PROJECTS ELIGIBLE FOR JARC FUNDING. March 2013

Similar documents
Welcome. Sign in Pick up comment form Visit stations to learn more Submit your comment form

OCTOBER 2012 (Fiscal Year 2013) Monthly Ridership Report METROBus and METRORail

December 2014 (Fiscal Year 2015) Monthly Ridership Report METROBus and METRORail

Public Transit Services on NH 120 Claremont - Lebanon

August 2014 (Fiscal Year 2014) Monthly Ridership Report METROBus and METRORail

JUNE 2011 (Fiscal Year 2011) Monthly Ridership Report METROBus and METRORail

June 2015 (Fiscal Year 2015)

Kingston Transportation Master Plan Draft Report Transit Forecasting 1

Like many transit service providers, the Port Authority of Allegheny County (Port Authority) uses a set of service level guidelines to determine

Community Transit Solutions for the Suburbs CTAA Expo June 2014

Monthly Ridership Report. Local Network (Local Bus Service + Light Rail Service) & Commuter Network (Park & Ride Service)

METRONext PUBLIC INVOLVEMENT PHASE I

RACINE COUNTY PUBLIC TRANSIT PLAN:

Caroline County / King George County Transit Studies. Meeting November 1, 2017

Approval of August 2019 Service Changes

DEMOGRAPHICS AND EXISTING SERVICE

Reducing Garbage-In for Discrete Choice Model Estimation

Welcome. Share information on the new investments and funding proposed for the Phase Two Plan

LA Metro Rapid - Considerations in Identifying BRT Corridors. Martha Butler LACMTA, Transportation Planning Manager Los Angeles, California

This report recommends routing changes resulting from the Junction Area Study.

Northwest Corridor Transit Study

Region of Waterloo Transportation and Environmental Services Transit Services

Ridership Growth Strategy (RGS) Status Update

OFFERING MEMORANDUM East Arapahoe Road, Greenwood Village, CO. JEFF HALLBERG PRINCIPAL

What was Old is New Again

Link Union Station (LINK US)

Fare Policy Discussion Background and History

DRT Performance Measurement: the U.S. Experience

FREE STANDING OUT PARCEL FOR LEASE Dollar General Plaza - Bank Building 2695 N Military Trail, West Palm Beach, FL 33419

These elements are designed to make service more convenient, connected, and memorable.

Monthly Ridership Report

METRO Green Line ridership has already exceeded expectations in its first month.

ORANGE COUNTY TRANSPORTATION AUTHORITY. Go Local Fixed-Guideway Program History and Project Update. PowerPoint 3

APPENDIX B COMMUTER BUS FAREBOX POLICY PEER REVIEW

Summary of Proposed NH 120 Service

MUSKEGON AREA TRANSIT SYSTEM PROPOSAL FOR FARE AND SERVICE ADJUSTMENTS TO BE PHASED IN BEGINNING JANUARY 1, 2018

The Boulder (and Boulder County) Experience. June 6 th, 2017 RTD s Pass Program Working Group 2 nd Meeting

COUNCIL AGENDA REPORT

Federal Budget Submission. Prepared for the House of Commons Standing Committee on Finance. Greater Toronto Airports Authority

4. ANALYSIS OF EXISTING RIDERSHIP AND ROUTE PERFORMANCE

SAMTRANS TITLE VI STANDARDS AND POLICIES

Tolling in Washington State. Craig J. Stone, P.E. Assistant Secretary, Toll Division

Westbrook Station. Transit Oriented Development Opportunity

Presentation to the DRCOG Board August 16, 2017

Fremont-South Bay Corridor

Quarterly Report Transit Bureau, Local Transit Operations. First Quarter, Fiscal Year 2015 (July 2014 September 2014) ART & STAR

I-95 Transit/ TDM Study. LRTP Advisory Committee Meeting June 22, 2017

2018 Service Implementation Plan Executive Summary

Houston Regional Transit: Fare Structures (effective March 2015)

Now Available. Urban Rail Transport. in India Urban Bus Transport. in India India Infrastructure Research.

