Northeast India (officially called North Eastern Region, NER) is the

Similar documents
INFRASTRUCTURE DEVELOPMENT IN THE NORTH-EAST

BY NHIDCL. 25 t h MAY, 2018

REGIONAL POLICY DIALOGUE ON STRENGTHENING TRANSPORT CONNECTIVITY IN SOUTHERN ASIA

Ministry of Development of North Eastern Region

TENTATIVE ITINERARY NEFIT TRADE DELEGATION TO ATTEND INVEST MYANMAR SUMMIT 2019

Adequate infrastructure facilities are a pre requisite for industrial development. The infrastructure facilities available in Assam are as follows:

Strengthening Transport Connectivity between CLMV-T and India: Opportunities and Challenges

CENTRALLY SPONSORED SCHEMES

Outline. (1) JICA and India. (2) Infrastructure Development. (3) Cross-Border Connectivity

SECTOR ASSESSMENT (SUMMARY): Transport, and Information and Communication Technology - Air Transport 1

the total length of railway lines in the country and the length out of that electrified in terms of kilometre and percentage, State-wise;

Travelling in Northeast India

Joy & Secrets of. Tribal Frontier. FEB/Mar Highlights of the trip. Destinations. An Adventure with Sudhakar Selwyn

Helicopter Connectivity in North East

THE REPUBLIC OF THE UNION OF MYANMAR

Daily Current Affairs Capsule 19 th January 2019

Tribal. Joy & Secrets of. Frontier. Mar Highlights of the trip. Destinations. An Adventure with Sudhakar Selwyn

esupersavernortheast Scheme Terms and Conditions

Tourism Marketing: With Emphasis On North East India Sunday, 18 December :27

esupersavereconomy Scheme Terms and Conditions

Development of Road Infrastructure in India

Accelerated Road Development Programme (SARDP-NE) and Border Highways under Border Area Development Programme (BADP) in Arunachal Pradesh

Strengthening Transport Connectivity through Road Corridors in Bangladesh

The winning states in each of the three award categories were as follows:

SOUTHWEST MONSOON-2008: DAILY FLOOD SITUATION REPORT

Tourism potential in Bangladesh. 26 th of march 2008

The Upcoming Opportunities of Rail Transportation Development in Southeast Asia MANAGING DIRECTOR OF PROFREIGHT GROUP

ADB s Initiatives on Promoting Transport Connectivity in South Asia

Exploring the Unexplored India: An Opportunity in Tourism Industry (With Special Reference to Eastern States in India)

Status of Integrated Transport in Bangladesh. Presented by Md. Ehsan-E-Elahi Joint Secretary Road Transport & Highways Division

URBANIZATION IN THE HILL DISTRICTS OF ASSAM

2 AGATTI Airports Authority of India, Agatti Airport Controller

SITREP NO-110/ hours 32-20/2007-NDM-I Ministry of Home Affairs (Disaster Management Division) Dated, 18 TH September, 2007

ASEAN India Ports and Shipping Networks

Tourism Potentials in Poverty Reduction in South Asia

CITY PAIR WISE DOMESTIC PASSENGER TRAFFIC STATISTICS FOR THE MONTH OF AUGUST, 2015

Rural Tourism of North East India: Prospects and Challenges

DEEPENING CONNECTIVITY & EXPANDING TRADE THROUGH INVESTMENT IN INFRASTRUCTURE & IMPROVING SYNERGY RECCA-VII AT A GLANCE

Lamu Port and New Transport Corridor Development to Southern Sudan and Ethiopia (LAPSSET).

IRAN AS THE GATEWAY TO CIS. In the name of Allah, the compassionate, the merciful

CITY PAIR WISE DOMESTIC PASSENGER TRAFFIC STATISTICS FOR THE MONTH OF JAN, 2017

PHD Aviation Summit: Indian Civil Aviation Benefit Beyond Borders. February 18 th, Presented To:

Which current trends are your best friends?

