Historic England (Designation) Consultation Report 14 December 2017

Similar documents
Historic England (Designation) Reject at Initial Assessment Report 13 March 2018

TransPennine Route Listing Review: Existing Listings Prepared for Network Rail and Historic England March Alan Baxter

A487 PONT SEIONT ARCHAEOLOGICAL RECORDING REPORT NO Y mddiriedolaeth Archaeolegol Gwynedd Gwynedd Archaeological Trust

11 Majors Barn. 19 Mill Street Exploring Abergavenny

Register of Parks and Gardens of Special Historic Interest in England. The first publicly owned park in Bradford, open in early 1850s.

FORGE LANE DEWSBURY WF12 9EN

Looking north from the SW shieling site with Lub na Luachrach in the foreground

Chester's City Walls. Guide Location: England» Chester # of Attractions: 8 Tour Duration: 1 hour(s) Travel Distance: 2.3 km.

Changes to train times Easter Weekend Manchester to Stalybridge and Huddersfield

Our Lady and St Edward. Gordon Road, St Ann s, Nottingham NG3. National Grid Reference SK Statement of Importance

Whitney Bridge. A rare tax free business. FOR SALE Freehold. Whitney-on-Wye, Herefordshire HR3 6EW

HB/10/06/003 Camus House, 46 Lisky Rd, Strabane. Foyle Valley

A travel description of the Brisbane Airport Domestic Terminal Precinct. Author: Mr Terry Boyle of the Tactual Mapping Committee (September 2013)

TRANSFORMING TRANSPENNINE

City of Sydney (COS) Bridges - an Overview & Current Asset Management Practices

Barnsley, Dearne & Dove Canals Trust HS2 Mitigation Options

808 Cherry Avenue

In your area. Stourton to Hunslet LA17. June Introduction. High Speed Two (HS2) is

CAPEL SAESNEG STRYD FAWR Y BALA LL23 7AG PRICE: 50,000. VIEWING: Strictly by appointment with the Selling Agents

29 Plas Derwen. Exploring Abergavenny

In your area. South Kirkby to Sharlston Common LA14. June Introduction

5.7 Local road upgrades

Friends Meeting House, Leicester. 16 Queens Road, Leicester, LE2 1WP. National Grid Reference: SK Statement of Significance

The Bridestone Rocks from Lydgate

Higher Viaduct. Route - January 2012

Friends Meeting House, Hitchin. 1 Paynes Park, Hitchin, Hertfordshire, SG5 1EH. National Grid Reference: TL Statement of Significance

A meeting house built on a new site in 1961 to the design of Joseph Konrad. The building is of low heritage significance.

Historical value The building was erected on a new site to serve a new meeting and in itself is of low historical value.

Claro Community Archaeology Group

FOUNDATIONS OF ARCHAEOLOGY A WALK IN VERNDITCH CHASE

PHOTOGRAPHY LOCATIONS

THE PROPOSED NETWORK RAIL (ESSEX AND OTHERS LEVEL CROSSING REDUCTION) ORDER DEPARTMENT FOR TRANSPORT REFERENCE: TWA/17/APP/05

Jim O Sullivan Chief Executive

YHA Malham Access Statement

marsden jazz festival 25 years of jazz in the yorkshire pennines village trail

Sand and Aggregates

The Clyde Walkway. Cambuslang Bridge to Strathclyde Country Park. Thanks to

An Introduction to HS2

In your area. Warmfield to Swillington and Woodlesford LA15. June Introduction

BACKGROUND TO THE EAST COAST MAIN LINE AND INTERCITY EAST COAST FRANCHISE

TAKING THE NORTH FURTHER

YHA Bath - Access Statement

TIMBER BOLLARDS TYPE I. TYPE ll TS mm Radius 150 x 100 white painted Timber post dia Timber Post. Ground Level NOTES:

Hay Wood, Rowington and Baddesley Clinton - Warwickshire

301 7½ Street SW

DEVON HOUSE Crook of Devon Kinross KY13 0UL

Woodland House, Park House, Maple House & Beech House

Friends Meeting House, Pickering. 19 Castlegate, Pickering, YO18 7AX. National Grid Reference: SE Statement of Significance

Lancaster Castle THE CASTLE STUDIES GROUP JOURNAL NO 26:

Skipton Castle Woods Accessibility Statement November 2016

Ormiston House HAWICK ROXBURGHSHIRE

OUTSTANDING AND UNIQUE DEVELOPMENT OPPORTUNITY GELT HALL, CASTLE CARROCK, CUMBRIA

ALL CHANGE NEW TRAIN TIMES FROM SUNDAY 20 MAY

In your area. Manchester Piccadilly Station MA08. June Introduction. High Speed Two (HS2) is

Approximate distance: 7.5 miles For this walk we ve included OS grid references should you wish to use them.

