INVEST ATLANTA Westside Tax Allocation District Environmental Assessment for Crosstown Inner Loop (Purple Line) Atlanta Streetcar Extension

Similar documents
// Atlanta Streetcar System Plan

MARTA & City of Atlanta Sales Tax Referendums. Public Hearings May 25 & 26, 2016 June 1 & 2, 2016

A VIBRANT RETAIL OPPORTUNITY IN THE HEART OF DOWNTOWN ATLANTA PEACHTREECENTER.COM

Tower Above DOWNTOWN ATLANTA

A VIBRANT RETAIL OPPORTUNITY IN THE HEART OF DOWNTOWN ATLANTA PEACHTREECENTER.COM

The Atlanta BeltLine. & Sustainable Development GAFM Conferance. // March 25, 2014

working together for over 100 years

The Atlanta BeltLine. Project Overview Map

SafeCare In-House Workshop Atlanta, GA

Route 2 - Ponce de Leon Ave/Druid Hills. Route 3 - Martin Luther King Jr Dr/Auburn Ave

HOTEL SITE Centennial Olympic Park

Unique Retail Opportunity in Downtown Atlanta Introductory Information Package. Revised: 8/5/13

Appendix 1: Phase I Strategies

EXPERIENCE AN ICON REBORN

OLYMPIC PARK DEVELOPMENT SITE 377 Centennial Olympic Park Drive - Atlanta, GA 30313


// LEARN // ENGAGE // VOLUNTEER // DONATE // PROJECT OVERVIEW MAP

OLYMPIC PARK DEVELOPMENT SITE 3 77 C entenn i a l O l y mp i c P a r k Dr ive - A t lan t a, G A

Wednesday, January 10 6:30-8:00 p.m. Adamsville Rec Center 3201 MLK Jr. Drive SW Atlanta, GA 30311

Call for Public Hearing August 2019 Service Changes

ORANGE COUNTY TRANSPORTATION AUTHORITY. Go Local Fixed-Guideway Program History and Project Update. PowerPoint 3

Virginia Association of Railway Patrons 2008 Annual Meeting March 1, 2008

The Atlanta Streetcar: Laying the Tracks for a Better Future

MARTA SERVICE CHANGES

Central Broward Transit (CBT) Phase 1 Public Open House January 21, 2016

Development in Atlanta

Call for Public Hearing August 2019 Service Changes

Hillsborough MPO Technical Advisory Committee. Monday, February 20, 2017

West Santa Ana Branch Transit Corridor. Community Meetings March 12, 13, 17 & 19, 2018

Establishes a fare structure for Tacoma Link light rail, to be implemented in September 2014.

Creating Sustainable Communities Through Public Transportation

Driving Directions from Emory Midtown to Places of Interest

KNOW YOU BEFORE. Complete Transportation Guide to Super Bowl LIII

CREATING CONNECTIONS IN THE CITY OF NIAGARA FALLS

TORONTO TRANSIT COMMISSION REPORT NO.

17 - Summer 2015 Atlanta Streetcar

CREATING CONNECTIONS IN DURHAM REGION

Draft for approval by TCC on 2/3, TAQC on 2/9 and ARC Board on 2/22. Regional Trail Plan. Mike Alexander, Director, Center for Livable Communities

TORONTO TRANSIT COMMISSION REPORT NO.

Atlanta, Georgia. Top 5. The Centennial Olympic Park. Martin Luther King, Jr. Na... World of Coca-Cola. The Punchline Comedy Club.

TORONTO TRANSIT COMMISSION REPORT NO.

ACI LEGAL COMMITTEE MEETING

DOWNTOWN BRT ALTERNATIVE - 19th AVE

WELCOME AND AGENDA DOWNTOWN REDMOND LINK EXTENSION

TORONTO TRANSIT COMMISSION REPORT NO.