CITY PAIR WISE DOMESTIC PASSENGER TRAFFIC STATISTICS FOR THE MONTH OF MARCH, 2017

CITY PAIR WISE DOMESTIC PASSENGER TRAFFIC STATISTICS FOR THE MONTH OF SEPTEMBER, 2017 (Provisional )

SOUTHWEST MONSOON-2008: DAILY FLOOD SITUATION REPORT

VISHWAKARMA. (Online Monthly e - Journal of Construction Industry Development Council) Vol. 4 Issue XI E Journal of CIDC Nov, 2015

Economic Sustainability and expected benefits

¾Ö ÖÖÖÖ¼ÜÖ Ö ÖÖÊ ÔÜ ÒÜÃ Ü / VISAKHAPATNAM PORT TRUST {ÉÊ Ú{ÉJÉ / CIRCULAR NO. 338

IAT Annual Conference 'Driving Forward

Table-1.1 SEASONS, SOWING & HARVESTING PERIOD AND PRODUCTION. Five year Average Production ( to Harvesting Period.

Objectives of the study:

TCS-Nielsen India's Biggest IT Outsourcing Deal. Australia discovered missing submarine 103 years after World War I

Railways in India 2012

Message from Chairman, Committee on Trade with ASEAN countries

Optimizing the Benefits of Regional Tourism Cooperation

ASSAM THE LAND OF RED RIVERS AND BLUE HILLS

Hindu Kush Karakorum Pamir Landscape Initiative (HKPL)

Airindia Domestic Fares (Apex & Instant Purchase Fares) TABLE IV LTC Fares updated as on TABLE IV- LTC Fares

Tourism Circuit Development in Peripheral Destinations: Case of Tripura, India

Centre for Aviation Studies

DAINIK EXPRESS. Largest, Highest and Biggest in India. Team of DAINIK EXPRESS

International Civil Aviation Organization REVIEW OF STATE CONTINGENCY PLANNING REQUIREMENTS. (Presented by the Secretariat) SUMMARY

Nostalgic Tourism and Make in India with Special Reference to North-East India.

India - State-wise Wastelands Distribution (Percentage to total geographical area)

REAUTHORISATION OF THE ALLIANCE BETWEEN AIR NEW ZEALAND AND CATHAY PACIFIC

HLTC (Economy Class) DLTC (Executiv e Class)

SITREP NO-69/ hours 32-20/2008-NDM-I Ministry of Home Affairs (Disaster Management Division) Dated, 8 th August, 2008

Government of the Republic of the Union of Myanmar. Ministry of Construction. Public Works

ASSAM THE LAND OF RED RIVERS AND BLUE HILLS

DCB Bank Regional Nodal Officers

I. The Danube Area: an important potential for a strong Europe

TRANSPORT INFRASTRUCTURE Edition: February - April 2017

Memorandum of Understanding with ACT Government

32-20/2008-NDM-I Ministry of Home Affairs (Disaster Management Division) SOUTHWEST MONSOON-2008: DAILY FLOOD SITUATION REPORT

GOOD HeART art from the heart

Development of Ski Resorts in the Indian Himalayas

Update on the Coalition Efforts to Make the Proposed I-20 Corridor Long-Distance Passenger Rail Connection a Reality

LAND VALUE CAPTURE FOR RAILWAY STATION DEVELOPMENT. Changing perception of Railways

Road Network in India, Public Private Partnership Financing & Case Study Narendra Sharma, SE(PPP), MoRT&H

Sikkim And Bhutan: A Travellers Guide By A.N. Agarwala READ ONLINE

Shaker Ahmed, Ph.D. Professor & Chairman Dept. of Tourism and Hospitality Management University of Dhaka

COMMUNICATION THE RT. HON. PERRY G. CHRISTIE PRIME MINISTER AND MEMBER OF PARLIAMENT FOR CENTREVILLE

DESPITE GLOBAL ISSUES, TOURISM IS ON A GROWTH PATH

BY Saurabh Pandey Junior research fellow(jrf) NET, MA, B.TECH 3 Years teaching experience UPSC Faculty

Welcome HAI Delegates

Dooars Tourist attractions

CULTURE AND COMMUNITY WAY OF LIFE TRAIL BRIEF

National Biodiversity Strategy and Action Plan, India

INFRASTRUCTURE DEVELOPMENT IN TANZANIA

MICE (Meetings, Incentives, Conventions and Exhibitions)

ASSAM THE LAND OF RED RIVERS AND BLUE HILLS

TABLE IV- LTC Fares. DLTC (Executive Class) HLTC (Economy Class) S No SECTOR & V.V

Austrade Supporting Australian Rail Industry s Global Focus. Rail Sector Lead and Trade Manager, Infrastructure

SECURITIES AND EXCHANGE COMMISSION

Distinguished guests, parliamentary colleagues, ladies and gentlemen.

