Providing the Context Air Navigation Integrated Work Programme Michael Hohm Technical Officer, Airspace Management & Optimization IMP Secretary International Civil Aviation Organization (ICAO) 26 January 2015
The Integrated Work Programme A NEW FOCUS ON IMPLEMENTATION BY REGIONS Treat Standards Development as a project 26 January 2015 2
Traditional Methods Annex and PANS Amendments to States Global Plans SARPs & PANS Guidance Material What Annex 1 Annex 6 Annex 8 DOC 9735 DOC 9946 Seminars, Workshops and Symposia Computer-Based Training Training and guidance are often not synchronized with amendments 26 January 2015 3
Needs Analysis / Validation Compliance & Verification Global Plans if needed Assess & Measure Global & Regional SARPs & PANS Implementation Planning Training & Guidance 26 January 2015 4
Needs Analysis / Validation AIR NAVIGATION INTEGRATED WORK PROGRAMME Compliance & Verification Global Plans if needed Assess & Measure Global & Regional Safety and Air Navigation Regulatory and Operational Improvements (ROIs) SARPs & PANS Implementation Planning Enablers Recurrent Activities Training & Guidance 26 January 2015 5
Integrated Planning for Implementation IMPROVED METHODS Using the point of view of the implementer Provision of a singular package for implementation Global Plans SARPs & PANS Implementation Planning Guidance Material Assess & Measure What Annex 1 Annex 6 Annex 8 DOC Guidance 9735 material DOC 9946 Seminars, Workshops and Symposia Computer-Based Training Compliance & Verification USOAP Protocol Questions (if needed) Seminars, workshops and Symposia Computer-Based Training When 26 January 2015 6
Implementation Kits AN Work Programme / Deliverables Implementation Kit Operational Improvement 26 January 2015 7
TYPE Structure of the Work Programme Enablers Enablers Operational Improvement Recurrent 26 January 2015 8
Definitions Operational Improvements for ikits Results in improvements to safety and/or air navigation capacity and/or efficiency Enablers Items that do not serve to provide operational improvements in and of themselves, but are enablers for a number of different operational improvements Recurrent Ongoing items, classified into: REC-A: Activities related to the maintenance of provisions REC-B: Activities related to the life cycle of provisions REC-C: Activities related to the Global Plans (GASP/GANP) 26 January 2015 9
Operational Improvements for ikits 1. Optimize airspace and airport usage through demand/capacity balancing 2. Increase harmonization of the regulatory approach to air operators approvals and recognition 3. Improve efficiency of surface operations, in particular at congested aerodromes 4. Improve safety performance at and in the vicinity of aerodromes 5. Improve throughput at aerodromes through integration of landside/airside 6. Improve efficiency of en-route operations through the availability of userpreferred routing 7. Facilitate access by RPA to non-segregated airspace 8. Optimize aerodrome departure/arrival rates in all meteorological conditions 9. Improve efficiency of TMA operations 10. Improve in-flight safety performance 1 September 2014 10
Enablers Information management Communication, Navigation and Surveillance Meteorology Safety Management Human Performance And 26 January 2015 11
COMPOSITION TYPE Structure of the Work Programme Enablers Enablers Operational Improvement Recurrent ikit 2016 ikit 2018 ikit 2016 ikit 2018 Deliverable Deliverable Deliverable Deliverable Deliverable 26 January 2015 12
Work Packages vs Deliverables Work Packages Deliverables ROI-1-2016-1 Annex A Annex B PANS ROI-1-2016-1 Annex A Annex B PANS Guidance Material Training ikit ROI-2-2016-4 Annex C Annex D PANS For Approval and Council Adoption ROI-2-2016-4 Annex A Annex C Annex D PANS Guidance Material Training For Implementation Planning ikit 26 January 2015 13
Work Program Areas 1. IM Concept, Service Architecture, and Roadmap IM concept ATM information Service architecture Roadmap update 2. Operational Messaging (NOTAM review) 3. Information Exchange Collection and use of information Exchange models AIRM 4. Service Requirements Security requirements Access, integrity, and quality Bandwidth requirements 5. Institutional Issues and Governance
Work Package Planning ASBU Modules Implementation Kit Regulatory and Operational Improvement
Planning for Implementation Information Management ikit 2016 ikit Integrated Information Management First Phase Enablers Provisions on the collection, use and exchange of information (MET, AIM and ATM) (Annex 15, Manual on the SWIM concept, PANS-AIM) 2018 ikit Integrated Information Management Second Phase Enablers Provisions on the collection, use and exchange of information (MET, AIM and ATM) (Annex 4, Annex 15, PANS-AIM, AIS Manual) System Wide Information Management (SWIM) concept and provisions (Annex 15, Manual on the SWIM Concept) ATM Information Reference Model (Manual on the Air Traffic Management Reference Model) Provisions and guidance on the use of improved NOTAM system (Annex 11, Annex 15, PANS-ATM, PANS-AIM)