UPGRADING OF NAIROBI URBAN ROAD NETWORK

Similar documents
DECONGESTION OF ROADS IN NAIROBI

UHDA NEWS. Welcome Note. In This Issue

KENYA S NEWEST COMMUNITY.

APPENDIX 15 EXPECTED ENVIRONMENTAL IMPACTS OF THE MASTER PLAN

GAMA 2020 PUBLIC TRANSPORT VISION

Major Scheme Business Case Summary Report for Programme Entry

Business Case Approved. Under Construction. Business Case Approved. Under Construction

Oxfordshire Local Enterprise Partnership

ICN Gateway Breakfast (SA) Jon Whelan A/Manager Project Delivery 9 July 2015

Projects overview 2018

Jim O Sullivan Chief Executive

A63 Castle Street, Hull HullBID Network Lunch 24 August 2017

1 PROJECT STATUS UPDATE 2 ND CONCESSION FROM BRISTOL ROAD TO DOANE ROAD TOWNS OF EAST GWILLIMBURY AND NEWMARKET

Public Transport for Perth in 2031

Inside Government Conference Case Study: Norwich Northern Distributor Road

A303. Sparkford to Ilchester Dualling Scheme. Public consultation. Welcome. Highways England -- creative MCR18_0016

IAT Annual Conference 'Driving Forward

TENDER NO: KCAA/038/ EXPRESION OF INTEREST (EOI)

IRISH PARKING ASSOCIATION. The use of Pay and Display in Traffic Management in Kilkenny City

The implementation of this Master Plan will be undertaken in logical stages to meet passenger and workforce demands.

To: From: Plans showing the alignments of the routes discussed in this section are presented in Appendix A.

Sino-European Sustainable Urbanisation Park (SUP)

As part of our transport vision, Leeds City Council, working with the West Yorkshire Combined Authority and Leeds Bradford Airport Company, is

N4 Carrick-on-Shannon to Dromod Road Project. 2.1 Introduction

PLANNING THE SUNBURY GROWTH CORRIDOR

Proposal to Redevelop Lower Kananaskis River-Barrier Lake. Bow Valley Provincial Park

LYNDHURST NEW URBAN DEVELOPMENT AREA STRUCTURE PLAN. Lyndhurst New Urban Development Area Structure Plan OUTCOMES AND PERFORMANCE STANDARDS

A140 study and Major Road Network

1 SUBWAY EXTENSION TO VAUGHAN CORPORATE CENTRE - OPERATING AGREEMENT UPDATE

Next Generation Cycleway Design. Improving connectivity and cycling behaviours through design

CREATING CONNECTIONS IN THE TOWN OF GRIMSBY PUBLIC MEETING NOVEMBER 21, 2017

WELLINGTON $422 MILLION $614 MILLION $83 MILLION 22% SPEND $1.9 BILLION

ALL ABOARD LABOR S LONG TERM PASSENGER TRANSPORT STRATEGY

SYDNEY S SECOND AIRPORT

CREATING CONNECTIONS IN THE CITY OF NIAGARA FALLS PUBLIC MEETING DECEMBER 6, 2017

NAIOP. Marcia McAllister Metropolitan Washington Airports Authority

An Overview of Transport Sector Infrastructural programmes and Projects in Zambia

Glen Innes Strategic Plan

Construction Staging Adelaide Street West

Kilkenny Borough Council. Heavy Commercial Vehicles Route Management April 2014

THE WELSH MINISTERS STATEMENT OF REASONS

MELBOURNE METRO RAIL PROJECT EXPANDING MELBOURNE S UNDERGROUND RAIL NETWORK UPDATE FOR RESIDENTS OF THE DOMAIN PRECINCT APRIL 2016

Co-ordinated and Orderly Growth A Suite of Infrastructure and Public Assets for the Future... 1

South Australia Transport Infrastructure Summit Adelaide May 2009

Proposal to Redevelop Lower Kananaskis River-Barrier Lake. Bow Valley Provincial Park. Frequently Asked Questions

South East Traffic Solution

Progress Report on the Gautrain Rapid Rail Link Portfolio Committee on Transport

2010 FIFA WORLD CUP HOST CITY: CAPE TOWN

Hamilton City Council Transport Strategy

THE CHARTERED INSTITUTION OF HIGHWAYS & TRANSPORTATION. The A19 Trunk Road

Industry briefing NOVEMBER 2017

CHINGOLA-SOLWEZI-JIMBE RAILWAY LINE

Launceston and Tamar Valley Traffic Vision

Submission to Infrastructure Victoria s Draft 30-Year Infrastructure Strategy

We further recognise that some pain and changes are required from the entire City in order to construct and deliver the project.

Safe, Timely & Comfortable Move for Better Future ~Japan-India Cooperation on Railway Sector ~

BUSINESS OPPORTUNITIES IN TANZANIA

African Initiative for Combating Desertification to Strengthen Resilience to Climate Change in the Sahel and Horn of Africa

ASHGABAT, TURKMENISTAN

The Coalition s Policy

A Master Plan is one of the most important documents that can be prepared by an Airport.