N4 Carrick-on-Shannon to Dromod Road Project. 2.1 Introduction

Northern Rockies District Value of Tourism Research Project December 2007

West Midlands Sustainable Urban

INDIA MYANMAR BILATERAL RELATIONS

Transcription:

SECTION - 3 ZONAL RAILWAY NFR (Const.) A Life Line In Connectivity And Infrastructure Development In North Eastern Region & Neighbouring Countries General Manager Northeast Frontier Railway (Construction) Northeast India (officially called North Eastern Region, NER) is the easternmost region of India representing both a geographic and political administrative region of India. This region comprises eight States- Arunachal Pradesh, Assam, Manipur, Meghalaya, Mizoram, Nagaland, Sikkim and Tripura. The Siliguri Corridor (popularly known as chicken neck) in West Bengal, with a width of 21 to 40 kilometres, connects the North Eastern Region with rest of India. Though the NER was a prosperous area in British India, after independence and creation of Bangladesh (then East Pakistan), all existing communication links through Bangladesh were snapped. Though new roads and railways were constructed through the Siliguri corridor, but due to this bottleneck, the overall progress of the entire Northeast region is lagging behind in the development of rail network, causing a major stumbling block in the socio economic development of the region. Keeping this in view, North East Region Vision 2020 was formulated which aims at connecting all the State capitals of Northeast region with rail network by the year 2020.Possibility of restoration of old communication links and opening of new international mouths through Bangladesh, Nepal and Myanmar are also being explored. Construction Organization of N. F. Railway was created in 1979 headed by GM/Const. and has been entrusted with the task of construction of new railway lines, gauge conversion, doubling and other major works in the eight Northeastern States including some parts of Bihar and West Bengal. Most parts of the N.E. region have difficult terrain, poor infrastructure facilities and are infested with problem of militancy. In spite of these impediments, Construction Organization is making significant contribution in the development of rail network in the Northeast region. The Northeast region shares more than 4,500 kilometres of international border with China in the north, Myanmar in the east, Bangladesh in the southwest and Bhutan to the northwest. From the strategic point of view, it is important to have better rail/road communication connecting all the NE States. National/ Other Projects For better management, control and monitoring, Railway projects which connect State capitals of Northeast region have been declared as National Projects by the Govt. of India to ensure enhanced funding for these projects. N.F. Railway Construction Organization is implementing11 National Projects in the Northeastern Region which include nine New Lines projects including one Rail-cum-Road Bogibeel Bridge Project near Dibrugarh over river Brahmaputra and two Gauge Conversion projects. Apart from these National Projects, there are 32 other projects which are at different stages of construction. A summarized position of these projects in Northeast region is as under: Shri N. K. Prasad Northeast Frontier Railway (Construction Organisation) Indian Railways 121

