DEMETER satellite disposal, CNES give an example of French Space Act compliance. Florence DUCHEVET & Henri DARNES - CNES

Similar documents
Arianespace Launch Service Operator Policy for Space Safety

François CAHUZAC / Arnaud BIARD

Flight management during Concordiasi campaign

July VA 219. ATV Georges Lemaître

SUMMARY. of the North. Reference: A B

VORCORE/STRATEOLE. VORCORE / STRATEOLE Workshop. September 16-17, Paris VORCORE SYSTEM DESCRIPTION VORCORE IMPLEMENTATION 1/10/02

LAUNCH KIT. December 2017 VA240. Galileo FOC-M7 SAT

Space Transportation Systems. System Concepts

LAUNCH KIT. September 2018 VA243. Horizons 3e. Azerspace-2/Intelsat 38

and the Environment Speaker: Guy Viselé External Communication Advisor ABC User Committee, February 2 nd 2009

CESSNA 400 EQUIPPED WITH GARMIN G1000

LAUNCH KIT. November 2017 VV11. MOHAMMED VI A satellite

Successful Return to Flight of the H-IIA Launch Vehicle

ESA-EDA: Paving the Way for New UAS Capabilities in Europe

A Study on Berth Maneuvering Using Ship Handling Simulator

Evaluation of Alternative Aircraft Types Dr. Peter Belobaba

LAUNCH KIT AUGUST 2018 VV12 AEOLUS

London Borough of Barnet Traffic & Development Design Team

Planned Orbital Flight Test of a 6m HIAD

LAUNCH KIT. December 2018 VA246 GSAT-11 GEO-KOMPSAT-2A

Launching a Sub-Orbital Spacecraft

5 Day Operator Course. 1.0 AIRSPACE CLASSROOM ONLINE EXECUTIVE VO Terms X X Classification

to Reduce Greenhouse Effects

April 16, Erik Larson

IN FLIGHT REFUELING FOR COMMERCIAL AIRLINERS

Article VI of the Outer Space Treaty Issues and Implementation. Margaret Roberts Senior Attorney National Aeronautics and Space Administration

Chapter 3 GV Performance and Flight Planning Guidelines

Historical background

Missions, Operations & Ground Infrastructure

The President s Commission on Implementation of US Space Exploration Policy

FLIGHT OPERATIONS INTRODUCTION ICAO Air Navigation Commission

ICAO Initiatives on Aircraft Noise

Questionnaire on possible legal issues with regard to aerospace objects: replies from Member States

LAUNCHING YOUR UNMANNED AIRCRAFT PROGRAM

Space Based ADS-B. ICAO SAT meeting - June 2016 AIREON LLC PROPRIETARY INFORMATION

NZQA registered unit standard version 2 Page 1 of 5. Demonstrate flying skills for a commercial pilot licence (balloon)

Integrated Flight Instrument Systems

H-II TRANSFER VEHICLE TRAJECTORY PLANNING AND FLIGHT OPERATION RESULTS

PERTH AND KINROSS COUNCIL. Housing and Health Committee. 25 May Perth and Kinross Local Housing Strategy

A SEGMENTED ARCHITECTURE APPROACH TO PROVIDE A CONTINUOUS, LONG-TERM, ADAPTIVE AND COST- EFFECTIVE GLACIERS MONITORING SYSTEM

Commercial Space Transportation Update

SPACE SHUTTLE MISSION SUMMARY INTRODUCTION

NZQA registered unit standard version 2 Page 1 of 5. Demonstrate competence for multi-engine flight instruction

LFBO / Toulouse-Blagnac / TLS

PARAMOUNT A Local Based Service (LBS) Prototype for Mountaineers and Rescuers

CONTENTS VS21 ARIANESPACE TO ORBIT THE FIRST SIX SATELLITES IN THE ONEWEB CONSTELLATION. OneWeb F6

Sustaining quality of services through service reliability and availability

InterFAB Ops meeting Traffic volatility in Brussels hotspot sectors

A launch for the International Space Station

Bombardier s CRJ Rumors of its Demise are Greatly Exaggerated

French DSNA approach to CNS rationalization & evolution

COMPANY POLICY Flight Safety & Operating Regulations

December VA 221 DIRECTV-14 GSAT-16

Valley Fliers 1402 Auburn Way North, #223 Auburn WA 98002

TRAINING COURSE OUTLINE

LAUNCH KIT. April 2019 VS22. O3b Satellites

PROJECT CLEAN AIR. Certification Scheme for Clean Air Charter. Final Report. For. Cathay Pacific Airways Limited (CX) Prepared by

DESTIMED PROJECT CALL FOR EXPRESSION OF INTEREST FOR THE IMPLEMENTATION OF ECOTOURISM PILOT ACTIONS IN CROATIAN MPAS

Follow up to the implementation of safety and air navigation regional priorities XMAN: A CONCEPT TAKING ADVANTAGE OF ATFCM CROSS-BORDER EXCHANGES

Context Scope Procurement approach Topics for discussions Timeline. EDA/ESA UAS Workshop May

Advanced Flight Control System Failure States Airworthiness Requirements and Verification

HUMAN FACTORS GENERAL PART- 66 TRAINER MEDIAS. B1 category. HUMAN FACTORS B1 category GENERAL MODULE 09. Lesson 01.