Providing public transportation since 1999 between Washington and Milwaukee Counties

Washington Metropolitan Area Transit Authority Services Utilization Study

From personal to mass transit

Post Oak Blvd & San Felipe St

Hampton Roads Passenger Rail Task Force. February 29, 2012

ROUTE EVALUATION ROUTE 21 Denton County Transportation Authority

Riders Advisory Council Rail Subcommittee April 9, 2008

Tri-Rail Coastal Link and Downtown Miami Link. Miami-Dade County Black Affairs Advisory Board February 3, 2016

DOWNTOWN BRT ALTERNATIVE - 19th AVE

Today s Agenda. Today s Panel. Coming Attractions. Do You Get What You Incent?: A Virtual Discussion. May 2-4, September 9-12, 2007

transportation + demographics = opportunity

Why we re here: For educational purposes only

284,557 inhabitants + 23% 60,000 vehicles during peak periods Growing need in terms of moving people public transit Saturation of the road network

October REGIONAL ROUTE PERFORMANCE ANALYSIS

Greater Portland Transit District

(This page intentionally left blank.)

14 YORK REGION TRANSIT (YRT/VIVA) SOUTHWEST DIVISION OPERATIONS AND MAINTENANCE CONTRACT EXTENSION

TTI REVIEW OF FARE POLICY: PRELIMINARY FINDINGS

City of Kingston Report to Council Report Number Mayor and Members of Council Jim Keech, President & CEO, Utilities Kingston

Airport Planning Area

CENTRAL OREGON REGIONAL TRANSIT MASTER PLAN

Quality of Life Study

CURRENT SHORT-RANGE TRANSIT PLANNING PRACTICE. 1. SRTP -- Definition & Introduction 2. Measures and Standards

INFLUENCE AFFLUENCE MEETS

Call for Public Hearing August 2019 Service Changes

RIDERSHIP TRENDS. October 2017

Miami Orlando Passenger Rail Project Overview

Improving Directional Signage for TTC Services at Pearson Airport

Dulles Corridor Metrorail Project Update Dulles Area Transportation Association August 25, 2009

Planning for RAV: Lon LaClaire, Transportation Engineer Anita Molaro, Development Planner CITY OF VANCOUVER

A COMPARISON OF THE MILWAUKEE METROPOLITAN AREA TO ITS PEERS

WESTERN EL DORADO COUNTY SHORT AND LONG-RANGE TRANSIT PLAN Executive Summary

2017 LRT Passenger Count Report

Intercity Transit Short / Long Range Plan Short-Term Recommendations Transit Authority Meeting

NAIOP. Marcia McAllister Metropolitan Washington Airports Authority

Horizon 1 Implementation Update

DRAFT Service Implementation Plan

FY Year End Performance Report

Sarasota County Area Transit Express Bus and North Port Park and Ride

Business Growth (as of mid 2002)

Chairman and Members of the Planning and Development Committee. Edward R. Sajecki, Commissioner of Planning and Building

Household Travel Survey Overview

Mobile Farebox Repair Program: Setting Standards & Maximizing Regained Revenue

Indianapolis - MIDTOWN - Redevelopment

Galveston County. Population: 322,225 (2015 est.) Access to 2 deep water ports. Location of a world class industrial complex

Moving Forward: SFRTA Projects & Initiatives. ULI Southeast Florida/Caribbean Infrastructure Committee July 27, 2011

DISTRICT EXPRESS LANES ANNUAL REPORT FISCAL YEAR 2017 JULY 1, 2016 JUNE 30, FloridaExpressLanes.com

Service Performance 2013 Networked Family of Services

PROMENADE AT THE QUAY LOWER LONSDALE NORTH VANCOUVER

PALM BEACH MPO. May 3, Valerie Neilson, AICP Multimodal Manager Palm Beach MPO

Transcription:

PROJECTS ELIGIBLE FOR JARC FUNDING March 2013

Job Access Reverse Commute (JARC) Projects The Houston Galveston Area Council (H-GAC) has issued a 30-day call for proposals for JARC projects for the Houston Urbanized Area Applications for JARC funds are due April 4, 2013 Grant funds currently available through JARC $5,179,916 Proposed METRO projects for JARC applications are: Swiftline Extension Operating Bellaire Quickline Operating Renwick Crosstown Sunday Service Operating 1