Speed control humps - Scotland, England and Wales

Lovely Hall. Lovely Hall Lane Salesbury BB1 9EQ

Centurion Way Chichester

A63 Preferred Route Announcement

Newton of Drumduan, Dess, Aboyne, Royal Deeside

ELMET(E) HALL By Anthony Silson

Dufferin Jog Elimination Project

FOR SALE PRIME DEVELOPMENT OPPORTUNITY NOR THE RN QUARTER

Hwy Retaining Wall/ Sea Wall. Not Eligible, see Statement of Significance Also member of listed NR district: Mantorville Historic District

London to Oxford Trek map

HS2 Update 19 FEBRUARY 2017

SLATEFORD HOUSE Lanark Road, Edinburgh, EH14 1TL. Development Opportunity with Residential / Commercial / Leisure Potential

FRYUP GILL FARM, Whitby, North Yorkshire, YO21 2AP

Friends Meeting House, Lancaster. Meeting House Lane, Lancaster, LA1 1TX. National Grid Reference: SD Statement of Significance

Chiselbury Camp hillfort

CSG Annual Conference - Cork - April Carrigadrohid Castle

The Swansea Canal & St Catherine s Church at Pontardawe

Why build a third runway, when you can build a longer runway?

the ultimate trans pennine trail guide coast to coast across northern england by bike or on foot ultimate guide series

Evidential value The former schoolroom, the oldest part of the building, has been considerably altered, but still has medium evidential value.

OFFICE ACCOMMODATION TO LET OR FOR SALE

CWMGIEDD FROM ABERCRAVE

Packthorne Farm WHITMINSTER, GLOUCESTER

Up to 50 acres for employment development J5 / M18 / Doncaster / South Yorkshire. Hatfield Power Park

BUSINESS UNIT FOR SALE/MIGHT LEASE St Ives, Cambridgeshire

THE EXO BUILDING POINT VILLAGE NORTH WALL DUBLIN 1 CONSERVATION ASSESSMENT

RETAIL OPPORTUNITY. A new retail destination. Riverside Building Riverside Way, Nottingham NG2 1DP

Texas Department of Transportation Corpus Christi District. Corpus Christi Harbor Bridge

BUILD. In this issue: NEW AERIALS OF CONSTRUCTION NEW PROJECT IN CONSTRUCTION PAC K AG E 4. August 2018

In your area. Stonebroom to Clay Cross LA09. June Introduction

Survey of Deadwater Fell and Peel Fell

Description for the Round Rotherham 8 December 2007

Hotel, Conference and Training Venue Tollerton Road, Huby, Near York, YO61 1JB. BBurn Hall

Watten Mains Farmhouse, Wick, Caithness

City of Kingston Report to Municipal Heritage Committee Report Number MHC

Local Studies Collection. Trade Directories

ATTRACTIVE VICTORIAN HOUSE IN IRONBRIDGE GORGE WITH VIEWS OVER RIVER

SURVEY OF RAILWAYS IN COUNTIES LOUTH AND MONAGHAN Summary. Fred Hamond

INVESTMENT CITY CENTRE INVESTMENT GROUND FLOOR AND BASEMENT WESTLEGATE, NORWICH NR1 3LR LET TO EVANS CYCLES

Hunter Water S170 Register

NEW AUGUSTUS STREET, BRADFORD BD1 5LL. Trust House ST. JAMES BUSINESS PARK. GRADE A OFFICE ACCOMMODATION Up to 1, sq m (14,893 sq ft)

Report Author: Jo Turton, Executive Director for the Environment, Lancashire County Council

The Old Bridges of Derbyshire & Nottinghamshire

Exciting Residential Development Opportunity

Residential and Retail Development Site at Jim Bush Drive, Prestonpans, East Lothian, EH32 9GP

