A350 XWB Programme Update

Similar documents
A350XWB Programme Status

Global Investor Forum Airbus. Fabrice Brégier Chief Executive Officer Airbus. Page 1

Technical Press Briefing

First Flight 19 July 2018

AIRBUS QUICK NEWS - DUBAI AIRSHOW NOVEMBER EDITION

PROGRAMME STATUS PROGRAMME STATUS

RAAA Annual Convention This information is property of Embraer and cannot be used or reproduced without written permission.

The A330 Family Powering into the future

INVESTOR MEETING. CEO Airbus Group CEO Airbus CFO Airbus Group & Airbus. Tom Enders Fabrice Bregier Harald Wilhelm PARIS AIRSHOW 2015

Fokker Technologies The Fokker mind, heart and soul

International Conference on Integrated Modular Avionics Moscow

Designing for ease of future maintenance

Providing industry leading aircraft maintenance and engineering solutions.

Transformation in Procurement. Challenges for the Global Aircraft Industry. HAL Executives Presentation Toulouse, October 13, 2014

MRO Trends: Airbus update

Commercial offer on leasing out aircraft

Business Aviation DASSAULT AVIATION & The Falcon and New development methods

ITA Europe 2015 Keynote Speaker

Your success is our goal. Rely on our engineering.

787 Design for Maintainability

Mobile Aircraft Maintenance Crew (MAMC) EXTENDING YOUR SUCCESS

Location: 2. It shows on at least two more places an example of the principle of dichotomy,

AVIATION MAINTENANCE TECHNOLOGY

Aeronautics & Air Transport in FP7. DG RTD-H.3 - Aeronautics Brussels, January 2007

TYPE CERTIFICATE DATA SHEET

Simulating Airbags for ExoMars Project Using Grids for Competitive Advantage Where Is Your Performance Data?

The Design, Engineering and Innovation team is the primary provider of engineering services to Etihad Airways and the focal point of technical

Wolfgang Engler Zulassungsanforderungen und Testprogramme für den A 380

! "#$ #%& Challenge the future. Delft University of Technology

Aeronautics & Air Transport in FP7

ETIHAD AIRWAYS ANNOUNCES ORDER FOR UP TO 117 AIRBUS AIRCRAFT

RAAA Annual Convention 2015 Mark Dunnachie Vice President Asia Pacific

GERMAN EQUITY FORUM 2016

AIRCRAFT SPECIFICATION SUMMARY. Airbus A

Aviation market is back worldwide

Performance. Aircraft System

Dornier OE-LIR MSN 3115

PRESS CONFERENCE. Saint-Cloud July, 26 th 2017

Maintenance Cost Estimation Method of an Aircraft Manufacturer

EMBRAER 170/190 FLIGHT TEST DEVELOPMENT PROGRAM

A320 FAMILY: The most successful aircraft family. Key Figures* 20% fuel burn reduction. 5% lower airframe A320 FAMILY.

MetroAir Virtual Airlines

Air Traffic Management

A350 Technology. Aviation Technical Education Council. Name Thierry HARQUIN. Orlando, Florida 21 April th March 2007

Athens International Airport, Marketing Workshop. The Challenges facing Air Transport. John Blanchfield Director, Technical Marketing, Airbus

First Airbus arrives in UK for conversion to RAF Voyager (05/09/2011)

Flight test organisation

AIRBUS WRAPS UP ITS SUCCESSFUL 2018 SINGAPORE AIRSHOW PARTICIPATION

Aerospace. Tim Mahoney z. President and CEO

Services by Airbus Training. A350XWB Reaching new horizons together

Maintaining the dream

Thales on the Civil Aerospace market

2014 Annual Results 1

AE 452 Aeronautical Engineering Design II Cost Analysis. Prof. Dr. Serkan Özgen Dept. Aerospace Engineering

Space Based ADS-B. ICAO SAT meeting - June 2016 AIREON LLC PROPRIETARY INFORMATION

IDG damage due to low oil level operation

Aircraft Controls MILITARY AIRCRAFT COMMERCIAL AIRCRAFT AFTERMARKET

Q300 Serial Number 583 Available for Sale. Offers for Sale. Q Series: Q300 MSN 583. TTSN: 24,072 Flight Hours TCSN: 33,232 Flight Cycles

Airworthiness Directive

What did people think in 1970?

Ethiopian Sets Yet another Year of Growth Milestones

Q300 Serial Number 657 Available for Sale. Offers for Sale. Q Series: Q300 MSN 657. TTSN: 17,909 Flight Hours TCSN: 20,374 Flight Cycles

Application Solutions for Today s Aerospace Industry

April 1, 2015 Pay Scales TechOps Scales

H215. HELICOPTERS Civil

The Thales Group APENDICE H. (Mr.) Bruno Vilaine THALES - ATM division Head of Integrated Logistic Support Dept Speaker (Panel : 2)

More mobility for the world. Subline for division or product. Overline 12pt

AIR ACTIVITIES BADGE AT THE YORKSHIRE AIR MUSEUM Stage 2

Registry Publication 17

Hans-Peter Ring EADS Chief Financial Officer. Cowen Conference February 8 th 2012

