Providing the Context Air Navigation Integrated Work Programme

Similar documents
ICAO GANP Requirements and Evolution

International Civil Aviation Organization. ICAO Updates. 13 th COSCAP-NA Steering Committee Meeting

REMOTELY PILOTED AIRCRAFT SYSTEMS SYMPOSIUM March RPAS Panel. Leslie Cary, RPAS Programme Manager, ICAO Randy Willis, RPAS Panel Chairman

TWELFTH AIR NAVIGATION CONFERENCE

ACI World Safety Seminar Beijing November 2008 AN OVERVIEW OF ICAO SAFETY PROGRAMMES

TWELFTH AIR NAVIGATION CONFERENCE DRAFT REPORT OF THE COMMITTEE ON AGENDA ITEM 4

Regional Annex 19 Safety Management

ICAO provisions on data link implementation

TWELFTH AIR NAVIGATION CONFERENCE

ICAO Initiatives on Global Tracking

From AIS to AIM. COMSOFT AIS to AIM Lima, Peru Context and Overview Isabel Zambrano Rodriguez

AN-Conf/12-WP/162 TWELFTH THE CONFERENCE. The attached report

GANP 2019/ASBUs. Olga de Frutos. Marrakesh/10 th December Technical Officer Air Navigation

ICAO EXPERT GROUPS PROPOSAL

The Importance of AIM and the Operational Concept

ICAO Universal Security Audit Programme (USAP) ICAO Regional Aviation Security Audit Seminar

Participant Presentations (Topics of Interest to the Meeting) GASP SAFETY PERFORMANCE INDICATORS. (Presented by the Secretariat) EXECUTIVE SUMMARY

What is safety oversight?

TWELFTH AIR NAVIGATION CONFERENCE

MANAGING THE CHANGES AS A STATE CASE STUDY UAE Airspace Restructuring Project

ICAO. Here is how the ICAO legal framework for drones is developed.

International Civil Aviation Organization SECRETARIAT ADMINISTRATIVE INSTRUCTIONS ON THE IMPLEMENTATION OF THE ICAO CIVIL AVIATION TRAINING POLICY

Work Programme of ICAO Panels and Study Groups

RMT.0464 ATS Requirements The NPA

Safety Management 1st edition

AERONAUTICAL INFORMATION DIGITAL DATBASES INTERGATION AND QUALITY MANAGED MIGRATION

AMOs approval and global recognition Status update

AIRPORT PLANNING. Joseph K CHEONG. Lima, September 2018

30 SEP - 02 OCT, 2014

Global Air Navigation Planning

MID-SST/3-PPT/5 USOAP CMA UPDATE

MID Region AIM SG/2. AIS-AIM Study Group 31 August Paul Bosman - EUROCONTROL Chair ICAO AIS-AIMSG

WORLD INTERNATIONAL CIVIL AVIATION ORGANIZATION 18/7/14 REPORT ON. Fifteenth Session. the

Aviation System Block Upgrades (ASBU), Blocks 0 and 1

2018 Annex Amendments

MIDAD Project IDS Vision

Aerodrome Safety. H.V. SUDARSHAN International Civil Aviation Organization

Introduction to Amendment 40 to Annex 15

TWELFTH AIR NAVIGATION CONFERENCE

Elie El Khoury ICAO Regional Officer ATM/SAR Middle East Office Cairo/

AIXM/WXXM CONFERENCE 2010

1. Passenger Locator Form 2. Universal Safety Oversight Audit Programme

EUROPEAN COMMISSION DIRECTORATE-GENERAL FOR MOBILITY AND TRANSPORT

WORKSHOP 1 ICAO RPAS Panel Working Group 1 Airworthiness

FINAL REPORT OF THE USOAP CMA AUDIT OF THE CIVIL AVIATION SYSTEM OF THE KINGDOM OF NORWAY

ICAO Annex 14 Standards and Aerodrome Certification

ICAO LPRs from 1996 to now. Nicole Barrette. Kuwait, 9 November Technical Specialist (Licensing and Training Standards)

Remotely Piloted Aircraft Systems (RPAS)

ATFM/CDM ICAO s Perspective

Amendment 37,38 to Annex 15 Amendment 57 to Annex 4

NPF/SIP/2011 NPF/SIP/2011--WP/20 WP/20

TWELFTH AIR NAVIGATION CONFERENCE

TWELFTH AIR NAVIGATION CONFERENCE

Evidence Based Training from a Regulator s Perspective

INTERNATIONAL CIVIL AVIATION ORGANISATION (ICAO) WORSHOP ON ASBU. (Dakar, SENEGAL, September 2017) STATUS OF IMPLEMENTATION OF ICAO ASBU