SECTION - 3 Zonal Railway Plan Head New Line Gauge Conversion Doubling Total Projects in progress (Nos.) 25 7 11 43 Total anticipated cost 61749 16527 11325 89601 Expenditure as on 31.3.2017 22432 14773 1407 38612 Balance as on 01.04.2017 39316 1754 9918 50989 Budget Grant for 2017-18 5304 589 672 6565 National Projects (Nos.) 9 2-11 Sanctioned Length of 1946 2471 659 5076 ongoing Projects as on 01.04.2017 (Km) Length of ongoing projects 561 2471 66 3098 commissioned as on 1.4.2017 (Km) Balance length of ongoing projects as on 1.4.2017 (Km) 1385 0 593 1978 Construction Organization has so far constructed two major bridges over mighty river Brahmaputra, has converted all existing MG lines into Broad Gauge which includes Lumding Silchar, Arunachal Jiribam & Badarpur Kumarghat (421 Km), Rangiya Murkongselek including finger line of Balipara Bhalukpong (505 Km), Jogbani Katihar Barsoi Radhikapur and Katihar Teznarayanpur(236.14 Km), New Jalpaiguri Siliguri New Bongaigaon including branch lines (419.17 km), Katakhal Bairabi (84 Km). Construction Organisation hasalso constructed new BG railway lines to connect Itanagar, capital of Arunachal Pradesh and Agartala, capital of Tripura. For the current year 2017-18, NF Railway Construction organizationhas fixed a target of commissioning of 148.92 Km of BG network out of which total New Line of 88.71 Km and Doubling of 60.21 Km have so far been completed. Balance lengths are nearing completion. In last four years and in current year, 1422.57 Km BG line have been commissioned by running of passenger train services. Year-wise commissioning of track is given in table below : Year NL GC DL Total 2011-12 58.92 100.58 9.76 169.26 2012-13 0.00 0.00 0.00 0.00 2013-14 0.00 154.66 0.00 154.66 2014-15 41.75 172 10.30 224.05 2015-16 132.05 398.47 8.12 538.64 2016-17 172.00 291.40 17.62 481.02 In addition to above, record number of tunnels (71.65 Km out of 177.30 Km) Km and large number of major bridges are also constructed in last four and half years. Longest rail cum road bridge at Bogibeel across River Brahmaputra (5 Km) and bridge with tallest pier (141m) at Noney in Manipur as part of Jiribam-Imphal Project are under construction. Several other tall pier bridges are under different stages of construction in Jiribam-Imphal (Manipur) and Bairabhi-Sairang (Mizoram) New Line Projects. State-wise details of various ongoing projects are furnished below: Arunachal Pradesh New BG line was commissioned from Harmuti in Assam to Naharlagun (Itanagar) on 07.04.2014. With the commencement of train services up to Naharlagun, Itanagar became the second state capital in North East after Guwahati (Assam) to figure on the BG map of Indian Railways after country s independence. At present another new line project from Murkongselek to Pasighat (26.15 Km) is planned to be taken up in Arunachal Pradesh. (left) Naharlagun Railway Station, 1 st Passenger train at Naharlagun Station (Itanagar) (right) Three strategic surveys in State of Arunachal Pradesh viz. i) Pasighat Tezu -Parsuramkund Rupai (227.00 Km), ii) Misamari (Bhalukpong) Tenga-Twang (378.00 Km) and iii) North Lakhimpur Bame (Along) Silapathar (249.00 Km) are also in progress. Once the surveys are completed, these works are likely to be sanctioned in near future. Assam Guwahati, the capital of Assam was connected by metre gauge railway line well before Independence. The capital was provided with broad gauge rail connectivity after completion of New BG extension from New Bongaigaon to Guwahati in 1984. Subsequently, several important projects were taken up in the State of Assam. A mega road bridge Kaliabhomora Bridge over river Brahmaputra near Tezpur was constructed in 1988 by Construction Organization. A new BG railway line connecting Jogighopa to Kamakhya via south bank (144.54 Km) with construction of a road cum rail bridge over river Brahmaputra at Jogighopa was completed in 2000 to reduce traffic congestion on the New Bongaigaon Rangiya Kamakhya section (including Saraighat 122 Indian Railways

bridge near Guwahati). Several railway projects were undertaken to provide rail links to neighboring States. Thus, railway line from Balipara to Bhalukpong in Arunachal Pradesh (35.46 Km MG line), Lalabazar to Bhairabi in Mizoram (48.15 Km MG Line), Arunachal station to Jiribam in Manipur (49.16 Km MG line) and Amguri to Tuli in Nagaland (14.65 Km BG line) were completed during early 1990s. At present the Gauge Conversion project of Lumding Badarpur Silchar, Arunachal Jiribam, Badarpur Kumarghat, Baraigram Dullavcherra, Karimganj Maishashan Karimganj Bye-pass (Total-420.90 Km), Katakhal Bairabhi (84.00 Km), Rangiya Balipara Harmuti Murkongselek with finger lines Balipara Bhalukpong and Rangapara North Dekargaon (Total 505 Km)has been completed and commissioned for passenger services.thus, the entire MG network has been converted to BG network. The Karimganj Maishashan link will be a part of Trans-Asian Rail Network through Bangladesh. Work is also near completion stage at 5 Km long, 3 rd Mega Rail-cum-Road Bridge at Bogibeel on mighty river Brahmaputra near Dibrugarh. All the 41 girders have been launchedand road deck slab concreting is in progress. The north bank road approach is already completed and south bank approach is in progress under PWD, Assam. It is expected to commission all works of the bridge in 2018. A new rail bridge over river Brahmaputra near Tezpur as a part of the newly proposed Tezpur Silghat New line and another rail bridge at Saraighat near Guwahati and parallel to existing single line Rail cum Road Bridgeare on the anvil. New line connecting Sivasagar Jorhat and Salona Khumtai are proposed and preparation of DPR and detailed estimate are in progress. To remove the communication bottleneck, the single line BG section from New Jalpaiguri to Lumding is under conversion to Double Line BG section. With completion of this doubling work, the line capacity of the section will improve. From New Bongaigaon to Guwahati, the doubling work is in progress via Goalpara Town (South bank. The proposed 2 nd bridge over Brahmaputra at Saraighat will help conversion of the section from New Bongaigaon to Kamakhya via Rangiya. Completion of the doubling works will help to SECTION - 3 Zonal Railway increase the track capacity in the busy and over saturated section from New Jalpaiguri to Lumding. Meghalaya In the state of Meghalaya, the first ever railway link started with rest of the country after commissioning of Dudhnoi-Mendipathar new BG line by flagging off of the first passenger train from Mendipathar station on 29.11.2014 by Hon ble Prime Minister. Other new line projects for Meghalaya are Tetelia (Assam) to Byrnihat (Meghalaya) (21.5 Km) Phase-I and Byrnihat to Shillong (108 Km in Meghalaya) Phase-II which are in progress. Mendipathar Station Building Manipur In Manipur, a new line of 111 Km from Jiribam to Imphal, the capital of Manipur has been taken up from both ends to expedite the work. The entire project is expected to be commissioned by December, 2020. As a part of this project, a marvelous bridge is under construction near Noney. The Railway Bridge (No.164) will be the bridge with world s tallest pier of 141 meter height surpassing the existing tallest pier of 139 meter of Malarijeka bridge in Montenegro, Europe. Survey work for extension of the above line up to Moreh is completed. Morehin India is a border town with Myanmar. The Jiribam-Imphal-Moreh-Kalay (Myanmar) is a part of the proposed Trans Asia Railway Network. Bogibeel Bridge near Dibrugarh Indian Railways 123 Bridge No. 44 Work in progress, Jiribam - Imphal project