Maintenance Briefing Notes. Aircraft bonding, grounding/earthing requirements during maintenance. Maintenance Briefing Notes, Page 1

Part 104 CAA Consolidation 1 March 2007 Gliders - Operating Rules

Operational feedback of generative design with 3DEXPERIENCE

Cathay Pacific Airways 2013 Analyst Briefing 25 June Cathay Pacific Airways Analyst Briefing 27 November 2013

TWELFTH AIR NAVIGATION CONFERENCE

Modernising UK Airspace 2025 Vision for Airspace Tools and Procedures. Controller Pilot Symposium 24 October 2018

B.S. PROGRAM IN AVIATION TECHNOLOGY MANAGEMENT Course Descriptions

DGCANO SUBJECT REFERENCE COMPLIANCE APPLICABILITY DGCA/BOEING 767/01 EMERGENCY EVACUATION SLIDES FAA AD AS IN THE AD AS IN THE AD

Review of. Boeing B Captain. Produced by Captain Sim

More mobility for the world. Services for the Airbus A320. Family business NEW

AIR NAVIGATION ORDER

GANP 2019/ASBUs. Olga de Frutos. Marrakesh/10 th December Technical Officer Air Navigation

Q300 Serial Number 653 Available for Sale. Offers for Sale. Q Series: Q300 MSN 653. TTSN: 19,775 Flight Hours TCSN: 22,775 Flight Cycles

WORKSHOP TRAINING & FLEET SAFETY

It's time. After years of work

Editorial Martin Stucki, CEO

Air Navigation Bureau ICAO Headquarters, Montreal

Building A Vibrant Air Cargo Hub at Singapore Changi Airport

Introduction. Airline Economics. Copyright 2017 Boeing. All rights reserved.

1995 EMB-120ER Presently operated by SkyWest Airlines, USA msn

1.6 M Manhours per year. 9 Heavy wide-body bays incl 3 A380 bays with paint facilities. More than 200,000 m 2 of apron & hangars

CIRRUS AIRPLANE MAINTENANCE MANUAL

PR-429BF-600M. Bell 429 Blade Fold Kit Operations Manual

Mobile Aircraft Maintenance Crew A380 Door Modification EXTENDING YOUR SUCCESS

AE 452 Aeronautical Engineering Design II Cost of an Airplane. Prof. Dr. Serkan Özgen Dept. Aerospace Engineering April 2017

Paulo Cesar de Souza e Silva President & CEO

Flight Operations Safety Awareness Seminar (FOSAS)

Notification of a Proposal to issue an Airworthiness Directive

1990 BOEING MSN 24770

The Sukhoi Superjet 100 has been developed by. Sukhoi Civil Aircraft Company in partnership with. Alenia Aermacchi to meet the growing demand of

Transcription:

A350 XWB Programme Update Toulouse, June 5 th Presented by Didier EVRARD EVP - Head of A350 XWB Programme

Airbus Innovation Days 2012 A350 XWB Programme From FAL Start to First flight Readiness for Flight Tests Ramp-up and maturity -1000 update

Airbus Innovation Days 2012 Where we left off from last Innovation Days... May 2012 First assembled fuselage (ES) transfer to Station 40

Route to A350 XWB First Flight Q3-12 Nose Fuselage Power-ON MSN1 Fuselage junction EW wing testing in preparation Q4-12 MSN001 Wing / Fuselage junction Full A/C Power-ON Ground tests start Q1-13 Start of Virtual 1 st Flight Campaign MSN001 Preparation for 1 st Flight ES and EW test start Q2-13 Load Calibration on MSN1 Ground Vibration Test on MSN1 Electro-Magnetic Hazard test MSN3

Final Ground Tests on MSN001 / MSN003 Flight Load Calibration Engine Powerplant installation installation GVT Fuel, Cabin pressurization and Radio Communication DONE Flight Loads calibration of wing and tails DONE Powerplant and APU Installation in Station 22 DONE Ground Vibration Test DONE Final systems upgrades and tests DONE Final checks and preparations ONGOING Ground Tests on MSN001 done and A/C handed over to Flight Test May 31 st

Airbus Innovation Days 2012 Trent XWB engines first run June 2 nd

Airbus Innovation Days 2012 A350 XWB Programme From FAL Start to First flight Readiness for Flight Tests Ramp-up and maturity -1000 update

Structure Testing Pyramid for maturity at Entry Into Service Design Component demonstrators 2011 2012 Sub-assembly demonstrators Full-scale airframe testing Preparation 2013 Flight test Major Full Scale Tests under progress to complete Structure Test Pyramid

Virtual Full Scale Test to simulate before tests ES3 Rear End model Rear fuselage & VTP ES1 Nose Model S11 / 12 ES2 Centre Model Centre fuselage & Wing 65 Mdof 24 LC Mdof: Millions degree of freedom Detailed non-linear model at full airframe level

Main structural Static tests on going Full Airframe except dummy HTP, LGS, tail cone, Pylon & movables LH wing box with dummies CWB, MLG, pylon and movables Static Test for First Flight Clearance and Type Certification