Northwest Corridor LRT Line to Irving/DFW

Connecting Sydney Olympic Park and GPOP with Greater Sydney. Final Summary Report 29 May 2017

PLEASE READ Proposal for Sustainable Service

Why we re here: For educational purposes only

CREATING CONNECTIONS IN THE CITY OF ST. CATHARINES

Chapel Hill Transit: Short Range Transit Plan. Preferred Alternative DRAFT

Memorandum. Roger Millar, Secretary of Transportation. Date: April 5, Interstate 90 Operations and Mercer Island Mobility

LOCATED IN CINCINNATI S MOST EXCITING ENTERTAINMENT DESTINATION OVER-THE-RHINE

SCOPING INFORMATION PACKET

4 YORK REGION TRANSIT DON MILLS SUBWAY STATION ACCESS AGREEMENT

Redevelopment Site 3933 Main Street Dallas, TX FOR SALE Property Overview List Price Land Size Building Size Mark O Briant Tonia Stevens

Report by Finance Committee (B) Washington Metropolitan Area Transit Authority Board Action/Information Summary

Equitable Building 100 Peachtree Street PREPARED BY: COLEMAN MORRIS Vice President tel:

SECTION 106 ACTIVITIES ANNUAL REPORT

Building the transportation network we need for the future in Niagara Region

DEVELOPMENT OPPORTUNITY. 236 Williams Street Atlanta, Georgia 30303

Building the transportation network we need for the future in Niagara Region

SOMERVISION & Green Line Extension Open House

Approval of August 2019 Service Changes

Markham Sports, Entertainment & Cultural Centre April 20, 2012

State and national leadership selections: Congratulations are extended to the following selectees:

SECTION 106 ACTIVITIES ANNUAL REPORT

CREATING CONNECTIONS IN THE CITY OF NIAGARA FALLS PUBLIC MEETING DECEMBER 6, 2017

WHY QUARRY YARDS? A CONNECTION TO EVERYTHING. A COMMUNITY CREATED FOR THE new atlanta A PLACE TO ESTABLISH YOUR BRAND DEVELOPMENT PAGE QUARRY YARDS

CREATING CONNECTIONS IN THE TOWN OF GRIMSBY PUBLIC MEETING NOVEMBER 21, 2017

2017 TBARTA Future Regional Priority Projects Adopted by TBARTA Board, December 9, 2016

Northwest Corridor LRT Line to Irving/DFW

HYATT REGENCY ATLANTA 265 Peachtree Street, N. E. Atlanta, GA USA. T +1 (404) F +1 (404) atlantaregency.hyatt.

Capital Programs Update

Chairman and Members of the Planning and Development Committee. Edward R. Sajecki, Commissioner of Planning and Building

Creating Connections in Niagara Region

TORONTO TRANSIT COMMISSION REPORT NO.

Building the transportation network we need for the future in Niagara Region

I-70/I-71 Project Public Meeting Presented By

North Miami-Dade County Retail/Flex Space For Lease First Year Rent Starting at $11.50/SF, Gross

DEVELOPING VALLEY TOURISM ALIGNED WITH SUSTAINABILITY GOALS

7:00 p.m. General meeting called to order. Paul Conte, Chair 7:05 p.m. Introductions Reminder: All JWN members should fill out and return a sign-in

SONOMA LOCAL AGENCY FORMATION COMMISSION 111 SANTA ROSA AVENUE, SUITE 240, SANTA ROSA, CA (707)

The vision for enhanced service on Riverside between downtown and the airport is not a new concept.

EP8.2 Presentation Exhibition GO Station Improvements

Memorandum. Fund Allocation Fund Programming Policy/Legislation Plan/Study Capital Project Oversight/Delivery Budget/Finance Contract/Agreement Other:

Metrolinx Projects: Temporary Delegation for Long- Term Road Closures

DENISON STREET EXTENSION. Transportation Committee. January 14, Feasibility Study

Claremont Project Background and Update Community Meeting September 11, 2017

Exposition Corridor Transit Project Phase 2

284,557 inhabitants + 23% 60,000 vehicles during peak periods Growing need in terms of moving people public transit Saturation of the road network

Establishing a National Urban Park in the Rouge Valley

Service Recommendation Plan. June 2018

April 21, 2016 Next Stop Urban Burbs

A VISION FOR EL MIRAGE

OVERVIEW MAP // L EARN // E NGAGE // V OLUNTEER // D ONATE //

AGENDA ITEM 2 C Action Item. Transit Advisory Committee. Brian James, Planning and Marketing Manager

EXHIBIT 1. BOARD AUTHORIZATION FOR PUBLIC HEARING AND SUBSEQUENT ISSUANCE OF A JOINT DEVELOPMENT SOLICITATION

KING STREET PILOT STUDY PUBLIC MEETING

Union Station Queens Quay Transit Link Study

Transcription:

