Strategic Signal Timing Changes = BIG Results. Barbara Jones, PE, PTOE DGL Consulting Engineers, LLC Senior Traffic Engineer

Similar documents
5.1 Traffic and Transportation

FHWA P/N Guidelines. Corridor Relationship. Highway 22 Segment 1 - US 169 to CSAH 2 Relevance / Documentation of Need

A VISION FOR I-95. January 12, Delaware Department of Transportation

# 7. Date of Meeting: September 2, 2015 BOARD OF SUPERVISORS BUSINESS MEETING ACTION ITEM SUBJECT:

%g 109 %g 9. %g 99. %g 9. %g 4. %g 4 %g ,95 (/ 1. Route 109 Corridor Study. %g 35. Corridor Study Area Study Area. Sanford.

Southern Oregon Transportation Engineering, LLC

State Route 8 Corridor. Northern Summit County s Path to Success

Slow Down! Reducing Downtown Bloomington s Progression Speed

Mercer SCOOT Adaptive Signal Control. Karl Typolt, Transpo Group PSRC RTOC July 6th, 2017

Project Application. General Information ODOT PID. ODOT District. Primary County (3 char abrv)

Proposed Bicycle Lanes on Yonge Street from Queens Quay to Front Street

A. CONCLUSIONS OF THE FGEIS

Michigan s Engineering Safety Program for Local Roadways

Pedestrian Safety Review Spadina Avenue

Washington State Transportation Commission

PROGRESS PARK CONNECTOR

Project Application. General Information ODOT PID. ODOT District. Primary County (3 char abrv)

Guide to. Road Construction Projects

FINAL TERMINAL TRAFFIC MONITORING STUDY

APPENDIX J MODIFICATIONS PERFORMED TO THE TOR

Downtown Skokie & Oakton Street Corridor Study (Draft)

Memorandum. Roger Millar, Secretary of Transportation. Date: April 5, Interstate 90 Operations and Mercer Island Mobility

Route 141 and I-44 Design-Build Project Community Involvement Group. March 21, 2016

FOR IMMEDIATE RELEASE Fiorella Teodista January 5, 2018 SOUTH FLORIDA AND TREASURE COAST WEEKLY LANE CLOSURES AND WORK ZONE ADVISORY

APPENDIX H MILESTONE 2 TRAFFIC OPERATIONS ANALYSIS OF THE AT-GRADE CROSSINGS

4. Safety Concerns Potential Short and Medium-Term Improvements

Baltimore Ravens Egress Study

Washington St. & Ash Coulee Dr./43 rd Ave Intersection Study

B. Congestion Trends. Congestion Trends

NORTHEAST OHIO AREAWIDE COORDINATING AGENCY MEMORANDUM

Dulles Corridor Improvements. Drive to Ride

LUDWIG RD. SUBDIVISION PROJECT TRAFFIC IMPACT ANALYSIS

Construction Update. ODOT District Two Construction Update. For Immediate Release Thursday, October 18, Lucas County

Ohio Department of Transportation Construction Update

MEMORANDUM. Lynn Hayes LSA Associates, Inc.

ROUTE 20 CORRIDOR STUDY ---- Orange County, Virginia

MEMORANDUM. Bob Zagozda, Chief Financial Officer Westside Community Schools. Mark Meisinger, PE, PTOE Felsburg Holt & Ullevig. DATE: June 11, 2018

November 21, 2012 Barbara Kelleher, (954)

Yonge Street / Highway 401 Improvements Update. Public Works and Infrastructure Committee. General Manager, Transportation Services

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY BOARD OF DIRECTORS. RESOLUTION No

Albany NY Red Light Camera Locations and Activation Dates 1 Central Avenue & Colvin Avenue

ROUTE 122 CORRIDOR STUDY ---- Bedford County and Bedford City, Virginia

EXISTING CONDITIONS A. INTRODUCTION. Route 107 Corridor Study Report

Project Deliverable 4.1.3f Individual City Report - City of San Dimas

10.0 Recommendations Methodology Assumptions

Transportation Improvement District (TID) Exercise New Castle County Unified Development Code

INTERSTATE 395 EXPRESS LANES NORTHERN EXTENSION TRAFFIC & TRANSPORTATION TECHNICAL REPORT SEPTEMBER 2016

TABLE OF CONTENTS. 1 P age

NORTH FRASER PERIMETER ROAD WEST CORRIDOR DEFINITION STUDY

Launceston City Council. Kings Meadows Traffic Management Report for Public Consultation

Exit 136 (Centreport Parkway/Stafford County) to Exit 130 (Route 3/Fredericksburg)

