Ecolibrium. Common good. A Games facility built for all. THE OFFICIAL JOURNAL OF AIRAH MARCH 2018 VOLUME 17.2 RRP $14.95

Similar documents
Gold Coast. Rapid Transit. Chapter twelve Social impact. Chapter content

Sunshine Coast Council Locked Bag 72 Sunshine Coast Mail Centre QLD Submitted via online portal. 2 June 2017.

SUSTAINABILITY HIGHLIGHTS

The Challenges for the European Tourism Sustainable

The Sunshine Coast is part of the global community and generates wealth through export, high-value industries and new investment.

CORPORATE ACCOMMODATION SOLUTIONS

CAIRNS RECTANGULAR PITCH STADIUM NEEDS STUDY PART 1 CAIRNS REGIONAL COUNCIL DRAFT REPORT SEPTEMBER 2011

Gold Coast 2018 Commonwealth Games April 2018

Sustainable Procurement Policy for Heathrow Airport Limited

MEDIUM SIZE STADIUM STRATEGY

Sustainable Brisbane Walking Tour

Smart Cities Plan IMPLEMENTATION. Townsville City Deal. April 2017

Sustainable Regions Executive Summary Airlie Beach Mackay Region North Stradbroke Island Winton. Prepared by

A Master Plan is one of the most important documents that can be prepared by an Airport.

Item 1. Leadership Board. On: 1 April Report by: Director of Development and Housing Services. Heading: Update on City Deal. 1.

ASHTON GATE SPORTS & CONVENTION CENTRE. A New Home For Bristol Flyers

4countries. We understand the fundamentals. A trusted partner. We have delivered million sqm. 1.8 million car spaces.

Waterways Management Program

Gold Coast. Rapid Transit. Chapter content. Chapter four Route selection and staging

Review of brisbane Airport Noise Abatement Procedures

The Strategic Commercial and Procurement Manager

Cairns Convention Centre Project type: Commercial

4 MAY Venue Development Strategy

PERTH AND KINROSS COUNCIL. Housing and Health Committee. 25 May Perth and Kinross Local Housing Strategy

30 th January Local Government s critical role in driving the tourism economy. January 2016 de Waal

ATTACHMENT A. P a g e 6 I t e m #

NATIONAL AIRSPACE POLICY OF NEW ZEALAND

Bartlett Square Welcome. Investment Framework. London Airport Ltd

Land Use and Environmental Control

LISTED BUILDING AND FIRE STATION CENTRAL SITE WHITGIFT STREET OLD PARADISE GARDENS

Public Submissions in response to the Bill closed on 2 July 2015 and Council lodged a copy of the submission provided as Attachment 1.

PARTNERING FOR SUCCESS

MERIDIAN DELTA LTD BRIEFING DOCUMENT

Fair Park Management Agreement Update

1231 SANDGATE ROAD, NUNDAH, QLD

Communication and consultation protocol

This is a submission to Council s Delivery Plan and Operational Plan

Wales. Andy Thomas. Route Managing Director Wales. Ken Skates, Cabinet Secretary for Economy and Infrastructure, Welsh Government

BRISBANE CITY COUNCIL PLANNING FOR TENNIS TOGETHER FEBRUARY 2017

How is air quality managed. in Sydney s road tunnels?

TERMINAL DEVELOPMENT PLAN

Introducing Green Star

ENVIRONMENT ACTION PLAN

AN INTRODUCTION TO THE GC2018 RECONCILIATION ACTION PLAN

Clyde Waterfront and Renfrew Riverside Project Glasgow Airport Investment Area Project

Promoting Sustainable Tourism: The economic benefits for Local Government 4 April Presented by Caroline Ungersbock