INVEST ATLANTA Westside Tax Allocation District Environmental Assessment for Crosstown Inner Loop (Purple Line) Atlanta Streetcar Extension FUNDING SOURCE: $650,000 of Westside TAD Tax Increment $365,625 from Atlanta Regional Commission (ARC) PROJECT SPONSOR/ IMPLEMENTATION AGENT: Atlanta Beltline, Inc. (ABI) LOCATION: The Crosstown Inner Loop (Purple Line) is a bi-directional, onstreet and loop operation along Fair Street, MLK, Jr. Drive, Luckie Street, Auburn Avenue, Edgewood Avenue, Irwin Street and the Atlanta BeltLine corridor serving the following key destinations: Centennial Olympic Park Downtown Georgia State University The King Center The Crosstown Inner West Streetcar Corridor is the western portion of the Crosstown corridor that runs from Centennial Olympic Park to the Atlanta BeltLine Westside Trail via MLK, Jr. Drive, Joseph E. Lowery Blvd., Fair Street and Westview Drive. The project is 2.5 miles long of which 1.59 miles, or 64%, falls within the Westside TAD. This addition to the Crosstown Inner Loop will expand service to include the following key destinations: Castleberry Hill Neighborhood Historic Ashview Heights Neighborhood Atlanta University Center Atlanta Preparatory Academy Booker T Washington High School Jones Elementary School Atlanta BeltLine Parks and Trails Council District: 3 & 4 NPU: L & M PROJECT DESCRIPTION: Atlanta BeltLine, Inc., under the direction of the City of Atlanta, has been managing the National Environmental Policy Act (NEPA) clearance for the Atlanta BeltLine East Environmental Assessment transit project, which extends from Montgomery Ferry Drive south to Glenwood Avenue through an alignment along Edgewood Avenue and/or Irwin Street. The recent adoption of the Streetcar System Plan (SSP) which identifies specific operating routes, along with the ongoing progress with the NEPA process has proved it prudent and cost effective to include the corridor west of the Downtown Streetcar,

which will allow the City to complete the NEPA process for the Purple Line route. This proposed extension would include the 2.5 mile western portion of the Crosstown corridor which runs from Centennial Olympic Park through the Atlanta University Center (AUC) to the Atlanta BeltLine Westside Trail via MLK, Jr. Drive, Joseph E. Lowery Blvd., and Westview Drive. This effort would enable ABI to clear the remainder of the Purple Line under the current NEPA effort, and would also prevent the City from incurring greater costs in clearing the rest of the Purple Line under a separate procurement process. This recommendation been discussed with FTA Region 4 and there is mutual agreement that this is a cost effective and logical approach. This effort would also ensure that both East-West crosstown alignments on the SSP are cleared and ready to be eligible for major federal funding opportunities. BACKGROUND: The Crosstown Inner West Corridor streetcar project emerged from The Atlanta Streetcar System Plan (SSP) which was approved and adopted by Atlanta City Council in December 2015. The Project includes approximately 2.5 route miles of a streetcar system that would connect to Atlanta s existing streetcar service in Downtown Atlanta. It would operate on embedded rails within the public road right-of-way, and connect to planned transit along the Atlanta BeltLine corridor s west side (site of the Westside Trail currently under construction). The Project would include the streetcar alignment, station stops, a maintenance facility, and other ancillary facilities. The Purpose and Need for the Project is to: Achieve the goals of Plan 2040 Regional Transportation Plan; Provide improved mobility, accessibility, and connectivity; and Support Atlanta s goals for economic development. The Project would serve key destinations in Atlanta s urban core, such as Centennial Olympic Park, the College Football Hall of Fame, Philips Arena, the CNN Center, the Georgia World Congress Center, Mercedes-Benz Stadium (opening 2017), the Atlanta University Center, and the Atlanta BeltLine Westside Trail. It would provide transit services within or adjacent to the West End, Westview, Ashview Heights, Just Us, College Town at West End, Vine City, and Castleberry Hill. It is also expected to result in economic development opportunities and provide an alternative travel mode for residents, employees and visitors alike. JOB CREATION: 1,800 construction jobs will be created to construct the project and 2,000 permanent jobs will be created once the system is completed.

FUNDING USES: SOURCES USE OF FUNDS AMOUNT % PROJECT COST ARC Consultants for Federal Planning/Environmental $365,625 36.0% Westside TAD Documentation Consultant Design Engineer to Support Environmental Documentation $650,000 64.0% TOTAL $1,015,625 100% PROJECT SCHEDULE: ACTIVITY Consultants resume EA work on revised scope Complete Environmental Review and New Starts Documentation DATE May 2016 December 2016

The Crosstown Inner West Streetcar Corridor (Purple Line)

Atlanta Streetcar System Routes