Massachusetts Port Authority Sustainable Design Standards and Guidelines. AAPA Annual Convention Galveston, TX October 28, 2009

Similar documents
JOSLIN FIELD, MAGIC VALLEY REGIONAL AIRPORT DECEMBER 2012

MASSACHUSETTS PORT AUTHORITY REQUEST FOR LETTERS OF INTEREST DEVELOPMENT OF THE MASSPORT MARINE TERMINAL

STUDY OVERVIEW MASTER PLAN GOALS AND OBJECTIVES

Japanese policy on ship recycling

Opportunities in Non-Container Trade and the Expanding Cruise Industry

CHAPTER 1: INTRODUCTION

Study Design Outline. Background. Overview. Desired Study Outcomes. Study Approach. Goals (preliminary) Recession History

Massport Study Team Evaluation of CAC Noise Study Alternatives. October 2010

Annual Airport Finance and Administration Conference Innovative Funding Strategies. March 4, 2013 Destin, Florida Bonnie Deger Ossege

Traditional and Alternative Financing of Cruise Terminals

Port of Los Angeles IAPH Green Port Survey

ENVIRONMENT ACTION PLAN

TRB and ACRP Research Updates: Practical Application

Sunshine Coast Council Locked Bag 72 Sunshine Coast Mail Centre QLD Submitted via online portal. 2 June 2017.

Port of San Diego Overview and Updates. September 2017

NATIONAL AIRSPACE POLICY OF NEW ZEALAND

Waterfront Plan Working Group Meeting Maritime & Water-Dependent Uses Meeting Agenda

Draft Planning Controls Planning Scheme Amendment GC81

PORT OF CORPUS CHRISTI BUILDING FOR THE FUTURE

BUILDING THE CAPACITY FOR GREATNESS 2019 STATE OF THE PORT

Restoration and Redevelopment of the Former Durango Paper Mill Site

Airport Sustainability Planning

A Master Plan is one of the most important documents that can be prepared by an Airport.

Port of Long Beach 2012 Capital Program Update. G.J. Cardamone, PE, FCMAA Director of Construction Management

GHANA S ACTION PLAN ON CO 2 EMISSIONS REDUCTION ACTIVITIES

Technical Cooperation Bureau

Crown Corporation BUSINESS PLANS FOR THE FISCAL YEAR Trade Centre Limited. Table of Contents. Business Plan

Program Manual. January 1, EarthCraft House Single Family Program. Viridiant 1431 West Main Street Richmond, VA

Legislation Having Application to James Cook University as at 30 June 2013

3 Pilbara ports provide gateways

2018 Accomplishments

THIRTEENTH AIR NAVIGATION CONFERENCE

Safety Regulatory Oversight of Commercial Operations Conducted Offshore

Ted Stevens Anchorage International Airport

The Upper River: Our next big development opportunity? Tuesday, Nov. 15, 2016 CenterPoint Energy

Korea Eco-Label Program and Green Supply Chain Related Activities

Massachusetts Office of Travel & Tourism New Bedford Tourism Summit, May 22, 2018

FIRST PUBLIC WORKSHOP

Aerodrome s Inspector Workshop Sint Maarten 11 to 15 June 2012

Beyond Gateway Ports Navigating New Destinations

Exhibition Place Waste Diversion Program

2017 Accomplishments

Lake Tahoe Airport Master Plan Public Meeting March 16, 2015

Update on STX France. October, 2017

Session 5: Complex and Creative Financial Transactions

Crown Corporation Business Plans. Trade Centre Limited

Serving the Tampa Bay Maritime Community Since Celebrating over 125 Years of Service

Chapter 1: Project Overview & Justification 1.1 Project Overview

Shore Power at Port of Seattle. A viable solution to curb emissions at berth

PORT DEVELOPMENT STRATEGIES & SUCCESS STORIES. PORTMIAMI AN EVOLVING GATEWAY Juan M. Kuryla, PPM PortMiami Director and CEO