Transcription:

Case Name: North Trans-Pennine Phase 2: Footbridge MVL3/8 Case Number: 1449762 Background Historic England has been asked to assess this structure for listing in connection with the proposed upgrade of the Trans-Pennine railway route from Manchester to York and Selby. Asset(s) under Assessment Facts about the asset(s) can be found in the Annex(es) to this report. Annex Name Heritage Category 1 Railway overbridge MVL3/8, Listing Footbridge Visits Date Visit Type 13 October 2017 Full inspection Page 1 of 4

Annex 1 The factual details are being assessed as the basis for a proposed addition to The National Heritage List for England. Factual Details Name: Railway overbridge MVL3/8, Footbridge Location Footpath between A635 Wakefield Road and Spring Bank Lane, Heyrod. County District District Type Parish Tameside Metropolitan Authority Non Civil Parish History In contrast to the main trunk lines of the late 1830s that were constructed by single railway companies the route from Stalybridge to Leeds had fragmented origins and was the work of three different railway companies: the Huddersfield & Manchester Railway, Leeds, Dewsbury & Manchester Railway, and the Manchester & Leeds Railway. The Huddersfield & Manchester Railway was authorised in 1845 and followed the route of the Huddersfield Narrow Canal for much of its length, including a railway tunnel through the Pennine hills set alongside the earlier Standedge Canal Company tunnel of 1811; in 1846 the railway company also acquired the canal. Joseph Locke and Alfred Stanistreet Jee were appointed to survey and design the new line, the two engineers having already worked together on a major project linking Manchester and Sheffield. Jee became the lead engineer for the Huddersfield line, which passed through challenging terrain, assisted by resident engineers that included his brother Moreland Jee (until 1848) and Herbert F Mackworth. Construction of the line was divided into various contracts, with many contractors being only responsible for a single cutting, viaduct or tunnel portal. The largest contract for the Standedge Tunnel between Diggle and Marsden was let to a single contractor, Thomas Nicholson in 1847. The tunnel's completion in 1849 marked the opening of the line. The Leeds end of the route, which was also authorised in 1845, was constructed by the Leeds, Dewsbury & Manchester Railway. The engineer was Thomas Grainger who had previously largely worked in Scotland, and the line was completed in 1849. A short three-mile section of the route between Heaton Lodge Junction and Thornhill Junction near Mirfield was developed by the Manchester & Leeds Railway and was constructed between 1837 and 1840, with George Stephenson as the chief engineer. The structures on this line were designed by Thomas Gooch under the oversight of Stephenson. In 1847 the railway company changed its name to the Lancashire & Yorkshire Railway. In 1847 the Huddersfield & Manchester Railway and the Leeds, Dewsbury & Manchester Railway were acquired by the London & North Western Railway (LNWR) so that the company could access the city of Leeds and the textile towns of West Yorkshire. This pitted them as rivals to the Lancashire & Yorkshire Railway, although at points on the route the two companies had to work together. By 1851 the London & North Western Railway had an overall mileage of railway track of 800 miles and it became the most prominent railway company in the country and the largest joint-stock concern in the world in the late C19. Although the LNWR had a general manager, Captain Mark Huish, the lines of the Stalybridge to Leeds route still managed their own affairs. LNWR later carried out expansion works, including the widening of tracks and bridges, the construction of additional tunnels, and station alterations. In 1923 the line became part of the London Midland & Scottish Railway, and subsequently part of the nationalised British Railways in 1948. The line, its structures and track are currently owned by Network Rail, and the passenger services operated by TransPennine Express and Northern Rail. Page 2 of 4

