SAFETY NOTICE OPERATIONAL AND SAFETY PLAN FOR THE CONSTRUCTION OF NEW GENERAL AVIATION HANGAR FACILITY BRIEFING NOTES DURATION 6 MONTHS

Similar documents
AIRFIELD OPERATIONAL INSTRUCTION 26 GENERAL AVIATION OPERATIONS

Low Visibility Operations

ICAO Aerodrome s Manual. AERODROME S INSPECTOR WORKSHOP St. Maarten, MAHO June 2012

Health and Safety Tenant/User

STANDARD OPERATING PROCEDURES TACTICAL OPERATIONS b AIRCRAFT INCIDENTS AND ACCIDENTS EFFECTIVE: OCTOBER 2007

1.0 PURPOSE. a) Ensure safe movement with the objective of preventing collisions between aircraft, and between aircraft and obstacles;

SAFEGUARDING OF AERODROMES. Advice Note 1

ORANGE AIRPORT METHOD OF WORKING PLAN. Orange Airport

TERRACE-KITIMAT AIRPORT SOCIETY APRON MANAGMENT PLAN

Turweston Aerodrome Rules

LIGHT AIRCRAFT ASSOCIATION

East Midlands Airport 2018 Aerodrome Manual

AOP 11 Low Visibility Procedures (LVP s) (Aerodrome Operating Procedure)

APRON MANAGEMENT SERVICES

Runway Crossings at Brisbane International Airport

Network Safeworking Rules and Procedures

Aerodrome Manual. ICAO/FAA Comprehensive Aerodrome Certification Inspector Workshop. Presented To: Caribbean States By: FAA Office of Airports

MANAGING THE RISK TO AVIATION SAFETY OF WIND TURBINE INSTALLATIONS (WIND FARMS)/WIND MONITORING TOWERS.

TUCSON INTERNATIONAL AIRPORT (TUS) DISABLED AIRCRAFT RECOVERY PLAN Section TABLE OF CONTENTS Page

KLHQ Fairfield County Emergency Response Plan (August 13, 2012)

OPERATIONAL SAFETY POLICY GROUND RUNNING OF AIRCRAFT MARCH This document is uncontrolled when printed

Vancouver Airport Authority. Contractor Safety Management Program [CSMP] Airside Contractor & Construction Safety

PART F SECTION 2 RESPONSIBILITIES AND ACTIONS

Form No. OPS-20 Issue No. 01 Airport Safety Induction Revision No. 01

GROUND TOWER HELI RADAR

Guideline: Rules and appropriate practices for disabled aircraft removal

8 Aviation Support. 8.1 Aerodrome Rescue and Fire Fighting Services. 8.2 Aircraft Refuelling. 8.3 Air Cargo

Steve Parry has left for pastures new and you can contact Richie Gallagher on Steve s old mobile number

The airfield. Hangers A259

INTERNATIONAL FIRE TRAINING CENTRE

Brigham City Regional Airport s AIRPORT EMERGENCY RESPONSE PLAN

Striving for Excellence in Aviation Ground Safety

Access to and security of the airport

INTERNATIONAL FIRE TRAINING CENTRE

GUYANA CIVIL AVIATION REGULATION PART X- FOREIGN OPERATORS.

PART H SECTION 3 GENERAL REQUIREMENTS AND PROCEDURES GOVERNING THE EXECUTION OF WORKS ON OR ADJACENT TO AIRSIDE OPERATIONAL AREAS

2 Definitions Ardmore Airport Limited. Ardmore Airport Limited, as owner and operator. Airside Driving Permit.

Airport Rules and Regulations

Appendix D AIRSIDE VEHICLE DRIVING BEST PRACTICES

SECTION 2 - GENERAL REGULATIONS

TANZANIA CIVIL AVIATION AUTHORITY SAFETY REGULATION CHECKLIST FOR INSPECTION OF SURFACE MOVEMENT GUIDANCE CONTROL SYSTEM (SMGCS)