Kilometres. Blacktown. Penrith. Parramatta. Liverpool Bankstown. Campbelltown

3 Pilbara ports provide gateways

Singita Serengeti One Planet Annual Review 2017/18

SUSTAINABLE DEVELOPMENT PLAN 2015

Draft Executive Summary

Green Fields Leppington

Welcome to AVI AFRIQUE 2017

A TRANSPORT SYSTEM CONNECTING PEOPLE TO PLACES

Geothermal Down-Bore Heat Exchanger Project New Zealand

Newcastle Transport Program Newcastle Light Rail Determination Report

9 November, Defence White Paper 2015 R1-3-A135 Russell Offices Department of Defence PO Box 7901 CANBERRA BC ACT 2610.

Expression of Interest for: Inaugural Venue Naming Rights Partnership Brisbane Arena

Pioneer Events Center

HELLENIC REPUBLIC Voluntary National Review on the Implementation of the 2030 Agenda for Sustainable Development. 16 July 2018

The implementation of this Master Plan will be undertaken in logical stages to meet passenger and workforce demands.

HOTEL ROOM MANAGEMENT SYSTEM OVERVIEW

European Charter for Sustainable and Responsible Tourism

Congestion. Addressing urban congestion in SEQ. How do you define congestion? South East Queensland is growing. Sustained growth in motorised travel

Non-technical summary

Tourism and Climate Change A Framework for Action

ADELAIDE OVAL REDEVELOPMENT

Introduction. Valentine Sports Park Home of Football is a state of the art sporting complex

First Steps Towards Sustainable Operation of Road Tunnels. George Mavroyeni Australia

Cabinet 16 December Cabinet, 16 December At a Special Cabinet Meeting of North Ayrshire Council at 2.30 p.m.

IATA Fuel Efficiency Program

PARTNERING FOR SUCCESS

PLA WA Regional Council Elections 2013

Living & Working Tourism

Environmental Assessment. Runway 14 Smart Tracking Approach Gold Coast Airport

Decision Strategic Plan Commission Paper 5/ th May 2017

Introduction 3. Part 1: Defining and Measuring a High Quality Planning Service 4. Part 2: Supporting Evidence 34

Urban Beach Demonstration Project: Annexure A (Specification)

CHRISTCHURCH MOTORWAYS. Project Summary Statement February 2010

Approval of Limited Facilities Camping Interim Policy 1

Gold Coast: Modelled Future PIA Queensland Awards for Planning Excellence 2014 Nomination under Cutting Edge Research category

BACKCOUNTRY TRAIL FLOOD REHABILITATION PROGRAM

4 15 April Is your business ready for the Games? Working together

Re: Inquiry into the contribution of sport to Indigenous wellbeing and mentoring

TOWN OF PORT HEDLAND INNOVATE RECONCILIATION ACTION PLAN

YWCA Townsville Townsville

Propulsion Solutions for Fishing Vessels SERVICES

Proposals for the Harrogate Road / New Line Junction Improvement Scheme. August / September Supported by:

TAYplan SDPA. Main Issues Report. Options for Scotland s s SusTAYnable Region (Strategic Development Planning Authority)

With the first portion of this process complete, we anticipate the general timeline for the remainder of the process to be:

WORKING DRAFT (DECEMBER 2016) - FOR COMMUNITY REVIEW BY

ANGLIAN WATER GREEN BOND

THIRTEENTH AIR NAVIGATION CONFERENCE

Report of the Strategic Director of Place to the meeting of Executive to be held on 11 September 2018

ATM STRATEGIC PLAN VOLUME I. Optimising Safety, Capacity, Efficiency and Environment AIRPORTS AUTHORITY OF INDIA DIRECTORATE OF AIR TRAFFIC MANAGEMENT

GOLD COAST CONVENTION AND EXHIBITION CENTRE NOVEMBER 2017 PARTNERSHIP PROSPECTUS

PROJECTS & TECHNICAL SERVICES

ICAO Young Aviation Professionals Programme

Magnetic Heart of Queensland

Tourism Development Framework for Scotland. Executive Summary- Development Framework to 2020 for the Visitor Economy (Refresh 2016)

Transcription:

THE OFFICIAL JOURNAL OF AIRAH Ecolibrium MARCH 2018 VOLUME 17.2 RRP $14.95 PRINT POST APPROVAL NUMBER PP352532/00001 Common good A Games facility built for all.