This overbridge was built to carry the footpath between Spring Bank Lane and Wakefield Road over the railway. It was designed by AS Jee and dates from the line s construction between 1845 and 1849. The upper courses of the parapets appear to be of a different brick from the lower six courses and the upper courses and the stone parapet copings are probably a later addition, perhaps replacing earlier brick or an iron balustrade. The deck has been overlaid with tarmac. Otherwise the bridge appears little-altered. Details Railway overbridge and flight of steps, 1845-1849, by AS Jee for the Huddersfield and Manchester Railway. MATERIALS: sandstone, cast iron, red brick, blue engineering brick. DESCRIPTION: the bridge carries a footpath running east-west over the railway, with steps on the eastern side down to a path running south-east towards Spring Bank Lane. The single span has a deck formed by cast-iron edge beams with a brick jack arch spanning between the bottom flanges. The abutments are battered, of squared and coursed quarry-faced stone with a weathered plinth and surmounted by an ashlar band. Projecting piers at all four inner corners are quoined, with a flush return linking them beneath the span. The piers have parapet imposts of three weathered ashlar steps, and pyramidal caps. The approach walls are of random-coursed squared stone with punched hog s-back copings and a weathered projecting band at the base. The parapets are of blue engineering brick laid in alternate header and stretcher courses, the bottom six courses with more apparent weathering. The stone parapet copings are twice-weathered. The deck is surfaced with tarmac. On the eastern side steep steps run down to the north between the approach walls to a landing enclosed by a curving northern wall, with monumental posts at the eastern corners. The posts are circular with a weathered plinth, punch-dressed, and with a dome-topped deep circular cap to the southern post, that to the north being missing. The northern approach wall continues for two metres beyond the post alongside the footpath, stepping down to meet the ground. Mild steel handrails are fixed to the southern post and the inner faces of the approach walls. SUBSIDIARY FEATURES: from the landing, four sandstone steps run down to the footpath, which is comprised of short landings of sandstone setts divided by flights of three shallow steps with setted treads and flagstone risers, all well-worn. Selected Sources Other TransPennine Route Statement of History and Significance: West of Leeds V3.1. Prepared for Network Rail, March 2017. Alan Baxter Ltd. Page 3 of 4

Map National Grid Reference: SD9733200110 Crown Copyright and database right 2015. All rights reserved. Ordnance Survey Licence number 100024900. The above map is for quick reference purposes only and may not be to scale. For a copy of the full scale map, please see the attached PDF 1452382_1.pdf. Page 4 of 4

Case Name: North Trans-Pennine Phase 2: Manchester Road MVL3/10 Case Number: 1449758 Background Historic England has been asked to assess this structure for listing in connection with the proposed upgrade of the Trans-Pennine railway route from Manchester to York and Selby. Asset(s) under Assessment Facts about the asset(s) can be found in the Annex(es) to this report. Annex Name Heritage Category 1 Railway underbridge Listing MVL3/10, Manchester Road Visits Date Visit Type 13 October 2017 Full inspection Page 1 of 4

Annex 1 The factual details are being assessed as the basis for a proposed addition to The National Heritage List for England. Factual Details Name: Railway underbridge MVL3/10, Manchester Road Location A635 Manchester Road, Mossley. County District District Type Parish Tameside Metropolitan Authority Mossley Tameside Metropolitan Authority Non Civil Parish History In contrast to the main trunk lines of the late 1830s that were constructed by single railway companies the route from Stalybridge to Leeds had fragmented origins and was the work of three different railway companies: the Huddersfield & Manchester Railway, Leeds, Dewsbury & Manchester Railway, and the Manchester & Leeds Railway. The Huddersfield & Manchester Railway was authorised in 1845 and followed the route of the Huddersfield Narrow Canal for much of its length, including a railway tunnel through the Pennine hills set alongside the earlier Standedge Canal Company tunnel of 1811; in 1846 the railway company also acquired the canal. Joseph Locke and Alfred Stanistreet Jee were appointed to survey and design the new line, the two engineers having already worked together on a major project linking Manchester and Sheffield. Jee became the lead engineer for the Huddersfield line, which passed through challenging terrain, assisted by resident engineers that included his brother Moreland Jee (until 1848) and Herbert F Mackworth. Construction of the line was divided into various contracts, with many contractors being only responsible for a single cutting, viaduct or tunnel portal. The largest contract for the Standedge Tunnel between Diggle and Marsden was let to a single contractor, Thomas Nicholson in 1847. The tunnel's completion in 1849 marked the opening of the line. The Leeds end of the route, which was also authorised in 1845, was constructed by the Leeds, Dewsbury & Manchester Railway. The engineer was Thomas Grainger who had previously largely worked in Scotland, and the line was completed in 1849. A short three-mile section of the route between Heaton Lodge Junction and Thornhill Junction near Mirfield was developed by the Manchester & Leeds Railway and was constructed between 1837 and 1840, with George Stephenson as the chief engineer. The structures on this line were designed by Thomas Gooch under the oversight of Stephenson. In 1847 the railway company changed its name to the Lancashire & Yorkshire Railway. In 1847 the Huddersfield & Manchester Railway and the Leeds, Dewsbury & Manchester Railway were acquired by the London & North Western Railway (LNWR) so that the company could access the city of Leeds and the textile towns of West Yorkshire. This pitted them as rivals to the Lancashire & Yorkshire Railway, although at points on the route the two companies had to work together. By 1851 the London & North Western Railway had an overall mileage of railway track of 800 miles and it became the most prominent railway company in the country and the largest joint-stock concern in the world in the late C19. Although the LNWR had a general manager, Captain Mark Huish, the lines of the Stalybridge to Leeds route still managed their own affairs. LNWR later carried out expansion works, including the widening of tracks and bridges, the construction of additional tunnels, and station alterations. In 1923 the line became part of the London Midland & Scottish Railway, and subsequently part of the nationalised British Railways in 1948. The line, its structures and track are currently owned by Network Rail, and the passenger services operated by TransPennine Express and Northern Rail. Page 2 of 4