SECTION - 3 Zonal Railway Tripura The existing MG line from Churaibari to Kumarghat has been converted to BG. New railway line from Kumarghat to Agartala has been completed in two stages- first as MG in 2006 and then converted to BG in 2015. To expand the railway network further in the state, the work of construction of new BG line from Agartala to Sabroom (112 Km) is going on in full swing. Commissioning of Phase-I work from Agartala to Udaipur (44 Km) and Phase II Udaipur Garjee (9.20 Km) have been completed so far.this line has the potential of extension to Chittagong Port in Bangladesh. When connected, Tripura will be a gateway to entire NE regions. Another new line connecting Agartala with Akhaura in Bangaldeshis in progress to link Indian Railways with Bangladesh Railways. This line will be a part of the Trans Asian Railway Network and will provide a much shorter connectivity from Tripura to Kolkata and vis-à-vis to Southern India. Once, this line is commissioned, people of NE region can move to Kolkata and other southern parts of India through Bangladesh. It will drastically reduce the travel distance and time. At present, Railway distance between Agartala and Kolkata on Indian Network is 1613 Km. The same distance through Bangladesh will be 514 Km only. This Indo-Bangla Rail Network will connect Agartala (India) with Chittagong Port of Banladesh which shall be at a distance of only 213 km. First Commercial Freight Train run on 21.02.2015 to Mizoram Nagaland To connect Kohima, the capital of Nagaland, Dhansiri- Sukhobi-Zubza covering a distance of 92 Km is in progress. The Project was declared as a National Project in 2007. Land acquisition is completed between Km2.75 to Km 16.00 and construction works have started. Land acquisition for the balance length is in progress. Another project of construction of a new line from Dimapur to Tizit (257 Km) has also been sanctioned in the budget 2013-14. Final Location Survey for this project is in progress. Agartala Railway Station (Tripura) Udaipur Railway Station (Tripura) Mizoram In the State of Mizoram, work of new line from Bhairabi to Sairang (51.38 Km) is in progress and is targeted to be commissioned by December 2020.A survey for a new line from Aizawl to Hbichhuah is already completed. Sikkim Sikkim is yet to be connected with Indian Railway network. A new line from Sivok in West Bengal to Rangpo in Sikkim (44.39 Km) is presently under construction. Detailed estimates for ` 3380.58 Cr has been sanctioned by Railway Board on 02.12.2015. The project has been entrusted to M/s. IRCON for execution. MoU has been signed. Land acquisition in West Bengal is slow due to forest clearance. Work has started in Sikkim portion. Rail Connectivity with Neighbouring Countries (Nepal, Bhutan and Bangladesh) To provide rail connectivity to the neighbouring countries like Nepal, Bhutan and Bangladesh, the Construction Organization has under taken many survey works for new railway lines to these countries. These are : Connectivity with Bangladesh Agartala (India) Akhaura (Bangladesh) As stated above the works have already started. Radhikapur (India) Birol (Bangladesh) The old 124 Indian Railways