Common good As one of the key venues for the Gold Coast 2018 Commonwealth Games to be held next month, the Gold Coast Sports and Leisure Centre has been designed to accommodate a range of sports, with both the short and long term in mind. Sean McGowan reports. Located on the Nerang-Broadbeach Road in Carrara adjacent to Metricon Stadium the $105 million Gold Coast Sports and Leisure Centre is a multi-purpose facility incorporating two 6,000m² mixed-use indoor halls connected by a pedestrian plaza. Totalling some 16,500m², the centre also accommodates meeting and function rooms, associated support facilities, 460 underground carparking spaces, and the new headquarters and training home of the Gold Coast Suns (AFL) Football Club. As well as the City of Gold Coast having permanent offices within the facility, it is also anticipated that the centre will become home to Queensland s premier state representative sporting bodies. In Games mode this April, the centre will play venue to four sports: badminton, 38 ECOLIBRIUM MARCH 2018

In mode after the Commonwealth Games, the centre will become an important community facility. para powerlifting, weightlifting and wrestling. The Hall 1 show hall will feature a grandstand capacity of 5,300 people (including players and officials). After the Games, the venue will become an important community facility. In mode, it will support a range of ball sports, including elite and community-grade basketball (14 courts), netball (10 courts) and badminton. It will also provide vital space for exhibitions and community events. To cater for such varying use and occupancy numbers, the Gold Coast Sports and Leisure Centre features a unique, energy-efficient multi-mode ventilation design by building services and ESD engineer, Norman Disney & Young (NDY). BALANCING STAKEHOLDER NEEDS NDY s involvement in the project began with an invitation to tender for the building services design works including ESD as part of the BVN Architects (as principal consultant) submission to the Queensland Government s Department of State Development (DSD). The consultant was initially engaged for pre-design and schematic design phases through the principal consultant in November 2013. NDY was later novated to the managing contractor, Hansen Yuncken, to complete the design and oversee the project through the tender and construction phases. NDY project leader and senior associate John McIntosh says the main challenge was working with so many stakeholders, who all had their own needs and requirements. The key stakeholders were the Department of State Development, whose focus was capital cost and program; the City of Gold Coast whose main focus was legacy and ongoing costs; and the Gold Coast 2018 Commonwealth Games Corporation (GOLDOC), whose focus was firmly on Games mode and what infrastructure could be built into the legacy works to cater for the Games. A number of community stakeholders associated with the various sporting groups to be accommodated in the facility were also consulted. MARCH 2018 ECOLIBRIUM 39

The halls have been designed to minimise air conditioning. These included groups representing basketball, netball and badminton. The stakeholders attended every design meeting and workshop throughout the design stages, McIntosh says, and actively contributed to the design outcomes. From the initial design meeting, NDY project director Andrew Gentner, M.AIRAH, says a key driver for the project was to maximise the ability of the centre to operate in natural ventilation mode or mechanically assisted ventilation modes. The idea was to minimise the requirement for the halls to operate full air conditioning. Energy efficiency, capital cost and ongoing running costs were all at the forefront of design discussions with the stakeholders, Gentner says. The initial brief from the Department of State Development was to provide a naturally ventilated facility for legacy community sports use, with bump-in air conditioning provided for Games mode. However, the City of Gold Coast (as the building owner and operator) also wanted the ability to stage major sporting, leisure and exhibition events throughout the year, with a view towards permanent air conditioning as and when needed. Through design optioneering, verification and cost analysis, it was determined the temporary air conditioning solution for the Games only was both inefficient and unnecessarily expensive. The Gold Coast Sports and Leisure Centre features a unique, energy-efficient multi-mode ventilation design 40 ECOLIBRIUM MARCH 2018 Temporary air conditioning for the Games was ruled out as an option.