15.0 TRAFFIC AND TRANSPORTATION

JOINT CORE STRATEGY FOR BROADLAND, NORWICH AND SOUTH NORFOLK EXAMINATION MATTER 3C EASTON/COSTESSEY

South of England north-south connectivity

BACKCOUNTRY TRAIL FLOOD REHABILITATION PROGRAM

Building the transportation network we need for the future in Niagara Region

1. Summary of key points 2

FUTURE TRANSPORT STRATEGY AND GREATER SYDNEY SERVICES AND INFRASTRUCTURE PLAN. Western Parkland City

N11 Arklow / Rathnew & N7 Newlands Cross PPP Contract. Kieran Kelly

Roundhouse Way Transport Interchange (Part of NATS City Centre Package)

CREATING CONNECTIONS IN THE CITY OF NIAGARA FALLS

PPP Projects. Ministry of Finance. PPP Central Unit

PART VIII APPLICATION FOR REVISED SOUTH SIDE TRAFFIC MANAGEMENT WORKS TO FACILITATE LUAS BXD PLANNING REPORT ROADS & TRAFFIC DEPARTMENT

5 Rail demand in Western Sydney

SERENJE NAKONDE ROAD PROJECT PROJECT

Opportunity for up to 2 million sq ft for Offices, Research & Development, Warehousing, Production and sustainable uses

IMPACT HOMES Introducing The Meadows Estate 3

AUCKLAND $1.2 BILLION $1.9 BILLION $149 MILLION 15% SPEND $5.7 BILLION

D L R C C T R A F F I C N E W S

RW Bruhn Bridge and Approaches Project

PCAL Case Study Retail Areas: Rouse Hill Town Centre

TRANSPORT UPDATE. September/October 2018

South of Fraser Transportation Priorities March 2017 Engagement

Hospitality Market Snapshot Nairobi & Its Suburbs. June 2016

A30 Chiverton to Carland Cross Improvement Scheme Preferred route announcement

Road Traffic Implications of a second runway at Gatwick Airport. Gatwick in perspective I. Prepared by a Senior Highway Engineer NUMBER 8

$244 $45 OVERVIEW National Land Transport Programme Bay of Plenty BAY OF PLENTY REGIONAL SUMMARY

INFRASTRUCTURE DEVELOPMENT IN TANZANIA

Part 005 Implementation Strategy _

Ex-Ante Evaluation (for Japanese ODA Loan)

Blackburn Road Blackburn Level Crossing Removal. Frequently Asked Questions August 2014 GENERAL

DETAILED DESIGN (Business Case Approved) OUTLINE DESIGN (Business Case Approved) FEASIBILITY (Business Case Approved - Scheme deferred until 2017/18)

Creating Connections in Niagara Region

7 TOWN OF BRADFORD WEST GWILLIMBURY OPA 15 INFORMATION REPORT ON THE BRADFORD BYPASS

Townsville Portlandia 2020

Camborne, Pool, Redruth East West link road key messages. An overview of the project proposals

Community Noise Consortium Meeting (CNC)

Building the transportation network we need for the future in Niagara Region

2018 Airport Master Plan Overview of Development Concepts. Greg Ballentine (WSP)

The Facts about Australia s outer suburbs

Transcription:

1 UPGRADING OF NAIROBI URBAN ROAD NETWORK Presented by: Eng. S. M. Kinoti Ag. DG -KURA Meeting at NAIROBI CLUB ON 8 TH FEBRUARY, 2017

2 OUTLINE 1.INTRODUCTION 2.NAIROBI PLANS (ROADS COMPONENT) 3.UPPERHILL PROJECT HIGHLIGHTS 4.CHALLENGES 5.EXPECTATIONS 6.Q AND A

3 INTRODUCTION KURA is a State Corporation under the Ministry of Transport, Infrastructure, Housing and Urban Development mandated to manage, develop, rehabilitate and maintain all national urban trunk roads.

4 INTRODUCTION Vision To be a global leader in the provision and management of urban roads network Mission To professionally provide quality, safe and adequate urban road network that satisfies stakeholder needs

5 URBAN TRANSPORT SITUATION IN NAIROBI Since inception 7 years ago KURA has been able to upgrade, construct and maintain over 12,000km of roads in the country most of them in Nairobi City County. Nairobi population is over 4m and the day s population is about 7m (Includes people from the nearby towns e.g Kajiado, Machakos, Kiambu) This leads to: - 1. Heavy traffic flows during peak hours 2. Traffic management demands outstripping the resources 3. Inadequate infrastructure facilities

6 MEASURES BEING TAKEN BY KURA TO ADDRESS TRAFFIC CONGESTION IN NAIROBI Nairobi Urban Transport Master Plan 2006 and the Nairobi Integrated Urban Development Plan (NIUPLAN), 2014 were developed through funding from Japan International Cooperation Agency ( JICA) KURA is implementing the road infrastructure components of these Plans Some of the completed projects under these master plans include: 1. Dualling of Langata Road from Kenya Wildlife Service to Bomas of Kenya 2. Improvement of Eastleigh Roads Phase 1 3. Improvement of Upperhill Roads Phase 1 4. Construction of Northern Bypass 5. Construction of Eastern Bypass 6. Construction of Nairobi Western Ring Roads