TMC/Palm Quickline - Capital Note: Project not moving forward. This project was withdrawn and the information is presented here only for comparative purposes. JARC Committee recommended $2.4 million for this project. Project Description: Replace 426 Swiftline and extend from TMC Transit Center to Palm Center with upgraded Quickline service Estimated Capital Cost: $8,083,835 JARC Funds Available: $5,179,916 Other Assigned Grants Available: $1,271,177 (CMAQ & BBF) Estimated METRO (Local) Cost: $1,632,742 Estimated Annual Operating Cost: $1,718,798 Estimated Ridership: 2015 400 boardings per day; annual boardings 101,600 2035 850 boardings per day; annual boardings 215,900 2

Swiftline Extension Operating & Capital Project Description: Extend current 426 Swiftline service to Palm Center Estimated Capital Cost: $630,000 Estimated Annual Operating Cost (Extension): $356,615 JARC Funds Available: $5,179,916 Est. JARC Operating Funds Est. METRO Operating Cost Year 1 $799,679* $178,308 Year 2 - $178,308 Year 3 - $178,308 Estimated Ridership: 2015 400 boardings per day; annual boardings 101,600 Increase of 125 boardings per day; annual increase of 31,750 2035 850 boardings per day; annual boardings 215,900 Note: CMAQ and BBF funds are assigned to the Signature Service program; funds are at risk *JARC request has been adjusted for overhead costs 3

Swiftline Extension..continued Project Pros: Limited stop service with better connectivity to customers who live and work in the TMC, MacGregor, OST and South Union area Service connects to Downtown and other employment and education centers in the region Provides improved intermodal connections at Palm Center (Southeast LRT) and the TMC (Redline LRT) Project Cons: Low ridership forecast CMAQ and BBF funds are assigned to the Signature Service program; funds are at risk No operating funds currently identified in the 3-year transit plan JARC provides operating assistance for 3 years only Leaves an estimated $3.87M in JARC funding unassigned 4

Bellaire Quickline All Day Service Operating Project Description: Extend operating parameters for existing Bellaire Quickline from peak period to all day service Estimated Annual Operating Cost (Incremental): $631,270 JARC Funds Available: $5,179,916 Est. JARC Operating Funds Est. METRO Operating Cost Year 1 $1,415,570* $315,635 Year 2 $315,635 Year 3 $315,635 Estimated Ridership: 2015 1,200 boardings per day; annual boardings 304,800 Increase 475 boardings per day; annual increase 120,650 2035 1,750 boardings per day; annual boardings 444,500 Note: CMAQ and BBF funds are assigned to the Signature Service program; funds are at risk *JARC request has been adjusted for overhead costs 5

Bellaire Quickline All Day Service..continued Project Pros: Frequent, limited stop service Improved connections to retail and employment centers between TMC, Sharpstown, Westchase and improved transfer connections Project Cons: CMAQ and BBF funds are assigned to the Signature Service program; funds are at risk No operating funds currently identified in the 3-year transit plan JARC provides operating assistance for 3 years only Leaves an estimated $3.76M of JARC funding unassigned 6

Renwick Crosstown Sunday Service Operating Project Description: Addition of Sunday service Estimated Annual Operating Cost (Incremental): $250,904 JARC Funds Available: $5,179,916 Est. JARC Operating Funds Est. METRO Operating Cost Year 1 $553,095* $125,452 Year 2 $125,452 Year 3 $125,452 Estimated Incremental Ridership: 2015 500 to 700 anticipated; annual boardings 29,900 anticipated Note: CMAQ and BBF funds are assigned to the Signature Service program; funds are at risk *JARC request has been adjusted for overhead costs 7

Renwick Crosstown Sunday Service..continued Project Pros: Large number of attractors/generators to and from multi-family homes, retail and other employment centers Enhanced connectivity to 10 or more bus routes Serves area with household incomes lower than METRO service area average Provides Sunday service where none exists Project Cons: CMAQ and BBF funds are assigned to the Signature Service program; funds are at risk No operating funds currently identified in the 3-year transit plan JARC provides operating assistance for 3 years only Leaves an estimated $4.62M in JARC funding unassigned 8

Summary Commitment if the METRO Board of Directors approves moving forward with all three (3) projects presented: JARC provides 50% match for operating cost JARC provides 80% match for capital cost Estimated annual operating cost in Local (METRO) funds $619,395 Estimated capital cost in Local (METRO) funds - $126,000 The Houston Region has Transportation Development Credits (TDCs), available and if granted to METRO, they could cover 100% of eligible project costs. 9