September VA 218. MEASAT-3b OPTUS 10

LAUNCH KIT. December 2018 VS20 CSO-1

COSMO-SkyMed COSMO-3

A launch for the International Space Station

Missione Rosetta: come raggiungere ed esplorare una cometa

April VA 222 THOR 7 SICRAL 2

SAVOIR industrial perspectives Thales Alenia Space View

Applicability / Compatibility of STPA with FAA Regulations & Guidance. First STAMP/STPA Workshop. Federal Aviation Administration

Australia s Favourite Airline Group. Leading through loyalty customers, partners and community

COMPLIANCE WITH THIS PUBLICATION IS MANDATORY

LAUNCH KIT. February 2019 VA247. Saudi Geostationary Satellite 1/Hellas Sat 4 GSAT-31

Clean-Green Energy Solution.The Tilos paradigm.

P310 VTOL UAV Operation Manual

Space Based ADS-B. Transforming the Way you See the Sky February, 2015

Cuadrilla Elswick Ltd

Gold Coast. Rapid Transit. Chapter twelve Social impact. Chapter content

WEIGHT, BALANCE & EQUIPMENT LIST

ASSEMBLY 35TH SESSION

Vega Operational Launch System Overview on launch operations and launch service cost drivers

Arianespace 2013 Organization, History and Programs

Real-time Simulations to Evaluate the RPAS Integration in Shared Airspace

The Suborbital Space Tourism Project of EADS Astrium

1 st Quarter Results FY

Air Traffic Control Agents: Landing and Collision Avoidance

Sustainable Aviation & Airports AOA Operations and Safety Conference, June 2014 Jonathon Counsell, SA Chair, Head of Environment, British Airways

Airspace Infringements: Impact on ATC

SPOT 5 incorporates major upgrades, with several new instruments improving the quality of images and services offered to customers.

CHECKLIST DJI MAVIC PRO

Optimizing trajectories over the 4DWeatherCube

Balloon systems development CONCORDIASI. Overview of T-PARC balloon flights

AIRBUS Generic Flight Test Installation

Flight 158 ARIANE 5. Follow the launch live on the internet broadband at (starting 20 minutes before lift-off)

NOVA Fall Camporee. Science in the woods. What could possibly go wrong? September 28-30, Camp Kikthawenund

Pseudo-Satellites and Their Use in Near Space

AIRLINES MAINTENANCE COST ANALYSIS USING SYSTEM DYNAMICS MODELING

ENVIRONMENT ACTION PLAN

Lake Tahoe Airport Master Plan Public Meeting March 16, 2015

ANDES, an underground laboratory in the Agua Negra tunnel

Transcription:

DEMETER satellite disposal, CNES give an example of French Space Act compliance Florence DUCHEVET & Henri DARNES - CNES 2nd INTERNATIONAL DEMETER WORKSHOP October 10th-12th, 2011

Contents Context French Space Act Disposal operations Part N 1 : fuel passivation Part N 2 : electrical passivation Conclusion DEMETER satellite disposal - 2nd INTERNATIONAL DEMETER WORKSHOP October 10th-12th, 2011 2

Context DEMETER is the first launched satellite of the MYRIADE family. June 29th 2004, DEMETER was launched with a required lifetime of 1 year and a 2 years target, the real life duration was 6,5 years. The initial orbit was a 700 km sun synchronous orbit January 2006, due to a solar panel anomaly that might lead to satellite loss, CNES decided to lower the initial altitude to 660 km. This altitude allowed CNES to be compliant with a duration of 25 years to re-enter the atmosphere in case of loss of the satellite. DEMETER satellite disposal - 2nd INTERNATIONAL DEMETER WORKSHOP October 10th-12th, 2011 3

Contents Context French Space Act Disposal operations Part N 1 : fuel passivation Part N 2 : electrical passivation Conclusion DEMETER satellite disposal - 2nd INTERNATIONAL DEMETER WORKSHOP October 10th-12th, 2011 4

French Space Act The French Space Act relating to space operations came into force in France on December 10 th 2010. For the disposal of satellites already in orbit at this date, technical regulation requires to seek the best possible strategy. By the end of 2009, CNES decided to retire the DEMETER satellite : 2010/12/10 End of programmation of the scientific mission 2011/03/17 Satellite end of life With this disposal, CNES wanted to give an example of French Space Act compliance. DEMETER satellite disposal - 2nd INTERNATIONAL DEMETER WORKSHOP October 10th-12th, 2011 5

Contents Context French Space Act Disposal operations Part N 1 : fuel passivation Part N 2 : electrical passivation Conclusion DEMETER satellite disposal - 2nd INTERNATIONAL DEMETER WORKSHOP October 10th-12th, 2011 6

