INSTALLATION GUIDE INTRODUCTION

Similar documents
for for HotValley TM TM

Blue Series Hot Melt Hose with RediFlext II Hanger System

OPERATOR INSTRUCTION MANUAL INCLUDING REPAIR PARTS FOR MODULAR GENERAL PURPOSE TENT SYSTEM (MGPTS) TYPE I

INSTALLATION INSTRUCTIONS AND OWNER'S MANUAL AWNINGS. For trailers & motor homes with straight sides TOOLS REQUIRED

Honda Ridgeline Installation Instructions

FLEX KEY ASSEMBLY. ..._ o RAFTER ARM TUBE MAIN ARM TUBE CAP NUT CLAW HINGE

READ ME FIRST! IMPORTANT WARNING! ENG. Roof top tent

Installation instruction

Installation and Maintenance Manual

Assembly Instructions

DO NOT USE WITH CROSSBAR SPREAD LESS THAN 24.

Tank. Part B, Section 1. This section covers the following unit configurations. Pump Piston Pump (E or G)

IMPORTANT OWNER-OPERATOR INSTALLATION INSTRUCTIONS C2204A

ADDED PROTECTION FOR SLIDE-OUT ROOMS. Installation. Introduction... 2 Product Overview...2 Component Checklist...3

14' x 32' x 12' Round Top Round Style Shelter Assembly Instructions

USER MANUAL PLEASE READ AND UNDERSTAND THIS MANUAL COMPLETELY BEFORE USE.

MYRIAD Banner Stand is a trademark of Skyline Exhibits. Patent Pending PN32294-B. MYRIAD Banner Stand

Installation Instructions for. Thrifty King CT Series Fountains

AND LOAD CANOPY RACK SPECIFICATIONS

ALEKO Victoria Series Retractable Awning Instructions for Installation and Operation

Otter Pro XT 1200 Cottage Installation and Set-Up Instructions

Retractable Awning Owner s Manual

OWNER S MANUAL: G5000 SLIDE-OUT AWNING SYSTEM

Therme storage water heater. Table of contents. Symbols used. Symbols used Symbol indicates a possible hazard. Installation instructions

Product instruction manual Ream Cutting Systems RE3943, RE3946, RE3947, RE3971, RE3952E

SECTIONAL OVERHEAD DOORS

RAFTER VI. Installation and Operation CAREFREE WITH AUTOMATIC AWNING SUPPORT. RV Accessory PRODUCT OVERVIEW

ELE-3COP-375 Title - Braid termination using a Band Strap Adaptor.

Installation Instructions for. Thrifty King CT Series Fountains

Series 2050 Garden Window Frequently Asked Questions

NEWMAR SERVICE SCHOOL

HARD DOOR UPGRADE KIT

All of these configurations are from one 2005 Blue Ultralite Trayman. Just slide the straps up and over your shoulders and they will slip into place.

JOINING MULLION (DIRECT MULL) ASSEMBLY INSTRUCTIONS FOR 3-WAY OR 4-WAY JOINTS FOR IMPERVIA AWNING, CASEMENT AND LARGE AWNING

Otter Pro XT Cabin Installation and Set-Up Instructions

Contents. Introduction...3 Description...3. Pack Contents...4. Rada Heavy Duty EV Shower Fittings Right Angled Connector (RAC)...

10 X 20 X 8 Dome Canopy

FORM (Apr. 2006)

Roller Bar End Cap (w/round Drive Shaft) Replacement Instructions for Vista and Motorized Awnings * Helpers needed *

BRJK11F2, BTJK11F2, BRJK07F2, BTJK07F2, kit

30M AUTOMATIC HOSE REEL Professional Series INSTRUCTION MANUAL

PIONEER LITE PATIO AWNING OWNER'S MANUAL

300 Model 870 Four Wheel Hose Cart Owner s Manual

Solera Power Awning OEM INSTALLATION MANUAL

Installation & Operation Manual VHM Variable Height Series Arms with Fixed Angle Front End

Installation Guide Cable

INFRARED BURNER KIT INSTRUCTIONS

Model 698/ and Model in 1 Hose Reel Owner s Manual

INSTRUCTION MANUAL ALEKO RETRACTABLE AWNING

PRODUCT MANUAL - M096

OWNER'S MANUAL CAMPOUT TABLE OF CONTENTS

/ Tool and Equipment Safety Tether System (T.E.S.T.S)

DIAMOND TECH INTERNATIONAL Innovations For Creativity DIAMOND LASER BAND SAW OPERATIONS MANUAL

General Purpose Shelter

Item # BJ2PC With 8 Leg Frame, Cover, and Enclosure Kit with Windows Size: 10 8 Wide x 20 Long (Side Height 6 8 ) (Center Peak Height 9 9 )