EW Wing in Erding 1g Wing Bend Test for Flight Control Surfaces successfully completed end of March and 1,25 Limit Load beginning of May

Static Testing Aircraft in testing facilities Systems Testing objectives for maturity at Entry Into Service ES Static Test Airframe started end March 2013

Static Testing Aircraft Lower Fuselage Loading New concept of composite wing loading Fuselage Loading on Floor Fuselage Pressure

Systems Testing Pyramid for maturity at Entry Into Service Design Component demonstrators 2010 2011-2012 2013 Integration Bench Testing Function Integration Benches A/C 0 (Iron Bird +Simu) Flying Test Bed Flight test Final Integration Tests are aircraft level with First Flight Standards on going

System Testing on Aircraft 0 Flight Control & Hydraulic Integration testing ongoing since May 2011 Virtual First Flight tests started on 31 st Jan as per plan with FF System Standards Approx 700 virtual flight sessions performed Operational and Multi Systems tests sessions enabling to optimize tests efficiency and lead time

System Testing on Aircraft 0 Virtual First Flight First Flight Clearance and Operability Tests underway to prove Maturity

Trent XWB on test 2 x Robustness Integration Cyclic Endurance LP System Performance 2 x Mechanical 2 x Flight 12 engines, approx 4200 hours and 7400 Cycles completed in Engine Development Plan

Trent XWB Flying Test Bed for Maturity 17 th May 2013 FTB1 Performance, Integration and Operability Feb/Jul12 FTB2 Hot Weather Campaign and Cold Days Aug 12/Feb13 FTB3 Icing and Drainage - Apr/Jun13 FTB3 Objectives: CS-25 Natural Icing Air Inlet Distortion Drainage Performance Powerplant and Systems already tested on FTB with more test hours than ever achieved before and in hot and cold environment

Trent XWB Flying Test Bed Flight hours = 256 FH Run hours = 351 h 74 Flights performed Status end May 13 FTB3 Campaign started in May 2013 Engine change on going Performance Air Inlet distortion Relight Optimization CS-25 Natural icing

Trent XWB Engine Development Program FBO RIG TEST Fan Blade Out Test successfully passed

Airbus Innovation Days 2012 A350 XWB Programme From FAL Start to First flight Readiness for Flight Tests Ramp-up and maturity -1000 update

EIS H2 2014 Airbus Innovation Days 2012 FAL journey for Flight test aircraft MSN005 Cabin-equipped aircraft MSN004 MSN002 Cabin-equipped aircraft MSN003 MSN001 MSN5000 (ES) On track for EIS in second half 2014

Cabin Virtual First Flight Integration Bench for Air Systems, Cabin & Cargo Systems Cabin 0 and V&V Platform on track for Cabin Virtual First Flight

Monthly Production Rate Airbus Innovation Days 2013 Transition from development to serial production 2011 2012 2013 2014 2015 2016 2011 2012 2013 2014 2015 2016 3 1 Design quality Supply Chain performance Aircraft maturity A350 XWB industrial ramp-up gates Customization Customer readiness

Intense Customization activities Number of active version in 2013 4 Customization Definition Freeze declared since 2011 Pragmatic Customization deployment with more than 10 Customers in 2013

Catalogue enrichment 2011 2013 Where we started Equinox Z300 Solstys CL3620 Journey Arcus Cirrus Celeste* 2012 2013 Still expanding! Pinnacle 5751 Bars Nespresso maker Flex floor path marking Hybrite NELIs PYC 5810 Constant catalogue enrichment demonstrated High level of customer adherence to the catalogue (*) Innovation proposal being processed

A350 XWB Configurator Configurator tool in pilot phase with early customers

Preparation to EIS Airline 1: Flight test conditions to mirror Airlines operations Flight Line Hangar for Working Parties and daily maintenance Full refurbishment of flight line building to accommodate airline like operations New hangar construction ongoing EIS preparation activities with launch Customer (Qatar Airways) on main areas (Training, Technical Data, material and logistics, )

Airbus Innovation Days 2012 A350 XWB Programme From FAL Start to First flight Readiness for Flight Tests Ramp-up and maturity -1000 update

A350-1000 outlook A350-1000 Design and technology insertion freeze Structure sizing in progress Concept freeze Design freeze Final assembly start First flight EIS 2011 2012 2013 2014 2015 2016 2017 New A350-1000 endorsed by the market

A350-1000 is a stretch of the -900 Wing Fuel Pump Re-Use Same IMA Same Electrics + 5 frames + 6 frames Same Flight Control Equipment Part Number Common Avionics Platform AGS pack Re-Use Same Hydraulics A350-1000 development from A350-900 is low risk Common Enabling platform

A350-1000 Trent XWB-97 Powerplant First engine run in one year

Wrap-up MSN1 close to its first flight Cabin flight test preparation started Route to EIS in H2 2014 is confirmed Maturity at EIS and production ramp-up are the next challenges -1000 development is low risk and on track Still a lot of challenges ahead despite very good progress in the last year

Trade Media Briefing 17 th May 2013 Airbus Innovation Days 2013 Airbus Innovation Days 2013