GRANDE PRAIRIE AIRPORT. Reduced Visibility Operations Plan

FLYING ORDER BOOK POWER

RECONSTRUCT/REHABILITATE TRANSIENT APRON AND TAXIWAY 'A' PHASING PLAN - PHASE 1

THE CIVIL AVIATION AUTHORITY OF THAILAND. Aeronautical Information Service Department AIP SUPPLEMENT

EMERGENCY CONTINGENCY PLAN

Contents. Subpart A General 91.1 Purpose... 7

OPERATIONAL PROCEDURES

(a) it has been licensed for the purpose, and save in accordance with the conditions prescribed in such licence; or

Airside Driving Policy

BEDFORD AERODROME LANDING REQUEST FORM

LANCASTER & MORECAMBE MODEL AIRCRAFT CLUB FIELD & SAFETY RULES 1) GENERAL REQUIREMENTS

REGULATIONS (10) FOREIGN AIR OPERATORS

PART D SECTION 2 STAND ALLOCATION

DEPARTMENT OF CIVIL AVIATION ANNEX 1 REPUBLIC OF MAURITIUS

Appendix 6.1: Hazard Worksheet

14 WING GREENWOOD ATC STANDARD OPERATIONAL PROCEDURES

Airport Operating Standard. Transfer of Explosive Cargo

Ground Movement Handling of Large Passenger and Cargo Carrying Aircraft

Airmen s Academic Examination

Farnborough International Airshow 2018 HELICOPTER OPERATORS GUIDE

CAUTION! JET BLAST ON APRON

Dangerous Goods Emergency Response

Airside Vehicle Control Manual

THE ANN ARBOR MUNICIPAL AIRPORT RULES AND REGULATION. Adopted July 17, 2013

Pre-Coordination Runway Scheduling Limits Winter 2014

Civil Aviation Rules, 2052 (1996)

MASTER PLAN 2010 ADDENDUM REPORT

VANCOUVER AIRPORT AUTHORITY TARIFF OF FEES AND CHARGES Effective January 1, 2019 Subject to Change PAYMENT TERMS AND CONDITIONS

Darley Moor Airfield Flying Orders

Document Control Identification. Document History. Authorisation. Rail Safety Manager Brookfield Rail

1.2 An Approach Control Unit Shall Provide the following services: c) Alerting Service and assistance to organizations involved in SAR Actions;

K SIGNAGE & TRAFFIC CONTROL. Table of Contents

OPERATIONAL SAFETY POLICY TRANSFER OF EXPLOSIVE CARGO MARCH This document is uncontrolled when printed

JMA Flying Event Safety Rules

SUPPLEMENTARY CONDITIONS APPLICABLE TO TOWER CRANES 2012

Cork Airport Airside Driving Policy

Section 32 TABLE OF CONTENTS Airfield and Aircraft Operations. 32.A General B Aircraft

Control of Cranes and Other Temporary Obstacles

NEAR MISS. Unit 1. Describe the picture. Radiotelephony - Listening. Plain English - Listening for gist. Plain English - Listening for detail

SAFE COORDINATIONS IN THE PROVISION OF CAPSCA - AIRLINES CAPT. AHMED HASHIM HUSSEIN SAFETY MANAGER - BADR AIRLINES

Islay Airport Open Day & Air Show

JOB DESCRIPTION FBO Manager

A.3 List of Effective Pages

Airside Driving Policy

Safety and Airspace Regulation Group. 31 May Policy Statement STANDARD INSTRUMENT DEPARTURE TRUNCATION POLICY.

