Similar documents
Composite CN Value Based on Hydrologic Soil Group and Estimated Future Land Cover

BRUNSWICK'S BOWLING 350 MCHENRY ROAD, BUFFALO GROVE, IL

AVAILABLE FOR SALE ENTITLED 53,228 SF BUILDING FOR SALE Washington Dr., Fontana. Property Features:

KING CONDOMINIUM RESIDENCES (REZONING)

HEARST GARDENS BERKELEY, CA 94702

2600 COLORADO ENTRY DESIGN

Leidesdorff Village D&S Developement 2277 Fair Oaks Boulevard, Studio 220 Sacramento, California

Public Information Center August 12, 2010

CLAREMONT CLUB, SPA & RESIDENCES

RED = CLOSED TO PUBLIC

FOR LEASE: RAINBOW & WARM SPRINGS CENTER

DESIGN AND CONSTRUCTION OPEN HOUSE

Specification Details: Coded Dash Number M28803/1 -MC PART LISTINGS MANUFACTURER'S DESIGNATION OR TYPE NUMBER TEST OR QUALIFICATION REFERENCE

PACIFIC FISHERY MANAGEMENT COUNCIL CHAIR S RECEPTION. Saturday, March 5, :00 p.m. Second Floor Foyer Hilton Hotel Vancouver, Washington

4. Improvement Plan Elements

PRELIMINARY PLANS END PROJECT NW 16TH AVE NW 13TH ST. BEGIN PROJECT NW 10TH AVE ALACHUA 329 W UNIVERSITY AVE MAIN ST. ALACHUA 331 LOCATION MAP

Start Time:3:40 pm End Time:4:00 pm Distance:6.57 mi. Driver Sign-Off Time:04:05 pm

Imagery 2017 Google, Map data 2017 Google Commercial Land with finished offsites

Farmington Metropolitan Planning Area Farmington Metropolitan Planning Organization Transportation Improvement Program (TIP)

Make Model Number(s) STC No: Description System Covered SA449GL

Nov. 29, 2007 PL Ontario Municipal Board Commission des affaires municipales de l Ontario. Judith Sellens and Claire Sellens

ATTACHMENT C CITY OF FEDERAL WAY 2018 ASPHALT OVERLAY PROJECT BID SCHEDULE

January 2018 Air Traffic Activity Summary

2016 Commercial Real Estate. Review and Forecast

SITE PLAN FOR LEASING INFORMATION CONTACT PEACHTREECENTER.COM BAKER ST PEACHTREE CENTER AVE PEACHTREE ST JOHN PORTMAN BLVD COURTLAND ST

LESLIE BARNS & CONNECTION TRACK. Project Update Construction and Traffic Management Consultation

EVERknowledgeable EVERresponsive EVERhonorable EVERGREEN.

County of Fairfax, Virginia. Silver Line Update. Committee for Dulles March 2, Mark Canale Fairfax County Department of Transportation

Construction Staging Area 700 Bay Street - Elizabeth Street and Walton Street

FOR LEASE 5431 H Street Sacramento, CA

Town Hall Meeting. July 28, 2016 Sherwood School of Music 1312 S. Michigan Ave.

DRAFT TH AVE NE URBAN DESIGN MERIT PRESENTATION DPD# NOVEMBER 2017

MIAMI RIVER COMMISSION

LYNNWOOD LINK EXTENSION FI NAL ENV I RO NM ENTA L IM PA C T S TATE M E N T

377 Spadina Rd & 17 Montclair Ave Zoning Amendment Application Final Report

DRAW YOUR. LIFE s Chapter here A COLLECTION OF GREAT VALUE HOMES

ADVANCED WARNING SYSTEM FOR SHARED USE CROSSING ON HOWARD STREET EAST OF NORDICA AVENUE

Purpose of Presentation. Outline of Presentation. Preliminary Design Presentation HIGHTSTOWN MUNICIPAL BUILDING Hightstown, NJ

CMA Map Layout S Hazel Court. Denver, Saturday, February 6, 2016

C ARME L C I TY C E N T E R

PROJECT TEAM VICINITY PLAN NTS LOCATION PLANS NTS. Mark Petrella, A.I.A. Kimberly McCarron, NCARB

Construction Staging Area 197 Redpath Avenue

APPENDIX C TRANSPORTATION PLANNING DOCUMENTS

25 th Avenue Grade Separation. September 13, 2017

TOP VIEW FRONT VIEW WEBSITE : C DETAIL LCB PT. WASKITA KARYA KLBM. Client : Project: Drawing Title : GENERAL ARRANGEMENT LCB