35EXPRESS PROJECT UPDATE FOR DENTON COUNTY COMMISSIONERS

STAR Bond Development

VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT Aug , 2016

Fairfax County Parkway Widening Fairfax County

Palm Beach County Traffic Report July 13 through July 20, 2012

Replace Traffic Signal By Others (will accommodate longer arm for dual left turn lane) Install New Sign Structure

Appendix 4.1 L. No-Build Project Descriptions

ROAD SAFETY AUDIT. Iyannough Road (Route 28) at Yarmouth Road. Town of Barnstable. September 2012

Yarmouth Road Corridor Study Barnstable

SANTA CLARA COUNTY I-280 CORRIDOR STUDY

KING STREET TRANSIT PILOT

Ohio Department of Transportation Traffic Advisory. District 4 Allen C. Biehl, P.E., Deputy Director S. Arlington Road.

KING STREET TRANSIT PILOT

Finchley and Golders Green Area Committee 27 April 2017

Interstate 90 and Mercer Island Mobility Study APRIL Commissioned by. Prepared by

CALIFORNIA HIGH-OCCUPANCY VEHICLE LANE DEGRADATION ACTION PLAN

TABLE OF CONTENTS. Coral Springs Charter High School and Middle School Job No Page 2

May 1, 2015 Meredith Cruz, (561) Palm Beach County Traffic Report May 1 through May 8, 2015

Neighbourdhood Committee NDG-Westmount. October 16, 2017

CONSTRUCTION PROJECTS IN CUYAHOGA COUNTY CLEVELAND EUCLID 3/9/18 RICHMOND MAYFIELD HIGHLAND HEIGHTS HEIGHTS SOUTH EAST MAYFIELD EUCLID CLEVELAND

Mount Pleasant (42, 43) and Connecticut Avenue (L1, L2) Lines Service Evaluation Study Open House Welcome! wmata.com/bus

2 Construction Program

HOV LANE PERFORMANCE MONITORING: 2000 REPORT EXECUTIVE SUMMARY

FREDERICKSBURG DISTRICT. District Engineer Marcie Parker, P.E. May 8, 2018

Parking Amendments - Bay Street, between Harbour Street and Queens Quay West (York Street, Bay Street, and Yonge Street Ramp Removal)

April 4, 2014 Chuck McGinness, FDOT TREASURE COAST TRAFFIC REPORT April 4 through April 11, 2014

I-70/I-71 Project Public Meeting Presented By

Planning. Proposed Development at the Southeast Corner of Lakeshore Road West and Brookfield Road Intersection FINAL.

Project Application. General Information ODOT PID. ODOT District. Primary County (3 char abrv)

Regulations to deter cut-through traffic - Heath Street V\fest, between Spadina Road and Avenue Road. Toronto and East York Community Council

PURPOSE AND NEED (CONCURRENCE POINT 1) NEW CANADA ROAD PROJECT FROM STATE ROUTE 1 (U.S. HIGHWAY 70) TO U.S. INTERSTATE 40

VDOT HOT SPOTS IN THE FREDERICKSBURG DISTRICT June 12 June 18, 2016

RW Bruhn Bridge and Approaches Project

ROUTE 630 DIVERGING DIAMOND INTERCHANGE

Public Open House. Chief Peguis Trail Project

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

Frequently Asked Questions on the Route 29 Solutions Improvements Projects

Report to the Strategic Development Committee

Traffic Analysis Final Report

M2 Junction 5. improvements scheme. Preferred route announcement

2008 DEKALB COUNTY TRANSPORTATION PLAN (UPDATE)

MORE TIME PLACEMENT HIGH TRAFFIC LOCATIONS 10-SECOND AD SPOTS

FDOT Treasure Coast Traffic Impact Report June 19 through June 26, 2015

Transform66: Inside the Beltway

Exit 148 (Quantico) to Exit 133 (Route 17/Fredericksburg)

Weekly East Tennessee Construction Report for May 31-June 6, 2018

Lake Erie Commerce Center Traffic Analysis

Major Projects Overview

I-405 Express Toll Lanes Coming in 2015

Transcription:

Strategic Signal Timing Changes = BIG Results Barbara Jones, PE, PTOE DGL Consulting Engineers, LLC Senior Traffic Engineer

Pre Signal Timing Updates

Signal Timing Updates Average Retiming Interval Percent of Respondents More Frequently than Every 3 Years 42 Around 5 Years 18 Around 10 Years 5 More than 10 Years 35 Source: Tarnoff and Ordonez (2004)

Benefits of Signal Retiming The Institute of Transportation Engineers has determined that Signal Retiming reduces: Motorist delay Overall travel time Fuel Consumption Vehicle Emissions Number of Crashes 40:1 ROI Results