LODGE 460 CABIN. Part No ASSEMBLY & CARE INSTRUCTIONS

USER MANUAL BMU WORKCAGE. CONFORM TO THE MACHINE DIRECTIVE 2006/42/EC and to EN1808 (1999)

Fire's Edge Fire Pit/Fire Pit Inserts For (Automated) Model 100-A

INSTALLATION INSTRUCTIONS for vertical awnings

M129 SERVICE MANUAL- M129 MODEL #G-2 MANUAL CAN OPENER

YCU 750 TU Unitized Curtain Wall System

INSTRUCTIONS INSTALLATION UNIVERSAL SERIES PATIO AWNING HARDWARE , , ,

OWNER'S MANUAL FREEDOM AWNINGS

CJ-7 YJ PREPARATION INSTALLING THE WHEEL WELLS. Jeep Wrangler CJ-7/YJ BedRug Interior Installation Instructions

Otter Pro X-Over Lodge Installation and Set-Up Instructions

Otter XT 650 Cabin Installation and Set-Up Instructions

Contents. Company Background FLOWSTOPPER Plugging Device Kit and Replacement Parts Key Features & Benefits... 4

Installation Guide: Round Trampoline

ZipWall See NEW ZipDoor on page 8

300 ft. 5/8 Hose wagon

YCU 750 TU Unitized Curtain Wall System

Solar Power Shade INSTRUCTION MANUAL

Read all instructions and warnings before using this fireplace. WARNING

FEATHER-LITE ROOF TOP TENT SET-UP GUIDE

Model 205 Fireview Maintenance Kit

Installation and User s Manual 12 x 10 MOTORIZED AWNING

XENON HELIDECK FLOODLIGHT INDUSTRY USER MANUAL

Suggested Installation Instructions for: , Embroidered Front End Mask

Auxiliary 63.5l Fuel Tank Ford/Mazda Pick-up Truck 2012-Current READ ME! IMPORTANT WARNING!

Thermostatic Griddle Field Service Kit Instructions

TITAN Fuel Tanks. INSTALLATION INSTRUCTIONS G e n e r a t i o n V

9/16" deep socket Socket wrench (ratchet) 3/16" drill bit 5/8" spade bit Electric drill or power screwdriver Safety glasses

JARVIS. Model 70 Airsnip Air Powered Scissors

Retractable Hose Reel

IMPORTANT OWNER-OPERATOR INSTALLATION INSTRUCTIONS C3215/C3215A

GoBidet Bidet Attachment

ASSEMBLY & CARE INSTRUCTIONS

FIESTA & FIESTA HD PATIO AWNINGS

Alien Flier Zip Line Products Installation/Owner s Manual

TUCSON PATIO AWNING INSTALLATION MANUAL

Standard Awning Installation Instructions

Frequently Asked Questions

Solera Classic Awning OEM INSTALLATION MANUAL

Installation Instructions for the Rolltec Adalia X3M Extenda Awning

INSTANT GARAGE MODEL NO: CIG81224 ASSEMBLY INSTRUCTIONS PART NO: ORIGINAL INSTRUCTIONS

INFRARED BURNER KIT INSTRUCTIONS

NORTHFIELD CORPORATION 1870 COMMERCE DR. DE PERE, WI UNITED STATES

Genesis. Side Burner Accessory Installation. Step 3. Step 1. Step 2. For use with Genesis Gas Barbecues Only

UltraGroove and UltraGroove Metal

INSTALLATION INSTRUCTIONS for folding arm awnings

Transcription:

INSTALLATION GUIDE for for HotEdge Rail Rail INTRODUCTION HotEdge Rail is a patent pending one-piece roof edge ice melt systems engineered to easily install on standing seam, pro panel, and corrugated metal roof structures. A three-sided raceway securely compresses a single commercial grade self regulating heat trace cable in place for direct heat transfer to existing metal roof drip edge. The benefit of a direct heat transfer is less heat trace cable is needed to prevent ice dam and icicles formations on all roof edges. Less heat trace cable means lower energy costs. Easily installs around gutters and downspouts. And since no modifications are required to existing roof structure, overall project costs remain a fraction of all other market alternatives. The open raceway design conforms to the NEC (National Electrical Code) Article 426 and provides access for insertion, inspection and replacement. As a result, the HotEdge Rail is the only UL Listed roof edge ice melt system available today. This is especially significant for architects, electricians, and commercial builders whom rely on systems that have completed this rigorous testing for safety and compliance. Heat cable raceway spacer Adjustable roof V-pitch Heat cable raceway Upturned retention hem Figure 1 Optional vertical mounting slots 3YK5 E336195 Deicing and snow melting equipment The ice melt cable manufacturer s installation instructions are provided with the cable. These procedures must be followed. Installation personnel must be skilled in the art and be aware of the dangers inherent in this type of construction work. This product is designed to be part of a complete roof structure. Only experienced professional contractors should install this product. Completely read and understand these documents before starting the project. 800.411.3296 61 61