SRC POSITION PAPER. Edition March 2011 Released Issue

Implementation Planning and Support Section (Safety)

NORTH ATLANTIC VISION

TWELFTH AIR NAVIGATION CONFERENCE

THE GLOBAL PERSPECTIVE ON GASP/GANP/GASOS

TWELFTH AIR NAVIGATION CONFERENCE

From AIS to AIM. Paul Bosman, Head of Aviation Cooperation and Strategies, EUROCONTROL

ICAO Universal Safety

ICAO Provisions: Obligations for Certification Annex 6 Document 8335

1.0 PURPOSE 2.0 REFERENCES 3.0 BACKGROUND

1. Prerequisites may be amended depending on the experience of trainee.

Aerodrome Certification Applicable provisions

Packaging Tomorrow s Aviation System

WORKING PAPER IVATF/2-WP/21 10/6/11. International UPDATEDD ASH RELATED SUMMARY. At the 1.1. to 30. first meeting. Coordination Group to. (e.g. 1.

Terms of Reference for a rulemaking task. Requirements for Air Traffic Services (ATS)

Availability and Competence of Technical and Inspection Personnel in Civil Aviation Administrations

CRITICAL IMPLEMENTATION REQUIREMENTS FOR PBN, AIM QMS, MET QMS AND AERODROME CERTIFICATION. (Presented by the Secretariat)

Nancy Graham Director, Air Navigation Bureau, ICAO

Aeronautical Information Management

Implementation of the Performance-Based Air Navigation Systems for the CAR Region ICAO Regional TC Project RLA/09/801 Agenda Item 6 WP/14

Russian Federation ATM modernization program

ICAO EUR Region Performance Framework

The Legal Framework for RPAS/UAS Suitability of the Chicago Convention and its Annexes

AFI Plan Aerodromes Certification Project Workshop for ESAF Region (Nairobi, Kenya, August 2016)

Information Management towards SWIM

COMMISSION OF THE EUROPEAN COMMUNITIES. Draft. COMMISSION REGULATION (EU) No /2010

Technical Cooperation Bureau

INTERNATIONAL CIVIL AVIATION ORGANIZATION

FASI(N) IoM/Antrim Systemisation Airspace Change Decision

Overview of the Aviation System Block Upgrades (ASBUs) Concept and PBN

A NO COUNTRY LEFT BEHIND Initiative:

Universal Safety Oversight Audit Programme Protocol Questions, Continuous Monitoring Approach (CMA)

WORLDWIDE SYMPOSIUM ON ENABLING THE NET-CENTRIC INFORMATION ENVIRONMENT:

CAR/SAM ELECTRONIC AIR NAVIGATION PLAN (eanp) (Presented by the Secretariat) EXECUTIVE SUMMARY

Ref.: AN 4/ /27 15 April 2015

TANZANIA CIVIL AVIATION AUTHORITY AIR NAVIGATION SERVICES INSPECTORATE. Title: CONSTRUCTION OF VISUAL AND INSTRUMENT FLIGHT PROCEDURES

COMMISSION IMPLEMENTING REGULATION (EU)

Central American Agency for Aviation Safety

International Civil Aviation Organization. (Presented by the Secretariat) Adopted and approved amendments to ICAO Annexes and PANS

TWELFTH AIR NAVIGATION CONFERENCE

RMT.0464 ATS Requirements

ATFM Implementation Thailand and Southeast Asia. 55 th DGCA Conference October 2018 Nadi, Fiji

Development of the Global AIM Strategy (AIM Projects)

ICAO ASBU Implementation/ Surveillance and ATS Automation

ICAO updates. ICAO European and North Atlantic Office. 12 September 2013 Page 1

Transcription:

Providing the Context Air Navigation Integrated Work Programme Michael Hohm Technical Officer, Airspace Management & Optimization IMP Secretary International Civil Aviation Organization (ICAO) 26 January 2015

The Integrated Work Programme A NEW FOCUS ON IMPLEMENTATION BY REGIONS Treat Standards Development as a project 26 January 2015 2

Traditional Methods Annex and PANS Amendments to States Global Plans SARPs & PANS Guidance Material What Annex 1 Annex 6 Annex 8 DOC 9735 DOC 9946 Seminars, Workshops and Symposia Computer-Based Training Training and guidance are often not synchronized with amendments 26 January 2015 3

