IGI Airport : The Journey so far and the future.

Similar documents
Global Aviation Market. Connie Muller Mumbai International Airport Limited (MIAL)

Ronan Delaney. DELANEY_RONAN_AVIATION_JUN_2018.DOCX

Airport Investments Summit 2017 June Delhi International Airport Ltd. (DIAL) Sidharath Kapur, President, GMR Airports Limited (GAL)

An Overview of GMR Megawide Consortium s Unsolicited Proposal. March 2018

Press Release March 1, Refer to: Anna Salgado

Pre-Feasibility Report (As Per The Provision Of EIA Notification 2006)

GMR Group s Airports Journey. Emerging Airports Show, Kuwait October 2015

TERMINAL DEVELOPMENT PLAN

Brisbane Airport Ground Transport Operators Forum Tuesday 25 July, 2pm Brisbane Airport Meeting Room Ground Transport Operators

Birmingham Airport 2033

Airport Slot Capacity: you only get what you give

Appendix. Gatwick Airport Ltd - Further information on Gatwick s revised phasing strategy (including Programme) Gatwick Airport Limited

Monitorable Targets & Milestones for INFRASTRUCTURE SECTOR : Planning Commission, Government of India

AIRPORT MODERNISATION IN INDIA By K Roy Paul Secretary, Ministry of Civil Aviation, India and Chairman, Air-India Limited

Airport Master Planning Process & Update

Aero Expo 2016 Civil Aviation Convention & Exhibition Enhancing Regional & Remote Connectivity. November 18 th, 2016.

KANNUR INTERNATIONAL AIRPORT LIMITED (KIAL) Status Report as on 5 May Total land planned for the project acres

Work of the ACI World Safety and Technical Standing committee(wstsc) - PP Singh, Chair STSC & Head Safety, Compliance & Enforcement DIAL,IGI Airport

CIVIL AVIATION AUTHORITY

Master Plan Update Technical Advisory Committee Meeting

Presentation to the British Irish Airport s EXPO John Heffernan Chief Development Officer, Dublin Airport

Introduction to Airports and Their Characteristics Prof. Amedeo Odoni

24-26 March 2014 Cairo, Egypt. Technology. Session #6 Presentation #2

Visit to METSO Alwar (22Mar.2014) A Brief Review

PRE FEASIBILITY REPORT

An Overview of Airport Infrastructure in India. By V.P.Agrawal, Chairman, Airports Authority of India

ATFM IMPLEMENATION IN INDIA PROGRESS THROUGH COLLABORATION PRESENTED BY- AIRPORTS AUTHORITY OF INDIA

Update of the Airport Master Plan. Initial Runway & Land Use Alternatives

SAN JOSÉ INTERNATIONAL AIRPORT

Growth. Helping Asian aviation grow

Lake Tahoe Airport Master Plan

Fraport Regional Airports of Greece Management Company S.A.

2017+ GROWTH STRATEGY

TRBUSINESS. It was also driven by an increase of long-haul destinations, and expanded short haul networks.

Airport Planning and Terminal Design

ATFM IMPLEMENATION IN INDIA PROGRESS THROUGH COLLABORATION PRESENTED BY- AIRPORTS AUTHORITY OF INDIA

LS TRAVEL RETAIL CONFECTIONERY CONCEPT SO CHOCOLATE OPENS SECOND STORE IN CHANGI AIRPORT

STUDY WORK GROUP MEETING No. 4. July 12, 2017

The Ever Evolving Naha Airport (Outline of Naha Airport Passenger Terminal Building) Naha Airport Building Co., Ltd.

CASE STUDY The New Guayaquil International Airport

Opening A New Airport Terminal

GATWICK AIRPORT SCHEDULING DECLARATION FOR SUMMER 2017

Performance monitoring report for 2014/15

Country City Lounge Name Location Facilities Australia Brisbane Plaza Premium Lounge - International Departures

ACI perspective of The Airport Planning Challenge

GSP TERMINAL IMPROVEMENT PROGRAM PRESS KIT

Logan International Airport Right Sizing and Good Terminal Planning

AirportInfo. Passenger Facility Charge

SLC Airport Project Adds New Scope; Teams Scramble to Stay on Schedule

10th ACI Airport Economics & Finance Conference

For personal use only

NARITA INTERNATIONAL AIRPORT OVERSEAS

6 th CAPSCA Asia Pacific Meeting. Business Continuity Management Systems: Implementation Guidelines for Airports

TAPP II: Infrastructure Tracker (hard and soft) As of February 25, 2018 Funding Type