The role of the Cash Buyer

The Strategic Commercial and Procurement Manager

1. Introduction. 2. Overview of Existing Conditions

Fjarðabyggð Municipality Harbour Fund

O Hare Modernization Program

MONTEREY REGIONAL AIRPORT MASTER PLAN TOPICAL QUESTIONS FROM THE PLANNING ADVISORY COMMITTEE AND TOPICAL RESPONSES

REAUTHORISATION OF THE ALLIANCE BETWEEN AIR NEW ZEALAND AND CATHAY PACIFIC

Frequently Asked Questions

Port Everglades 2014 Master/Vision Plan Update

Port Everglades: Making The Last Mile Count. AAPA Annual Convention November 3, 2015

OVERVIEW OF ICAO S ACTIVITIES IN AIR TRANSPORT

2017 STAKEHOLDER REPORT

Noise Abatement 101. July 13, Regular Board Meeting / August 7, 2014 Hillsborough County Aviation Authority

CRUISE TERMINAL DEVELOPMENT THE TRUE STORY

NORTHLAND-BELTLINE CORRIDOR

Message from the CEO. Message from the Chair. 2 portofhalifax.ca

Port Everglades Master/Vision Plan Update

2014 SUSTAINABILITY REPORT 1,850 DFW FLIGHTS A DAY ENVIRONMENTAL STEWARDSHIP DOMESTIC DESTINATIONS 62M INTERNATIONAL DESTINATIONS PASSENGERS

Airport Master Planning Process & Update

September Standard recognised by Global Sustainable Tourism Council

The Corporation of the City of Kawartha Lakes Council Report

Mr. David Peng, General Manager, Kings Aviation. Set Up an AOC and Operating Helicopters in China

ASSEMBLY 37TH SESSION

PERTH AND KINROSS COUNCIL. Housing and Health Committee. 25 May Perth and Kinross Local Housing Strategy

N EASME/EMFF/2016/ /002

SUSTAINABILITY REPORT Prepared for ROSCon 2017

Cruise Industry Perspective on OWS and Waste Management

L1555-D1 Electric Vehicle and Ground Service Equipment Charging Initiative

Logan International Airport Right Sizing and Good Terminal Planning

SOUTH AFRICA PBN NEAR TERM IMPLEMENTATION PLAN PROJECT

PRICE REDUCED. Delaware River Port Development Opportunity 707 Water Street, Gloucester City, New Jersey. Sale Price $2,650,000

Tulsa Airports Improvement Trust Strategic Plan Update

Hotels and Inns. Green Purchasing Network (GPN)

UNMANNED AIRCRAFT PROVISIONS IN FAA REAUTHORIZATION BILL

Contribution to the implementation of the EUSDR's Action Plan. Priorities for the year 2013 Ministry of Infrastructure of Ukraine

Environmental. Messe Basel and Messe Zürich

14 C.F.R. Part 158. Passenger Facility Charge Program Logan International Airport. Public Notice

Tourism Australia s StRATEGIC and Creative Direction KAREN HALBERT I EGM CORPORATE AFFAIRS, GOVERNMENT & INDUSTRY

Master Plan of Costa Rica Atlantic Coast Limon - Moin. November, 2008 Costa Rica

A view on the organisation of Military Oversight over foreign companies

GENERAL HOTELS CORPORATION. Delivering Comprehensive Hotel Management & Development For Over Fifty Years.

Program Manual Version 2.0 July 2018

Press Release. Bilfinger 2017: Stable foundation laid for the future

Port Everglades Master/Vision Plan Update

Floating Docks. Our unique capability is your solution

MAXIMIZING INVESTMENT AND UTILIZATION

Southern New Jersey s International Seaports

the foss seattle shipyard helping you succeed in a competitive market

RNP AR APCH Approvals: An Operator s Perspective

Please see the full job description and specification on page 4 for further details.