Needs Analysis / Validation Compliance & Verification Global Plans if needed Assess & Measure Global & Regional SARPs & PANS Implementation Planning Training & Guidance 26 January 2015 4

Needs Analysis / Validation AIR NAVIGATION INTEGRATED WORK PROGRAMME Compliance & Verification Global Plans if needed Assess & Measure Global & Regional Safety and Air Navigation Regulatory and Operational Improvements (ROIs) SARPs & PANS Implementation Planning Enablers Recurrent Activities Training & Guidance 26 January 2015 5

Integrated Planning for Implementation IMPROVED METHODS Using the point of view of the implementer Provision of a singular package for implementation Global Plans SARPs & PANS Implementation Planning Guidance Material Assess & Measure What Annex 1 Annex 6 Annex 8 DOC Guidance 9735 material DOC 9946 Seminars, Workshops and Symposia Computer-Based Training Compliance & Verification USOAP Protocol Questions (if needed) Seminars, workshops and Symposia Computer-Based Training When 26 January 2015 6

Implementation Kits AN Work Programme / Deliverables Implementation Kit Operational Improvement 26 January 2015 7

TYPE Structure of the Work Programme Enablers Enablers Operational Improvement Recurrent 26 January 2015 8

Definitions Operational Improvements for ikits Results in improvements to safety and/or air navigation capacity and/or efficiency Enablers Items that do not serve to provide operational improvements in and of themselves, but are enablers for a number of different operational improvements Recurrent Ongoing items, classified into: REC-A: Activities related to the maintenance of provisions REC-B: Activities related to the life cycle of provisions REC-C: Activities related to the Global Plans (GASP/GANP) 26 January 2015 9

Operational Improvements for ikits 1. Optimize airspace and airport usage through demand/capacity balancing 2. Increase harmonization of the regulatory approach to air operators approvals and recognition 3. Improve efficiency of surface operations, in particular at congested aerodromes 4. Improve safety performance at and in the vicinity of aerodromes 5. Improve throughput at aerodromes through integration of landside/airside 6. Improve efficiency of en-route operations through the availability of userpreferred routing 7. Facilitate access by RPA to non-segregated airspace 8. Optimize aerodrome departure/arrival rates in all meteorological conditions 9. Improve efficiency of TMA operations 10. Improve in-flight safety performance 1 September 2014 10

Enablers Information management Communication, Navigation and Surveillance Meteorology Safety Management Human Performance And 26 January 2015 11

COMPOSITION TYPE Structure of the Work Programme Enablers Enablers Operational Improvement Recurrent ikit 2016 ikit 2018 ikit 2016 ikit 2018 Deliverable Deliverable Deliverable Deliverable Deliverable 26 January 2015 12

Work Packages vs Deliverables Work Packages Deliverables ROI-1-2016-1 Annex A Annex B PANS ROI-1-2016-1 Annex A Annex B PANS Guidance Material Training ikit ROI-2-2016-4 Annex C Annex D PANS For Approval and Council Adoption ROI-2-2016-4 Annex A Annex C Annex D PANS Guidance Material Training For Implementation Planning ikit 26 January 2015 13

Work Program Areas 1. IM Concept, Service Architecture, and Roadmap IM concept ATM information Service architecture Roadmap update 2. Operational Messaging (NOTAM review) 3. Information Exchange Collection and use of information Exchange models AIRM 4. Service Requirements Security requirements Access, integrity, and quality Bandwidth requirements 5. Institutional Issues and Governance

Work Package Planning ASBU Modules Implementation Kit Regulatory and Operational Improvement

Planning for Implementation Information Management ikit 2016 ikit Integrated Information Management First Phase Enablers Provisions on the collection, use and exchange of information (MET, AIM and ATM) (Annex 15, Manual on the SWIM concept, PANS-AIM) 2018 ikit Integrated Information Management Second Phase Enablers Provisions on the collection, use and exchange of information (MET, AIM and ATM) (Annex 4, Annex 15, PANS-AIM, AIS Manual) System Wide Information Management (SWIM) concept and provisions (Annex 15, Manual on the SWIM Concept) ATM Information Reference Model (Manual on the Air Traffic Management Reference Model) Provisions and guidance on the use of improved NOTAM system (Annex 11, Annex 15, PANS-ATM, PANS-AIM)