For personal use only

Runway Scheduling Limits Summer 2015

Greater Orlando Aviation Authority

Transportation Research Board. Session Lessons Learned from Large Airport Development. Orlando Airport Experience

Charles H. Ada II Executive Manager A.B. Won Pat International Airport Guam

OUR WORLD WORKS FOR YOU

Infrastructure Projects in Mumbai Metropolitan Region & Maharashtra

Los Angeles International Airport (LAX) Airside $907M

ANALYST BRIEFING Financial Highlights As of 1H 2018

Brief Recap of Project to Date

Schiphol Group. Annual Report

Pre-Coordination Runway Scheduling Limits Winter 2014

State of the Aviation Industry

TAPP II: Infrastructure Tracker (projects and policy reforms) As of April 3, 2018

BNA Master Plan Update Public Meeting No. 2

OUR WORLD WORKS FOR YOU

Aviation ICT Forum OCT 2014

Changi Airport Group releases FY2011/12 Annual Report

GOVERNMENT OF INDIA DIRECTORIATE GENERAL OF CIVIL AVIATION NEW DELHI

AIR TRAVEL AND ITS POTENTIAL FOR DEVELOPMENT OF THE SAARC REGION

Airport Master Plan. Rapid City Regional Airport. October 2015 FAA Submittal

GREATER ORLANDO AVIATION AUTHORITY

14 C.F.R. Part 158. Passenger Facility Charge Program Logan International Airport. Public Notice

AIRPORT MASTER PLAN UPDATE

Manchester Airports Group

FORECASTING FUTURE ACTIVITY

Airports NOVEMBER For updated information, please visit

Airports of Thailand Public Company Limited

Service Excellence Beyond Your Imagination

TAV INVESTMENT HOLDING CO.

ANNUAL GENERAL MEETING

Challenges and opportunities for airport infrastructure. Angela Gittens, Kuala Lumpur, October 14, 2008

Annual General Meeting. April 15, 2010

MULTIPURPOSE SPORTS AND RECREATION FACILITY, CHEVAYUR, KOZHIKODE, KERALA GTCS

TABLE OF CONTENTS 9M10

AUSTRALIAN AIRPORTS ASSOCIATION AUSTRALIAN AIRPORTS DRIVING TOURISM GROWTH

Fort Wayne International Airport Master Plan Study. Executive Summary

The Third ATS Coordination Meeting of Bay of Bengal, Arabian Sea and Indian Ocean (BOBASIO) Region Hyderabad, India, 22 nd to 24 th October 2013.

Beijing Airport. Baggage handling system for one of the world s largest airports. Success story. Airport Logistics

FLL. Fort Lauderdale-Hollywood International Airport Yesterday, Today and Tomorrow. The Brazilian Business Group

IAA Submission on the Commission for Aviation Regulation s Draft 2014 Determination of Maximum Level of Charges at Dublin Airport

Airport Capacity Improvement, Operation Efficiency and Passenger Satisfaction

Heathrow (SP) Limited

Planned Procurement Opportunities Report. January 2019

Introduction of HANEDA and Infrastructure investment by Japan. Oct 18, 2014 Japan Airport Terminal Co., Ltd.

Information Paper 2 SUMMARY

Transcription:

IGI Airport : The Journey so far and the future. 21 st October 2010 Presented by: Peter W. Noyce Chief Operating Officer 0

1

Agenda 1 Introduction GMR / DIAL 2 Challenges during journey 3 DIAL Contribution 4 Terminal 3 building blocks 5 Master Plan 2

INTRODUCTION GMR GROUP 3

About - DIAL Delhi International Airport Pvt. Ltd. (DIAL) is a Joint Venture Consortium led by GMR with a 54% stake. Airports Authority of India (26%), Fraport (10%), Malaysia Airport (10%). Signed OMDA (Operation, Maintenance & Development Agreement )with AAI on 4 th April 2006. Airport handed over to JVC on 3 rd May 2006. As per OMDA, DIAL is responsible for operations, maintenance, development, design, construction, up gradation, modernization, finance and management of the airport. Important Control Functions like ATC, Security, Customs, Immigration, Quarantine and Meteorological services are with the respective Government agencies. Concession period of IGI Airport is 30 + 30 years 4

Agenda 1 Introduction GMR/DIAL 2 Challenges during journey 3 DIAL Contribution 4 Terminal 3 building blocks 5 Master Plan 5

