbound I-0 HOV Shoulder 50 Shoulder Existing Eastbound I-0 HOV Note: Street cross section concepts are based on preliminary information and are not intended to reflect final conditions.