VISITING LASHAM BY AIR

Technical Guidance Material for Aerodromes Rescue & Fire Fighting Services Advisory Circular

LANCASTER AIRPORT DRIVER TRAINING PROGRAM

GAWLER AIRFIELD OPERATIONAL GUIDELINES

SECTION 32. Airfield and Aircraft Operations

AI AIRCRAFT SERIOUS INCIDENT INVESTIGATION REPORT PRIVATELY OWNED J A T

English version. Airport Security Stockholm Arlanda Airport

ACCIDENT. Aircraft Type and Registration: Piper PA Cherokee, G-BRWO. No & Type of Engines: 1 Lycoming O-320-E3D piston engine

Effective: PERTH AIRPORT AIRSIDE SURFACE MONITORING FOR FORRESTFIELD AIRPORT LINK TUNNELLING

Petition for Exemption

AIP Supplement. Effective at: NZDT ( UTC) This AIP Supplement is issued separately and should be retained until cancelled.

GOVERNMENT OF INDIA OFFICE OF THE DIRECTOR GENERAL OF CIVIL AVIATION TECHNICAL CENTRE, OPP. SAFDURJUNG AIRPORT, NEW DELHI

Session 4. Cabin Safety Aspects in Accident Investigation

MANCHESTER AIRPORT AIRCRAFT PUSHBACK PROCEDURES. Effective from 27th November :01 hrs local.

Transcription:

SAFETY NOTICE OPERATIONAL AND SAFETY PLAN FOR THE CONSTRUCTION OF NEW GENERAL AVIATION HANGAR FACILITY BRIEFING NOTES START DATE 20 th April 2015 END DATE 11 TH September 2015 DURATION 6 MONTHS Issue 1 April 2015 London Ashford Airport Ltd 1

CONTENTS: PART 1 PART 2 PART 3. PART 4. PROJECT DESCRIPTION AND MANAGEMENT AIRSIDE SAFETY & WORKING ARRANGEMENTS EMERGENCIES & RESPONSE LIST OF MAPS, PLANS AND ASSOCIATED MATERIAL. London Ashford Airport Ltd 2

Part 1. PROJECT DESCRIPTION & MANAGEMENT 1. General Works Description 1.1 The project is to construct a new build general aviation hangar 23m Wide, 73m Long 8.8m high in a location 6m away from the current main hangar as shown on the enclosed drawings. The door clearance openings at either end are 20m wide and 5.7m high and its purpose is to provide undercover storage for a range of light piston engine aircraft up to medium size commercial / private jet aircraft. 1.2 The works generally consist of levelling an area of ground which was used some 30 years ago for wash down of commercial aircraft and more recently has been used for parking light aircraft. We will construct a steel framed hangar on the levelled space. The new hangar is approximately 4m lower than and next to the existing large T2 style hanger. 2. Works duration & timings 2.1 The works are scheduled to last for approximately 6 months starting with site set up 20 th April 2015. The projected completion date is 11 th September 2015. 2.2 It is proposed that the works will be Monday Friday 07:30 17:00 2.3 Timings and work days may occasionally alter to account for issues arising from weather or other situation outside of the control of the airport authority or contractor. All changes will be related to others as necessary. 3. Aerodrome Project Management 3.1 The overall project is managed through the airport Operations Department. The managers responsible for day to day control of the project are the Airport Manager & Terminal Supervisor. The airport Fire Services Manager will assist as required. Contact details for the airport authority are contained at part 4. 4. Contractor Project Management 4.1 The project contractor carrying out the works is; Civils Contracting Ltd 3 Archers Park, Branbridges Road, East Peckham, Kent TN12 5HP. London Ashford Airport Ltd 3