Development Considerations An existing airport with saturated terminals ( Terminals Capacity -12m, Traffic in 2006 16m which kept on increasing ) Immediate airfield and terminal capacity expansion required whilst minimizing impact on operations To meet requirements of OMDA Develop a new runway by Feb 2009 (completed 6 months ahead of schedule in Aug 08) Integrated Passenger terminal of international standard by 2010(T3 completed well in time, also ready for Commonwealth Games) Maximise capacity to handle long-term traffic growth, whilst meeting required service standards Develop modular Master Plan expandable to cater to traffic growth 6

Challenges during IGI modernization Capacity enhancement with minimum interruption to the existing operations. Maximise capacity to handle long-term traffic growth, whilst meeting required service standards set out by OMDA. Working in a public domain attracts lot of Media attention. Operating facilities (T1B building) built in 1940. Making IGI Airport Encroachment Free: There were nearly 2500 encroachments spread in IGI Airport since last 5 decades. Non existence of As-built drawings (for utilities like Electrical/Telephone/IT). Relocation of offices of airlines and other statutory agencies. 7

Challenges Faced - Lack of as built drawings 8

Agenda 1 Introduction GMR/DIAL 2 Challenges during the Journey 3 DIAL Contribution 4 Terminal 3 building blocks 5 Master Plan 9

DIAL has made considerable progress 10

Domestic Arrival Terminal 11

New Domestic Departure Terminal 1D 12

Runway 11/29 13

New Runway 11 / 29 14

First Commercial Flight on RWY 11/29, 21 st Sep 2008 15

Runway 10/28 16

Airside Equipment Rubber Removal Machine Runway/Taxiway Sweeping Machine Friction Tester Grass Cutting Machine Crash Fire Tender Runway Cleaning Equipment 17

Made positive efforts to improve ASQ 2009 2008 Achieving Target Rating - 4.16 Rank 32 / 140 2007 Started improving Rating 3.02 Rank 101 /125 Gaining Momentum Rating 3.15 Rank 124 / 127 amongst airports in Asia Pacific Region by ACI 18

Agenda 1 Introduction GMR/DIAL 2 Challenges during journey 3 DIAL Contribution 4 Terminal 3 building blocks 5 Master Plan 19

Terminal 3 - Challenge A Terminal with such dimensions has never been delivered in a timeframe in which T3 is being built. 20

Worked on aggressive schedule Airport Capacity Time Changi Airport Singapore (T3) 22 Million 76 months Heathrow T5 25 Million 60 Months Beijing Airport New Terminal for Olympics- T3 45 Million 60 months IGI Airport- T3 34 Million 37 months Schedule better than global standards 21

Building Blocks of Terminal 3 Capacity: 34 Mn Area: 502,000 sqm 8 Lane Access road High speed metro link 4300 Multi level car parking 2300 Surface Car parking 168 check-in counter 48 Boarding Gates 78 Aerobridges BHS 12800 bags/hr 5 Level in-line screening 6 CTX machines 14 Bag Reclaim Belts 49 O\B Imm. counters 46 I\B Imm. counters 92 Automatic walkways 63 elevators, 34 lifts 9 Level building 2 Piers - 1.2 Km each Roof St. Steel-18,000 MT Granite 110K Sq. m. Curtain wall-100k Sq. m. Carpet mtl.-170k Sq. m. 25 Sub stns. - 135 MVA 14 DG sets -42 MVA 8 chillers- 2.5K TR Cap. 7 MLD WTP;10 MLD STP 73 VDGS 2875 CCTV Cameras Access Control Card PA system: 8000 speakers 22

T3 snapshots. 23

T3 snapshots. 24

IGI Capacity Enhancement Phase-1 2010-11 Capacity: 60 2009-10 Million ATMs: 60 per hour 2007-08 Capacity: 12 Million 2008-09 Capacity: 18 Million ATMs: 60 per hour Pax Demand 24m Capacity: 26 Million ATMs: 60 per hour Pax Demand 24m Demand 28m 2006-07 Capacity: 12 Million ATMs: 42 per hour Pax Demand 20m ATMs: 32 per hour Pax Demand 16m 25

Agenda 1 Introduction GMR/DIAL 2 Challenges during journey 3 DIAL Contribution 4 Terminal 3 building blocks 5 Master Plan 26

Phase-1 2010 Terminal 1 Terminal 3 Terminal 2 Cross Taxiways Twin Taxiways Runway, 11/29 27

Saturation Phase 2026 28

Facilities to Passengers 29

What Next.. 30

The Future 31

Traffic Forecast Passengers 32

Thank you 33

34