This underbridge was built to carry the railway over Manchester Road. It was designed by AS Jee and dates from the line s construction between 1845 and 1849. The bridge is little-altered having not been widened and retains its original features. Details Railway underbridge, 1845-1849, by AS Jee for the Huddersfield & Manchester railway. MATERIALS: buff sandstone. DESCRIPTION: the bridge carries the railway over Manchester Road at a slight angle, running north-south. It comprises a central span flanked by projecting piers, linked by in-line wing walls which subtly curve outwards at the ends and terminate in further piers. The segmental-arch span springs from v-jointed rusticated abutments with canted corners and a projecting weathered impost band. The soffit, the walls beneath the span and the upper stonework are of regular-coursed quarry-faced stone. The voussoirs are ashlar, unfortunately partly concealed by modern warning signs. The whole length of wing walls and span is topped by a deep ashlar coping with projecting band. Selected Sources Other TransPennine Route Statement of History and Significance: West of Leeds V3.1. Prepared for Network Rail, March 2017. Alan Baxter Ltd. Page 3 of 4

Map National Grid Reference: SD9730600504 Crown Copyright and database right 2015. All rights reserved. Ordnance Survey Licence number 100024900. The above map is for quick reference purposes only and may not be to scale. For a copy of the full scale map, please see the attached PDF 1452392_1.pdf. Page 4 of 4

Case Name: North Trans-Pennine Phase 2: Scout tunnel MVL3/11 Case Number: 1449765 Background Historic England has been asked to assess this structure for listing in connection with the proposed upgrade of the Trans-Pennine railway route from Manchester to York and Selby. Asset(s) under Assessment Facts about the asset(s) can be found in the Annex(es) to this report. Annex Name Heritage Category 1 Railway tunnel portal, MVL3/11 Scout Tunnel (south end) Listing Visits Date Visit Type 13 October 2017 Full inspection Page 1 of 4