4.2 The contractor s site manager is Jeremy Hilder. Contact details for the contractor are contained at part 4. Part 2. AIRSIDE SAFETY & WORKING ARRANGEMENTS 1. Contractors Airside Briefing 1.1 Prior to starting work airside the contractor staff will be given a safety briefing on working within the airport environment, safety rules, likely hazards and emergency procedures. 2. Contractors Working Site Location and Marking 2.1 The working site is located 6m north of the current main T2 type hangar on an area formally used for aircraft wash down. As it is not possible to accommodate the works site and storage compound in to one area with a landside entrance, the areas are separated by a route used by general aviation to access the northern hangar doors as shown on the drawing Contractors Compound Locations and Aircraft Access Routes. 2.2 The work area perimeter will be marked and secured by the use of herras fencing panels. A lockable gate will be established at the north western end of the construction site fence line for access / egress. The gate will remain closed at all times when not being used. The fence line will have red or orange warning lights displayed along its length to highlight the compound perimeter during the hours of darkness. The perimeter fence line will be fitted with coloured stripes or small panels to highlight the perimeter for daytime use. 3. Contractors Storage Compound Location and Marking 3.1 The contractor s compound is situated on ground adjacent to the landside access gate 3 and to the North West; opposite the work site compound location. The compounds are separated by a route used by general aviation to access the northern hangar doors as shown on drawing at part 4. 3.2 The storage compound area perimeter will be marked and secured by the use of herras fencing panels. A lockable gate will be established at the north western end of the site fence line for access / egress to the landside access gate 3. The gate must be locked at all times when not in use. The fence line will have red or orange warning lights displayed along its length to highlight the compound perimeter from its airside London Ashford Airport Ltd 4

elevation during the hours of darkness. The perimeter fence line will be fitted with coloured stripes or small panels to highlight the perimeter along its airside elevation for daytime use. 4. Aircraft Movements & Traffic Management 4.1 Aircraft movements to or from the northern access doors to the main or engineering hangars. a. No aircraft will be given permission to taxi under its own power through these areas by ATC. b. Aircraft being taken out or placed in to the hangar using the northern hangar doors or to / from the adjacent small engineering hangar area must either be manually handled or under tow by airport authority ground handlers. c. The ground handlers will liaise with the contractors when aircraft are to be moved between the working and storage compounds as required. d. Aircraft being towed or otherwise moved will have right of way at all times. 4.2 Aircraft movements between the Bravo and Charlie aprons. a. No aircraft will be given permission to taxi under its own power by ATC between Charlie & Bravo aprons through the eastern works boundary fence line and the grass area to the opposite side. b. Aircraft required to traverse along this route must either be manually handled or under tow by airport authority ground handlers c. Pilots of aircraft wishing to relocate under power between the Bravo and Charlie aprons may do so with permission from ATC and routing via Charlie hold / central access / Bravo hold points. d. Aircraft being towed or otherwise being moved will have right of way at all times. e. The ground handlers will liaise with ATC when aircraft are to be moved under tow between the working compound and grass verge as required. London Ashford Airport Ltd 5

4.3 Vehicle movements between the working and storage compounds. a. Aircraft being towed or otherwise being moved will have right of way at all times. b. The contractor s will liaise with the airport ground handlers to ensure not aircraft are imminently to be moved within the area prior to moving plant or vehicles between the works and storage compounds. c. No compound gates are to remain open whilst they are not in use and should only opened to accept vehicle transfer once the contractor has assured himself there are no conflicting aircraft movements. d. During transfer between the compounds whilst both gates are open, the contractor will detail one person to direct the vehicles and act as a lookout for aircraft movements in the area. e. The airport management must be advised beforehand of and large deliveries of material or plant which are required to be placed directly into the working compound. This is to ensure those who need to be can be informed in a timely organised manner and the allocation of staff resources can be pre-arranged for escort in to airside areas. 5. Airside Security and Access Arrangements 5.1 There is a presence of staff Monday - Friday days during the hours 07:30 19:00. In addition there is a staff presence between 21:00 04:00 Monday Thursday except holiday days. 5.2 The airport authority will where discovered whilst the contractor is off site, report broken or blown down fencing, open accommodation containers, obvious damage or missing items to the site manager as soon as possible. Where the situation has the potential for damaging aircraft or a hazard to airside users; such as broken or blown over fence lines, the contractor will be responsible for turning out to the airport within a reasonable time to instigate repairs to the satisfaction of the airport duty manager. 5.3 Access to the storage compound will be via access gate 3. The contractor will be issued a key for the gate in order to allow deliveries, vehicles and plant directly in to its compound. Access for large deliveries will require prior permission from the airport operations London Ashford Airport Ltd 6