CLEVELAND, CINCINNATI, CHICAGO & ST. LOUIS RAILWAY COLLECTION,

Astoria Boulevard ADA Upgrade and Station Renewal. January 7, 2019

PRESENTS A RARE AND UNIQUE DEVELOPMENT OPPORTUNITY THE HISTORIC WHITE CHIEF LODGE FISH CAMP, CALIFORNIA

gables station s dixie hwy & ponce de leon blvd coral gables, fl 33133

HILLCREST OAKS 6600 & 6606 LBJ FWY., DALLAS TX 75240

MINUTES OF THE REGULAR MEETING WORTHINGTON ARCHITECTURAL REVIEW BOARD WORTHINGTON MUNICIPAL PLANNING COMMISSION. January 12, 2012

Depot. Chapel. El Sub Sta. 43 to 53 to to m

AND AND ALL OF SAID LANDS SITUATE, LYING AND BEING IN THE CITY OF HOLLYWOOD, BROWARD COUNTY, FLORIDA, CONTAINING 326,439 SQUARE FEET ( ACRES).

BARS, FIREPITS, FIREPLACES, PATIOS, PILLARS, SEAT WALLS, TABLES + WATERFALLS. Stone Oasis Landscape Kits

Ideal RV Park in One of the Most Beautiful, Charming Small Mountain Towns

Boston Redevelopment Authority 2/26/ Chestnut Hill Avenue Boston/Brookline, MA

Minutes of the Township of Aberdeen Zoning Board of Adjustment Public Meeting of Wednesday, July 10, 2013

INSPECTION HISTORY REPORT Friday, December 8, 2017

FOR LEASE Gateway Boulevard, Newark FEATURES PACIFIC RESEARCH CENTER. Freestanding Office / Lab / R&D Building. ± 126,721 SF Available

Interested in this property? Call TEAM

416 East Verona Ave. Letter of Intent

Nordic Plow. Lawn Tractor Plow w / Handle (PLOW) 771 W. North Avenue, West Chicago, IL Copyright 1/1/16

SITE FOR LEASE: THE LANDING SITE FEATURES. Owner/Licensee NOW OPEN!

Exhibit 18A ANDERSON STREET DETAIL LECOUNT SQUARE New Rochelle, New York

HENLEAZE, STOKE BISHOP & WESTBURY-ON-TRYM NEIGHBOURHOOD PARTNERSHIP September Chock Lane Traffic Calming scheme Monitoring Report

3317 EXPO- SITION PL LOS ANGELES

PROPERTY FEATURES PRICE: CALL FOR DETAILS AVAILABLE: 1,000-34,000± SF LOCATION:

ROYAL VIEW DEVELOPMENT

Ballston Common Mall 4238 Wilson Blvd., # 3104 Arlington, Virginia 22203

District of Squamish Financial Plan for the Years Capital Revenues and Expenditures

Date Rec d TL PC PC 16/11/16 16/11/16 DB AB CD 13/12/16 14/12/16 8/11/16 8/11/16 VB RC CB 4/12/16 5/12/16

OFFERING MEMORANDUM OR FOR INFORMATION PLEASE CONTACT:

LLOYD CROSSING SHOPPING C BURKHARDT & LLOYD EXPY 422, Discount and Junior Department St STRIP VERY GOOD 027 1/6

DONCASTER BOROUGH COUNCIL (VARIOUS ROADS, DONCASTER) (MOVING TRAFFIC) (CONSOLIDATION) ORDER 2009 (AMENDMENT NO. ) ORDER 2018

DEPARTMENT OF TRANSPORTATION. Federal Aviation Administration. 14 CFR Part 39. [Docket No NE-08-AD; Amendment ; AD ]

Householder Application for Planning Permission for works or extension to a dwelling. Town and Country Planning Act 1990

Sept. Oct. Nov. Dec President s Message. Upcoming Meetings. Best Regards, Bob Berry

Date & Fare Type. 10-Oct-15 Saver. 24-Oct-15 Saver. 5-Nov-15 Saver. 15-Dec-15 Early Saver. 17-Dec-15 Early Saver

STONEMOR INDIANA LLC 1414 S GREEN RIVER RD 699, Exempt, Other STRIP AVERAGE 027 1/6

FOR LEASE 7707 Gateway Boulevard, Newark CA

THE VIRGIL SKYLINE SILVER LAKE/KOREATOWN CREATIVE CAMPUS 137 N VIRGIL AVENUE LOS ANGELES, CA 90004

FLU CLINICS. Flu immunizations are offered during pharmacy opening hours throughout the flu season in addition to the dates listed below.