2013 Signal Timing Task Order What are the expected outcomes from a signal timing project? Capacity Improvements Travel Time Improvements

2013 Signal Timing Task Order Additional outcomes that may present from a signal timing project? Reduction in crashes Reduction in crash severity Change in crash type

Crash Modification Factors (CMFs) Adjust Clearance (Red/Yellow) Phasing Signal Timing Adjustments / Coordination Left Turn Angle Sideswipe Rear End Severity

Average Crash Costs Estimated Costs 2014 2016 Injury $55,700 $57,000 PDO $8,500 $8,700 Source: ODOT Office of Program Management (2017)

2013 Signal Timing Task Order Corridors studied for pre-implementation vs postimplementation safety improvements COL-30, Lisbon, OH (4 signals) LOR-83, Avon, OH (8 signals) LAK-306, Mentor, OH (8 signals)

COL-30 Lisbon, OH US 30 LINCOLN WAY BEAVER ST. MARKET ST. JEFFERSON ST. WASHINGTON ST.

COL-30 Lisbon, OH Corridor Issues: Heavy truck traffic (10% avg, 20% peak) US 30 (Lincoln Way) / Market St Convergence of 1-US Route and 3-State Routes Traffic using local streets to avoid congestion Signal not upgraded with COL-30-18.32 TBC never programmed to work with other signals Signal timing did not match COL-30-18.32 plans Inconsistencies in programming were found

COL-30 Lisbon, OH DGL Recommendations: Signal Time Modifications Add GPS Time Clock at Market St or verify/correct time on a routine basis Additional Recommendations: Remark crosswalks and stop bars Adjust signal head locations where needed Replace heads with LED s where needed

COL-30 Lisbon, OH Signal Timing Outcomes: Capacity Improvements Intersection AM Peak Expected Reduction in Intersection Delay Noon Peak PM Peak Night Off-Peak US-30 & Beaver -4.3% - - -2.1% US-30 & Market -9.0% -6.8% 6.5% -13.4% US-30 & Jefferson Market & Washington -6.0% -6.3% -6.1% - -24.4% -19.8% -17.9% -16.7%

COL-30 Lisbon, OH Signal Timing Outcomes: Time Period AM Peak Day Off- Peak Noon Peak PM Peak Travel Time Improvements Reduction Direction Average Travel Time Average Stopped Time Eastbound 1 3 Westbound 1 2 Eastbound -14-10 Westbound 14 17 Eastbound -3 - Westbound 2-1 Eastbound -26-25 Westbound -9-4

COL-30 Lisbon, OH 2014 Pre-Implementation 8 crashes 3 Injury, 5 PDO 2016 Post-Implementation 6 crashes 0 Injury, 6 PDO 7 6 5 Frequency of Crashes by Year and Severity POST-IMPL PRE-IMPL 4 3 2 1 0 2014 2016 Property Damage Crash Injury Crash

COL-30 Lisbon, OH 4 Frequency of Crashes by Year and Type 3 2 2014 2016 1 0 Angle Backing Fixed Object Other Non-Collision Rear End Sideswipe - Passing

COL-30 Lisbon, OH CRASH TYPE # OF CRASHES 2014 2016 COST PER CRASH TOTAL COST # OF CRASHES COST PER CRASH TOTAL COST INJURY 3 55,700 167,100 0 57,000 0 PDO 5 8,500 42,500 6 8,700 52,200 TOTALS 8 209,600 6 52,200 CRASH REDUCTION = 2 COST SAVINGS = $157,400

COL-30 Lisbon, OH ODOT Investment $19,262 Crash Cost Savings $157,400 Return on Investment Year 1 8:1

CHESTER RD. LOR-83, Avon, OH SR 83 CENTER ST. AVONBELDEN I-90

LOR-83, Avon, OH Corridor Issues: Highly commercial corridor Connectivity to major highway (I-90) ADT = 26,000 to 30,000 vpd Timing plans were present but not operational Did not accommodate directional changes throughout the day

LOR-83, Avon, OH DGL Recommendations: Time of Day (TOD) Plans Additional Recommendations: Add destination lane use pavement markings Consider adding a second left turn lane at I-90 ramp intersections Consider an alternate interchange design

LOR-83, Avon, OH Signal Timing Outcomes: SR-83 Arterial LOS Improvements (Synchro) Analysis Period Expected Change in Travel Time Northbound Southbound Overall AM Peak -9.5% -5.8% -7.9% Day Off-Peak 4.0% -18.6% -8.6% Mid-Day Peak -9.5% -14.7% -12.1% PM Peak -6.5% -12.5% -9.6% Weekend -7.4% -12.7% -9.8%