7 MAP OF ROADS PROJECTS WITHIN NAIROBI

8 MAP FOR NAIROBI MISSING LINKS

9 ON-GOING PROJECTS: 1. Construction of Eastern Missing Link Roads and Non-Motorized Transport Facilities (NMT) in Nairobi Kenya 2. Nairobi Outer Ring Road (C59) Improvement Project 3. Dualling of Ngong road(phase 1) from Kenya National Library Services to Junction Ring Road Kilimani 4. Construction of Waiyaki Way Red Hill Project 5. Upgrading of Industrial Area Roads Phase 1

9 ON-GOING PROJECTS CONT D.. 6. Construction of Baraka link Road (Kangundo Rd Komarock Road) 7. Upgrading of Lenana Muchugia Dagoreti Link Rd 8. Improvement of Eastleigh Roads Phase 11 9. Piloting of Intelligent Transportation System(ITS) on Western Ring Roads 10.Upgrading of Upperhill Mabagathi Link Rd 11.Rehabilitation and Upgrading of Upper Hill Rds Phase 11

10 UP-COMING PROJECTS: 1. Ngong Road Phase 2 (Prestige Dagoreti Corner) JICA 2. Ngong Rd Phase 3 (Dagoreti Corner Karen Roundabout) - GoK 3. Upgrading of Industrial Area Roads Phase 2 4. Design and construction of Missing Links in Nairobi Eastern Region 5. Design and construction of Upperhill Overpasses and Missing Links in Nairobi Western Region 6. Design for implementation of Intelligent Transportation System on various junctions within Nairobi CBD

11 ELEVATED SECTION ON OUTERING RD

12 WAIYAKI WAY RED HILL STRUCTURES

13 EXPANSION OF NGONG ROAD PHASE 1

14 LIKONI/ENTERPRISE RD INTERCHANGE

15 UPGRADING OF UPPERHILL ROADS PHASE II AND UPPERHILL MBAGATHI LINK ROAD

16 INTRODUCTION Under Vision 2030, Upperhill is designed to be the Regional Financial hub (East, Central and the horn of Africa). Eastleigh and City Centre are designed to be commercial hubs of the city KONZA is the Technocity. KURA is fulfilling the dream of Vision 2030 and we are all witnessing this transformation today.

18

TOTAL 14.2 18 Road Name UPPERHILL PROJECT ROADS Length (KM) Existing Rd width Upper Hill Road 1.0 18 21.6 Lower Hill Road 1.4 30 21.6 Masaba Road 1.3 18 21.6 Matumbato Road 1.0 18 21.6 Chyulu Road 0.5 9-12 21.6 Menengai Road 0.4 18-30 21.6 Mara Road 0.4 18-30 21.6 Link Road between Chyulu and Mara Road 0.5 9-12 21.6 Upperhill Mbagathi Link Road 2.1 30 21.6 Mawenzi Road 0.6 15-18 12 Improvement of roads within KNH and Mbagathi Way 5.0 12-18 12 Design Rd Width

19 REHABILITATION AND UPGRADING OF UPPER HILL ROADS (PHASE 11) Project Title Rehabilitation and Upgrading of Upper Hill Roads (Phase 11) Financier Employer Engineer Contractor Contract Sum Government of Kenya Director General, Kenya Urban Roads Authority (KURA) General Manager (Design and Construction), KURA Tosha Holdings Ltd 2.25 Billion Date of Award 19 th September, 2016 Commencement date 6 th December, 2016 Contract period 24 months Date of completion 7 th December, 2018 Period of time elapsed 2 months

20 Project Title Financier Employer Engineer Contractor CONSTRUCTION OF UPPER HILL - MBAGATHI LINK ROADS Construction Of Upper Hill -Mbagathi Link Roads Government of Kenya Director General, Kenya Urban Roads Authority (KURA) General Manager (Design and Construction), KURA INTERWAYS WORKS LTD Contract Sum 1.25 Billion Date of Award 19 th September, 2016 Commencement date 6 th December, 2016 Contract period 18 months Date of completion 7 th June, 2018 Period of time elapsed 2 months

21 EXTENT OF CONTRACT Construction of the roads to dual carriageways Construction of walkways and cycle lanes Construction of drainage structures. Protection works including stone pitching and gabions as necessary Installation of road furniture and road markings Relocation of services Rehabilitation of roads within KNH and Mawensi Road Construction of a footbridge over Mbagathi way

22 UPPERHILL PHASE 2

23 PROJECT MAP

24 TYPICAL CROSSECTION

25 UPPER HILL MBAGATHI LINK RD

26 UPPER HILL MBAGATHI LINK RD

27 CHALLENGES Service relocation i.e Sewer and water lines, Power lines and Data cables. Unavailability of adequate space for roads expansion Unknown details of land already surrendered Access to land for areas not surrendered

28 EXPECTATIONS Property owners who have surrendered for expansion of the Road corridor to avail the details of surrender. Property owners who have not surrendered to do as per Structure plan. Cooperation from all the stakeholders during construction period

29