Annex 1 The factual details are being assessed as the basis for a proposed addition to The National Heritage List for England. Factual Details Name: Railway tunnel portal, MVL3/11 Scout Tunnel (south end) Location South end of Scout tunnel, 100m west of Manchester Road, Mossley. County District District Type Parish Tameside Metropolitan Authority Mossley History In contrast to the main trunk lines of the late 1830s that were constructed by single railway companies the route from Stalybridge to Leeds had fragmented origins and was the work of three different railway companies: the Huddersfield & Manchester Railway, Leeds, Dewsbury & Manchester Railway, and the Manchester & Leeds Railway. The Huddersfield & Manchester Railway was authorised in 1845 and followed the route of the Huddersfield Narrow Canal for much of its length, including a railway tunnel through the Pennine hills set alongside the earlier Standedge Canal Company tunnel of 1811; in 1846 the railway company also acquired the canal. Joseph Locke and Alfred Stanistreet Jee were appointed to survey and design the new line, the two engineers having already worked together on a major project linking Manchester and Sheffield. Jee became the lead engineer for the Huddersfield line, which passed through challenging terrain, assisted by resident engineers that included his brother Moreland Jee (until 1848) and Herbert F Mackworth. Construction of the line was divided into various contracts, with many contractors being only responsible for a single cutting, viaduct or tunnel portal. The largest contract for the Standedge Tunnel between Diggle and Marsden was let to a single contractor, Thomas Nicholson in 1847. The tunnel's completion in 1849 marked the opening of the line. The Leeds end of the route, which was also authorised in 1845, was constructed by the Leeds, Dewsbury & Manchester Railway. The engineer was Thomas Grainger who had previously largely worked in Scotland, and the line was completed in 1849. A short three-mile section of the route between Heaton Lodge Junction and Thornhill Junction near Mirfield was developed by the Manchester & Leeds Railway and was constructed between 1837 and 1840, with George Stephenson as the chief engineer. The structures on this line were designed by Thomas Gooch under the oversight of Stephenson. In 1847 the railway company changed its name to the Lancashire & Yorkshire Railway. In 1847 the Huddersfield & Manchester Railway and the Leeds, Dewsbury & Manchester Railway were acquired by the London & North Western Railway (LNWR) so that the company could access the city of Leeds and the textile towns of West Yorkshire. This pitted them as rivals to the Lancashire & Yorkshire Railway, although at points on the route the two companies had to work together. By 1851 the London & North Western Railway had an overall mileage of railway track of 800 miles and it became the most prominent railway company in the country and the largest joint-stock concern in the world in the late C19. Although the LNWR had a general manager, Captain Mark Huish, the lines of the Stalybridge to Leeds route still managed their own affairs. LNWR later carried out expansion works, including the widening of tracks and bridges, the construction of additional tunnels, and station alterations. In 1923 the line became part of the London Midland & Scottish Railway, and subsequently part of the nationalised British Railways in 1948. The line, its structures and track are currently owned by Network Rail, and the passenger services operated by TransPennine Express and Northern Rail. Page 2 of 4

Scout tunnel was built to carry the railway through a small hill between Stalybridge and Mossley. The south portal was designed by AS Jee and dates from the line s construction between 1845 and 1849. The portal remains as built. Details Railway tunnel portal, 1845-1849, by AS Jee for the Huddersfield & Manchester railway. MATERIALS: buff sandstone. DESCRIPTION: the portal faces south, standing against the south face of the hill, elevated above the road. It comprises a single horseshoe arch flanked by octagonal piers with abutments to either side running into the steep sides of the cutting. The arch has alternate giant voussoirs and random-coursed blocks; all other walling is regular-coursed quarry-faced stone. A giant upper course runs across the whole, with an ashlar parapet above with prominent roll moulding at its base. Selected Sources Other TransPennine Route Statement of History and Significance: West of Leeds V3.1. Prepared for Network Rail, March 2017. Alan Baxter Ltd. Page 3 of 4

Map National Grid Reference: SD9729101240 Crown Copyright and database right 2015. All rights reserved. Ordnance Survey Licence number 100024900. The above map is for quick reference purposes only and may not be to scale. For a copy of the full scale map, please see the attached PDF 1452399_1.pdf. Page 4 of 4

Case Name: North Trans-Pennine Phase 2: Roughtown Road MVL3/17 Case Number: 1450557 Background Historic England has been asked to assess this structure for listing in connection with the proposed upgrade of the Trans-Pennine railway route from Manchester to York and Selby. Asset(s) under Assessment Facts about the asset(s) can be found in the Annex(es) to this report. Annex Name Heritage Category 1 Railway overbridge MVL3/17, Listing Roughtown Road Visits Date Visit Type 13 October 2017 Full inspection Page 1 of 4