LOR-83, Avon, OH Signal Timing Outcomes: SR-83 Travel Time Improvements (Actual) Time Period Direction Average Travel Time Reduction AM Peak Day Off- Peak Mid-Day Peak PM Peak Northbound 2 Southbound -49 Northbound -27 Southbound -34 Northbound -52 Southbound -64 Northbound -23 Southbound 82

LOR-83, Avon, OH 2014 Pre-Implementation 99 crashes 23 Injury, 76 PDO 2016 Post-Implementation 97 crashes 17 Injury, 80 PDO 90 80 70 60 50 40 30 20 10 0 Frequency of Crashes by Year and Severity PRE-IMPL POST-IMPL 2014 2016 Property Damage Crash Injury Crash

LOR-83, Avon, OH 70 Frequency of Crashes by Year and Type 60 50 40 30 2014 2016 20 10 0 Angle Fixed Object Rear End Sideswipe - Passing Left Turn Sideswipe - Meeting Pedalcycles

LOR-83, Avon, OH CRASH TYPE # OF CRASHES 2014 2016 COST PER CRASH TOTAL COST # OF CRASHES COST PER CRASH TOTAL COST INJURY 23 55,700 1,281,100 17 57,000 969,000 PDO 76 8,500 646,100 80 8,700 696,000 TOTALS 99 1,927,100 97 1,665,000 CRASH REDUCTION = 2 COST SAVINGS = $262,100

LOR-83, Avon, OH ODOT Investment $27,152 Crash Cost Savings $262,100 Return on Investment Year 1 10:1

LAK-306, Mentor, OH

LAK-306, Mentor, OH Corridor Issues: Highly commercial corridor Connectivity to major highway (SR 2) ADT = 35,000 vpd Significant queuing especially northbound

LAK-306, Mentor, OH DGL Recommendations: Phasing changes Timing changes Extend timing for protected lefts Additional Recommendations: Look at timing changes at additional intersections Extend Phase Splits if queuing continues

LAK-306, Mentor, OH Signal Timing Outcomes: SR-306 Arterial LOS Improvements (Synchro) Analysis Period Expected Change in Travel Time Northbound Southbound Overall AM Peak -8.2% 4.1% -1.6% Day Off-Peak -4.5% -2.9% -3.7% Mid-Day Peak -5.9% -9.2% -7.5% PM Peak -24.4% -1.5% -15.3% Night Off-Peak -2.1% -1.3% -1.7% Weekend 0.9% -9.3% -4.2%

LAK-306, Mentor, OH Signal Timing Outcomes: Time Period AM Peak Day Off- Peak Mid-Day Peak PM Peak Weekend SR-306 Travel Time Improvements (Actual) Direction Average Travel Time Reduction Northbound 30.8% Southbound 37.9% Northbound 27.5% Southbound 15.3% Northbound 24.1% Southbound 30.8% Northbound 37.4% Southbound 12.9% Northbound 18.2% Southbound 20.6%

LAK-306, Mentor, OH 2014 Pre-Implementation 151 crashes 30 Injury, 121 PDO 2016 Post-Implementation 145 crashes 28 Injury, 117 PDO 140 120 Frequency of Crashes by Year and Severity PRE-IMPL POST-IMPL 100 80 60 40 20 0 2014 2016 Property Damage Crash Injury Crash

LAK-306, Mentor, OH 90 Frequency of Crashes by Year and Type 80 70 Number of Crashes 60 50 40 30 2014 2016 20 10 0 Angle Backing Fixed Object Other Non- Collision Rear End Sideswipe - Passing Parked Vehicle Pedalcycles Left Turn Sideswipe - Meeting Pedestrian

LAK-306, Mentor, OH CRASH TYPE # OF CRASHES 2014 2016 COST PER CRASH TOTAL COST # OF CRASHES COST PER CRASH TOTAL COST INJURY 30 55,700 1,671,000 28 57,000 1,596,000 PDO 121 8,500 1,028,500 117 8,700 1,017,900 TOTALS 151 2,699,500 145 2,613,900 CRASH REDUCTION = 6 COST SAVINGS = $55,600

LAK-306, Mentor, OH ODOT Investment $43,873 Crash Cost Savings $55,600 Return on Investment Year 1 1.25:1

Results

Takeaway Signal Timing Project Benefits: Travel Speed Approaches Posted Speed Far Less Travel Time Far Fewer Stops Far Fewer Vehicle Emissions Reduce the Number of Crashes Reduce the Severity of Crashes

Takeaway Source: ODOT Office of Traffic Operations (2016)

Post Signal Timing Updates

Questions Laurie Adams, PE, PTOE, PTP DGL Consulting Engineers, LLC ladams@dgl-ltd.com Visit DGL at Booth 721!