LESSONS FROM THE CONSULTANT NDY project leader and senior associate John McIntosh shares some of the lessons learned from the Gold Coast Sports and Leisure Centre project. 1. Listen to and involve the stakeholders It also offered no legacy benefit to the community. This led to the mechanical services brief being amended to include the provision of full air conditioning to the halls. The ability of the centre to operate in natural ventilation mode, or mechanically assisted ventilation modes had to maximised. This minimises the requirement to operate full air conditioning. MULTI-MODE In response, NDY designed a unique multi-mode ventilation system that minimises the energy consumption of the facility while maximising occupant comfort. This resulted in the provision of a four-step ventilation solution with: Step 1: Operation of façade louvres to provide natural ventilation 2. Understand all the different stakeholder briefs 3. Determine the most suitable design strategy to address all brief requirements 4. Ensure stakeholder buy-in to the proposed design strategies. This was vital to prove the performance of each of the ventilation steps. SIZING THE SYSTEM One of the key design challenges of the multi-mode system was in sizing the air conditioning systems to best cater for both Games and legacy populations. McIntosh says the initial Games-mode occupancy levels were briefed by the Department of State Development and GOLDOC. The following table summarises the various design populations the facility was required to accommodate. As well as CFD modelling, extensive heat-load modelling was undertaken on all operating scenarios. This optimised the size and configuration of the central chilled water plant, as well as sizing the air handling units (AHUs). Particular attention was also given to the design of the system to cater for badminton one of four feature sports to be hosted at the Games. Extensive heat-load modelling was undertaken to establish the optimum sizing for the layout and selection of ductwork and diffusers to meet badminton air movement requirements, says McIntosh. Under badminton conditions, a minimum of 1.5 air changes per hour, and a maximum of 0.1m/s air velocity across the field of play are required so as to minimise air currents and the drift of the shuttlecock as it moves across the court. ENERGY EFFICIENT DESIGN The central chilled water plant designed by NDY comprises two large centrifugal chillers, and a low-load chiller located in a rooftop plant room, with cooling towers adjacent. This chilled water is distributed to dedicated AHUs serving each functional area. Constant-volume units serve the halls and function rooms, while variablevolume units were used to serve the council offices and the Gold Coast Suns facilities. All AHUs and fan-coil units (FCUs) feature high-efficiency motors, with economy cycle operation and outside-air control provided to the AHUs. Step 2: Step 3: Step 4: Operation of high-volume, low-speed fans in conjunction with the louvres Mechanically assisted ventilation utilising the hall smoke exhaust fans Full air conditioning. This system was designed to be controlled by the building management system (BMS) based on ambient and internal conditions, with optional operator input in relation to the particular use, if required. The Gold Coast climate provided opportunity to maximise natural and mechanical ventilation of the halls, says Gentner. Extensive computational fluid dynamics (CFD) modelling was undertaken to determine the optimal arrangement, location and orientation of intake louvres, as well as fan locations and mechanical ventilation openings. Part of Project Hall 1 Show Hall Hall 2 Community Hall Gold Coast Suns Level 2 Function Facilities Level 3 Commentary Box Design population summary table Games Sport Exhibition Major Event Hall 2 Major Event 2,750 5,000 1,500 5,202 500 2,750 500 1,500 500 4,000 206 206 206 206 206 1,089 1,089 1,089 1,089 1,089 8 8 Source: NDY MARCH 2018 ECOLIBRIUM 41

All building services have also been designed to sit above the designated flood level. To further the energy efficiency of the systems, variable-speed drives (VSDs) are installed on all fans and pumps. An energy metering system is also installed. Importantly, the system design provides flexible operation of the systems to suit all combination of centre uses at any particular time. The mechanical system enables the operator, via the BMS, to nominate the Totalling 16,500m 2, the centre accommodates the HQ and training facility for the AFL s Gold Coast Suns. number of mechanical ventilation steps available to suit the particular use or event, says Gentner. For example, for recreational sporting events, the full air conditioning step may be disabled, allowing the BMS to automatically control between the remaining available steps. For Show Court use, exhibitions or trade events, all mechanical ventilation steps can be made available. BENCHMARKING The design of the Gold Coast Sports and Leisure Centre sets a new standard in occupant comfort in relation to the use of natural and multi-mode ventilation systems in a sub-tropical environment. It also measures up so far as energy efficiency is concerned. As per the requirements of the design brief, benchmarking against the GBCA s Green Star Public Building v1 rating tool, as well as the One Planet Living Design Principles, was completed. One Planet Living forms a holistic framework to provide guidance for local government, businesses and the built environment comprehensively addressing key sustainability issues and effectively making a sustainable lifestyle a reality (see breakout). These 10 principals are set as goals for the Commonwealth Games events, says Gentner. Consequently, the Gold Mechanical services layout Hall 1 (Show Hall) Mechanical services layout Hall 2 (Community) 42 ECOLIBRIUM MARCH 2018