management. The airport manager will sign out keys as appropriate to the contractors site manager who must retain the key in a suitably safe manner at all times. 5.4 The airport authority will require copies of keys to locks attached to fence line access points by the contractor. The keys will be retained by the duty airport fire officer and will help to enable a reasonable response to be made by emergency services in the event they are required whilst the contractor is off site. In such cases the site manager will be informed as soon as operationally practicable of the issue at hand. 6. On Airport Crane Operations 6.1 The steel frame erecting, fitting of cladding and hanger doors is planned between 8 th May and 24 th August. A crane will be on site for all or the majority of the time during these works. 6.2 Adverse weather and especially low cloud or fog situations could result in the Air Traffic Control Officer withdrawing permission for the crane to be operated or limiting the operation whilst the adverse weather affects the aerodrome. This decision will be taken to halt crane operations in conjunction with the airport duty manager. 6.3 The contractor will produce a working method statement and risk assessments for crane operation at least two weeks prior to commencement of the crane operation commencing. This is required in order for airport management to scrutinise the documents and produce a safety document for airport users. 6.4 The airport manager will perform a safeguarding exercise to accurately calculate and establish the level of any penetrations in to the aerodrome safety surfaces. He will update the CAP 791 part 2 with relevant information from the contractor s documentation and the findings of the safeguarding exercise. 6.5 The airport manager will ensure that the revised document is brought to the attention of and circulated to all staff, on-airport companies and is available to other users via notice boards at key areas such as flight briefing. He will also ensure that appropriate NOTAM action is taken relating to the use of crane on site. London Ashford Airport Ltd 7

Part 3. EMERGENCIES & RESPONSE 1. Evacuation of contractors personnel 1.1 The contractor will draw up a plan for evacuation from the occupied compounds and any crane or plant operating in the area it will include reconciliation of the number of workers and visitors under his control in conjunction with the detail below. The site manager will ensure a copy of this document is passed to the airport Fire Services and Operations managers for information. 1.2 In an emergency situation where an evacuation of the works or storage compound becomes necessary, the contractor is informed that the airport main muster point is situated at the main terminal car park with appropriate signs displayed along the security fence line towards access gate 4. The contractor should take the nearest exit to landside this could be directly through the adjacent access gate 3 locking the gate behind them then make their way towards the main car park and the muster point. Or alternatively, via airside past the southern end of the main hangar keeping close to and along the fence line to gate 4 and the muster point where a member of staff will give them access landside. 1.3 The site manager will confirm to the fire officer on duty at the muster point that he has accounted for all his staff and site visitors. He must state also if any person is not accounted for. 1.4 The fire officer will make the decision to allow persons back in to the buildings and work areas as the emergency passes. 2. Summoning Emergency Assistance 2.1 Where the contractor witnesses an incident / accident or requires the attendance of the emergency services, they should initially telephone the Air Traffic Controller on duty stating their name and company, their location on the airport, the nature and location of the emergency and what services they require. The ATC officer will arrange contact with the external services and alert the airport Fire & Rescue Service who are able to respond quickly to many differing types of emergencies from a high level of first aid as trained medical first responders to the local community area to fire suppression and rescue facilities. 2.2 Where 999 is called, the relevant information must also be passed to the Air Traffic Control Officer as they will need to assess the London Ashford Airport Ltd 8