INSTALLATION GUIDE for for HotEdge HotEdge Rail Rail Heat Cable Heat Cable Metal drip edge Foam Tape Raceway Raceway Screw Screw Fascia Fascia Fig. 2 - Mounting the HotEdge Rail & Ice Melt Cable Fig. 3 - Foam Tape Option - Mounting the HotEdge Rail & Ice Melt Cable The HotEdge Rail is also available with a self-adhesive foam tape that can be applied to the HotEdge Rail, which may improve the transfer of heat from the ice melt cable to the metal drip edge. Some roof drip edges are wavy (exhibit oil canning) and are not straight. The foam tape can eliminate any air gap, insuring constant contact of the ice melt cable with the bottom of the metal drip edge. The foam tape is installed in the HotEdge Rail before it is mounted. Then the HotEdge Rail cable system installation instructions are followed to complete installation of the system. Overview The overall objective is to keep the snow melt in a liquid state until it is drained away from the structure s foundation. A heated gutter and downspout system is required for most applications. It is necessary to minimize any air gap between the ice melt cable rail, the ice melt cable and the bottom of the drip edge. The storm window effect of any air gap in this critical area dramatically decreases the amount of heat that is transferred from the self-regulating ice melt cable to the metal drip edge and metal fascia. 800.411.3296 62 62

for for HotEdge Rail Rail HotEdge Installation Instructions 1. Preparation and Pitch Adjustment for Each Metal Drip Edge The HotEdge Rail can be placed in a standard sheet metal bending brake to adjust the angle of each HotEdge Rail to the pitch of the metal drip edge. Pinching the patent pending V-bend in the brake will change the angle of the HotEdge Rail raceway to match the angle of the bottom of the roof drip edge. It is recommended that the estimator visit the job site with a sample of the standard HotEdge Rail product to see if additional bending adjustments need to be made. The pitch of the individual metal drip edges on a given structure may vary, so careful angle measurements are important during this phase. Caution: Do not over bend the V-Pitch adjustment. A spring like force is required to conpress the heat cable under the metal drip edge. (See Figure 2) Without the cable in place, the final bend of the V-Pitch should place the Upturned Retention Hem in light contact with the underside of the metal drip edge. There should be about a 1/10 inch gap between the bottom of the metal drip edge and the top of the ice melt cable raceway spacer. This spacing provides a spring-like force to retain the ice melt cable in the raceway. This also insures a tight contact for maximum heat transfer. (See Fig.1 & Fig 2) 2. Job Site Installation of the HotEdge Rail Important The entry and exit points of the ice melt cable from the HotEdge Rail raceway require a slight downward bend of the ice melt cable raceway (Fig. 1, #3) to prevent the sharp cut edge from damaging the ice melt cable. The raceway can be cut to size at the job site, but the cut end needs to be de-burred with a file or similar tool. Position Hot Edge Rail raceway firmly against the fascia and slide the Hot Edge Rail upward to the bottom of the metal drip edge. The top of the Upturned Retention Hem (Fig.1, #4) should touch the bottom of the metal drip edge and allows the mounting of the HotEdge Rail without the ice melt cable at this time. Standard locking sheet metal clamp pliers can be used to hold the Rail in place during attachment screw placement. Preliminary Mounting of the HotEdge Rail Loosely drive two or three sheet metal screws, on two foot centers, into the center portion of the HotEdge Rail stick. The optional mounting slots configuration makes this job easier. Locking Sheet Metal Clamp Pliers HotEdge Rail can be overlapped or butted together. The screws at each end of the HotEdge Rail are not driven into the HotEdge Rail at this time. The ice melt cable is inserted in the next step (3). The screws are industry standard #9 or #10 self-tapping, drill point sheet metal roof construction screw with a metal and rubber washer about one to two inches long. These screws must be made from a metal compatible with the HotEdge Rail raceway metal material and the metal roof drip edge and metal fascia. Never allow dissimilar metals like steel or aluminum to contact copper. The HotEdge Rail is available in copper for copper roof edges or a painted metal alloy for steel or aluminum metal drip edges. The HotEdge Rail must be mounted to a metal drip edge to be safe and effective. Composite shingled roofs may require the installation of a metal drip edge or a metal slip sheet (snow slide) that can be heated. 800.411.3296 63 63