MULTI-MODE VS MIXED MODE According to NDY s Andrew Gentner, M.AIRAH, there are a number of key differences between the unique multi-mode system designed for the Gold Coast Sports and Leisure Centre, and the mixed-mode systems commonly found in commercial building projects. Mixed mode is more of a hybrid system, with a single plant operating in one or two operating modes, says Gentner. The HVAC design for the Gold Coast Sports and Leisure Centre is a true multi-mode system utilising several unique systems in either stand-alone mode or a combination of manual or temperature-controlled and stepped parallel systems. This design maximises natural ventilation, minimises unnecessary use of mechanical ventilation or air conditioning and therefore maximises energy efficiency and minimises ongoing operational cost to the council. Coast Sports and Leisure Centre has incorporated a number of ESD features to align with these principals and ensure sustainable design outcomes. The centre s design also exceeds the minimum performance requirement of National Construction Code, Section J. Says Gentner: The modelled energy consumption of 4,400,000kWh per annum is expected to be significantly reduced by up to 30 per cent through the use of the multi-mode ventilation system. One Planet Living design principles GAMES READY After reaching project completion in February 2017, the Gold Coast Sports and Leisure Centre hosted its first event the 2017 Sudirman Badminton Cup in late May 2017. The HVAC systems continue to operate as designed, says McIntosh. And feedback from the City of Gold Coast and the Gold Coast Suns has been very positive. The result shows that with careful planning and use of computer modelling, even in a subtropical environment the use of natural and mechanically assisted ventilation can provide comfort conditions, while still offering the flexibility to provide full air conditioning for specific events. As a key venue of the Gold Coast 2018 Commonwealth Games, the Gold Coast Sports and Leisure Centre stands ready as the world s sporting attention turns to the Gold Coast from April 4, 2018. PROJECT AT A GLANCE The personnel Zero Carbon Zero waste Sustainable transport Sustainable materials Local and sustainable food Sustainable water Land use and wildlife Culture and community Equity and local economy Health and happiness Making buildings more energy efficient and delivering all energy with renewable technologies. Reducing waste, reusing where possible, and ultimately sending zero waste to landfill. Encouraging low carbon modes of transport to reduce emissions and reducing the need to travel. Using sustainable healthy products, with low embodied energy, sourced locally, made from renewable or waste resources. Choosing low impact, local, seasonal and organic diets and reducing food waste. Using water more efficiently in buildings and in the products we buy; tackling local flooding and water course pollution. Protecting and restoring biodiversity and natural habitats through appropriate land use and integration in the built environment. Reviving local identity and wisdom; supporting and participating in the arts. Creating bioregional economies that support fair employment, inclusive communities and international fair trade. Encouraging active, sociable, meaningful lives to promote good health and wellbeing. Architect: BVN Builder: Hansen Yuncken Building services engineer: NDY Client: Department of State Development, Infrastructure & Planning ESD engineer: NDY Mechanical services contractor: Coolmaster Structural engineer: Bligh Tanner The equipment AHUs: Cooling & Heating Air and dirt separators: Masterflow Solutions BMS: Austec Cooling towers: BAC Chillers Daikin Dampers: Polyaire Diffusers: Polyaire Fans: Fantech, Pacific HVAC Heat recovery (pool): Air Change Australia Silencers and attenuators: Fantech Pumps: WILO VAV boxes: Barcol Air (Source: NDY) MARCH 2018 ECOLIBRIUM 43