I-270 Bridge Renovation at New Florissant Road

Similar documents
Full I-35E Mainlane Closure at Beckley Avenue - July 27-30

State Project Reconstruction I-84

GO 10 is planning to switch I 10 Eastbound traffic lanes after Sunland Park. The switch is set for Sunday, April 2. Details continue to develop.

Guide to. Road Construction Projects

Route 141 and I-44 Design-Build Project Community Involvement Group. March 21, 2016

Pardon Our Dust Public Information Meeting

FOR IMMEDIATE RELEASE Fiorella Teodista January 5, 2018 SOUTH FLORIDA AND TREASURE COAST WEEKLY LANE CLOSURES AND WORK ZONE ADVISORY

Important Lane Closures, April 3 9, 2011

NEWS RELEASE. EL PASO DISTRICT Jennifer Wright (915) a TxDOT Project For immediate release

TRAFFIC ALERT FOR FEBRUARY 4-8, 2019 Highway Work Zones in the Staunton District

FREDERICKSBURG DISTRICT. District Engineer Marcie Parker, P.E. May 8, 2018

April 4, 2014 Chuck McGinness, FDOT TREASURE COAST TRAFFIC REPORT April 4 through April 11, 2014

A VISION FOR I-95. January 12, Delaware Department of Transportation

NEWS RELEASE. EL PASO DISTRICT Jennifer Wright (915) a TxDOT Project For immediate release

AUGUST 3, 2009 METRO SERVICE RESTORATION PLAN

October Business Owner Task Force. Matt Sanman Public Information Coordinator

TRAFFIC ALERT FOR DECEMBER 10-14, 2018 Highway Work Zones in the Staunton District

NEWS RELEASE. EL PASO DISTRICT Jennifer Wright (915) a TxDOT Project For immediate release.

Pre-Construction Public Meeting July 2017

Commonwealth Avenue Bridge Deck Replacement Project. Legislative and Stakeholder Briefing. April 13, 2017

September 1, 2017 I-10 night closures scheduled for September hour full closure of I-10 West happens Sunday, Sept. 10

Night work update: Hills M2 Motorway and westbound on ramp at Pennant Hills Road

East Link Project Update. Maintenance of Traffic During Construction. April 21, 2015

I-10 West and Sunland Park Drive southbound will close July 13 at night. Detour onto North Mesa will be required.

35EXPRESS PROJECT UPDATE FOR DENTON COUNTY COMMISSIONERS

TRAFFIC ALERT FOR FEBRUARY 11-15, 2019 Highway Work Zones in the Staunton District

Exit 148 (Quantico) to Exit 133 (Route 17/Falmouth)

All closures this week happen at night, including full closures of Mesa and I-10

Organization Date. Sound Regional Council Regional Project Evaluation Committee. Brian Nielsen, Program Administrator

Exit 148 (Quantico) to Exit 133 (Route 17/Fredericksburg)

Constructor: Joseph B. Fay

Day and night work: Hills M2 Motorway tunnel portals and Coral Tree Drive electrical substation

Exit 136 (Centreport Parkway/Stafford County) to Exit 130 (Route 3/Fredericksburg)

Possible traffic snarls ahead for 60 Freeway with lane/ramp closures on the weekends in Diamond Bar

I-10 will close overnight Sunday through Thursday next week. Crews continue to make progress on Sunland s new bridges and ramps.

TRAFFIC ALERT FOR JANUARY 15-19, 2018 Highway Work Zones in the Staunton District

FOR IMMEDIATE RELEASE February 22, 2019 CONTACT: Jen K. Ward, SALEM 69

VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT June 12 June 18, 2016

RELEASE: IMMEDIATE Oct. 6, 2017 CONTACT: Darragh Copley Frye (office) (cell)

Section 106 Update Memo #1 Attachment D. Traffic Diversion & APE Expansion Methodology & Maps

Day and night time road closures and traffic changes on Campbell Street and surrounding streets, St Peters from Monday 9 April to Friday 13 April

TRAFFIC ALERT FOR MARCH 5-9, 2018 Highway Work Zones in the Staunton District

CONTACT: Nichole Lawrence CELL: FOR IMMEDIATE RELEASE Wednesday March 28, 2018

FDOT Treasure Coast Traffic Impact Report June 19 through June 26, 2015

Evaluation of High-Occupancy-Vehicle

VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT Aug , 2016

2017 Work and Launch of the Next Phase. Information meeting, Montréal-Ouest September 14, 2017

5.1 Traffic and Transportation

Damen Elston Fullerton Reconstruction, Intersection Improvements CDOT Project B-1-501

FEDERAL HIGHWAY ADMINISTRATION NEVADA DEPARTMENT OF TRANSPORTATION ENVIRONMENTAL IMPACT STATEMENT RE-EVALUATION

NEWS RELEASE. EL PASO DISTRICT Jennifer Wright (915) a TxDOT Project For immediate release