for for HotEdge Rail Rail 3. Ice Melt Cable Insertion Ice melt cable splices are not permitted in the HotEdge raceway. Individual home runs to an electrical junction box are highly recommended. The use of ice melt cable splices should be minimized as they have been shown to be unreliable. Splices make troubleshooting and repair difficult and expensive. The expense of the extra footage of cable is an important investment. Three extra feet of ice melt cable must be provided at each electrical junction box to allow the licensed electrical contractor to provide a drip loop and a power connection. At the end of the run, an extra one foot of cable is required for the installation of the end sealing device. If this extra cable is not provided, the entire run of ice melt cable will need to be replaced. Cable is easy to cut but it does not stretch. The ice melt cable is inserted into the horizontal slot between the top of the HotEdge raceway and the bottom of the metal drip edge. The locking sheet metal clamp pliers (Fig. 4) are used to squeeze the ice melt cable between the top of the Ice Melt Cable raceway and the bottom of the roof drip edge for a tight fit before the final mounting screws are driven into the HotEdge Rail. It is necessary to eliminate any air gap between the ice melt cable and the bottom of the drip edge. The storm window effect of any air gap in this critical area dramatically decreases the amount of heat that is transferred from the ice melt cable to the metal drip edge. Move along the HotEdge Rail with two or more locking sheet metal clamp pliers and drive additional screws, on two foot centers, into the balance of the HotEdge Rail for the final positioning. Additional screws may be added if required for a tight fit. Ensure the ice melt cable is pushed back past the Upturned Retention Hem into the ice melt cable raceway. Also insure the ice melt cable is not behind the vertical surface of the HotEdge raceway. Screw penetration of the ice melt cable must be avoided. Since ice melt cable splices are not permitted in the HotEdge Raceway, the entire cable run will need to be replaced if it is penetrated with a screw. There should be a small horizontal gap between the bottom of the metal roof drip edge and the Upturned Retention Hem to comply with electrical building codes that require ice melt cable to be Exposed for roof and structure ice melting. This is a good inspection slot to make sure the ice melt cable is correctly positioned. 800.411.3296 64 64

for for HotEdge Rail Rail 4. Electrical Connections Only a licensed electrical contractor should power up the system. The electrical connections and end seals require an experienced contractor. Details of the electrical installation in this document are brief and do not cover the many variables encountered in the field. More information is available in the ice melt cable manufacturer s installation instructions provided with the ice melt cable. EPD ground fault breakers with 30 ma trip points must be used, as per Article 426.28 of the NEC. At low temperatures, the startup current of self-regulating ice melt cable can be quite large. Consult the ice melt cable manufacturer s maximum cable length data charts for additional information. In all cases, the Listed ice melt cable manufacturer s instructions over-ride the HotEdge Installation Instructions. Consult with a licensed electrical contractor for system layout, junction box placement, maximum cable run lengths and power feed requirements as defined by the National Electrical Code (NEC), local building codes and the ice melt cable manufacturer. WARNING Low cost, constant current ice melt cable must not be used. Only safety agency Listed, self regulating ice and snow heat trace cable for roof structures that are provided with the system can be used. www.hotedge.com www.snoshield.com 888-976-6744 800.411.3296 65 65

for for HotEdge Rail Rail Self-regulating Heating Cable Supplied with System The HotEdge Rail is supplied with one of the following Listed (KOBQ) De-Icing and Snow-Melting Equipment Heating Cable and accessories (designed for roof and gutter de-icing and snow melt) indicated below and with the installation instructions provided by the heating cable manufacturer. Products from NuHeat 800.411.3296 66 66

for for HotEdge HotEdge Rail Rail Products from Tyco Thermal Controls LLC (Raychem) UL File KOBQ.E74811, De-icing and Snow-melting Equipment CSA Class 2872-01, File 021133_C_000 HEATERS-Cable and Cable Sets Raychem IceStop Roof & Gutter De-Icing Systems GM-1X Heating cables (120VAC, 10 watts per foot) GM-2X Heating cables (240VAC, 12 watts per foot and 277VAC, 12 watts per foot) FTC-P Power Connection & End Seal Kit FTC-HST Splice/Tee Connection Kit GMK-RC Roof Clips GM-RAKE Hanger Bracket Raychem WinterGard Wet Roof & Gutter De-Icing Systems H612 Heating cables (120VAC, 6 watts per foot) H622 Heating cables (208-277VAC, 6 watts per foot) H900 Power Connection & End Seal Kit H910 Splice/Tee & End Seal Kit H913 & H914 Roof Clip Kits H915 Hanger Bracket Kit H908 120VAC Plug-in Power Connection Kit System Test by the Electrical Contractor Insulation Resistance (Megohmmeter) Test The insulation resistance test is critical to ensure the safety and reliability of the heating cable system. This test should be performed as part of the installation of the system. It is also useful for troubleshooting an installed system. This test is required for warranty coverage from some cable manufacturers. See details in the ice melt cable manufacturer s installation instructions. A large peak amp reading at cold start-up may indicate a current draw issue. Some systems may require time delay relays to spread out this peak load. Individual home runs are recommended for troubleshooting, repair and replacement of the ice melt cable. 800.411.3296 67 67