effect on the aerodrome operations and may need to commence alternative procedures, reduce or suspend services as required dependant on the emergency at the time. The airport address and contact numbers are at part 4 of this document. 3. Aviation Emergencies 3.1 In the event of an aircraft accident or fire near the location of the work or storage compounds, the area must be evacuated immediately following the clearest and safest route away from the emergency as described in 1 above. 3.2 Aircraft accident or fire at a remote and away from the work or storage compounds the contractor will initially stop works and contact the airport duty manager for advice on whether it is safe to remain on site or not. 3.3 Where the crane is being used at height, it must be lowered immediately on hearing the crash siren (a continuous mid pitch siren) 4. Non-Aviation Emergencies 4.1 Where there is a fire or explosion on site all personnel must evacuate the area immediately and call the Air Traffic Control Officer as set out in the sections above. The person reporting must give their name, location, the nature of the emergency and the amount and severity of any injuries sustained. 4.2 Fuel and oil spills must be dealt with immediately. The contractor is responsible for retaining an amount of absorbent material to aid the clean-up. The airport authority retains a stock of absorbent pads and granules which may be available to the contractor at cost. The site manager must inform the airport Rescue and Fire Fighting Service (RFFS) and the airport duty manager as soon as possible in order that an evaluation of risk to other persons working airside and facilities can made. 4.3 Injuries to those working for the contractor must be reported to the site manager who will retain a log of such events. Major injuries etc, which fall in to the official reporting program RIDDOR must be dealt with by the contractor s site manager. The RFFS Department are able to afford first aid and assistance as in 2 above. London Ashford Airport Ltd 9

4.4 Security of the aerodrome is paramount to the airport operations and the following points must be observed. a. Access gates must be kept locked unless they are in use where they must not be left un-manned. b. Any keys or passes issued to the contractor by the airport authority or keys used to secure areas which are supplied by the contractor which have been lost or suspected to have been stolen must be reported to the airport duty manager as soon as operationally practicable. c. Do not leave bags or other items which may be perceived to be suspicious articles around the working areas or the main terminal buildings. The contractor must supply storage for staff personal items. d. Contractor s staff vehicles must be parked in areas approved by the airport authority. Do not leave unattended vehicles at access gates or along air side fence lines where they could be used as climbing aids. e. In the event that the contractor receives any security threat, warning or other communication from a third party which poses a risk to airport security must be reported to the airport duty manager as soon as possible. In the event that security threats are received by airport staff or other companies on airport, they will report the matter to the airport duty manager. f. Where a security threat warning is suspected to be credible, the airport duty manager will take appropriate action in relation to the airport infrastructure and advise on action to be taken by those using the site including contractors working within the airport on a temporary basis and inform the police and the DfT Threat office. London Ashford Airport Ltd 10

Part 4. LIST OF MAPS, PLANS AND ASSOCIATED MATERIAL. 4.1 Point of Contact Information Sheet 4.2 General Site Layout Overview Plan 4.3 Detailed contractor s Plan of Site Layout 4.4 New Hangar Plan and Elevations Drawing 4.5 Aircraft Tow or Manually Handled Only Routes 4.6 Site Evacuation Routes and Muster point London Ashford Airport Ltd 11

4.1 Point of Contact Information Sheet Airport Address: Lydd Airport Lydd Kent TN29 9QL Main Airport Phone Number: 01797 322400 frontdesk@lydd-airport.co.uk Airport Authority Contacts: Kate Adams, Terminal Supervisor: Mob: 07979 232811 Kate.adams@lydd-airport.co.uk Bernard Daly, Airport Manager: Mob: 07967 591173 Bernard.daly@lydd-airport.co.uk Paul Fisher, Fire Services Manager: Mob: 07765 577447 Paul.fisher@lydd-airport.co.uk Airport Duty Manager / Out of Hours Contact: Mobile: 07944 809868 Air Traffic Control (ATC) Officer (Emergencies) 01797 320881 Rescue and Fire Fighting Service Call via ATC Civils Contracting Ltd Contacts Jeremy Hilder, Project (Site) Manager Mob: 07989 306618 Nick Weaver, Contracts Director Mob: 07974 114172 Paul Medhurst, Managing Director Mob: 07971 790483 London Ashford Airport Ltd 12

Contractors Access Gate 3 Contractors Storage Area Air Traffic Control Tower Contractors Engineering Hangar Main Hangar T2 Type Main Terminal & Administration

No Aircraft To Move Under Power Within Shaded Areas

Contractors Access Gate 3 Contractors Storage Area WIP Site Evacuation Routes Contractors Main Terminal & Administration Site Workers Evacuation Route Emergency Muster Point