Annex 1 The factual details are being assessed as the basis for a proposed addition to The National Heritage List for England. Factual Details Name: Railway overbridge MVL3/17, Roughtown Road Location Higher Newtons, Mossley. County District District Type Parish Tameside Metropolitan Authority Mossley History In contrast to the main trunk lines of the late 1830s that were constructed by single railway companies the route from Stalybridge to Leeds had fragmented origins and was the work of three different railway companies: the Huddersfield & Manchester Railway, Leeds, Dewsbury & Manchester Railway, and the Manchester & Leeds Railway. The Huddersfield & Manchester Railway was authorised in 1845 and followed the route of the Huddersfield Narrow Canal for much of its length, including a railway tunnel through the Pennine hills set alongside the earlier Standedge Canal Company tunnel of 1811; in 1846 the railway company also acquired the canal. Joseph Locke and Alfred Stanistreet Jee were appointed to survey and design the new line, the two engineers having already worked together on a major project linking Manchester and Sheffield. Jee became the lead engineer for the Huddersfield line, which passed through challenging terrain, assisted by resident engineers that included his brother Moreland Jee (until 1848) and Herbert F Mackworth. Construction of the line was divided into various contracts, with many contractors being only responsible for a single cutting, viaduct or tunnel portal. The largest contract for the Standedge Tunnel between Diggle and Marsden was let to a single contractor, Thomas Nicholson in 1847. The tunnel's completion in 1849 marked the opening of the line. The Leeds end of the route, which was also authorised in 1845, was constructed by the Leeds, Dewsbury & Manchester Railway. The engineer was Thomas Grainger who had previously largely worked in Scotland, and the line was completed in 1849. A short three-mile section of the route between Heaton Lodge Junction and Thornhill Junction near Mirfield was developed by the Manchester & Leeds Railway and was constructed between 1837 and 1840, with George Stephenson as the chief engineer. The structures on this line were designed by Thomas Gooch under the oversight of Stephenson. In 1847 the railway company changed its name to the Lancashire & Yorkshire Railway. In 1847 the Huddersfield & Manchester Railway and the Leeds, Dewsbury & Manchester Railway were acquired by the London & North Western Railway (LNWR) so that the company could access the city of Leeds and the textile towns of West Yorkshire. This pitted them as rivals to the Lancashire & Yorkshire Railway, although at points on the route the two companies had to work together. By 1851 the London & North Western Railway had an overall mileage of railway track of 800 miles and it became the most prominent railway company in the country and the largest joint-stock concern in the world in the late C19. Although the LNWR had a general manager, Captain Mark Huish, the lines of the Stalybridge to Leeds route still managed their own affairs. LNWR later carried out expansion works, including the widening of tracks and bridges, the construction of additional tunnels, and station alterations. In 1923 the line became part of the London Midland & Scottish Railway, and subsequently part of the nationalised British Railways in 1948. The line, its structures and track are currently owned by Network Rail, and the passenger services operated by TransPennine Express and Northern Rail. Page 2 of 4

This overbridge was built to carry Roughtown Road over the railway. It was designed by AS Jee and dates from the line s construction between 1845 and 1849. It remains as built, apart from minor parapet repairs and deck resurfacing. Details Railway overbridge, 1845-1849, by AS Jee for the Huddersfield and Manchester railway. MATERIALS: buff sandstone. DESCRIPTION: the bridge carries Roughtown Road north-south across the railway, to the east of Mossley station. Due to gradients the deck slopes down towards the south. The bridge comprises a single segmental-arched span recessed between abutments to either side of the steep cutting, with a parapet. The stonework is regular-coursed and quarry-faced. The stone of the arch piers and the voussoirs have tooled margins, the keystone breaking the arch above and below. The impost band, sloping string course above the arch and the twice-weathered parapet copings are dressed. The abutments curve outwards slightly at all four corners and terminate in slender piers with shallow, pyramidal caps. The arch soffit is narrow-coursed masonry with tooled detailing. The road surface is tarmac. A short section of parapet copings in the south-west corner has been rendered, and a short cement kerb with modern bollards has been installed next to the inner face of the south-west corner. Selected Sources Other TransPennine Route Statement of History and Significance: West of Leeds V3.1. Prepared for Network Rail, March 2017. Alan Baxter Ltd. Page 3 of 4

Map National Grid Reference: SD9772402832 Crown Copyright and database right 2015. All rights reserved. Ordnance Survey Licence number 100024900. The above map is for quick reference purposes only and may not be to scale. For a copy of the full scale map, please see the attached PDF 1452405_1.pdf. Page 4 of 4

If you require an alternative accessible version of this document (for instance in audio, Braille or large print) please contact our Customer Services Department: Telephone: 0370 333 0607 Fax: 01793 414926 Textphone: 0800 015 0516 E-mail: customers@historicengland.org.uk