Transcription:

Massachusetts Port Authority Sustainable Design Standards and Guidelines AAPA Annual Convention Galveston, TX

Overview of Massachusetts Port Authority Independent State Authority Governor appoints Board Self-financing (i.e. no tax revenue) Primary Massport facilities: - Logan International Airport - Port of Boston - Tobin Bridge - Major waterfront land holdings

Massport s Maritime Operations Conley Container Terminal Black Falcon Cruise Terminal Boston Autoport Boston Fish Pier Massport Marine Terminal

Massachusetts Port Authority s Strategic Vision for the Port of Boston Increase the amount of foreign and domestic waterborne commerce (primarily containers) through the Port of Boston Develop facilities and related access infrastructure to support growth in key business lines Develop other Maritime properties to support core businesses and provide financial return to make capital investments in port facilities Operate in a fiscally, environmentally and socially sustainable manner

Massport Sustainability Initiatives and Programs Corporate Environmental Management Policy Authority-wide sustainability strategy in development Baseline inventory of Massport s port-related emissions underway Conley Terminal EMS and ISO 14001 Certification since 2003 Shore power at Fish Pier, tug and cement berths Extensive Recycling Programs including seafood processing waste and used fishing gear Incorporate green lease terms in new agreements Extensive public parks and green spaces managed by Maritime Dept. Voluntary compliance with LEED Plus green building requirements Redevelopment of underutilized and brownfield properties Longstanding social responsibility and community involvement programs NEW! Sustainable Design Standards and Guidelines (SDSG)

The SDSG is A LEED-like certification program that includes: - performance standards and guidelines for sustainable design - an implementation process - a documentation system to track progress and determine certification level Required to be used by all architects, engineers and planners to consistently integrate sustainable techniques and practices into all of Massport s capital projects Intended to provide innovative guidance for sustainable design that goes beyond existing programs for buildings (i.e. LEED), specifically to include non-building projects that are typical for the port industry.

SDSG Overview, cont d Developed by an interdepartmental Sustainability Working Group Tailored to Massport s needs, but transferrable to other ports Table-top exercises and implementation on current projects demonstrate that the SDSG is practical, implementable and will yield measurable benefits Currently being implemented on 6 port projects: Coastal Oil Property Acquisition and Remediation Rehab of Existing Cranes at Conley Container Terminal Conley Heavy Duty Pavement Rehabilitation Additional Conley Dock Cranes Refrigerated Container Racks at Conley Tractor Replacement

SDSG Framework 7 categories of performance standards 49 performance standards in total All Capital Projects must achieve a minimum rating of Certified Rating System: Level % of applicable points Certified 40-55% Silver 56-70% Gold 71-85% Platinum 86-100%

SDSG Categories 1. General 2. Project Site Design 3. Project Materials 4. Energy Management and Efficiency 5. Air Emissions 6. Water Management, Quality, and Efficiency 7. Indoor Air Quality & Occupant Comfort Each Category has 3-10 performance standards

SDSG Performance Standards Each performance standard addresses: Intent Benefits Required for Credit Additional Credits Required Documentation Strategies Example for Material Durability, 1 of 10 performance standards for Project Materials category:

SDSG Implementation 1. Determine sustainability goals What level rating can the project achieve? Which performance standards will be included in the design? Are there any additional points that could be achieved with an Innovation Worksheet? 2. Keep on target Fill out the Rating Sheet at the beginning of the design process Revise the rating sheet and innovation worksheets at 30%, 60% and 90% design stages 3. Massport designates final rating Provide documentation for approval

SDSG Implementation Rating Sheet Mark whether each performance standard applies to the project Mark performance standards included in the design as achieved Calculate projected rating Revise at 30%, 60% and 90% stages or if project changes Use Rating Sheet to stay on target for desired rating

SDSG Implementation Rating Sheet Mark whether each performance standard applies to the project Mark performance standards included in the design as achieved Calculate projected rating Revise at 30%, 60% and 90% stages or if project changes % of applicable Level Use Rating Sheet to stay on points target for desired rating Certified 40-55% Silver 56-70% Gold 71-85% Platinum 86-100%

SDSG Implementation Innovation Worksheets Purpose is to encourage thinking outside the box Three ways to use the innovation worksheets: 1. Innovation not included in SDSG 2. Exceeding requirements 3. Meeting intent without meeting exact requirements

In Conclusion Massport s new Sustainable Design Standards and Guidelines will: 1. Maximize the environmental, social and economic benefits of Massport s capital projects; 2. Allow measurement of sustainability performance so that progress can be communicated, knowledge transferred and gaps identified; and 3. Encourage the development and implementation of cutting-edge technologies.