Front Carport Design Standards, Requirements & Application

2 Burner ASSEMBLY MANUAL

IS A BUDGET ONLY DESCRIPTION QUANTITY UNIT

WHY MOVE YOUR BUSINESS TO HOLLYWOOD?

CITY OF CONCORD CURRENT PROJECTS REPORT SEPTEMBER DECEMBER 2017

DOWNTOWN3RD THE DESTINATION

Walk-On Waterfront Executive Home Qualicum Beach, BC

FOR LEASE 7999 Gateway Boulevard, Newark CA

709 & 711 ADMIRAL CALLAGHAN LANE

Log of Revisions. VS QC-Form 33 Rev AH, 30 May 2017 Page 1 of 6. Printed 5/30/2017. EVAS MODEL ELIGIBILITY LIST for Model 107STC

Brick Row Townhomes Attachments:

move up th Avenue SW Calgary, AB

move up th Avenue SW Calgary, AB

move up th Avenue SW Calgary, AB

FOR SALE. FREEHOLD BUILDING AND SITE With detailed planning consent for 6 x two bed flats and 4 x one or two bed houses

move up th Avenue SW Calgary, AB

... Permit Number: COM Situs: 1348 S Edgewater Cir Nampa, Id 83686

Courtyard House - Additional Information

Transcription:

359 36' 16" 57.592 12"WIDE GRAVEL STRIP C/W 2"X4" PT WOOD CEDGE Y CONC. SLAB. EL. 1.98M ONC. PAVER STANDARD 2.8Mx5.5M B B B A212"WIDE GRAVEL STRIP C/W 2"X4" PT WOOD EDGE EL. FOR CONTINUEATION SEE 3b R SJA R SJA R SJA SJA R TF5 F 1.50 AP PATIO B. FIN. CONC. GARAGE APROAC B. FIN. CONC. B1 B1 B1 A1 BUILDING NO.2 3 STOREY ENTRY CONC. SLAB. MIN. EL. 1.98M MA MA MA MA MA MA MA MA MA MA BUILDING NO.5 MA ASPALT DRIVEWAY STEPPING STONE TF5 F 1.50 MA MA MA MA 3.3M 1.39 VO VO 89 50' 24" 92.200 R 1.36 V7 ACCESSIBLE 3.7Mx5.5M TREE PROTTION ZONE #2 VP R VD VD VD VD VD VP VP 4.0 M VD VD R R #6816 VD VD 8.3 M R R SJA VD R VD VD R R 269 50'24" VBD VD STANDARD 2.8Mx5.5M 6.8 M R ACC ACC V6 R PATIO MF B. FIN. CONC. SJA VO VO VO 817 EXISTING TREES#6817 #6815 WILL BE TRANSPLANTED AP @12" AUU UNIT ENTRY EXP. AGG. CONC. UNIT ENTRY EXP. AGG. CONC. @12" AUU @12" GS TF5 F 1.50 PATIO B. FIN. CONC. LAWN AP PATIO B. FIN. CONC. VP MF MF LAWN LAWN 18"X18" STEPPING STONE 12"WIDE GRAVEL STRIP C/W 2"X4" PT WOOD EDGE PEDESTRIAN ENTRY ARBOUR SEE DETAIL PATIO B. FIN. CONC. 5 3d L3 CONC. PAVER MF MF 2.0M WIDE B. FIN. CONC. PUBLIC WALKWAY AS PER CITY STANDARD PEEABLE CONC. PAVER @12" GS MF MF MF PC LAWN VD VP VP VP PEEABLE CONC. PAVER LAWN LAWN BIKE RACK (3) CONC. PAVER LAWN MF SJA PC @12" AUU A1 B1 B1 B1 A1a G. R C. SJA A B B B ENTRY CONC. SLAB. MIN. EL. 1.98M Aa R R. R. R. R. BUILDING NO.6 SJA BUILDING NO.1 3 STOREY ENTRY CONC. SLAB. MIN. EL. 1.98M PCO @12" GS GARAGE APROAC B. FIN. CONC. ASPALT DRIVEWAY PATIO B. FIN. CONC. PATIO B. FIN. CONC. PATIO B. FIN. CONC. 12"WIDE GRAVEL STRIP C/W 2"X4" PT WOOD EDGE @12" AUU TF5 F 1.50 UNIT ENTRY CONC. PAVER AP AP AP 5'T CEDAR 4T WOOD FENCE SEE DETAIL 2 3d L3 EXISTING TREES#6815 & 6814 WILL BE TRANSPLANTED @12" AUU B. FIN. CONC. TF5 F 1.50 UNIT ENTRY EXP. AGG. CONC. 12"WIDE GRAVEL STRIP C/W 2"X4" PT WOOD EDGE LAWN 6T WOOD FENCE SEE DETAIL PATIO B. FIN. CONC. CONC. PAVER MA MA MA 2 3d L3 TF5 F 1.50 TF5 F 1.50 TF5 PCO TF5 F 1.50 F 1.50 TF5 F 1.50 TF5 F 1.50 R SJA PEEABLE CONC. PAVER SF RIMA SYSTEM INSTALL AS PER MANUFACTURE'S SP. 5'T CEDAR UNIT ENTRY EXP. AGG. CONC. GARAGE APROAC B. FIN. CONC. ASPALT DRIVEWAY 3T METAL FENCE SEE DETAIL 1 SJA R PJB (CONVERTIBLE UNIT) TF5 TF5 TF5 TF5 3d L3 F 1.50 F 1.50 F 1.50 F 1.50 TF5 F 1.50 PC 12"WIDE GRAVEL STRIP C/W 2"X4" PT WOOD EDGE ROAD END TRELLIS 3 SEE DETAIL 3d L3 PATIO B. FIN. CONC. MA MA MA MA MA PJB PJB PJB PJB TF5 F 1.50 EL. ENTRY CONC. SLAB. MIN. EL. 1.98M @12" GS LAWN TC PJB LAWN PJB PJB PJB PJB 8.1 M 2.0 M VBD 1.9 M 5.2 M 9.2 M B. FIN. CONC. VBD 12"WIDE GRAVEL STRIP C/W 2"X4" PT WOOD EDGE A2 B BUILDING NO.7 18"X18" STEPPING STONE B B Ab ARA BENC 1.32 LAWN TREE PROTTION ZONE #1 16" KOMPAN, CIRCUIT ELE400037 RT IND. 604.940.0067 ALLEN BLK EDGE 2 LAYERS & CAP WOOD CIP PLAY SURFACE 8" MAIL MA MA MA 47" 39" #6793 39" 39" R 12.2 M ARA 10.2 M NEW LOCATION OF EXT. KATSURA #6815 CONC. PAVER 6T WOOD FENCE SEE DETAIL BIKE RACK (4) 7 3d L3 PED. ENTRY SEE DETAIL 2 3d L3 R R R PATIO B. FIN. CONC. R PATIO B. FIN. CONC. LAWN 6.0M CK PATIO B. FIN. CONC. CK CK R CK 4T METAL FENCE SEE DETAIL LAWN PJB PJB 1.14 PJB PJB LAWN VD VD 1 3d L3 1 3d L3 4'T METAL FENCE SEE DETAIL LAWN 17.7 M CONC. SIDEWALK @12" ANN 1.5M WALKWAY @12" AUU CONC. SIDEWALK LAWN 2.5M BOULEVARD 1 3d L3 4'T METAL FENCE SEE DETAIL 4 3d L3 PROJT SIGN SEE DETAIL EXISTING TREE#6821 WILL BE TRANSPLANTED UNIT ENTRY EXP. AGG. CONC. NEW LOCATION OF EXT. WESTERN RED CEDAR #6821 BRIDGE STREET 1.65 1.68 IG OF R NEW CONC. SIDEWALK, GRASSED BLVD AND STREET TRE TO BE FINALIZED BY CIVIL ENG. 1.65 1.60 NEW CONC. SIDEWALK, GRASSED BLVD AND STREET TRE TO BE FINALIZED BY CIVIL ENG. 1.57 1.52 Aug. 7,2012: Public walkway revised, details modified Issued for DP Apr. 30,2012: Public walkway indicated along n. pl. Issued for DP Apr. 26,2012: Bldg.& ard landscape modified Pltg. adjusted. Issued for DP Dec. 9,2011: Road layout, bldg. modified hard lands. pltg. adjusted. Issued for DP Nov. 8,2011: Issued for DP REVISIONS / ISSUES & ASSOCIATES Landscape Architects 1942 E 5th Ave. Vancouver, BC V5N 1M2 T/F: (604) 255 5009 Email: itovan@mac.com Project: 9691,9711,9731 BRIDGE ST. RICMOND B.C. Drawing Title: LANDSCAPE PLAN Copyright. All rights reserved. This design and drawing, as an instrument of service, is the property of the landscape architect and may not be used in any way without the written permission of T. Ito and Associates Inc. Scale: Drawn: Checked: Date: Job: Sheet: 1/8" = 1'-0" MI TI JULY 19,2011 11L13 3a of 1