WEEKLY HIGHWAY ALERT RICHMOND DISTRICT

Interstate 90 and Mercer Island Mobility Study APRIL Commissioned by. Prepared by

Yonge Street / Highway 401 Improvements Update. Public Works and Infrastructure Committee. General Manager, Transportation Services

Important Lane Closures March 1 5, 2010

TRAFFIC ALERT FOR DECEMBER 25, 2017 to JANUARY 5, 2018 Highway Work Zones in the Staunton District

Arlington County Board Work Session Eastbound Widening January 17, Amanda Baxter, VDOT Special Projects Development Manager

State aims to cure accident-plagued South Jersey interchange

FDOT Treasure Coast Traffic Impact Report

Ohio Department of Transportation Construction Update

Neighbourdhood Committee NDG-Westmount. October 16, 2017

Engagement Summary Report. Trans-Canada Highway 1 RW Bruhn Bridge and Approaches Project Community Engagement February 1 18, 2018.

Route 29 Solutions Projects

November 21, 2012 Barbara Kelleher, (954)

State of Texas. District: County: Condition: Roadway: Direction: Time: Limits:

Project Overview. Hunter Mill Road Over Colvin Run Bridge Replacement Fairfax County. Get Involved. Public Information Meeting. Contact Information

Concord Road Interchange. Standard hours of work

Georgia 400 Tolls to End Friday, November 22 Toll collection scheduled to end after rush hour

NDG-Westmount Neighbourhood Committee. November 16, 2015

Construction underway. STATUS: 229 5,190 5,419 5,305 STIP REFERENCE #FR /01/2013

MONTANA CONSTRUCTION REPORT 06 / 14 / 2016

For Immediate Release Christine Girardin January 19, 2018 SUMTER COUNTY FLORIDA S TURNPIKE AND I-75 INTERCHANGE IMPROVEMENTS

Monthly Traffic Update

Transportation TRANSPORTATION PROJECTS

Maryland Route 36 (Mount Savage Road) and Maryland Route 35 (Ellerslie Road) Intersection Study. Cumberland Area Metropolitan Planning Organization

VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT

VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT

RELEASE: IMMEDIATE September 14, 2012 CONTACT: Sandy Myers (office) STA (cell)

Neighbourhood Committee NDG - Westmount. September 12, 2016

Memorandum. Roger Millar, Secretary of Transportation. Date: April 5, Interstate 90 Operations and Mercer Island Mobility

San Quentin Reuse Planning Committee Minutes Thursday, May 2, 2002 San Rafael Corporate Center

2006 WEEKDAY TRAFFIC PROFILE. June 15, 2007

SOUTHBOUND YONGE STREET TO EASTBOUND HIGHWAY 401 F L Y -UNDER

HAMPTON ROADS CROSSINGS PATRIOTS CROSSING AND HRBT

Public Information Center August 12, 2010

TRAFFIC ALERT FOR MARCH 26-30, 2018 Highway Work Zones in the Staunton District

TRAFFIC ALERT FOR SEPTEMBER 17-21, 2018 Highway Work Zones in the Staunton District

October 31, 2014 Chuck McGinness, (954)

Milestone: Bridge to Nowhere scheduled for demolition Aug 14

CHAPTER 4: ALTERNATIVES

May 1, 2015 Meredith Cruz, (561) Palm Beach County Traffic Report May 1 through May 8, 2015

NDG/Westmount Neighbourhood Committee. May 16, 2016

Hospital Link Project Project Update Winter 2018

2013 El Paso County Comprehensive Mobility Plan. December 16, 2013

El Dorado County / Tahoe Roadwork Schedule Sunday through Saturday September 9 September 15, 2012

Fairfax County Parkway Widening Fairfax County

TRAFFIC ALERT FOR OCTOBER 15-19, 2018 Highway Work Zones in the Staunton District

Frequently Asked Questions on the Route 29 Solutions Improvements Projects

State Route 8 Corridor. Northern Summit County s Path to Success

AGENDA ITEM I-6 Public Works

Transcription:

I-270 Bridge Renovation at New Florissant Road What is the problem? The I-270 bridge over New Florissant Road in north St. Louis County is more than 50 years old. It is classified as structurally deficient and this summer we have a project to replace the driving surface with a new structural overlay. This project is a practical solution to extend the usable life of the bridge until funding becomes available for a full replacement. What will this mean? In summer 2015, MoDOT has scheduled a project to renovate the driving surface on the bridge over New Florissant Road. To do this safely and quickly, MoDOT has determined that the department will need to close New Florissant Road under I-270 for one month to remove the driving surface of the bridge and replace it. New Florissant will be closed from Dunn Road to Jean Drive and there will no access to or from eastbound I-270. Substantial traffic delays are expected. When will construction begin? Major construction on I-270 over New Florissant Road will begin the week of July 6. Residents should expect noise at all hours of the day for the duration of the project. Why does New Florissant Road have to be closed? New Florissant Road must be closed in order to maintain traffic flow on I-270. Eastbound I-270 traffic will be routed down and back up the interchange ramp without stopping. There will be no access to or from eastbound I-270 at this location. Are there other options besides closing the road? MoDOT evaluated several options before determining closing New Florissant Road was the safest and fastest way to do the work. Other options for completing the bridge took longer, had longer anticipated backups and more confusing work zones to drive through. Please see reverse side for detour map.