connectivity before independence was restored in 2016. Haldibari (India) Chilahati (Bangladesh) Proposal for restoration of old connectivity with Bangladesh through this section is approved and works in Indian portion has already started with target date of completion as March 2018. Belonia (India) Feni (Bangladesh) - Survey to connect Belonia Station (India) on Agartala-Sabroom New BG line under construction with Feni (Bangladesh) has been sanctioned. The survey is yet to be carried out as MoU between Indian and Bangladesh Government for this work is yet to be executed. This line can provide port connectivity to Indian railway network and boost trade. Connectivity with Bhutan At present there is no rail linkwith Bhutan. Feasibility studies have been carried out for extending Rail head (India) to Bhutan at 5 locations. These are as under : Kokrajhar (Assam, India) to Gelephu (Bhutan) (57.70 Km) Pathsala (Assam, Indi) to Nanglam(Bhutan)(51.15 Km) Rangiya (Assam, India) to Samdrupjongkhar(Bhutan)(48.04 Km) Banarhat (West Bengal, India) to Samtse(Bhutan) (23.15 km) Hasimara(West Bengal, India) to Phuentsholing(Bhutan) (17.52 Km) Connectivity with Nepal At present there is no Rail linkwith Nepal. One BG connectivity work between Jogbani (India) and Biratnagar (Nepal) (18.60 Km) has already been sanctioned. The work in Indian portion is being executed by IRCON. The work is in progress. The tentative target for completion is March 19 subject to availability of land in Nepal. Survey for another connectivity between New Jalpairuri(Naksalbari)(India) and Kakrabita(Nepal) has also been completed. The work is not yet sanctioned. Raxaul(India) can also be connected up to Kathmandu(Nepal)(90 Km). Connectivity with Myanmar Imphal to Moreh (India) (123 Km) survey has been completed. Moreh to Tamu to Kalay (Myanmar_ survey has been completed by RITES. Agartala-Darlawn (Mizoram, India) to Kalay (Myanmar) (257 Km) can be proposed for survey and execution of works. Sairang (India) to Hbichhuah (India - Myanmar border) (325 Km) survey completed. This line can be further extended up to Koladyne river/sitwe port in Myanmar via Paletowa. Thus, a port connectivity at this easternmost part of the country can be achieved through this rail link. Connectivity with Trans Asian Railway Network (TARN) Mountainous northeast India can be connected to the railway network of neighbouring Myanmar to link Indian Railways 125 SECTION - 3 Zonal Railway up with the ambitious 81,000 km-long Trans-Asian Railway Network (TARN) through Imphal Moreh Tamu - Kalay. For the development of Northeast India s economy, trade, tourism and people-to- people contacts between the region and Southeast Asian countries, the TARN can play a vital role. Challenges during Execution of Works in Northeast Region The North Eastern region has always been very sensitive from the point of security. During execution of railway projects in Northeast region, Railways have been facing many challenges namely security, limited working season, non-availability of sophisticated machineries, parts, operators & service centers, frequent bandhs, non-availability of resourceful contractors, poor road & other infrastructure, poor medical facilities. Further, people in the north eastern hilly States are comprising of small ethnic tribal groups with their own unique culture and languages. These people of the hilly states are reluctant to welcome railways in their States due to apprehension that with advance of railways to their States, they may weaken their identity. Due to above reasons, the progress of works getsoften affected. Militant activities are hampering progress of works in different parts of Northeastern region as more & more insurgent groups existing in different parts are creating hurdles by threatening/abducting/killing railway and contractors supervisors and staff.the role of security forces who are tirelessly providing security to Railway staff, property and construction sites is also appreciated. Despite these problems, the morale of the officers, staff and contractors has been quite high. Significant progress could be achieved because of their sincerity along with cooperation extended by the State Government authorities. There is a need to synergize the efforts by all concerned to expedite these projects for speedy development of Northeast region to meet with the aspirations of the people of the region and to erase the feelings of alienation from rest of the country. Railway can bring overall development of this region which will ultimately bring peace and prosperity to the people of this region.