Disposal strategy MYRIADE satellites are microsatellites designed by CNES with a low cost approach and they were designed without taking into account disposal issues. To be in line with the regulations we applied : atmospheric re-entry phase duration limited to 25 years, fuel depletion, electrical passivation. In 2010, CNES sought the best possible disposal strategy to passivate a microsatellite. DEMETER satellite disposal - 2nd INTERNATIONAL DEMETER WORKSHOP October 10th-12th, 2011 7

Disposal operations Part N 1 : fuel passivation To lower the semi major axis of the orbit, To empty propellant tank until fuel depletion. Part N 2 : electrical passivation To discharge the battery, To switch off the satellite, To minimize the probability of satellite restart in case of OBC restart. DEMETER satellite disposal - 2nd INTERNATIONAL DEMETER WORKSHOP October 10th-12th, 2011 8

Contents Context French Space Act Disposal operations Part N 1 : fuel passivation Part N 2 : electrical passivation Conclusion DEMETER satellite disposal - 2nd INTERNATIONAL DEMETER WORKSHOP October 10th-12th, 2011 9

Part N 1 : fuel passivation The aimed orbit choice DEMETER orbit was already in line with regulation In October 2010, CNES decided to use a yo-yo scenario (lowering / raising orbit) in order not to take into account collision risks with other operational satellites. DEMETER satellite disposal - 2nd INTERNATIONAL DEMETER WORKSHOP October 10th-12th, 2011 10

Part N 1 : fuel passivation A scenario «yo-yo» means Day 1 : Maneuver N 1 with 1 burn Da < 0 Day 2 : Maneuver N 2 with 1 burn Da < 0 on opposite position Day 3: Maneuver N 3 with 1 burn Da > 0 Day 4: Maneuver N 4 with 1 burn Da > 0 on opposite position We wanted to keep a circular orbit. Man 1 PSO 30 Man 4 PSO 180 Man 3 PSO 0 1 burn per maneuver for security. Man 2 PSO 210 DEMETER satellite disposal - 2nd INTERNATIONAL DEMETER WORKSHOP October 10th-12th, 2011 11

Part N 1 : fuel passivation From January 4th 2011 to February 8th 2011 15 maneuvers were carried out to reach fuel depletion A maneuver = 2 minutes burn it means a 1,6 km variation on the semi major axis of the orbit. After each maneuver : the satellite behavior was analyzed,... and if OK, the next maneuver was calculated. DEMETER satellite disposal - 2nd INTERNATIONAL DEMETER WORKSHOP October 10th-12th, 2011 12

Part N 1 : fuel passivation We couldn't forecast exactly when the fuel depletion would be reached But for the two last maneuvers, we saw that these maneuvers were executed at lower pressure and with vapor state of hydrazine. that was a signal that fuel depletion was reached. Fuel passivation phase was finished. The reached orbit respects the duration of the atmospheric reentry phase, which is expected to be less than 25 years. For DEMETER, it is particularly difficult to estimate the duration because of the long payload appendages. DEMETER satellite disposal - 2nd INTERNATIONAL DEMETER WORKSHOP October 10th-12th, 2011 13

Contents Context French Space Act Disposal operations Part N 1 : fuel passivation Part N 2 : electrical passivation Conclusion DEMETER satellite disposal - 2nd INTERNATIONAL DEMETER WORKSHOP October 10th-12th, 2011 14

Part N 2 : electrical passivation We have to discharge the battery : the solar panel is pointed with its back towards the sun. We have to minimise probability of satellite reboot because if enough power is supplied by the solar array. it may restart. a new flight software which does nothing was uploaded and activated at the end of the electrical passivation day. DEMETER satellite disposal - 2nd INTERNATIONAL DEMETER WORKSHOP October 10th-12th, 2011 15

Part N 2 : electrical passivation The electrical passivation operations was processed on March 17th 2011 DEMETER satellite went out by the end of the day. Passage GS en anti canonique 6 IGS IGS VGS VBNR 36 5 30 4 Consigne VLIM=9V 24 (A) 3 18 (V) 2 Flux solaire réfléchi par la terre 12 1 6 0 0 536410 542290 548170 554050 559930 565810 571690 577570 583450 Extrait time (s) de la présentation de C.Elisabelar du 27/05/2011 DEMETER satellite disposal - 2nd INTERNATIONAL DEMETER WORKSHOP October 10th-12th, 2011 16

Conclusion 1 Satellite behaviour was excellent until the end. No anomalies occurred during disposal operations. DEMETER disposal demonstrated the feasibility of a complete diaphragm tank depletion. This disposal will permit to achieve complete depletion for other satellites carrying such a tank. For CNES, it concerns the MYRIADE or PROTEUS families. DEMETER satellite disposal - 2nd INTERNATIONAL DEMETER WORKSHOP October 10th-12th, 2011 17

Conclusion 2 Demeter was a scientific mission very pleasant to operate. More than 6,5 years in orbit without any major payload anomaly. Thank you for continuing to make live our work through your research works. Thank you for your attention. DEMETER satellite disposal - 2nd INTERNATIONAL DEMETER WORKSHOP October 10th-12th, 2011 18