I-270 Bridge Renovation at New Halls Ferry Road What is the problem? The I-270 bridge over New Halls Ferry Road in north St. Louis County is more than 50 years old. It is classified as structurally deficient and this summer we have a project to replace the driving surface with a new structural overlay. This project is a practical solution to extend the usable life of the bridge until funding becomes available for a full replacement. What will this mean? In summer 2015, MoDOT has scheduled a project to renovate the driving surface on the bridge over New Halls Ferry Road. To do this safely and quickly, MoDOT has determined that the department will need to close New Halls Ferry Road under I-270 for one month to remove the driving surface of the bridge and replace it. New Halls Ferry Road will be closed from Dunn to South Pershall Road and there will no access to or from eastbound I-270. There will be no access from eastbound I-270 to the one way outer road between New Halls Ferry Road and Old Halls Ferry Road. Substantial traffic delays are expected. When will construction begin? Major construction on I-270 over New Halls Ferry Road will begin the week of July 6. Residents should expect noise at all hours of the day for the duration of the project. Why does New Halls Ferry Road have to be closed? New Halls Ferry Road must be closed in order to maintain traffic flow on I-270. Eastbound I-270 traffic will be routed down and back up the interchange ramp without stopping. There will be no access to or from eastbound I-270 at this location. Are there other options besides closing the road? MoDOT evaluated several options before determining closing New Halls Ferry Road was the safest and fastest way to do the work. Other options for completing the bridge took longer, had longer anticipated backups and more confusing work zones to drive through. Please see reverse side for detour map.

I-270 Bridge Renovation at New Florissant and New Halls Ferry What is the problem? The I-270 bridges over New Florissant Road and New Halls Ferry Road in north St. Louis County are more than 50 years old. They are classified as structurally deficient with severe deterioration of the driving surface. This summer Mo- DOT has a project to replace the driving surface with a new structural overlay. This project will extend the usable life of the bridges until funding becomes available for full bridge replacements. What work is being done? In summer 2015, MoDOT will renovate the driving surface of the I-270 bridges over New Florissant Road and New Halls Ferry Road. I-270 will remain open however, significant traffic delays are expected. Due to the close vicinity of the bridges, construction will take place at both locations at the same time in order to get in and get out as safely and quickly as possible. When will construction begin? Preliminary construction will begin in early June 2015. This work will focus on preparing the ramps and by-pass for the I-270 lane closures. Most of this work will take place at night including various lane closures. Residents can expect to hear noise at all hours throughout the duration of the project. Major construction on the I-270 bridges over New Florissant Road and New Halls Ferry Road will begin the week of July 6. The construction work on both bridges will be completed at the same time and is anticipated to take a month. How will this impact traffic? From July through early August, eastbound I-270 will be reduced to two through lanes and routed down and back up the interchange ramps without stopping. There will be no access to or from eastbound I-270 at these locations. Westbound I -270 will continue to have three through lanes but traffic will be shifted. New Florissant Road and New Halls Ferry Road will be closed under I-270. Motorists should expect substantial backups on I-270 during construction. It is anticipated that average delays through the work zones could add 30 minutes or more to the daily commute. Motorists are encouraged to seek alternate routes to avoid this area during peak travel times. Motorists will need to use alternate streets to cross I-270 while New Florissant Road and New Halls Ferry Road are closed. They can also use adjacent interchanges to access I-270 while these interchanges are closed. Want more information? Go to htp://www.modot.org/stlouis/major_projects/i-270bridgerenovaton.htm Project contacts: Area Engineer Lisa Kuntz at 314-453-1879 or Lisa.Kuntz@modot.mo.gov Project Manager Lee Hillner at 314-453-5036 or Lee.Hillner@modot.mo.gov

I 270 Bridge Renovation at New Florissant Rd. and New Halls Ferry Rd. Tips to Help Businesses and Customers Prepare your employees with positive information How to direct people to your business around the closures Alternate routes as options Know what interchanges and overpasses are open Inform your customers of the closures and detours Suggest appointment times to help customers avoid peak rush hour delays Link to I 270 work zone website from your website http://www.modot.org/stlouis/major_projects/i 270BridgeRenovation.htm Follow us on social media Facebook at MoDOT St. Louis Twitter at MoDOT_StLouis Prepare directions to your business/event with alternate routes